Liquefied Petroleum Gas Facility Written Fire Safety Analysis

Similar documents
Liquefied Petroleum Gas Facility Written Fire Safety Analysis

Department of Public Safety

Temporary LPG Heat for Construction Sites Information Packet

Temporary LPG Heat for Construction Sites Work At Risk and Inspection Information Packet

Mobile Food Units. A definition of mobile food unit added in OFC Rule 2 is as follows:

SOUTH CAROLINA LIQUEFIED PETROLEUM GAS PROGRAM (LP-GAS)

North Liberty Fire Department Permit Application Temporary Storage & Use of LPG

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

Above Ground Fuel Tank Requirements

Iowa Propane Gas Association 2018 Training Descriptions

Changes for the New Edition. Senior Engineer, NFPA NFPA

1.0 Basic Principles and Practices of Propane Performance-Based Skills Assessment 2016

Public Safety [661] Chapter 226, Liquefied Petroleum Gas, Amended for Application within the State of Iowa

Iowa Propane Gas Association 2011 Training Descriptions

Petroleum Gas Systems - 1 -

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Small LP Gas Jurisdictional Systems. Kim Lapierre Technical Training Manager John Minchew Area Safety Manager West

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Emergency Planning and Release Reporting. Farmington Hills Fire Department James Neufeld

FIRE PROTECTION PROGRAM

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013

GASEOUS HYDROGEN SYSTEMS

GAS SAFETY Information Bulletin

5.07 Air Replenishment Systems

School EMERGENCY PLAN

Topic: Mechanical Ventilation Refresher Reference #: DG Level of Instruction: In service personnel Time Required: 3 hours

Safety Best Practices Manual

2018 Propane Training

Brandon Fire and Emergency Services

9S / 9E Inspection Worksheets. The fire department should complete the following sheets prior to inspection date

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES

LGB Gas fired boiler

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

APPENDIX 12 FIRE SAFETY REQUIREMENTS FOR LIQUEFIED PETROLEUM GAS (LPG) CYLINDER INSTALLATIONS

Model Policy On Portable Fire Extinguishers (Ontario Version)

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

Suburban Propane Notice of Public Awareness. Additional Information for Customer s Buried Piping

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

CORPUS CHRISTI FIRE PREVENTION MOBILE FOOD VENDOR REQUIREMENTS

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

OUTLINE FOR FIRE PREVENTION ACTIVITY

El Segundo Fire Department. Unified Program (UP) Form CONSOLIDATED CONTINGENCY PLAN I. FACILITY IDENTIFICATION

PROPANE EXCHANGE. Thanks to Southern States Cooperative, Tarantin Industries & Thompson Gas for advertising in this issue.

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO.

Minimum Information Required to Process your Special Occasion Application. Parking area Access to site

Compliance Guidance for non-technical managers

S150 S300 CONSTRUCTION HEATERS. Rev: August 15, 2008 SERVICE AND MAINTENANCE MANUAL No PLEASE RETAIN FOR FUTURE REFERENCE PRODUCTS

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

CITY OF PASADENA FIRE DEPARTMENT

342 Perimeter Security SECURITY SURVEY FORMS

REQUIREMENTS. For FIRE DEPARTMENTS. State of West Virginia. Bob Wise Governor THE DEPARTMENT OF MILITARY AFFAIRS AND PUBLIC SAFETY

Safety by Design. Phone: Fax: Box 2398, RR2, Collingwood, ON L9Y 3Z1

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

Construction Heat CH-02 (up to 400,000 BTU) Record of Training Curriculum Document

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS

New Construction Fire Inspection Process

LEAK TEST FREQUENCY: a. CONTINUOUS b. DAILY/NIGHTLY c. WEEKLY. d. MONTHLY e. OTHER (Specify):

June 2018 Safety Meeting Fire Extinguishers Part I

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Table of Contents. Consolidated Version, revised and verified January 24, (Original) August 21, 2017

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

A Safe Workplace A Workplace Safety and Health Manual for Your Community Section: II-B Subject:

2012 UPC Chapter 5 Water Heaters RV

100% Safety Shutoff Control 40,000 BTUH Input Rating Constant Pilot Propane Gas

OH&S WORKPLACE ASSESSMENT INSPECTION CHECKLIST

Emergency Evacuation Plan South Patterson Building (SPB)

Emergency Action Plan

Fire Safety Plan (FSP) Review Checklist 1

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

Plan Submittal Checklist

IIAR Minimum Safety Criteria for a Safe Ammonia Refrigeration System

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

Contractor Worksheet Underground Fires Major Hazard Standard

Vacant Building Loss Prevention Best Practices

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

PLACES OF ASSEMBLY CHAPTER 17

NFPA 37 Public Comment Responses Page 1 of 32

CHAPTER 10 STEAM AND HOT WATER BOILERS

MODELS LFP4218/LFP6018 TOP VENT GAS FIREPLACE

CARBON DIOXIDE SYSTEMS FOR BEVERAGE DISPENSING PERMIT REQUIREMENTS

Fire Department Access and Water Supply

Explosion Protection Engineering Principles

OPERATING INSTRUCTIONS AND OWNER S MANUAL

SECTION PLUMBING EQUIPMENT

GENERAL BASIC INSTALLATION INSTRUCTIONS INDIRECT GAS FIRED WATER HEATERS PARKER BOILER CO.

MERAMEC VALLEY R-III SCHOOL DISTRICT 126 North Payne Street Pacific, MO

Safety Program. Eastern Electrical Testing Corporation 2 Skyline Drive Clarks Summit, PA (570)

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Transcription:

Liquefied Petroleum Gas Facility Written Fire Safety Analysis For INDEX Page Introduction 2 Conducting the WFSA 2 WFSA CHECKLIST Section I Facility Information 3 Section II Facility Storage Container Information 4 Section III Container Product Control 5 Section IV Piping and Hose Systems 5 Section V Pumps and Compressors 6 Section VI Vaporizers 7 Section VII Accessing Plant Safety 7 Section VIII Operations and Maintenance 9 Section IX Employee Training 9 Section X Fire Service Information 10 Facility Operator Objectives 10 References 10 Comments 11 Facility Schematic 12 1

INTRODUCTION The National Fire Protection Association's LP Gas Code (NFPA 58), 2017 edition, has been adopted by the Missouri Propane Safety Commission. Within NFPA 58, Section 6 requires that a Written Fire Safety Analysis (WFSA) be completed for all LP gas installations that use ASME containers with an aggregate capacity of more than 4,000 gallons (water capacity). Manifolded tanks meet this threshold if the aggregate volume exceeds 4,000 gallons. The section also requires planning with local emergency agencies, such as fire and police departments, for the effective control of inadvertent product release or fire. This planning should consider the safety of emergency personnel, workers and the public. The WFSA provides owners and operators of affected facilities with a self audit tool that they can use to determine facility safety and enhance the effectiveness of local emergency responders. If serious hazards are identified during the assessment, special protection as allowed by NFPA 58 may be needed. CONDUCTING THE WFSA Your assessment must be prepared by a person approved by the Missouri Propane Safety Commission who has relevant experience and knowledge of industry practices. As a general rule, the Commission authorizes the owner or operator to prepare the WFSA. The exception is for an engineered facility, such as one that incorporates refrigerated storage, automated fuel standby (either industrial or utility) or pipeline terminals. These assessments must be prepared, stamped and signed by a professional engineer. Also, note that all storage tanks utilized by public utility companies as defined in RSMo 323 are regulated by the Missouri Public Service Commission. There are five elements addressed in the WFSA: 1. Evaluation of the total product control system and its effectiveness; 2. Analysis of hazards within the facility, including congestion or other local conditions; 3. Assessment of exposure to and from other properties, populations and activities; 4. Determination of the probable effectiveness of local fire departments based on water supply, response time and training; and 5. Evaluation of the application of water by hose streams or other methods of effective control of leakage, fire or other exposures. An authorized representative of your local fire department also must fill out Section X of the WFSA. This handbook will serve as a checklist for most Missouri LP gas facilities which fall under the WFSA requirement. In conducting your assessment, it might also be helpful to also consult NFPA's Pamphlets 58 and 54 along with the Missouri Propane Safety Commission "blue book" (2CSR 90) which contains applicable state laws and regulations. 2

WRITTEN FIRE SAFETY ANALYSIS CHECKLIST SECTION 1 1. Facility Name: 2. Physical Address: 3. County: 4. Mailing Address: Facility Information 5. City: Zip Code: 6. Latitude: Longitude: 7. Daytime Telephone: 8. Emergency Telephone: 9. Facility Fax Number: 10. Email: 11. Facility Owner/Manager 12. Type of Facility: Commercial Industrial Bulk plant Other 13. Propane is received by (check all that apply): Transport Bulk truck Pipeline Rail tanker 14. Propane is distributed from facility by (check all that apply): Vapor pipeline Liquid pipeline Transport Bulk truck Rail tanker Cylinders by truck Other 15. Number of vehicle gates in/out of facility: 16. Number of pedestrian gates in/out of facility: 17. Is the facility normally staffed? 18. If so, what are the normal hours? 19. Facility Environment: Rural Suburban City/Commercial Industrial City/Suburban residential 20. Type of roads to Facility: Private drive County road State highway Interstate highway 21. Road Construction: Asphalt Concrete Gravel Dirt SECTION II Facility Storage Container Information 1. Number of Storage Tanks: 2. Capacity in Water Gallons: 3. Working Pressure: 3

4. Do all tanks have attached/legible data plates? 5. Tank serial number 6. Tank manufacturer 7. Date of manufacture 8. Date(s) installed 9. Are tanks ASME constructed? 10. Are tanks manufactured for LP use? 11. Are container shells in good condition? 12. Is corrosion present on shell? 13. Are containers properly painted? 14. Are product ID placards displayed? 15. Are tanks located in flood plain? If yes, are tanks properly anchored? 16. Are tanks level? 17. If facility has more than one tank, are the tanks connected? If yes, are tank tops level with each other? 18. Do containers conform to setbacks? 19. Container support and conditions (footings/foundations? Concrete Acceptable Unacceptable Concrete/steel Acceptable Unacceptable Steel skid Acceptable Unacceptable Tank insulated at support Acceptable Unacceptable 4

SECTION III Container Product Control 1. Liquid gauging device 2. Pressure gauge 3. Required shut off valves 4. Required excess flow valves 5. Required back check valves 6. Relief valves Adequate capacity Proper sized vent stacks Rain caps installed? SECTION IV Piping and Hose Systems 1. Is piping safe and suitable for LP service, including design pressure, approved by manufacturer for such service and acceptable to the authority having jurisdiction? 2. Is each section that can be isolated by valves equipped with a hydrostatic relief valve? 3. Do piping materials conform to NFPA specifications? 4. Do pipe fittings conform to NFPA specifications including designed working pressure? 5. Do all valves, other than container valves, also meet NFPA specifications; are they suitable for the system application including working pressure? 6. Does the system contain a sufficient number, size and placement of excess flow valves and/or back check valves to adequately protect the system? 7. Is the loading/unloading portion of the piping system adequately protected by properly sized and adequately placed bulkheads or other protection? 8. Are emergency shutoff valves installed in the appropriate vapor and liquid locations? 9. Is all above ground piping properly supported and adequately protected from physical damage? 10. Is underground piping buried at a proper depth, protected with backfill and provided with adequate corrosion protection? 5

11. Are there provisions within the piping system to compensate for expansion, contraction, jarring and vibration? 12. Do all flexible piping components comply? 13. Are all hoses manufactured for LP use? 14. Do all hoses have a design working pressure of 350 PSI? 15. Are all hoses manufactured with a safety factor of 5:1? 16. Are hoses continuously marked "LP Gas," "Propane," "350 PSI"? 17. Is the manufacturer's name or trademark on the hose? 18. Do hose assemblies have a design capability of at least 700 PSI? 19. Do hoses and flexible connectors comply with NFPA? 20. Are hydrostatic relief valves installed in sections of hose that can be isolated by valves? SECTION V Pumps and Compressors 1. Are pumps designed for LP gas use and installed according to manufacturer's specifications? 2. Are compressors designed for LP gas use and installed according to manufacturer's specifications? 3. Are there means to limit suction pressure to within the design limits of the compressor? 4. Are there means to prevent the entrance of liquid LP into the compressor suction? SECTION VI Vaporizers 1. Type of vaporizer Direct fired Indirect fired Gas Electric Other 2. Vaporizer manufacturer 3. Vaporizer capacity 4. Date of installation 6

5. Is vaporizer installed according to manufacturer's specifications? 6. Does vaporizer have a design working pressure of 250 PSI? 7. Do vaporizer markings comply with NFPA 58? SECTION VII Assessing Plant Safety 1. Is the facility protected by a 6 foot industrial type fence with an appropriate number of gates? 2. Are the gates locked while the facility is unattended? 3. Does the storage area have a properly sized, fully charged and strategically placed fire extinguisher? 4. Have plans been submitted and approved as required by the Missouri Propane Gas Commission (or previously, Department of Weights and Measures)? 5. Date the plans were submitted Date plans approved 6. Are warning signs and placards posted as required? 7. Are emergency telephone numbers posted in conspicuous locations? 8. Does the product transfer location and operation comply with NFPA 58? 9. Do all electrical wiring and components meet National Electric Code and NPGA requirements? 10. Location of electric poles from storage (feet) 11. Are electrical lines a minimum of six feet horizontal from LP gas containers? 12. Are pumps equipped with an operating control or disconnect nearby? ) 13. Are emergency shut off valves equipped with remote cables or activating devices? 14. If there is refined fuel storage on the property, is it located at a lower grade than the LP gas container? 15. Are containers located at least 20 feet from aboveground tanks storing other Class I, II or III liquids? Not applicable 7

16. All sources of ignition being removed or turned off while transfer operations, connections or disconnections are made or when LP is being vented? 17. Does the system comply with NFPA regarding other ignition sources? 18. Are hoses, valves, piping and fittings maintained in good condition and free from leaks? 19. Exposures to facility Other fuel Storage Electrical lines/transformers/substations 20. Exposures from facility Traffic/vehicles Yes Yes Industrial facilities Commercial facilities Manufacturing Schools No No Other public/institutional buildings Farm fields/crops Anhydrous/Ammonia Other fuel storage 21. Are storage containers protected from vehicular damage? Yes Other 22. Is adequate nighttime lighting provided if the facility normally operates other than daylight hours? 23. Are combustible materials, weeds and tall grass kept at least 10 feet away from the storage area? SECTION VIII Operations and Maintenance 1. Are persons who operate LP gas bulk plant or industrial systems using written procedures for conducting activities associated with the job duties? 2. Does the facility owner or operator ensure that the operating procedures are updated as necessary when major changes occur and prior to starting up an altered system? 3. Has the owner or operator prepared and implemented procedures to maintain the mechanical integrity of the LP gas system? 4. Are all persons who perform maintenance of the LP gas system trained in the hazards of the system and in the maintenance and testing procedures applicable to the installation? 5. If there are maintenance contractors, do they ensure that their employees are trained and supervised in performing these procedures? Yes Yes No No No 8

SECTION IX Employee Training 1. Are all persons who transport and handle LP gases properly trained? 2. Are all persons who install, repair or service LP gas equipment trained? 3. Type and interval of training employees are required to attend CETP or equivalent every three years HazMat refresher every three years Other 4. Are employees trained in bulk plant emergency procedures? SECTION X Fire Service information (To be completed by the fire service) 1. Name of Fire Department 2. Location of nearest fire station 3. Telephone number 4. Is the facility accessible for fire fighting/emergency response? 5. Location/distance of nearest fire hydrant/water supply 6. Is water supply adequate to protect storage facility in case of fire? 7. Type of water supply Municipal Private Well Other 8. Is foam/equipment available? 9. Do fire service personnel have adequate training to respond to LP incidents? 10. Does the fire department have after hours access to this facility? 11. Are fire personnel familiar with the facility? 12. Name other fire services that could provide mutual aid of required and distance: Name Distance Name Distance Name Distance 13. Type of fire equipment/capabilities available from other fire services Facility Operator Objectives 1. Be a good neighbor! 2. Give a plant tour to all local fire departments and emergency response personnel. Explain plant and equipment operation. 3. Properly maintain and inventory all equipment. 4. Protect plant from tampering, theft and vandalism. 5. Respond to neighbor complaints and concerns in a timely fashion. 9

6. Prominently display emergency contact numbers and ensure they are answered. 7. Never discharge more product than is necessary into the atmosphere; always away from potential ignition sources and upwind of neighbors. 8. Inform department of University of Missouri "Propane Emergencies" classes. References National Fire Protection Assn. Liquefied Petroleum Gas Code (NFPA 58) National Fire Protection Assn. National Fuels Gas Code (NFPA 54) Revised Statutes of the State of Missouri, Chapter 323, Liquefied Petroleum Gases Code of State Regulations, Title 2, Division 90, Chapter 10, LP Gases SECTION XIV Comments List any comments concerning this facility 10

SECTION XV Facility Schematic 11