BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

Similar documents
GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Endorsement of Design for Route 7/George Washington Boulevard Overpass. Algonkian and Broad Run

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

23 EA , , , , , , , LF , , ,596.

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

JOB CREATION PROJECTS

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Installation of Traffic Calming Measures in the Kirkpatrick Farms Subdivision

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Federal Project No.: PM03369

University Park Subdivision Street Assessment Report

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in May 2010 construction rates)

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

startup. Construction of contractor entrance off University City Blvd connecting to Lot 8 has started.

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Downtown Redevelopment Project Update

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

5-Year Street Reconstruction Plan ( )

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

DESIGN SCENE SUBJECT INDEX

ROANOKE STREET IMPROVEMENTS CHRISTIANSBURG, VIRGINIA VDOT PROJECT # U R24 UPC #:

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

Federal Project No.: OC-095-1(365), OC-095-1(367)

Farmersville Parkway Phase III

leel NG CITY COUNCIL AGENDA REPORT Honorable Mayor and City Council Members

Governor Stone Parkway Shared Use Path Planning Study

Stafford County Strategic Plans

Roads Plan

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

Public input has been an important part of the plan development process.

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

Spring 2018 Construction Update

Abingdon Urban Path System

DESIGN CRITERIA PACKAGE

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

6. CPRC Group, requests sketch plan review for 70 Pleasant Hill Road, Map R77, Lot 7

Const. ROADS - Description

Please call or me at if you cannot attend

PROJECTS UNDER CONSTRUCTION

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 20, 2016

Capital Projects impacting Odenton Town Center

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

BULLETIN. Temperature Controls (VAV) (3/11/2010)

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Cottage Grove Road Reconstruction. City of Madison Engineering

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

Fall 2017 Construction Update

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

Loudoun to Pleasant View 500kV Rebuild & Brambleton to Mosby 500kV Projects

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

7 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Special Revenue Funds

Alternatives Analysis Summary Memorandum

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

The Arlington County Park and Recreation Commission and Department of Parks, Recreation and Cultural Resources. PEG APPLICATION FORM Fiscal Year 2012

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Prince William Street Project (Grant Avenue to Wellington Road)

Agenda Summary December 11, 2017

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ARLINGTON COUNTY, VIRGINIA

1173 W. University Dr. Request to construct a new Alumni Center.

DATE: May 25, Watershed Conservation Authority Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

County of Fairfax, Virginia

Capital Improvement Program. Development Services Staff Recommended Projects

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

Citizen Advisory Group Meeting 5: Land Use April 14, 2011

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON

PLANNING COMMISSION Work Session Meeting Agenda

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

Capital Projects in and near Odenton Town Center

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

CASE NUMBER: 16SN0565 (AMENDED) APPLICANT: C.A.H. Investments, LLC

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Carson Street Streetscape Improvements. Request for Proposals

4/8/2015 Item #10D Page 1

PROJECT SHOWING MINUTES

Old Mill Community Association Bioretention Facility

Location. Served. Category. Units Start Year. Previous Appropriations

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

To: All Holders of the Virginia Department of Transportation s 2001 Road and Bridge Standards

Old Jail HVAC Replacement Feasibility Report

Transcription:

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard and Ryan Road Blue Ridge CRITICAL ACTION DATE: At the pleasure of the Board STAFF CONTACTS: Eloisa Thring, Transportation and Capital Infrastructure Kathleen Leidich, Transportation and Capital Infrastructure Joe Kroboth, Transportation and Capital Infrastructure PURPOSE: To recommend the use of available funding sources for the installation of a traffic signal at the intersection of Northstar Boulevard and Ryan Road. STAFF RECOMMENDATION: Staff recommends the Board of Supervisors (Board) direct staff to prepare a budget adjustment to amend the FY 2016 Capital Improvements Program (CIP) budget to appropriate $129,699.24 in cash proffers from ZMAP-1993-0005, Sequence Number 99063995, in the Public Facilities Fund and transfer that amount to the Capital Fund, and transfer $175,000 from the Traffic Signal Contingency Fund to fund the installation of a traffic signal at the intersection of Northstar Boulevard (Route 659) and Ryan Road (Route 772). BACKGROUND: The subject intersection is experience increased traffic congestion due to development along Northstar Boulevard and Ryan Road from the western edge of Brambleton to Shreveport Drive (Route 621) and Loudoun County Parkway (Route 607) (Attachment 1). The opening of Northstar Boulevard from its intersection with Ryan Road to Creighton Road (Route 774) has also contributed to an increase in traffic volumes passing through the subject intersection. Although Northstar Boulevard provides relief for Belmont Ridge Road, motorists are still experiencing excessive delays at the subject intersection. As part of the FY 2014 CIP budget, $230,000 in local gasoline tax funding was appropriated in the Capital Fund for the warrant study, design and construction of the traffic signal at Northstar and Ryan Road. The traffic signal warrant analysis for the referenced intersection was prepared and approved by the Virginia Department of Transportation (VDOT) on September 5, 2012. In July 2013, the

Item #9, Traffic Signal Construction Funding for the Intersection of Northstar Boulevard and Ryan Road Board of Supervisors Business Meeting September 2, 2015 Page 2 design of the traffic signal plans commenced based on the approval of the warrant analysis. On October 30, 2014, VDOT approved the traffic signal plans. (Attachment 2). On October 6, 2014, a determination (ZCOR-2014-0184) was issued regarding the use of proffer funds from ZMAP-1993-0005, Sequence Number 99063995, to fund the installation of a traffic signal at Northstar Boulevard and Ryan Road; and determined the proposal was appropriate (Attachment 3). ISSUES: Staff does not anticipate any additional issues related to the installation of the proposed signal. FISCAL IMPACT: Based on the VDOT approved traffic signal plans, the engineer s estimate for the signal installation project, including contingency, is $534,000 (Attachment 4). A balance of $230,000 is currently available in the project budget. With the accrued interest, ZMAP-1993-0005, Sequence Number 99063995, currently contains a balance of $129,699.24 available for the construction of the referenced traffic signal. Should the Board approve staff s recommendations, a balance of $0 would remain in ZMAP-1993-0005, Sequence Number 99063995. The Traffic Signal Contingency Fund currently contains a balance of $244,431.81 of which staff is proposing to transfer $175,000 to the Northstar Boulevard and Ryan Road signal project. 1 Should the Board approve staff s recommendations, a balance of $69,431.81 would remain in the Traffic Signal Contingency Fund (Table 1). Proposed Signal Funding Table 1: Staff Recommended Funding Plan Available Balance Amount Requested to be Utilized Projected Remaining Balance Existing Project Funding $230,000 $230,000 $0 Brambleton ZMAP-1993-0005 Sequence # 99063995 $129,699.24 $129,699.24 $0 Traffic Signal Contingency Fund $244,431.81 $175,000 $69,431.81 Totals 604,131.05 $534,699.24 $69,431.81 ALTERNATIVES: The Board may choose to direct staff to prepare a budget adjustment to appropriate $129,699.24 in the Public Facilities Fund from ZMAP-1993-0005, Sequence Number 1 Staff notes that the current balance is $280,302. However, as part of Item #7 for the September 2, 2015 Business Meeting, staff is proposing the use of $35,870.19 for the Belmont Ridge Road/Northstar Boulevard intersection improvements, which if approved would result in a balance of $244.431.81.

Item #9, Traffic Signal Construction Funding for the Intersection of Northstar Boulevard and Ryan Road Board of Supervisors Business Meeting September 2, 2015 Page 3 99063995, and transfer that amount to the Capital Fund, and transfer $175,000 from the Traffic Signal Contingency Fund to fund the construction of a traffic signal at the intersection of Northstar Boulevard and Ryan Road or propose an alternate motion. DRAFT MOTIONS: 1. I move that the Board of Supervisors direct staff to prepare a budget adjustment to amend the FY 2016 Capital Improvements Program budget by appropriating $129,699.24 in the Public Facilities Fund, as identified in Table 1, and transfer that amount to the Capital Fund, and transfer $175,000 within the Capital Fund from the Traffic Signal Contingency account to the Northstar Boulevard and Ryan Road Traffic Signal project account. OR 2. I move an alternate motion. ATTACHMENTS: 1. Location Map 2. Approved Traffic Signal Installation Plan at the Intersection of Northstar Boulevard and Ryan Road 3. ZCOR-2014-1084 4. Engineer s Construction Cost Estimate

PROJECT LOCATION MAP RyanRd Northstar Blvd/Ryan Road Intersection Loudoun Co. Pkwy Brambleton Northstar Blvd Creighton Rd ATTACHMENT 1 A-1

ATTACHMENT 2 A-2

ATTACHMENT 3 A-3

A-4

A-5

A-6

A-7

Northstar Boulevard/Ryan Road Traffic Signal Project Cost Estimate 7/31/2015 Item Unit Unit Price Quantity Extension Construction (See cost estimate following pages) LS $ 420,000.00 1 $ 420,000.00 20% Bid Contingency LS $ 84,000.00 1 $ 84,000.00 Estimated Construction Management & Testing LS $ 30,000.00 1 $ 30,000.00 Total $ 534,000.00 ATTACHMENT 4 A-8

VIA Hand Delivery July 8, 2014 Mr. Bill King Transportation Program Manager / Special Projects Loudoun County Department of Transportation & Capital Infrastructure 1 Harrison Street, S.E. Fourth Floor Leesburg, VA 20175 Re: Probable Cost Estimate Ryan Road (Route 772) at Northstar Boulevard (Route 659 Relocated) CPAP # 2004 0024 Loudoun County, Virginia Mr. King: As requested, the project team has prepared a detailed cost estimate for the traffic signalization and intersection improvements shown on the final engineering plans for the Ryan Road at Northstar Boulevard intersection, currently under final review by VDOT. The itemized estimates are attached and have been summarized below for your reference. Probable Estimate Summary: Traffic Signal: $ 335,000 Pavement Marking & Signage: $ 53,000 Roadway Improvements: $ 32,000 Total: $ 420,000 Should you have any questions regarding these materials please feel free to contact me or Chris Turnbull at (703) 443 1442. Sincerely, Nathan George Senior Designer COPY: Chris Kabatt, Wells + Associates, Inc (Electronic Copy) Chris Turnbull, Wells + Associates, Inc (Electronic Copy) 5925 File A-9

PROBABLE ENGINEER'S COST ESTIMATE NORTHSTAR BOULEVARD (RT. 659 RELOCATED) @ RYAN ROAD (RT.772) Traffic Signal Improvements EQUIPMENT TO BE FURNISHED AND/OR INSTALLED BY THE CONTRACTOR ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL 100 MOBILIZATION LS 1 $5,000.00 $5,000.00 24265 NS MAINTENANCE OF TRAFFIC LS 1 $2,000.00 $2,000.00 50108 SIGN PANEL SF 180 $35.00 $6,300.00 51030 CONTROLLER EA 1 $20,500.00 $20,500.00 51160 ELEC.SERV.GROUNDING ELECTRODE (10') EA 10 $150.00 $1,500.00 51170 ELECTRICAL SERVICE SE 5 EA 1 $2,400.00 $2,400.00 51184 TRAF. SIG. HEAD SEC 12" LED EA 44 $200.00 $8,800.00 3- SECTION BACKPLATES EA 8 $50.00 $400.00 5- SECTION BACKPLATES EA 4 $100.00 $400.00 51210 PEDESTAL POLE PF 2 10' EA 8 $650.00 $5,200.00 51238 CONC. FOUND. SIGNAL POLE PF 8 CY 32 $750.00 $24,000.00 51240 CONC. FOUNDATION PF 2 EA 8 $550.00 $4,400.00 51247 CONCRETE FOUND. CF 3 EA 1 $1,500.00 $1,500.00 51347 SIG. POLE MP 1 20' ONE ARM 60' EA 1 $12,500.00 $12,500.00 SP SIG. POLE MP 1 20' ONE ARM 65' EA 1 $14,000.00 $14,000.00 SP SIG. POLE MP 1 20' ONE ARM 70' EA 2 $15,000.00 $30,000.00 51607 14/7 CONDUCTOR CABLE LF 4000 $2.00 $8,000.00 51700 14/2 CONDUCTOR CABLE SHIELDED LF 10500 $1.50 $15,750.00 SP CAMPBELL AGPS PEDESTRIAN PUSH BUTTON EA 8 $1,250.00 $10,000.00 SP CAMPBELL AGPS CONTROL UNIT & INTERFACE EQUIP. LS 1 $13,500.00 $13,500.00 51830 HANGER ASSEMBLY SM 3, ONE WAY EA 12 $250.00 $3,000.00 51838 HANGER ASSM.SMB 3, ONE WAY EA 8 $125.00 $1,000.00 51910 SAW CUT LF 2450 $8.35 $20,457.50 52404 PEDESTRIAN SIGNAL HEADS SP-9 EA 8 $600.00 $4,800.00 54034 TY.B CL.I PAVE. LINE MARK. 6" LF 960 $2.00 $1,920.00 54042 TY.B CL.I PAVE. LINE MARK. 24" LF 230 $7.00 $1,610.00 55060 6 CONDUCTOR CABLE LF 725 $2.00 $1,450.00 55586 JUNCTION BOX JB S1 EA 3 $750.00 $2,250.00 55587 JUNCTION BOX JB S2 EA 14 $825.00 $11,550.00 55588 JUNCTION BOX JB S3 EA 1 $900.00 $900.00 56022 1" METAL CONDUIT LF 300 $15.00 $4,500.00 56026 1-1/4" METAL CONDUIT LF 40 $18.00 $720.00 56029 1" PVC CONDUIT LF 20 $6.00 $120.00 56030 2" PVC CONDUIT LF 250 $9.00 $2,250.00 56034 3" PVC CONDUIT LF 1250 $12.00 $15,000.00 56038 4" PVC CONDUIT LF 50 $15.00 $750.00 56052 BORED CONDUIT 4" LF 650 $42.00 $27,300.00 Cost Estimate form - all items 7/7/2014 Wells + Associates, Inc Leesburg, Virginia A-10

PROBABLE ENGINEER'S COST ESTIMATE NORTHSTAR BOULEVARD (RT. 659 RELOCATED) @ RYAN ROAD (RT.772) Traffic Signal Improvements EQUIPMENT TO BE FURNISHED AND/OR INSTALLED BY THE CONTRACTOR ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL 56200 TRENCH EXCAVATION ECI-1 LF 1300 $10.00 $13,000.00 56205 TEST BORE EA 4 $1,250.00 $5,000.00 SUBTOTAL $303,727.50 CONTINGENCIES (10%) $30,372.75 TOTAL $334,100.25 TOTAL - USE FOR ESTIMATE $335,000.00 Cost Estimate form - all items 7/7/2014 Wells + Associates, Inc Leesburg, Virginia A-11

PROBABLE ENGINEER'S COST ESTIMATE NORTHSTAR BOULEVARD (RT. 659 RELOCATED) @ RYAN ROAD (RT.772) Pavement Marking & Signage Improvements EQUIPMENT TO BE FURNISHED AND/OR INSTALLED BY THE CONTRACTOR ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL 100 MOBILIZATION LS 1 $2,000.00 $2,000.00 24265 NS MAINTENANCE OF TRAFFIC LS 1 $3,500.00 $3,500.00 50108 SIGN PANEL SF 54 $27.00 $1,458.00 50600 REMOVE TY.I SIGNS EA 21 $140.00 $2,940.00 54032 TY.B CL.I PAVE. LINE MARK. 4" LF 7000 $1.25 $8,750.00 54105 ERAD. OF EXIST.PAVE.MARKING LF 1100 $2.00 $2,200.00 54106 ERAD. OF EXIST.NONLINEAR PAV.MARK SF 5500 $4.35 $23,925.00 54300 PAVE.MESS.MARK.ELONG.ARROW SIN EA 23 $115.00 $2,645.00 SUBTOTAL $47,418.00 CONTINGENCIES (10%) $4,741.80 TOTAL $52,159.80 TOTAL - USE FOR ESTIMATE $53,000.00 Cost Estimate form - all items 7/7/2014 Wells + Associates, Inc Leesburg, Virginia A-12

Engineer's Opinion of Probable Construction Cost for NorthStar Boulevard & Ryan Road Intersection Improvements Blue Ridge District, Loudoun County, Virginia June 23, 2014 christopher consultants, ltd. Construction Cost Estimate: Item Description Quantity Unit Cost Cost Demolition / Site Work Bituminous Pavement up to 4" 85 SY x $6.63 = $563.55 Demo Concrete 100 SY x $14.01 = $1,401.00 Remove Sign 8 EA x $100.00 = $800.00 Milling ( up to 2" Depth) 235 SY x $18.00 = $4,230.00 Subtotal = $6,994.55 Earthwork Dump Charge-unsuitable material 25 CY x $35.00 = $875.00 Rough Grading (relatively Flat) 525 SY x $1.00 = $525.00 Subtotal = $1,400.00 Street Construction 1.5" Overlay 235 SY x $11.68 = $2,744.80 Concrete Curb & Gutter (CG-7) 215 LF x $24.53 = $5,273.95 4" Concrete Sidewalk with 4" Stone Base 200 SY x $45.09 = $9,018.00 Detectable Warning Strips 58 LF x $25.00 = $1,450.00 Relocate Signs 1 EA x $100.00 = $100.00 Subtotal = $18,586.75 Erosion & Sediment Control Silt Fence 100 LF x $4.67 = $467.00 Storm Drain Inlet Control 5 EA x $176.80 = $884.00 Seeding with mulch/fertilizing/tack 150 SY x $3.88 = $582.00 Subtotal = $1,933.00 Contengencies: Assumed to be 10% based on final engineering plans. Subtotal Contingency (10%) = $28,914.30 = $2,891.43 Total = $31,805.73 Notes This Engineer's Opinion of Probable Cost is based upon the "Northstar Blvd. and Ryan Rd. Intersection Improvements" prepared by ccl, dated June 23, 2014. Since ccl has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor's methods of determining prices, or over competitive bidding or market conditions, this Opinion of Probable Construction Costs is made based on ccl's best judgment as an experienced and qualified professional engineer, familiar with the construction industry; however, ccl can not and does not guarantee that proposals, bids or actual Construction Costs will not vary from the Opinions of Probable Construction Costs prepared by ccl. Exclusion The Cost of pavement markings shown on the drawings is excluded from this probable construction cost. A-13 1