Similar documents
1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ]

Objectives. To review updated IBC and fire test requirements when designing for life safety.

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

Questions related to specific materials, methods, and services will be addressed at the conclusion of the presentation.

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperLite TM I-XL minute SuperLite TM I-XL IGU minute PART 1 GENERAL

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Temperature Rise Door Framing

FIRE/SMOKE BARRIER FUNDAMENTALS

Code Technologies Committee Report Fire Rated Glazing Group A changes: Fire rated glazing

NFPA 80 Overview January 21, 2016

Agency for Health Care Administration

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

The Residences at Christina Landing Wilmington, DE

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

2009 NFPA Text 2009 International Building Code Text Recommendation. NFPA IBC 2009 IBC is most recent

Agency for Health Care Administration

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperClear 45-HS (patent pending)

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

ICC CODE TECHNOLOGY COMMITTEE Area of Study Labeling of Fire Rated Glazing

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

January 1, 2014 Mandatory Effective Date

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

Fire and Life Safety Committee

F, T, L and W Ratings - What are the Code & Testing Requirements?

Fire Rated Door Assemblies: Compliant Designs

WORKSHEET 3-1 THE MANITOBA OFFICE OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

Basic Fire Door Requirements

1. The provisions of paragraph (D)(1104) of this rule shall apply to all existing buildings.

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

Agency for Health Care Administration

SAF-BCF SECOND REVISIONS WITH STATEMENTS

Fire Protection Coffee Break Training May 2016

Agency for Health Care Administration

FIRE SAFETY SURVEY REPORT 2000 CODE - HEALTH CARE Medicare Medicaid

Report on First Revisions with Statement June 2014 NFPA 101

Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH)

Prepublication New Text Jan 2018 Changes to Environment of Care and Life Safety Chapters

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

K SURVEY FOR DATE OF PLAN APPROVAL SURVEY UNDER

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

AHC Meeting #7 July 12-13, Occupancy WG Report

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

Hands On Training for Fire Door Products and Fire Door Assemblies

REQUEST FOR PROPOSAL No Fire Extinguishers, Fire Suppression, Fire Alarms, Emergency Lighting & Sprinkler Systems Maintenance


Developing a Healthcare Facility Fire Door Inspection Program

Changes to Environment of Care, Equipment Management, and Life Safety Chapters Related to Life Safety Code Updates

Life Safety - Means of Egress/Exits NFPA 101

GENERAL FIRE SAFETY TERMS & DEFINITIONS

Interfacing Fire Alarm, Sprinkler and Elevator Systems

Agency for Health Care Administration

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU TENANT IMPROVEMENT GROUP A FIRE PLAN REVIEW CHECKLIST

FIRE SAFETY SURVEY REPORT 2000 CODE - HEALTH CARE Medicare Medicaid

Safety Code Users. Fire Tests for Life SUPPLEMENT 3. Marcelo M. Hirschler FIRE PROPERTIES

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)


The Physical Environment Portal: Module 5, LS Leadership

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

2012 B.C. Building Code Compliance Review (Division B Part 3)

ELEVATORS. Integration of Codes between Fire Alarm, Sprinklers, and Elevators 12/5/2017

SECTION FIRE-RATED GLASS AND FRAME

First Revision No NFPA [ Section No ]


Fire-Rated Glazing Changes in 2012 International Building Code (IBC)

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Life Safety Crosswalk

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION

2000 to 2012 Hospital K-tag crosswalk matrix for hospitals 2000 Tag #

Agency for Health Care Administration

Public Comment No. 1-NFPA [ Section No ]

Report on First Revisions with Statement June 2014 NFPA 101

Fire and Smoke Door Inspections Qualified Training 02/03/17

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

Fire station fire design manual

REPORT HOLDER: SMOKE GUARD, INC. 287 NORTH MAPLE GROVE ROAD BOISE, IDAHO EVALUATION SUBJECT:

Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

INITIAL FIRE SAFETY ASSESSMENT

CERTIFICATE OF FIRE APPROVAL

SEMINOLE FIRE DEPARTMENT TENT PERMIT CONDITIONS

Report on First Revisions with Statement June 2014 NFPA 101

Fire Prevention Coffee Break Training. May 2017

rpsa FIRE PROTECTION ENGINEERS

EXIT ROUTES, EMERGENCY ACTION PLANS, AND. FIRE PREVENTION PLANS. PART 1: INTRODUCTION

Report on Public Input June 2014 NFPA 101

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Transcription:

www.safti.com 888.653.3333 2012 NFPA 101 Tables Table 8.3.3.12 - Assemblies Table 8.3.4.2 Minimum Ratings f Opening Protectives in Resistance- Assemblies and - s Infmational Supplement to NFPA 101 Table 8.3.3.12 The SAFTI recommended product found in these tables are not part of the 2012 NFPA 101, but provided by SAFTI as guide f choosing and specifying the crect code approved product. If you have any questions regarding these tables, contact SAFTI at 888.653.3333 send an email to codesuppt@safti.com.

Table 8.3.3.12 - Assemblies Test Standard Definition of Recommended SAFTI (not in NFPA added f ASTM E119 ANSI/UL 263* W Meets wall assembly criteria. SuperLite II-XL (SL II-XL) 60-120 NFPA 257 OH Meets fire window assembly criteria including the hose stream test. SuperLite II-XL (SL II-XL) 45 SuperLite I-W () PYRAN Platinum (PP) by SAFTI PYRAN Platinum F (PPF) by SAFTI PYRAN Platinum L (PPL) by SAFTI NFPA 252 D Meets fire do assembly criteria. SuperLite I & I-XL () SuperLite II-XL (SL II-XL) 45-120 SuperLite I-W () SuperLite X-90 () PYRAN Platinum F (PPF) by SAFTI PYRAN Platinum L (PPL) by SAFTI H Meets fire do assembly hose stream test. SuperLite II-XL (SL II-XL) 45-120 SuperLite I-W () SuperLite X-90 () PYRAN Platinum F (PPF) by SAFTI PYRAN Platinum L (PPL) by SAFTI T Meets 450º F (230º C) temperature rise criteria f 30 minutes SuperLite II-XL (SL II-XL) 45-120 XXX The time in minutes of the fire resistance fire protection rating of the glazing assembly *ASTM E 119, Standard Tests Methods f Tests of Building Construction and Materials, and ANSI/UL263, Standard f Tests of Building Construction and Materials.

Table 8.3.4.2 Minimum Ratings f Opening Protectives in Resistance- Assemblies and - s Component Walls and Partitions Do Assemblies Do Max Size (in 2 ) a - Do Recommen ded SAFTI (not in NFPA added f Minimum Side Light/Transom Assembly Rating Resista nce - Side Light/Transom Resistance Recommende d SAFTI (not in NFPA added f Window Assemblies b,c - Window Recommended SAFTI (not in NFPA added f Elevat hoistways 2 1-1/2 155 in. 2 d D-H-90 1 1 155 in. 2 d D-H-60 NP 1 NP D-H-W-60 NP W-60 D-H-W-60 1/2 1/3 85 in. 2 c D-20 1/3 1/3 D-H-20 NP W-30 Elevat lobby (per 7.2.13.4) 1 1 100 in. 2 b 100 in. 2, D-H-T-60 D-H-W- 60 a NP 1 NP D-H-W-60 NP W-60 >100 in 2, D-H-W- 60 b Vertical shafts, including stairways, exits and refuse chutes 2 1-1/2 Max size 1 1 Max size D-H-90 D-H-60 NP 1 NP D-H-W-60 NP W-60 D-H-W-60

Component Walls and Partitions Do Assemblies Do Max Size (in 2 ) a - Do Recommen ded SAFTI (not in NFPA added f Minimum Side Light/Transom Assembly Rating Resista nce - Side Light/Transom Resistance Recommende d SAFTI (not in NFPA added f Window Assemblies b,c - Window Recommended SAFTI (not in NFPA added f Replacement panels in existing vertical shafts 1/2 1/3 Max size D-20 1/3 1/3 D-H-20 NP W-30 Barriers 3 3 100 in. 2 b 100 in. 2, D-H-180 D-H-W- 180 a NP 3 NP D-H-W-180 NP W-180 >100 in 2, D-H-W- 180 b 2 1-1/2 Max size D-H-90 1 3/4 Max size D-H-45 D-H-W-45 3/4 f 3/4 f D-H-45 D-H-W-45 Hizontal exits 1/2 1/3 Max size 2 1-1/2 Max size D-20 D-H-90 1/3 1/3 D-H-20 W-60 1/3 OH-20 W-30 Hizontal exits served by bridges bet. buildings 2 3/4 Max size f D-H-45 D-H-W-45 3/4 f 3/4 f D-H-45 D-H-W-45 W-120 SL II-XL 120

Component Walls and Partitions Do Assemblies Do Max Size (in 2 ) a - Do Recommen ded SAFTI (not in NFPA added f Minimum Side Light/Transom Assembly Rating Resista nce - Side Light/Transom Resistance Recommende d SAFTI (not in NFPA added f Window Assemblies b,c - Window Recommended SAFTI (not in NFPA added f Exit access 1 1/3 Max size crids g D-20 3/4 3/4 D-H-45 D-H-W-20 W-60 1/2 1/3 Max size D-20 1/3 1/3 D-H-20 D-H-W-20 1/3 OH-20 W-30 Smoke 1 1/3 Max size barriers a D-20 3/4 3/4 D-H-45 D-H-W-20 W-60 Smoke 1/2 1/3 Max size partitions g, h D-20 1/3 1/3 D-H-20 D-H-W-20 1/3 OH-20 W-30 NP: Not permitted. a Note: 1 inch 2 =.00064516 m 2 b resistance-rated glazing to ASTM E 119, Standard Test Methods f Tests of Building Construction and Materials, ANSI/UL 263, Standard f Tests of Building Construction and Materials, shall be permitted in the maximum size. (See 8.3.3.7.) c -rated glazing in exteri windows shall be marked in accdance with Table 8.3.3.12 d See ASME A17.1, Safety Code f Elevats and Escalats, f additional infmation. e See ASTM A17.3, Safety Code f Existing Elevats and Escalats, f additional infmation. f Maximum area of individual exposed lights shall be 1298 in. 2 (0.84 m 2 ) with no dimension exceeding 54 in. (1.37 m) unless otherwise. [80: Table 4.4.5, note b, and 80:4.4.5.1] g dos are not required to have a hose stream test per NFPA 252, Standard Methods of Tests of Do Assemblies; ASTM E 2074, Standard Test Method f Tests of Do Assemblies, Including Positive Pressure Testing of Side Hinged and Pivoted Swinging Do Assemblies; ANSI/UL 10B, Standard f Tests of Do Assemblies; ANSI/ UL 10C, Standard f Positive Pressure Tests of Do Assemblies. h F residential board and care, see 32.2.3.1 and 33.2.3.1. Table 8.3.4.2 was revised by tentative interim amendment (TIA).

Infmational Supplement to NFPA 101 Table 8.3.3.12 NFPA 101 further limits the maximum do vision panel size to 100 sq. inches where the code requires a temperature rise do in 60-and 90-minute do openings. 2012 NFPA 101, Life Safety Code 8.3.3.8 materials that have been, listed, and labeled to indicate the type of opening to be protected f fire protection purposes shall be permitted to be used in approved opening protectives in accdance with Table 8.3.4.2 and in sizes in accdance with NFPA 80, Standard f Dos and Other Opening Protectives. 2013 NFPA 80, Standard f Dos and Other Opening Protectives 4.4.5* material shall be permitted in fire dos having the fire protection ratings shown in Table 4.4.5 when in accdance with NFPA 252, Standard Methods of Tests of Do Assemblies, and shall be limited in size and area in accdance with Table 4.4.5. Table 4.4.5 Do Rating Do Rating Maximum Area of (per Do Leaf a ) 1/2, 1/3 Limited to maximum area 3/4 Limited to maximum area b 1 c, 1-1/2 a,c Limited to maximum area 3 a 100 in. 2 (0.65 m 2 ) a See also requirements in 4.4.4. b See 4.4.5.1. c protection-rated glazing materials exceeding 100 in. 2 (0.065 m 2 ) in area are not permitted in temperature rise-rated dos.