WDP. Installation manual WDP. Gutter system. Ag/MIT/UmEN /14 rev 1.0

Similar documents
AX51 with Munters Drive

Flatsided Discharge Cone Models: 54GC & 54GCX

BA2702-P Linear Actuator

Motor Kit for SW Shutter. Instruction Manual. Motor Kit for SW Shutter. Models: FA2685. Munters Corporation, November 2013 QM1017r6

IA Inlet Actuator. Instruction Manual. IA Inlet Actuator Models: IA0090 IA0090P. Munters Corporation, March 2017 QM1235r1

BA4000 Series Curtain Machine

RC Series Discharge Cones

MD Munters Drive. Instruction Manual. Munters Drive * Motor and Controller Replacement Kit. Motor & Controller Replacement kit for AX and VX Fans

BI28SP Ceiling Inlet. Instruction Manual. BI28SP Ceiling Inlet. Bi-Flow, Spring Actuated. Models: BI28SP BI28SP-01

FM Munters Drive. Instruction Manual. Munters Drive * Motor Replacement Kit. Motor Replacement Kit for AX and VX Fans

Manual for use and maintenance. + CE Declaration of conformity. TU600 - TU800 Chimney fan. Ag/MIT/UmGB /14 rev 1.0

Assembly- and Usermanual. Rainmaker. Code No GB. Edition: 09/2007

MFS. Manual for use and maintenance. + CE Declaration of conformity MFS. Air circulation fan. Models: MFS36 - MFS52. Ag/MIT/UmGB /13 rev1.

AIR HEATING PRODUCTS

VX51 and VX55 with Munters Drive 51 and 55 Exhaust Fan

M I S T E L I M I N AT I O N. Mist elimination in Flue Gas Desulphurization. The buck stops here.

INSTALLATION AND OPERATION. -, 3. -is INSTRUCTIONS FOR COOLAIR S EVAP-PAD COOLING SYSTEM. Coo/ah AMERICAN COOLAIR CORPORATION

OVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17737T/K-17737T-S

Safety. Rinse Kit for Multi-Pro 1200 and 1250 Turf Sprayers Model No Safety and Instructional Decals. Installation Instructions

Single Lever Pull Out Kitchen Faucet

IMPORTANT SAFETY INSTRUCTIONS EC-AG1-25 EC-AG1, EC-AG2 SAVE THESE INSTRUCTIONS.

Fleck 5600 SXT. Installation Guide. Make a list of all of the plumbing fittings needed to install; a typical list looks like this:

4-1 1 / 2 " Tees / 2 " hole saw w/ 1/4" drill bit / 2 " Male slip plugs

Karess ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS

SUPPLEMENTARY INSTRUCTIONS

Installation Instructions

Positive Pressure Filtered Swine Facilities

Installation Instructions for. WaterMaster Series Fountains

General System Layout Sketch

HydroCycle Vertical Aeroponic Systems

1/7 SPOUT INSTALLATION

Acrylic Claw Foot Tub

REVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 现代型分体座便器 CONTEMPORARY TWO-PIECE TOILET K-17178T-S/K-17178T-SP

FOR THE RECORD. You should record the model and serial numbers, which can be found on the back of the unit, for future reference.

Parasitic Cysts - Cryptosporidium and Giardia, Chemicals, Heavy Metals, Dissolved Salts, Offensive Tastes and Odours, Sediment, Dirt,

Owner s Manual BONAIRE. Durango Window Cooler. Model 4500E, 5900E

Installation Instructions for. WaterMaster Series Fountains

LYRA 1000 VVS Installation and Operation Manual LYRA 1000 VVS THERMAL STORE LYRA 1000 VVS

TECHNICAL DATA. Wet 26a. February 22, 2009

ADAIR ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 4.0L EXPOSED CLASS FIVE ONE-PIECE TOILET 4.0 K-5306T/K-5306T-S

ONE PIECE TOILET LT3. Model: MPN: B0940 INSTALLATION INSTRUCTIONS. Version: 1.0

SunRay 1000 Solar Water Pasteurizer Installation Instructions

ENCLOSED UNIT TECHNICAL MANUAL Items # &

AQVA ULTRA Faucet Purifier AQ003-1 User s Guide

INSTALLATION GUIDE Little Butler Hot Water Dispensing Faucets and Drinking Water Dispensing Faucets

PolyMax H2-24 Dutch Bucket System

REACH ORDERING INFORMATION NOTES T01-B

REVE ORDERING INFORMATION NOTES T01-E INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17178T-S2/K-17178T-SBG2/K-17178T-SP2

FFP S700 SERIES. Pull-Out Spray Faucet. Installation guide

Installation & Operating Instructions

JAZ. Operator s Manual. Diesel/Kerosene Air Heaters JAZ 42 JAZ 80 JAZ 80 W JAZ 125 JAZ 160

MODEL E

Installation & Service Guide

PERSUADETM ORDERING INFORMATION NOTES T01-D INSTALLATION INSTRUCTIONS 3/4.8L TWO-PIECE TOILET 3/4.8L K-3654T-W/K-3654T-CW

HydroCycle Vertical Aeroponic Systems

SAN RAPHAEL GRANDE ORDERING INFORMATION NOTES T01-B INSTALLATION INSTRUCTIOINS 4.8L SKIRTED CLASS FIVE ONE-PIECE TOILET 4.

INSTALLATION INSTRUCTIONS

Installation Manual PS-200 & PS-201

INSTALLATION INSTRUCTIONS

Oahu Showerspa Model #1035 Owner's Manual

ARCHERTM ORDERING INFORMATION NOTES T01-C INSTALLATION INSTRUCTIONS VITREOUS CHINA ONE-PIECE TOILET K-3639T/K-3639T-C

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Remote Water Quality System Standard Equipment (supplied by EPI) Remote Water Quality System Optional Equipment (supplied by EPI)

Installation Instructions for. DairyFount Series Fountains

COMPRESSED AIR DRYER. SAFETY... Page 2 MAINTENANCE... Page 5. INSTALLATION... Page 3 PARTS AND KITS... Page 6

INSTALLATION GUIDE Little Butler Hot Water Dispensing Faucets and Drinking Water Dispensing Faucets

PIPE DREAMS 96. Aeroponic Garden IMPORTANT:

Glass and Dishwashers AMX / AUX Series

Installation Manual PS-225 & PS-275

3/4.8 AERODYNE 3/4.8L CLASS FIVE+

HARMSCO INSTALLATION AND OPERATION MANUAL UPFLOW SWIMMING POOL CARTRIDGE FILTER CARTRIDGE CLEANING INSTRUCTIONS HARMSCO CARTRIDGES

Basin Mixer. Installation & Aftercare Instructions. Please retain for future reference.

ULTIMATE REVERSE OSMOSIS SYSTEM

SYSTEMS for CATALYTIC FILTERS

Owner s Manual BONAIRE. Model 3500M, 4200M

Electrical cable Water supply tube Fittings for tube Coupler Teflon tape. Hole saw min. 2½" bit

WELLWORTH WATERGUARD VITREOUS CHINA SIPHON JET TOILET

Alkaline RO System INSTALLATION MANUAL

Evaporative Humidifier/Cooler FA6 for AHU s Technical manual FA6. HC/MMA/TGB /10 pdf SOS ReklamStudio

REVIVAL LITE VITREOUS CHINA REVERSE TRAP TOILET

INSTALLATION INSTRUCTIONS. Cubix Widespread Faucet Part #: 3204, 5204, 3304, 5304 HANDLE STYLES

BASIN MIXERS INSTALLATION & AFTERCARE INSTRUCTIONS

INSTALLATION INSTRUCTIONS

ADAIR ORDERING INFORMATION T01-A

PORTRAIT LITE VITREOUS CHINA REVERSE TRAP TOILET

Acrylic Claw Foot Tub

Type 2 safety light curtain Type 2 according to the IEC/EN parts 1 and 2 Compact profile: 31 x 32 mm 30 mm resolution for hand detection Wide r

TSL-Aerofoil. wall mounted basin. installation + maintenance

Installation Instructions Solar Controller Kit (Part Number AQ )

ADVANTAGE-100H-SC EXTRACTOR

TOUCHDOWN 48 CEILING FAN

HP310-C EXTRACTOR 120V

Installation Instructions for. OmniFount

ARIN THERMOSTATIC SHOWER SYSTEM

Installation Manual Universal Side-of-Pole Mount UNI-SP/02A

PRF-RO Pentair Reverse Osmosis System Installation and Maintenance Manual SAFETY GUIDES THE BASIC REVERSE OSMOSIS SYSTEM. Tools and Materials Required

INSTALLATION INSTRUCTIONS

Next Generation Corona Discharge Installation & Operation Manual

SMF PUMP OWNER S MANUAL

20-GALLON PARTS WASHER OWNER S MANUAL

Transcription:

WDP Installation manual WDP Gutter system Ag/MIT/UmEN-2171-03/14 rev 1.0

Munters reserves the right to make alterations to specifications, quantities, dimensions etc. for production or other reasons subsequent to publication. The information contained herein has been prepared by qualified experts within Munters. While we believe the information is accurate and complete, we make no warranty or representation for any particular purpose. The information is offered in good faith and with the understanding that any use of the units or accessories in breach of the directions and warnings in this document is at the sole discretion and risk of the user. 2 Munters AB, 2014

Contents 1. General 4 1.1 Disclaimer 4 1.2 Introduction 4 1.3 Notes 4 2. Before using 5 2.1 Delivery check 6 2.2 Packaging and transport 6 2.3 Typical installations 6 3. Installation 7 3.1 Mounting the brackets 7 3.2 Assembling the bottom gutter 9 3.3 Mounting the sides 10 3.4 Assembling the top gutter 11 3.5 Inserting the drains 12 3.6 Inserting the CELdek pads 13 3.7 Double "T" profile for Celdek pads overlapping 14 3.8 Water distribution components 15 3.9 Plumbing kit components for the distribution pipes 17 4. Commissioning 19 4.1 First time start up 19 4.2 Setting the bleed-off rate 19 4.3 Trouble shooting 20 5. Maintenance 21 5.1 Mineral deposits 21 5.2 Algae 21 5.3 Regular maintenance 21 5.4 Replacement of a CELdek pad 22 6. Technical specifications 23 6.1 Pump functioning 23 6.2 General 23 6.3 Water tank 24 3 Munters AB, 2014

1. General 1.1 Disclaimer Munters reserves the right to make alternations to specifications, quantities, dimensions etc. for production or other reasons, subsequent to publication. The information contained herein has been prepared by qualified experts within Munters. While we believe the information is accurate and complete, we make no warranty or representation for any particular purposes. The information is offered in good faith and with the understanding that any use of the units or accessories in breach of the directions and warnings in this document is at the sole discretion and risk of the user. Any complaints concerning the products are conditioned by the strict compliance of the instructions contained by the manual. The manufacturer reserves the right to forfeit any claims e.g. corrosion resulting from nonobservance of the instructions and non-compliant use e.g. proper bleed-off. 1.2 Introduction Congratulations on your excellent choice of purchasing a Munters WDP gutter system! In order to realise the full benefit from this product it is important that it is installed, commissioned and operated correctly. Before installation or using the WDP gutter system, this manual should be studied carefully. It is also recommended that it is kept safely for future reference. The manual is intended as a reference for installation, commissioning and day-to-day operation of the Munters WDP gutter system. 1.3 Notes Date of release: April 2014. Munters cannot guarantee to inform users about changes or to distribute new manuals to them. All rights reserved. No part of this manual may be reproduced in any manner whatsoever without the expressed written permission of Munters. The contents of this manual are subject to change without notice. 4 Munters AB, 2014

2. Before using WARNING! The presence of Chlorine in the water will cause corrosion to the Gutter. DO NOT USE water containing Chlorine. WARNING! The presence of Chlorides in the water will cause corrosion to the Gutter. DO NOT USE water having Chlorides content higher than 200mg/l. WARNING! Do not expose the gutter system to substances containing barium polysulfide (insecticides, pesticides and fungicides) as irreversible damage may occur to the gutter system. Please note the limits for make-up water and sump water at ambient temperature for evaporative cooling systems. Constituent Make-up* Water Sump ** Water Reasons Chlorides (as Cl) <50 mg/l <200 mg/l High Chlorides will cause corrosion of metal parts. Chlorides are contributed by contaminants such as sodium chloride. Chlorine is a minor contributor Chlorine and bromine will rarely control algae because they are Chlorine or 0-1.5 mg/l *** 0 mg/l both very volatile and will not stay in the water. Bromine Both will turn Munters pads soft and shorten their life. Low ph is acid and will cause the paper to be brittle. High ph is more like lye and causes the paper to become fluffy like cotton. ph 6.0-8.5 7.0-9.0 Pads will last the longest with a ph of 7 to 9. If the water absorbs ammonia from the air drawn across the pads, the ph can increase to as high as 10.5. Bleed off definitely helps to control ph. *) Make-up water is the water supply needed to replace the water which is lost by evaporation in a closed-circuit gutter system; **) Sump water is the water found in the covered tank or cistern; Sources of water: Deep wells or municipal water supplies are recommended; ***) Chlorinated municipal make-up water is not recommended for spray on pads; Lake and river water should be filtered and chemically treated for microbial growth; Seawater, brackish water and reclaimed water are not recommended; Rainwater, reverse osmosis water, demineralized water and zeolite softened water should be used with caution. Consult Munters before using. Note: only pure water evaporates from the evaporative cooling pads. Naturally occurring components such as sodium and chlorides, minerals and contaminants such as sulfur or barium present in the water, do not evaporate. Over the time, as these substances concentrate in the remaining water, they can become harmful resulting in damaging the gutter system and the evaporative cooling pads. Any disregard of the above warnings and recommendations shall exonerate the manufacturer from any liability and shall be considered improper use of the gutter system. 5 Munters AB, 2014

2.1 Delivery check Upon receipt, inspect the item for external damage and if found, inform the forwarding agent without delay. Check the data on all the rating plates of the pumps, especially voltage and frequency. 2.2 Packaging and transport Since the gutter segments consist of numerous long pieces, care should be taken when the pieces are handled and stored. If the pieces are placed on a heap, the sides of the heap should be supported to prevent the heap from collapsing and causing injury. 2.3 Typical installations Typical ways in which the WDP system in combination with CELdek evaporative cooling pads can be installed in structures are indicated in the diagrams below. The diagrams depict structures as seen from above with the relative placement of Euroemme extraction fans and CELdek evaporative cooling pads. The WDP system is intended for installation on the outside of the structure. CELdek evaporative cooling pads Extraction fans CELdek evaporative cooling pads WDP gutter system Structure wall 6 Munters AB, 2014

3. Installation 3.1 Mounting the brackets The gutter sections are manufactured in five different lengths, 3m, 2.4, 1.8, 1.2 and 0.6m. An installation can be compiled by using different combinations of the lengths. Use Diagram 1 to decide on the placement of the various lengths of gutter. Mount each bottom bracket using q.ty 2, Ø8 Fisher. Mount each top bracket using q.ty 2,Ø6 Fisher. ALIGNMENT! Ensure that all the top brackets and a the bottom brackets are mounted on the same horizontal level. Use a spirit-level or other suitable device. (see pictures on side) Verify the distance between the top and bottom brackets continuously. Place the bottom support gutter every meter and the top gutter support where it is required. H+212 7 Munters AB, 2014

Gutter sections Available lengths: 0.6 m 1.2 m 1.8 m 2.4 m 3.0 m It is recommended to use as many as possible 3.0 m sections, than complete the required length with a shorter cut on size section. Please note that total length must be a multiple of 0.6 m. Examples: 1. total length 12 m: use q.ty 4 sections with 3.0 m length; 2. total length 16.8 m: use q.ty 5 sections with 3.0 m length and q.ty 1 section with 1.8 m length. Water supply and drain Using 0.75 hp pump on 100 mm thick evaporative pad it is suggested to place a water supply every 24 m and a water drain every 12 m. Using 0.75 hp pump on 150 mm thick evaporative pad it is suggested to place a water supply every 16 m and a water drain every 12 m. If several water connections are required, divide distance between them uniformly. q.ty 2 water connections L/4 L/2 L/4 q.ty 3 water connections L/6 L/3 L/3 L/6 q.ty 4 water connections L/8 L/4 L/4 L/4 L/8 Diagram 1 8 Munters AB, 2014

3.2 Assembling the bottom gutter Join the section of the bottom gutter, then start applying silicon in correspondence of the holes. Fix the bottom gutter using q.ty 6, M6 x 16 hex screws and its nuts. Apply silicon to the groove on the bottom gutter as indicated in the picture on the left. Do it for both sides of the gutter. To ensure a watertight seal, apply silicon to both the inside and outside of the gutter and spread it. Once the whole bottom gutter length has been assembled and the silicon cured, wash any debris out by using water. Lock it on its support as shown in the picture. In the 150mm thickness gutter add the extra CELdek Pad support supplied every 600mm. 9 Munters AB, 2014

3.3 Mounting the sides 1. In correspondence of the side panels cut the bottom gutter at 30mm distance from the external edge, then bend it flat. 2. Apply the silicon on the bottom part of the sides and in correspondence of the holes. 3. Fix the side to the bottom gutter by q.ty 6, M6x16 hex-screws and its nuts. Tighten bolts and nuts by mean of q.ty 2, Ø 10 spanner. 10 Munters AB, 2014

3.4 Assembling the top gutter 1. Join each top gutter support sliding into the top side gutter groove then fix them to the water distribution pipe support by q.ty 1,M6 x 16 hexscrew and its nut. 2. Join the complete assembly you have obtained to the side panels (both sides) by q.ty 1, M6 x 30 screw and its nut. 3. Fix the top gutter support to the wall by using q.ty 2, Ø6 screw anchors. 4. Continue to secure the top gutter support to the wall joining togheter the top side panels. 11 Munters AB, 2014

3.5 Inserting the drains Use Diagram 1 to decide on the placement of the drains. There should be one drain every 12m in 100mm gutter thickness and every 12m in 150mm gutter thickness. Once the positions of the drains have been identified, drill holes of ø 60 mm into the bottom gutter. Put the rubber gasket on the threaded spout, then insert the spout in the hole of the bottom gutter and tight it in it's position by screwing the threaded ring placed on the other side of gutter. 12 Munters AB, 2014

3.6 Inserting the CELdek pads Shake every pad and distributor before inserting in order to remove dust. Insert the CELdek as indicated in the picture on the left. Ensure that all pads are moved tightly together once inserted. Insert the distributor pad from the top side as indicated. Ensure that the vertical alignment between the CELdek and the gutters is in line as indicated. The last pad and distributor may need to be trimmed. Use a saw if trimming is required. Right Wrong Place the top side gutter onto the distributor pad and join it to water distribution pipe support by q.ty 1, M6 x 30crew and its nut. Join each top side gutter as previously described. Fix the complete assembled you have obtained to the side panel by q.ty 1, M6 x 30 screw and its nut. 13 Munters AB, 2014

3.7 Double "T" profile for CELdek pads overlapping. When you order these item you will recive the double "T" profile in the same lenght of the gutter system you asked for. Screw the nut into the threaded bar and than put in with the washer into the square hole as shown in the pict. Then put the "T" profile on the CELdek pad. In order to lock the T profile place on the opposite side the other T profile inserting the threaded bar into the square hole, then put the Ø6 washer and screw the M6 nut. Make this operation for all the T profile lenght in correspondence of the square hole. Make sure to place the double T profile inside the side panel as shown in the picture. Overlap the CELdek pad and tighten all the nuts of the threaded bar. After that follow the top gutter assembling instruction. 14 Munters AB, 2014

3.8 Water distribution components. All the threaded connections need to have Teflon tape wrapped tightly around the thread to ensure a watertight seal, while sleeved connections need to be glued with PVC glue. The plastic pipe is supplied in 2 sections. One is 1m T long and the second is supplied according to the installation demands. The plastic tube is supplied in 1 section of 1,8m long. Plumbing kit components Pos. Pict. Description Q.ty 2 Alimentation brass valve 1/2" 1 12 11 5 19 20 16 14 13 15 5 13 17 12 18 20 19 5 11 12 3 Plastic floating ball 1 11 10 9 10 11 12 13 14 6 Plastic pipe DN40 L=1000 1 5 8 7 5 Male threaded adaptor 40x50x1.1/4 3 6 5 4 9 Male threaded tee adaptor 1.1/4 FFF 1 3 2 1 10 Threaded nipple 1.1/4" 2 11 Single union valve F/F threaded 1.1/4FF 2 15 Munters AB, 2014

Pos. Pict. Description Q.ty 12 Threaded hose adaptor 1.1/4x4 2 19 Plastic pipe DN40 L=200 2 13 Metal clamp 40/63 3 5 Male theaded adaptor 40x50x1.1/4" 2 14 Spiralled pipe D40 1,8 11 Single union valve F/F threaded 1.1/4"FF 2 17 Solvent cement hose adaptor 40x40 1 - PTFE tape 2 - PVC cement glue 1 Water distribution plastic pipe. Pos. Pict. Description Q.ty - PTFE tape 2 20 Pump and tank. Water distribution pipe 1 16 15 Solvent cement double socket 1 Plastic pipe L1000 for h1500 wdp L1500 for h2000 wdp L2000 for h3000 wdp 1 Pos. Pict. Description Q.ty 1 Water tank 1 18 Male threaded tee adaptor 40x40x1.1/4" FFF 1 7 Water tanl lid 1 Plunbing kit components for distribution pipes. 8 Trap door 1 Pos. Pict. Description Q.ty 12 Threaded hose adaptor 1.1/4"x40 2 4 Pump 1 16 Munters AB, 2014

3.9 Plumbing kit components for distribution pipes Using exploded view to rightly select the "T" piece with threaded central for the water supply. Put the seal into the plastic pipe in correspondence of its groove. Scratch the thread before wrapping the teflon tape around it. Apply the PVC cement glue around the plastic pipe and spread it. Join all the components as shown in the picture. Make sure to place the all assembling you have obtained in the right position as shown in the picture with the water supply hole of the hose adaptor and the water distribution hole of the plastic pipe top oriented. Connect the water distribution pipe in order to cover the system length. Connect the plumbing kit hose adaptor to the water distribution pipes hose adaptor as shown in the picture by mean of q.ty 1, plastic tube and q.ty 2 metal pipe. 17 Munters AB, 2014

Join all the components as shown in the pictures by using teflontape and the PVC cememt glue. Insert the complete assemble you have obtained in the side panel hole and then put it into the water distribution pipe. Make this operation for both side of the gutter. Put the top cover gutter onto the side top gutter pushing it into the groove. Cut the two top cover gutter in correspondence to the water supply hose adaptor. 18 Munters AB, 2014

4. Commissioning 4.1 First time start up After the gutter, pads and plumbing kit have been installed, connect the fresh water supply to the float valve in the tank and the pump to the electrical supply. The electrical connections should be done by a qualified electrician according to local laws and regulations. Remove any visible material from the tank and the gutter. Open the water supply to the tank Remove the drain pipes from the tank Once the tank has filled to the float valve, the pump can be started Let the system run for at least 15 minutes with the drain pipes still not connected to the tank. This will clean debris that might have been left in the system during the installation process. Make a note of any leaks that might have occurred Switch the pump off Let all the water drain from the drain pipes before they are replaced into the tank Unscrew the cap of the filter and clean the filament if necessary. Replace both the filament and the cap If there were any leaks, dry the places where the leaks occurred and re-seal If necessary, start the system again an check again for any leaks 4.2 Setting the bleed-off rate The bleed-off rate is the water flow that needs to be constantly drained off to keep the mineral concentration in the water to an optimal level. Too little bleed-off means too much scaling and clogging, resulting in frequent pad change. Too much bleed-off results in high water costs. It is therefore important to calculate the optimal bleed-off rate to get a long lasting pad with high performance. As a good starting value, use 0.2l/minute/running meter of gutter. If scaling becomes apparent, increase the amount of bleed-off. To adjust the bleed-off, follow the steps listed below: Place a 10l bucket underneath the outlet of the bleed-off Start the pump and allow it to run until the return water starts flowing into the tank Open the bleed-off valve and start measuring the time and continue to measure the time until the bucket is filled Use the table below as a quick guideline of how long it should take to fill the bucket with water. Adjust the opening of the valve more or less according to how long it has taken to fill the bucket. Once the right opening size for the valve is determined, keep the valve at this position to ensure constant bleed-off. As an alternative to the table, the following formula can be used to calculate the filling time for any size container. 19 Munters AB, 2014

Time = [Container volume] / [Length of gutter x 0.2] The quantity of water required is not dependant on the height of the pads installed. Gutter length [meter] Total bleedoff required [l/hour] Time to fill a 10l bucket [min] 6 75.0 8 9 112.5 5½ 12 150.0 4 15 187.5 3¼ 18 225.0 2¾ 21 262.5 2½ 24 300.0 2 4.3 Trouble shooting Problem Possible fault Corrective action No water circulating Pump doesn t work Check electrical connection Not enough water in the tank Fill the tank Water entry joint not opened Open water entry joint Valve closed Open valve Water leaking from the system Plumbing components not well Close better where necessary closed Not enough silicon applied in junction points Apply more silicon where necessary 20 Munters AB, 2014

5. Maintenance The performance of pads can be influenced by the formation of either mineral deposits or algae. The methods used for the prevention of either of the two are different and are described below. 5.1 Mineral Deposits During the evaporative cooling process some of the water evaporates, but the mineral salts remain in the water. This effectively increases the concentration of the mineral salts in the water, which leads to an increased likelihood for the formation of mineral deposits on the surface of the pads. The thickness of such deposits will increase over time and ultimately block the air passages and diminish the effectiveness of the pads. Below are some helpful guidelines for the prevention of the formation of mineral deposits. Ensure there is sufficient water in circulation in the system. This helps to wash dirt down from the pads. If 100mm thick pads are used, there should be at least 3.6l/min/running meter of gutter Ensure sufficient bleed-off In extremely dry circumstances the water quantity may be increased Too much water shouldn t be pumped up because this would transform the cooling pad wall into a closed water curtain jeopardizing the performances Minimize the number of on/off wetting cycles for the cooling pads. Brush dry pads with a soft bristled brush when small crystals start forming. Ensure that the brush strokes are in the direction of the sheets in the pad (up and down). Do not use chemicals on the pad 5.2 Algae Algae require three essential elements to survive: Light Water Nutrients Anywhere that an abundance of the three are required, the likelihood of algae growth is high. Below are some recommendations that will help to reduce the likelihood of algae growth Completely dry the cooling pads once every 24 hours It is not recommended to use chemicals on a daily basis Shade the pads and the tank Flush and disinfect the entire system quarterly 5.3 Regular maintenance Clean the filter of the plumbing kit and pump regularly, dirty filter can reduce the water flow rate by 50% or more Check system regularly for damaged or clogged cooling pads and replace damaged pads 21 Munters AB, 2014

5.4 Replacement of a CELdek pad Change pads only when the system is completely dried. Cut out the pad that needs to be replaced and remove it. Cut the new pad in the middle to obtain two pieces. Insert the new distributor (it ll remain inside the top gutter). Insert the upper part of the CELdek that has been cut. Ensure that the pad is at an angle. Insert the second half at an angle as indicated on the left. Push two pieces in together until they are flush with the other pads 22 Munters AB, 2014

6. Technical specifications 6.1 Pump functioning The float switch on the pump is there for protection of the pump, should the water level become too low. The diagram below illustrates how the float switch operates. Please take note at which levels the pump will switch off and at which level it will switch on again. 6.2 Pump functioning Pump Nominal power Type phases Frequency Voltage Current Max capacity Weight type [W] [hp] [Hz] [V] [A] [l/min] [m] [kg] a 0.25 0.33 1 50 230 1.4 128 1.7 3.75 b 0.25 0.33 1 60 230 1.4 128 1.7 3.75 c 0.37 0.5 1 50 230 2.1 165 2.9 4.7 d 0.37 0.5 1 60 230 2.1 165 2.9 4.7 e 0.55 0.75 1 50 230 3.5 250 3.8 6 f 0.55 0.75 1 60 230 3.5 250 3.8 6 g 0.55 0.75 3 50 400 1.9 250 3.8 6 h 0.55 0.75 3 60 400 1.9 250 3.8 6 Max operating temperature 40 C Discharge pipe connection 11/4'' Pump shaft Acciaio inossidabile AISI 416 Pump body Type a-d: polipropilene / Type e-h: acciaio inossidabile AISI 304 IEC protective class IP68 Winding insulation grade Type a-d: F / Type e-h: B Kit h 1.5= 2.7m Kit h 2.0= 3.2m Kit h 3.0= 3.7m 23 Munters AB, 2014

6.3 Water Tank Tank type Capacity W D H [l] [mm] [mm] [mm] A 300 800 660 860 B 500 990 840 910 Kit A= 400mm Kit B= 500mm 24 Munters AB, 2014

WDP gutter system is developed and produced by Munters Italy S.p.A., Italy www.munters.com Australia Munters Pty Limited, Phone +61 2 8843 1594, Brazil Munters Brasil Industria e Comercio Ltda, Phone +55 41 3317 5050, Canada Munters Corporation Mason, Phone +1 517 676 7070, China Munters Air Treatment Equipment (Beijing) Co. Ltd, Phone +86 10 80 418 000, Denmark Munters A/S, Phone +45 9862 3311, India Munters India, Phone +91 20 3052 2520, Indonesia Munters, Phone +62 818 739 235, Italy Munters Italy S.p.A., Chiusavecchia, Phone +39 0183 52 11, Japan Munters K.K., Phone +81 3 5970 0021, Korea Munters Korea Co. Ltd., Phone +82 2 761 8701, Mexico Munters Mexico, Phone +52 818 262 54 00, Russia Munters AB, Phone +7 812 448 5740, Singapore Munters Pte Ltd., Phone +65 744 6828, South Africa and Sub-Sahara Countries Munters (Pty) Ltd., Phone +27 11 997 2000, Spain Munters Spain S.A., Phone +34 91 640 09 02, Sweden Munters AB, Phone +46 8 626 63 00, Thailand Munters Co. Ltd., Phone +66 2 642 2670, Turkey Munters Form Endüstri Sistemleri A.Ş, Phone +90 262 751 3750, USA Munters Corporation Mason, Phone +1 517 676 7070, Vietnam Munters Vietnam, Phone +84 8 3825 6838, Export & Other countries Munters Italy S.p.A., Chiusavecchia Phone +39 0183 52 11 Ag/MIT/UmEN-2171-03/14 rev 1.0 Munters AB, 2014