Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016

Similar documents
Joe Pool Lake Master Plan Revision Public Information Meeting May 23, 2017

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017

Public Information Meeting

Lake O the Pines Master Plan Revision Public Information Meeting April 25 & 27, 2017

Joe Pool Lake Lake Master Plan Public Information Meeting Presentation of Final Draft Revision July 31, 2018

EAU GALLE PROJECT MASTER PLAN APPENDIX C PUBLIC INVOLVEMENT

Raystown Lake Master Plan Revision. Public Meeting April 25 & 26, 2018 How does the revision process work?

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates

Pine Flat Lake Master Plan Update FACT SHEET September 2014

Chapter 5: Recreation

Mark Greenig Recreation and Land Use Planner CH2M Hill

PARTF Scoring System for Grants

Chapter 5: Natural Resources and Environment

The City shall enhance and improve the accessibility of parks and recreational facilities while protecting their quality. by:

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

This page intentionally blank.

Parks and Open Space Preservation and Dedication. January 26, 2016 Fort Worth City Council Pre-Council Meeting Randle Harwood and Richard Zavala

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Preface. Erie. Scranton. Allentown. Pittsburgh. Harrisburg. Philadelphia

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design

Mendota Heights 2040 Comprehensive Plan Draft Vers

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

Welcome. to the Bull Shoals Lake Master Plan Revision Open House

Please read the entire document

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

PARKS AND RECREATION

Chapter PROJECT AUTHORIZATIONS

City of Missoula and Missoula County Open Space Planning Open House

DRAFT MAP AMENDMENT FLU 04-4

Master Plan Objectives and Policies

Town of Peru Comprehensive Plan Executive Summary

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Zoning Ordinance Article 3

Wisconsin downtown action council Downtown project case study profile

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

Objective: Resolution to recommend adoption of the Big Thompson Assessment to the Planning Commission

Silverwood Masterplan Kickoff Meeting. Jim Neidhart Dane County Parks Planning

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

City of Tacoma Planning and Development Services

San Diego River Coalition 2012 Work Plan

Lake Arlington Master Plan. Presented by Randle Harwood, Planning and Development Director October 27, 2015

The Trust for Public Land. in Minnesota

Arkansas River Corridor

Portage County Parks, Trails and Greenways Plan

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

Shoreline Master Program Town of La Conner, Washington

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

LAND USE MANAGEMENT PLAN ARTICLE

STREAM BUFFERS

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

Community Conservation Workshop. Lake Placid

Best Practices Appendix: Waterfront Communities

Appendix E Section 4(f) Evaluation

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Rocky Areas Project Guidance HABITAT

Office of Greenways & Trails Providing Statewide Leadership and Coordination. Southeast Greenways and Trails Summit October 1-3, 2017

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

SCC PRD (2016) COUNTY PARK MASTER PLAN

CHAPTER 1 Introduction

CHAPTER 4 FUTURE LAND USE AND URBAN SERVICES DISTRICTS

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

Pinellas County Greenways

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

glenwood canyon design process I-70 Statement of Direction TRG Recreation Subcommittee Colorado Division of Highways August 11, 1976 prepared by the

Subject: Hendry County Evaluation and Appraisal Report Letter of Understanding - Identification of Major Issues

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

Stafford County Strategic Plans

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

CHAPTER 13 RECREATION AND OPEN SPACE ELEMENT

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

ROSEMONT 138kV TRANSMISSION LINE PROJECT. Public Open House Meeting #2 August 27, 2009

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Las Colonias Park Master Plan

An Introduction to the Far North Land Use Strategy

McArthur Swamp Planning Unit. Fish, Plant, and Wildlife Habitat MCARTHUR SWAMP PLANNING UNIT

Parks, Trails, and Open space Element

Auke Bay Area Plan. Complete List of Goals and Policies for the Auke Bay Area Plan

City of Fort Lupton Site Plan Process

process of the Land Development Code to assure regional parks are available County-wide.

Appendices. Contents. Appendices - Sep 1997 CP-1 AP-1

OPEN SPACE CHAPTER 7: OVERVIEW. Preserve open space to protect natural resources, enhance character and provide passive recreation opportunities

Parks, Trails, and Open Space Element

Member Service Plan Sierra Nevada AmeriCorps Partnership

Chapter 10 IMPLEMENTATION RECOMMENDATIONS

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process

Sacramento County Regional Parks American River Parkway Group Activity & Special Event Procedures

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

EL DORADO COUNTY GENERAL PLAN PARKS AND RECREATION ELEMENT PRINCIPLE INTRODUCTION STATE AUTHORIZATION

Transcription:

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016 Marcus Schimank Canyon Lake Manager Capital Regional Office U.S. Army Corps of Engineers Fort Worth District US Army Corps of Engineers

Purpose of this Meeting Describe Purpose of Master Plan Describe the Revision Process Answer Questions Seek Your Participation & Input Explain Why Revision is Needed

National Environmental Policy Act of 1969 Applies to federal actions that affect the environment such as Master Plan revisions Requires federal agencies to CONSIDER and DOCUMENT the environmental impacts of their proposed actions as part of an agency s OVERALL planning and decision-making Requires federal agencies to cooperate with other federal, state and local governments as well as with organizations and citizens during project planning Scoping is where the federal agency asks for initial input from other agencies, citizens and organizations regarding project area, resources and uses

Purpose of Master Plans The Corps defines a Master Plan as The strategic land use management document that guides the comprehensive management and development of all project recreational, natural and cultural resources throughout the life of the water resource development project. Source: Chapter 3 of EP 1130-2-550 available at www.usace.army.mil/library/publications

Key Points Regarding Master Plans Main focus is stewardship of natural and cultural resources and operation of quality outdoor recreation areas Proposed effective life of a Master Plan is 25 years Recreational use of the water surface is addressed

What Master Plans Are Not Master Plans do not address in detail the technical aspects of water management for flood risk management, water supply or hydroelectric power

Additional Key Points Key sections of the Master Plan Revision include resource management objectives revised land use classifications management plan for each land classification Potential outcomes could be designation of lands for utility corridors, environmentally sensitive areas Protection of environmentally sensitive areas is given priority Stakeholder and Public Input is Important

What Will Not be Addressed National policy places strict limitations on the proposed construction of new public roads on Corps lands. With few exceptions road proposals that would cross federal land will not be addressed. Shoreline policy governing mowing, removal of vegetation and debris as well as pedestrian paths will not be addressed in the Master Plan.

Why Revise the Canyon Lake Master Plan? Current Master Plan is dated December 1970 and has exceeded its useful life. The way the lake is managed today is different from the way it was managed in 1970. For the past 15 years, the population around Canyon Lake and Comal County has experienced significant growth and the trend is expected to continue. The Master Plan must be revised to address current and future growth in the region.

The Corps Vision for Canyon Lake The land, water surface and recreational resources of Canyon Lake will be managed to protect, conserve, and sustain natural and cultural resources, especially environmentally sensitive resources, and provide outdoor recreation opportunities that complement overall project purposes for the benefit of present and future generations.

Canyon Lake Missions USACE Flood Risk Management Canyon Lake Dam GBRA Water Conservation GBRA Hydroelectric Power USACE Environmental Stewardship Golden Cheeked Warbler USACE Recreation

Fast Facts about Canyon Lake Dam construction occurred from 1958-1964 Cumulative Flood Damage Prevented > $663M 8,240 acres at conservation pool elevation of 909 2,747 acres of public land above 909 The federal property line is 81 miles long The shoreline at conservation pool is 80 miles long Estimated annual visitation is 850,000 to 900,000 Local economic impact in the tens of millions (total annual Comal Co. tourism impact $550M)

Master Plan Revision Process Accomplished by a team of Corps employees with input from other agencies Public and stakeholder input will be carefully considered An Environmental Assessment of the Master Plan will be prepared and included as an appendix

The Master Planning Process Data Collection Agency/Public Scoping 18 March 2016 Resource Analysis Development of Land Classifications and Resource Objectives Agency/Public Review Finalize Master Plan Based on Comments Received Adoption of Master Plan Revision Where we are today

Examples of Major Changes Possibly Needed in the Current Master Plan Re-examine the classification of project lands and the water surface Portions of currently designated parks and even non-park areas could be reclassified as environmentally sensitive areas Possible designation of utility corridors Prepare New Resource Management Objectives Possible changes to boating capacity which will be contingent on the completion of a new Boating Use Study

Canyon Lake Land Classification Current Land Classifications Operations and Maintenance Recreational Areas (Parks) Special Use Areas Proposed New Land Classifications Project Operations High Density Recreation Environmentally Sensitive Areas Aesthetic and Multiple Use Recreation Wildlife Areas Multiple Resource Management -Low Density Recreation -Wildlife Management -Vegetation Management -Future/Inactive Recreation Water Surface

BUILDING STRONG

Land Classification Project Operations High Density Recreation Multiple Resource Management Environmentally Sensitive Areas Easement Lands Definition Those lands required for the dam, operations center, office, maintenance compound and other areas that are used solely for project operations Land developed for intensive recreational activities by the visiting public, including developed recreation areas and areas for marinas and related concessions, and resorts Recreation Low Density: Activities such as hiking, primitive camping, wildlife observation, and hunting Wildlife Management General: Fish and wildlife management activities Vegetative Management: Management activities for the protection and development of a specific vegetative cover Inactive and/or Future Recreation Areas: Recreation areas planned for the future or that have been temporarily closed Areas where scientific, ecological, cultural or aesthetic features have been identified. These areas must be considered by management to ensure they are not adversely impacted All land for which USACE holds an easement interest but not fee title. Planned use and management of easement lands will be in strict accordance with the terms and conditions of the easement estate acquired for the project Definitions from USACE Engineer Pamphlet 1130-2-550: Recreation Operations and Maintenance Guidance and Procedures

Water Surface Classification Restricted Designated No-Wake Fish and Wildlife Sanctuary Open Recreation Definition Water areas restricted for project operations, safety, and security purposes To protect environmentally sensitive shoreline areas, recreational water access areas from disturbance, and for public safety Annual or seasonal restrictions on areas to protect fish and wildlife species during periods of migration, resting, feeding, nesting, and/or spawning Those waters available for year round or seasonal water-based recreational use Definitions from USACE Engineer Pamphlet 1130-2-550: Recreation Operations and Maintenance Guidance and Procedures

Land Classifications Project Operations - This category includes those lands required for the dam, spillway, powerhouse, switchyard, levees, dikes, offices, maintenance facilities, and other areas that are used solely for the operation of the project

Land Classifications High Density Recreation - Lands developed for intensive recreational activities for the visiting public such as day use parks, campgrounds as well as concessions like marinas and resorts.

Environmentally Sensitive Areas - Areas where scientific, ecological, cultural or aesthetic features have been identified. Designation of these lands is not limited to just lands that are otherwise protected by laws such as the Endangered Species Act, the National Historic Preservation Act or applicable State statutes. These areas must be considered by management to ensure they are not adversely impacted. Examples may include mature bottomland forests, river and stream corridors, scenic bluffs, and native prairie. Land Classifications Golden-cheeked Warbler (photo by USFWS)

Land Classifications Low Density Recreation - Lands with minimal development or infrastructure that support passive public recreational use such as primitive camping, fishing, hunting, trails and wildlife viewing areas.

Land Classifications Wildlife Management - Lands designated for stewardship of fish and wildlife resources

Land Classifications Vegetative Management - Lands designated for stewardship of forest, prairie, and other native vegetative cover

Water Classifications Water Surface- Restricted Water Surface-Designated No Wake Water Surface-Fish and Wildlife Sanctuary Water Surface- Open Recreation

Utility Corridors Linear strips of federal land used for consolidation of multiple utility lines Establish only where no viable alternative to crossing Federal land exists Main purpose is to reduce negative environmental Impacts Generally follow existing roads or utility lines

Recreation Objective: Expand existing trails and create new trails for a variety of users Extend key boat ramps to accommodate low lake levels Leasing Corps operated parks to other entities Adjustment to the lake s boating capacity Natural Resource Objective: Restore degraded prairie sites to support a diversity of native grasses and forbs Implement invasive species control programs Identify and protect environmentally sensitive areas Refine wildlife management programs General Objective: Examples of Potential Resource Objectives Reduce encroachments and trespass through improved boundary marking and surveillance

How Can I Participate? Attend Meetings Visit our website at: (http://www.swf.usace.army.mil/about/lakesandrecreationinformation/ MasterPlanUpdates/CanyonLake.aspx) Send us an e-mail: (CESWF-PER-CanyonLake@usace.army.mil) Visit with Corps personnel Tell your friends Fill out a comment card now or take it home and send later (30 days)

Master Plan Next Steps Typical lake master plan update will take 18 to 24 months to finalize. Canyon Lake Master Plan update is in the early stage of development First 30 day public comment 18 March thru 18 April Draft MP document: 12-15 months (April 2017) Draft MP / EA public meeting in Summer of 2017, followed by another 30 day Public/Agency comment period Final document: 4-6 months (Winter 2017-2018)

The End Please feel free to visit with staff members, view the maps, ask questions and help us produce an excellent Master Plan