Heat Transfer Packages

Similar documents
Plate Water Heaters Brazed Plate Water Heaters-BPH Series Plate and Frame Water Heaters-PFH Series

Water Heaters. Solar Applications

SEH Series. Stainless Steel Instantaneous Packaged Steam Fired Water Heaters

SWH Series. STONESTEEL Packaged Copper Coil Water Heaters Steam/Boiler Water/High Temperature Hot Water Vertical or Horizontal

FFH Series. Steam Fired Instantaneous Feed Forward Water Heaters

Plate Water Heaters Brazed Plate Water Heaters-BPH Series Plate and Frame Water Heaters-PFH Series

USG Series. Unfired Steam Generators Generate Clean Steam With Boiler Steam or High Temperature Hot Water as the Energy Source

Cemline Steel Tanks. Carbon Steel, Stainless Steel, Galvanized Steel, Copper A.S.M.E. Code, Non-Code

SPH Series. Vertical Packaged Storage Boiler Water Fired Plate Heat Exchanger Water Heaters CEMLINE CORPORATION

UNFIRED STEAM GENERATORS STANDARD EQUIPMENT

Commercial Semi-Instantaneous Water Heaters

EHB Series. STONESTEEL Commercial Electric Water Heaters Individually Mounted Elements Vertical or Horizontal CEMLINE CORPORATION

INDIRECT FIRED, SEMI-INSTANTANEOUS STEAM & BOILER WATER HEATER. Compact Design. High Recovery. Energy Efficient. Stainless Alloy Construction

Packaged Semi-Instantaneous Steam Fired Water Heater

Packaged Steam Fired Water Heater

Installation, Operation, and Maintenance Manual CEMLINE CORPORATION

Hydronic Product & Application Catalog

Semi-Instantaneous Indirect Fired Water Heater

Packaged Instantaneous Domestic Hot Water Generator Energy Source: Boiler Water

EZ Plate Instantaneous

ASME Packaged Indirect Fired Water Heater

Unfired Steam Generators (Series RB) Installation, Operation and Maintenance

Instant hot water Feed-Forward system unlimited supply accurate to +/- 4 F

High Capacity Instantaneous Steam Fired Water Heater

Installation, Operation and Maintenance

A. ASHRAE Handbook HVAC Applications, Snow Melting and Freeze Protection

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment

PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS

COBREX. Semi-Instantaneous. Steam-Fired Domestic Hot Water Generator. Up to 7000 MBH 150/ 175/ 215 Gallon Tank 25-year Warranty. PVI.

Submittal. RBVR Vertical Concealed Floor Mount FCU RBVR

Operation & Maintenance Manual

FULLY SELF-CONTAINED AIR CONDITIONING WITH INDUSTRIAL DURABILITY

HEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods

Brazed Plate Heat Exchangers TTP s Series

TURBOPOWER. Non-Condensing Gas, Oil or Combination Gas/Oil Storage Water Heater. 199 to 4000 MBH 150 to 4500 Gallons Tanks 25-year Warranty. PVI.

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

AFUE up to 85.2% Heating Input 105,000 to 245,000 Btuh

Installation & Operation Manual Models: TSU

TABLE B Remote Wire Connection

DIGITAL-FLO SEMI-INSTANTANEOUS VERTICAL HOT WATER

SECTION PLUMBING EQUIPMENT

SECTION PACKAGED HEAT TRANSFER SYSTEM

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

Laboratory Enclosed Scroll Air Compressor System with Premium NFPA Controls

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Advanced Heating & Hot Water Systems. High Efficiency Residential & Commercial Space Heating

.2 Section Waste Management and Disposal.

Suggested Specification: Benchmark 1.5 Low NOx Gas-Fired Hydronic Boiler(s)

Trinity Tft High Efficiency Gas Condensing Boiler & Water Heater

SuperTherm (VS Series) Indirect Fired, Semi-Instantaneous, Steam and Boiler Water Heater

SECTION WATER HEATERS

IN THE MARINE INDUSTRY

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Hydronic & HVAC Control Systems

ProRadiant Controls, Valves and Actuators

TECHNICAL. Series 18. Pump Packages

HEAT EXCHANGER FORMULAS & EXAMPLE

PRE-ASSEMBLED RADIANT CONTROL PANEL INSTALLATION MANUAL

DUKE UNIVERSITY DESIGN GUIDELINES

SB Series Brazed Plate Heat Exchanger Installation Manual

BASCO U-TUBE & TANK IMMERSION HEAT EXCHANGERS. ...world leaders in heat transfer technology

Silhouette. Feedwater Heater. Boiler Feedwater

ERGOMAX 7 INSTALLATION

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

QUICK SIZING CHARTS for BRAZED PLATE HEAT EXCHANGERS

Date: August 21, Proposal Number: G Engineer: Payment Terms: Net 30 Days

REFRIGERATION PRODUCTS

TABLE OF CONTENTS BRADFORD WHITE BOILERS

30GH Air-Cooled Liquid Chillers 30GH Nominal cooling capacity kw

Project Name: Location: Engineer: Contractor: I. GENERAL

ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL

Main Steam Vents. Hoffman Specialty Regulators. How to Select Steam Vents

Thermal Fluid Heaters

Bryan Water-Pak Indirect Systems 360,000 BTU to 4,500,000 BTU Inputs 199 to 3,533 Gallons Storage Capacity

Niles Steel Tank Hot Water Generator Installation and Operation Manual

University of Houston Master Construction Specifications Insert Project Name SECTION DOMESTIC WATER HEATERS PART 1 - GENERAL

AQUAS POOL PACKAGE INSTALLATION INSTRUCTIONS FOR MODELS: XPN AQUAS Pool Package

Liebert CSU3000 Chiller

Greenheck Coils. A Complete Line of Custom Coils to Meet Your Needs. 3/8, 1/2 and 5/8 inch OD Tubing

SECTION PLUMBING EQUIPMENT

VS SERIES NH3 STEAM VAPORIZERS OPERATION MANUAL

PROVIDES TEPID WATER FOR EMERGENCY SHOWER

MODEL SS1B PLUS PACKAGED STEAM GENERATOR SG-101. Installation, Operation & Maintenance Instructions. Instruction No.

Boiler Condensate Return Basics. Presented by Steve Connor February 24, 2016

Trinity Lx400 High Efficiency Gas Condensing Boiler & Water Heater

Control and power circuit fusing to meet N.E.C.

FLO-RITE-TEMP INSTANTANEOUS WATER HEATER INSTALLATION AND ADJUSTMENT INSTRUCTIONS FOR SINGLE AND DOUBLE WALL UNITS

Control Panel Checklist

VENTS. Main Steam Vents. How to Select Steam Vents. For Steam Vent selection information, please refer to Selection Guidelines on page 133.

199,000 to 4,000,000 Btu/h 150 to 4500 Gallons Storage

SECTION DOMESTIC WATER HEATERS

HIGH CAPACITY PRODUCT LINE

Better Design, Better Control, Better Systems.

Trinity Lx200 High Efficiency Gas Condensing Boiler & Water Heater

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

OPERATING AND MAINTENANCE MANUAL FOR INSTANTANEOUS STEAM FIRED WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL F

AQUAS POOL PACKAGE INSTALLATION INSTRUCTIONS FOR MODELS: AP AQUAS Pool Package

MAC-120HE-03 Air-Cooled Chiller

Transcription:

Heat Transfer Packages Heat Transfer Package (HTP Series) Building Heat, Process Heat, Swimming Pool Heater, Cooling Applications and Snow Melt Package (SMP Series) Steam,, High Temperature Hot Water, Chilled Water Shell & Tube and Plate Heat Exchangers CEMLINE CORPORATION P.O. BOX 55 CHESWICK, PENNSYLVANIA 15024 Phone: (724) 274-5430 FAX: (724) 274-5448 www.cemline.com

Cemline Heat Transfer Package (HTP Series) The Cemline Heat Transfer Package (HTP Series) is a heat exchange package designed to provide heat transfer between energy source (steam, boiler water, HTHW or chilled water) and the process liquid (water, pool water, thermal oil, or glycol blend, etc.). This package is provided with a heat exchanger, controls, and accessories allowing easy installation. When using boiler water as the energy source the brazed plate heat exchanger is supplied. A brazed plate heat exchanger can provide a lower approach temperature than a shell and tube heat exchanger while helping to improve the efficiency of today s condensing boiler(s). The Cem-trol II electronic controller and 2 or 3-way control valve delivers steady output temperature to the process fluid in a boiler water application. A shell and tube heat exchanger is an industry standard when using steam as the energy source and is supplied with a steam application. The Cem-trol II controller and steam control valve and condensate traps provide delivers steady output temperature to the process fluid in a steam application. Factory packaging keeps contractor installation time to a minimum the only connections of steam/condensate, boiler water or HTHW, heating fluid, and electric. Basic Plate Package Includes: Heat Exchanger: Brazed Plate or Plate & Frame Cem-trol II Controller complete with PID Control, temperature read-out, High Limits, and temperature sensors Control Valve: Electric, Pneumatic Strainers ( Side & Heating Fluid Side) Intra-Heater circulator Clean out ports for heat exchanger (Plate Heater Only) Steel Channel Base 16 Gauge Steel Frame with hammer tone enamel paint Temperature Gauge & Fluid Pressure Gauge Optional Equipment: 1/3 2/3 Control Valves 3 way Motorized Tempering Valve Ball Valves for isolation of heat exchanger Pump Heating Fluid Pump BACNET Interface Double Walled Plate Heat Exchanger Basic Shell & Tube Package Includes: Shell & Tube Heat Exchanger - A.S.M.E Code Rated 150 PSIG Cem-trol II Controller complete with PID Control, temperature read-out, High Limits, and temperature sensors Control Valve: Electric, Pneumatic, Pilot (Steam Only) Steam Strainer (Steam Only) Main and Drip (Steam Only) Vacuum Breaker (Steam Only) Steel Channel Base 16 Gauge Steel Jacket & Insulation Steam & Fluid Pressure Gauge Optional Equipment: Heat Exchanger Options: A.S.M.E rated 300, 400, 600 Stainless Steel Shell Stainless Steel Coil Head Epoxy Lined Coil Head (Pool water applications) Tubing Options: 90:10 Copper-Nickel, Stainless Steel, Double Walled Tubing (Copper/Copper, 90:10 CuNi/Copper, 90:10 Cu-Ni / 90:10 Cu-Ni). Tubesheet Options: Steel, Copper Lined, Stainless Steel, 90:10 Cu-Ni, Admiralty Brass 1/3 2/3 Control Valves Pumping / Non-Electric Condensate Pump Heating Fluid Pump BACNET Interface 2

[System Normal] Temp. Status Set Point 130 Deg F Normal Deg F Valve 1 10.0 Volts Menu Power On Primary High Limit Secondary High Limit [System Normal] Temp. Status Set Point 130 Deg F Normal Deg F Valve 1 10.0 Volts Menu Power On Primary High Limit Secondary High Limit Temp. 130 Deg F Valve 1 Temp. 130 Deg F Valve 1 [System Normal] Status Normal 10.0 Volts [System Normal] Status Normal 10.0 Volts Set Point Deg F Menu Power On Primary High Limit Secondary High Limit Set Point Deg F Menu Power On Primary High Limit Secondary High Limit Cemline Heat Transfer Package (HTP Series) Dimensional Data L Boiler Model Number W L H HTP 250 HTP 500 20" 20" 45" 45" 50" 50" HTP 750 25" 50" 55" HTP 1000 25" 50" 55" W Cem-Trol II Control Panel Temperature Sensors (or installed in storage tank) Control Valve Temperature Gauge Relief Valve Pipe to Drain Hot Water 36 H Cold Water Cold Water F Steam Model Number W L H HTP448-S HTP648-S HTP848-S 78" 78" " 60" 62" 64" 31.5" 33.5" 35.5" 30" 36" 36" 26" 32" 32" HTP1048-S " 65" 36.5" 36" 32" HTP1248-S " 65" 36.5" 36" 32" E F S Steam Hot Water Pressure Gauge Control Valve Relief Valve Cem-Trol II Control Panel Drip H E Main Condensate L W S 3

Cemline Heat Transfer Package (HTP Series) Sizing and Specifications Sizing Data Brazed Plate Heated Fluid Model HTP-250 HTP-500 HTP-750 HTP-1000 GPM 12.5 25 38 50 Temp. 40 40 40 04 Temp. GPM 12.8 26 38 51 Temp. Temp. Heat Load BTU/hr. 250,000 500,000 1,000,000 Sizing Data Steam Example: 150 F - F Steam Pressure 5 PSI 10 PSI 15 PSI Model GPM BTU/hr #/HR GPM BTU/hr #/HR GPM BTU/hr HTP-448 HTP-648 HTP-848 HTP-1048 25 50 150 375,000 1,200,000 2,250,000 385 765 1225 22 30 55 90 165 450,000 825,000 1,350,000 2,475,000 465 850 1390 2540 35 65 525,000 975,000 1,425,000 2,700,000 HTP-1248 200 3,000,000 3056 225 3,375,000 3390 250 3, #/HR 545 1010 1475 27 38 Steam as Energy Source (Shell and Tube HEX) Heat Transfer Package shall be Cemline Series HTP; factory assembled and packaged. Heat Transfer Package Heater shall be constructed in accordance with A.S.M.E. Code for working pressure of 150 psig. The heat exchanger shall be constructed with a carbon steel tank, with steel threaded openings, 3/4 O.D. copper tubes, steel tube sheet, and carbon steel coil head. Heat Transfer Package shall be mounted on a steel support skid. Heater shall be insulated with foam in place insulation protected by an enameled metal jacket, 20 gauge minimum thickness. Heater shall be factory assembled and piped including incoming steam strainer, (air) OR (pilot) or (electronic) operated temperature regulator, main and auxiliary float and thermostatic steam traps, and condensate strainer. Heat Transfer Package shall be supplied with a solid-state control module with LCD touch screen display and LED pilot lights. Control module shall be provided with PID control with red alarm lights and alarm horn with built in alarm silence. Control module shall be supplied with dry contacts to indicate alarms to the building automation system (BAS). Control module shall allow the BAS to remotely set and monitor the temperature via 4-20 ma input and output signals. Controller shall be supplied with Modbus protocol via RS-485 connection to communicate with BAS. Controller shall be supplied with an on-off switch. Heat Transfer Package shall be furnished with a water pressure gauge and an A.S.M.E. pressure relief valve of sufficient size to relieve total BTU input of the coil. Manufacturer shall assume responsibility for correct sizing of components to assure performance designated in design criteria. Heater shall be Cemline Corporation Model HTP. Heater shall be mounted horizontally. as Energy Source (Plate HEX) Heat Transfer Package shall be Cemline Series HTP; factory assembled and packaged. Heat Transfer Package shall be mounted on an enameled metal base, 16 gauge minimum thickness. Heater shall be factory assembled and piped including boiler water strainer and (air) OR (electric) operated temperature regulator. Factory piping shall include inlet strainer on the heated fluid side of the heat exchanger. Heat exchanger shall be (single) OR (double) walled (brazed) OR (plate & frame) 316L stainless steel plate type. Heat Transfer Package shall be supplied with a solid-state control module with LCD touch screen display and LED pilot lights. Control module shall be provided with PID control with red alarm lights and alarm horn with built in alarm silence. Control module shall be supplied with dry contacts to indicate alarms to the building automation system (BAS). Control module shall allow the BAS to remotely set and monitor the temperature via 4-20 ma input and output signals. Controller shall be supplied with Modbus protocol via RS-485 connection to communicate with BAS. Controller shall be supplied with an on-off switch. Heater shall be furnished with a water pressure gauge and an A.S.M.E. pressure relief valve of sufficient size to relieve total BTU input of heat exchanger. Manufacturer shall assume responsibility for correct sizing of components to assure performance designated in design criteria. Heater shall be Cemline Corporation Model HTP. Unit dimensions width x long x height. Plate exchanger to heat GPM of from F to F with GPM of F inlet F outlet. Coil to heat GPM of from F to F with psig steam to the control valve. 4

Cemline Snow Melt Package (SMP Series) The Cemline Snow Melt Package (Radiant Floor Heater) are heat exchange packages designed to provide heat transfer between energy source (boiler water or steam) and the radiant fluid (typically a 10-40% glycol blend). These packages are provided with a heat exchanger, controls, and accessories allowing easy installation in the radiant heat exchange system. When using boiler water as the energy source the brazed plate heat exchanger is supplied. A brazed plate heat exchanger can provide a lower approach temperature than a shell and tube heat exchanger while helping to improve the efficiency of today s condensing boiler(s). The radiant heat exchange system control and 3-way motorized tempering valve delivers steady output temperature to the radient heat exchange system loop in a boiler water application. A shell and tube heat exchanger is an industry standard when using steam as the energy source and is supplied with a steam application. The radiant heat exchange system control, steam control valve and condensate traps provided delivers steady output temperature to the radiant heat exchange system loop in a steam application. Factory packaging keeps contractor installation time to a minimum; the only connections required are of boiler water or steam/condensate, radiant fluid, and electric. Basic Package Includes: Brazed Plate Heat Exchanger Controller complete with boiler water return sensor, outlet radiant sensor, return radiant sensor, and slab sensor (installed by others in field) 3-way motorized tempering valve (Radiant Side) Strainers ( Side & Radiant Side) Boiler By-Pass Balancing Valve Ball Valves for isolation of heat exchanger Circuit Setter Ball Valves for isolation of heat exchanger Clean out ports for heat exchanger Steel Channel Base 16 Gauge Steel Frame with hammer tone enamel paint Optional Equipment: Pump Radiant Side Pump BACNET Interface Typical Piping Schematic Air Separator and Expansion Tank Boiler Pump Air Separator and Expansion Tank Pump Radiant Heat Loop Slab Sensor Basic Steam Package Includes: Optional Equipment: Shell & Tube Heat Exchanger - A.S.M.E Code Rated Controller complete with outlet radiant sensor, return water sensor, and slab sensor (installed by others in field) Steam Control Valve Steam Strainer Main and Drip Vacuum Breaker Steel Channel Base 16 Gauge Steel Jacket & Insulation Radiant Side Pump BACNET Interface Typical Piping Schematic Steam Steam Boiler Steam Pump Control Valve Air Separator and Expansion Tank Pump Radiant Heat Loop Slab Sensor 5

Cemline Snow Melt Package (SMP) Dimensional Data L Boiler Model Number W L H SMP 250 SMP 500 20" 20" 45" 45" 50" 50" SMP 750 25" 50" 55" SMP 1000 25" 50" 55" W Circuit Setter Valve Controller Balance Valve 3-Way Motorized Tempering Valve Radiant 36 H Radiant Radiant Steam Model Number W L H SMP436-S SMP648-S SMP848-S 60" 70" 78" " 60" 62" 64" 31.5" 33.5" 35.5" 30" 36" 36" 26" 32" 32" SMP1048-S " 65" 36.5" 36" 32" E F S F Steam Relief Valve Radiant Pressure Gauge Controller Control Valve Drip H E Main Condensate L W S 6

Cemline Snow Melt Package (SMP) Sizing and Specifications Sizing Data Steam Radiant Fluid: 40% Prop. Glycol, Temperature Rise: -125 F Steam Pressure 5 PSI 10 PSI 15 PSI Model GPM BTU/hr GPM BTU/hr GPM BTU/hr SMP-436-S SMP-648-S SMP-848-S SMP-1048-S 18 36 54 72 250,000 500,000 1,000,000 25 54 72 100 350,000 1,000,000 1,400,000 30 60 85 115 420,000 840,000 1,200,000 1,600,000 Sizing Data Radiant Fluid (40% Prop. Glycol) Model SMP-250 SMP-500 SMP-750 SMP-1000 GPM 18 36 54 72 Temp. Temp. 125 125 125 125 GPM 12.7 25 38 51 Temp. Temp. Heat Load BTU/hr. 250,000 500,000 1,000,000 Steam as Energy Source Snow Melt Package and Radiant Floor Heater shall be Cemline factory assembled and packaged. Snow Melt Package and Radiant Floor Heater shall be constructed in accordance with A.S.M.E. Code for working pressure of 150 psig. The packaged heater shall be constructed with a carbon steel tank, with steel threaded openings, 3/4 O.D. copper tubes, steel tube sheet, and steel coil head. Heater shall be mounted on a steel support skid. Heater shall be insulated with foam in place insulation protected by an enameled metal jacket, 20 gauge minimum thickness. Heater shall be factory assembled and piped including incoming steam strainer, (air) OR (pilot) or (electronic) operated temperature regulator, main and auxiliary float and thermostatic steam traps, and condensate strainer. Heater shall be supplied with solid-state control module with LED backlit LCD display and LED pilot lights to indicate power on-off, system output, burner on-off, slab pump on-off, alarm, valve open, and valve close. The controller shall be supplied with a slab sensor to measure temperature and the presence of precipitation. Controller shall be capable of operating a motorized valve or providing a modulating control output. Heater shall be furnished with a water pressure gauge and an A.S.M.E. pressure relief valve of sufficient size to relieve total BTU input of the coil. Manufacturer shall assume responsibility for correct sizing of components to assure performance designated in design criteria. Heater shall be Cemline Corporation Model SMP -S. Heater shall be mounted horizontally. Coil to heat GPM of % Propylene Glycol from F to F with psig steam to the control valve. as Energy Source Snow Melt Package and Radiant Floor Heater shall be Cemline factory assembled and packaged. Snow Melt Package and Radiant Floor Heater shall be mounted on an enameled metal base, 16 gauge minimum thickness. Heater shall be factory assembled and piped including boiler water strainer, circuit setter, and boiler water balancing valve. Factory piping shall include a 3-way motorized tempering valve and inlet strainer on the snow melt side of the heat exchanger. Heat exchanger shall be single walled brazed copper brazed 316L stainless steel plate type. Heater shall be supplied with solid-state control module with LED backlit LCD display and LED pilot lights to indicate power on-off, system output, burner on-off, slab pump on-off, alarm, valve open, and valve close. The controller shall be supplied with a slab sensor to measure temperature and the presence of precipitation. Controller shall be capable of operating a motorized valve or providing a modulating control output. Heater shall be furnished with a water pressure gauge and an A.S.M.E. pressure relief valve of sufficient size to relieve total BTU input of heat exchanger. Manufacturer shall assume responsibility for correct sizing of components to assure performance designated in design criteria. Heater shall be Cemline Corporation Model SMP. Unit dimensions " width x " long x " height. Plate exchanger to heat GPM of % Propylene Glycol from F to F with GPM of F inlet F outlet. 7

Sales Offices Other Sales Offices: Alaska Hawaii Puerto Rico Saudi Arabia Taiwan U.A.E. Available Cemline Brochures www.cemline.com Product Sizing Programs Brochures I.O.M. Manuals Drawings & Specifications Agent Locator Plant Tour STONESTEEL - Water Storage Tanks - Jacketed Storage Tanks - Commercial Electric and Packaged Copper Coil Water Heaters Submerged Heating Coils Replacement Tube Bundles Steel Tanks Chilled Water Buffer Tanks System Efficiency Buffer Tanks Electric Boilers Stainless Compact Packaged Copper Coil Water Heaters - Semi-instantaneous, Instantaneous Unfired Steam Generators Condensed Catalog Cemline is represented in all major cities. Please contact your local representative or call Cemline Corporation. 2017 Cemline Corporation All Rights Reserved. All trademarks on this brochure are the property of Cemline Corporation, unless otherwise noted or in any other way set forth as a third party rights. Unauthorized use of these trademarks, as well as the materials presented on this site, is expressly prohibited and constitutes a violation of the intellectual property rights of Cemline Corporation. Vol. 2.1 Scan to view our mobile web link. CEMLINE CORPORATION P.O. BOX 55 CHESWICK, PENNSYLVANIA 15024 Phone: (724) 274-5430 FAX: (724) 274-5448 www.cemline.com