PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2016, EDITION

Similar documents
CITY OF COOLIDGE BUILDING PERMIT FEE SCHEDULE AS APPROVED AND ADOPTED BY THE

City of Bullhead City PERMIT VALUATIONS AND FEES

Charter Township of Flushing Construction Permit Fee Schedule.Construction and Development Services Department

VILLAGE OF LOMBARD COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION PERMIT FEES. VILLAGE OF LOMBARD 255 E. Wilson Avenue Lombard, IL 60148

2. Building Code Permits and Related Fees 2018

SOMERSWORTH CODE FIRE PREVENTION AND LIFE SAFETY CHAPTER 21

FEE SCHEDULE Construction Services and Permitting

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE, 2000 EDITION SECTIONS

Community Development Department Commercial Permit Application

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT BUILDING INSPECTION SERVICE FEE SCHEDULE

FIRE PREVENTION CODE

RESOLUTION --=-=---=-~_

FONTANA FIRE PREVENTION DISTRICT USER FEE LIST 2015 DEVELOPMENT SERVICES FEES PLANNING APPLICATION FEES Administrative Site Plan 516 Conditional Use

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

Fire Department Fees.

SEMINOLE FIRE DEPARTMENT TENT PERMIT CONDITIONS

Pismo Beach, CA Municipal Code. Chapter 8.08 FIRE PREVENTION REGULATIONS

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

ST. LUCIE COUNTY FIRE DISTRICT FIRE PREVENTION CODE

The Iowa State Fire Code and its Application

Michigan Fireworks. Mike Evans Instructor # 2062 Program approval # A, 1S, 1T

Council of the City of York, PA Session 2008 Bill No. Ordinance No. INTRODUCED BY: Genevieve Ray DATE: November 18, 2008

OCFA Planning and Development Section Fees Effective September 28, 2015

WELLINGTON FIRE PROTECTION DISTRICT RESOLUTION #

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA

SMC FEE TYPE CURRENT FEE DESCRIPTION/DETAIL

PA 256 of 2011 Michigan Fireworks Safety Act What We Need To Know

District of Sicamous. Fire Department Bylaw No. 126, Effective Date February 26, 1996

ORDINANCE NO

ARKANSAS FIRE PROTECTION LICENSING BOARD ACT 743 OF 1977

CHAPTER 14 ELECTRICAL CODE

Glenwood Springs Fire Protection District Amendments to the 2009 International Fire Code

CITY OF SYRACUSE BOARD OF MECHANICAL EXAMINERS

Building Permit Fees (cont.)

Chapter 100 FIRE PREVENTION

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

2015 Recommended Building Code with Amendments. The Executive Committee of the Central Iowa Code Consortium does ordain as follows:

City of Lake Dallas Master Fee Schedule Fiscal Year 2018

MULTI-LEVEL & COVERED BOOTH CONDITIONS

Oklahoma. 265: Incorporated national codes and standards The following national codes and standards are incorporated by reference:

RESOLUTION 15-R-211. DCA: 1.5 Percent of all base building permits fees - $2.00 minim um (DCA: Department of Community Affairs- FloridaStatute553.

This fee schedule is for Building Inspection Fees only.

ADMINISTRATIVE ORDER # CERTIFICATES OF USE AND OCCUPANCY FOR EXISTING BUILDINGS

FIRE SAFETY CHAPTER 18A FIRE SAFETY

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

ORDINANCE NO NOW, THEREFORE, BE IT ENACTED BY THE CITY COUNCIL OF THE CITY OF FAIRBANKS, ALASKA, as follows:

CHRISTMAS TREE LOT INFORMATION & REQUIREMENTS

FIRE PREVENTION CODE. conditions hazardous to life and property from fire, hazardous materials, or explosion.

ORDINANCE NUMBER 4343

ENGROSSED SUBSTITUTE HOUSE BILL State of Washington 60th Legislature 2007 Regular Session

S 2758 S T A T E O F R H O D E I S L A N D

ORDINANCE NO. Establishing Fire and Life Safety Requirements for Existing Multi-Family Residential Buildings Classified as Group R, Division Occupancy

2015 International Code Adoption. And 2014 Electrical Code

LexisNexis (TM) New Jersey Annotated Statutes

SPRINKLER ORDINANCE Town of Yarmouth, Maine Recodified: 1/15/98 Amended: 4/19/01 Amended: 6/18/15

City of Calabasas Building and Safety Division Fee Schedule

ARTICLE I. IN GENERAL

Building Permit Type & Sub-Type Definitions

DOUGLAS L. BARRY FIRE CHIEF

2016 California Building Code Adoption OC amendments Summary Title/Subject Justification/Comments Action

Commercial, Manufacturing and Industrial: Office Areas.18/total sq. ft. Agricultural buildings, detached garages, and accessory.15/total sq. ft.

CITY OF LANCASTER FEE SCHEDULE

a. Duplication, including incident, fire, and other misc. reports: Copies and/or printouts, up to 8-1/2 x 14, color j. Postage Actual Cost

STRUCTURAL PERMIT FEES Fees Effective: August 1, 2017

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS

COMPLIANCE ALTERNATIVES

DECLARATORY STATEMENT. THIS CAUSE came on for consideration upon the Petition for Declaratory

ROSELAND FEE SCHEDULE Fees Effective: July 1, 2016

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition


Town of Bridgton FIRE PROTECTION AND LIFE SAFETY ORDINANCE

SOUTH METRO/CUNNINGHAM FIRE RESCUE AUTHORITY A RESOLUTION ADOPTING A FEE SCHEDULE

City of San Ramon. Zoning Ordinance. Adopted: October 27, Latest Revisions Effective: March 28, 2018

FIRE PREVENTION & PROTECTION CHAPTER 127 ARTICLE I GENERAL PROVISIONS

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

RESOLUTION NO R (Amending: R, R, R, R, R, R)

ELLIS COUNTY FIRE CODE

FIRE FIGHTER II APPLICATION PENNSYLVANIA VOLUNTARY FIRE SERVICE CERTIFICATION PROGRAM NFPA Edition

Elk Creek Fire Protection District

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Perris as follows:


West Norriton Township

A.C.A. Tit. 20, Subtit. 2, Ch. 22, Subch. 6 Note

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

Laboratories and Hazardous Materials. Company Overview

CITY OF PETALUMA FIRE DEPARTMENT. FIRE PERMIT AND HAZARDOUS MATERIALS (CUPA) FEE SCHEDULE (September 2002)

ENGINEERING/PLAN REVIEW - FEE SCHEDULE Exhibit A

Fire Inspection FAQ s

COMPLIANCE ALTERNATIVES

City of Santa Monica Fee Schedule Effective July 1, 2012

TABLE 3A BUILDING PERMIT AND PLAN REVIEW FEES

Comprehensive Inspection Agency (CIA) RESIDENTIAL & COMMERCIAL FEE SCHEDULE

First Published in the Wichita Eagle on November 9, 2010 CLEAN 11/02/2010 ORDINANCE NO

January 1, 2014 Mandatory Effective Date

BULLETIN: Subchapter 4 Retrofit Requirements for Nightclubs

Chapter 50 FIRE PREVENTION AND PROTECTION*

Open Burning Permit Program Reference Manual

Richmond County Building Inspections

2018 City of Hillsboro Fee Schedule

BOARD OF SUPERVISORS HEARINGS Inter-municipal transfer of liquor license $1,000 Conditional Use

Transcription:

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2016, EDITION TABLE OF CONTENTS BUILDING FEE CALCULATION 2 BUILDING FEES HAMILTON COUNTY BUILDING CODE (1-2 DWELLING UNITS) 2 OHIO BUILDING CODE 3 FIRE SUPPRESSION SYSTEMS 3 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) 4 TYPE OF CONSTRUCTION FACTOR 4 HAMILTON COUNTY ADMINISTRATIVE FEES 5 HAMILTON COUNTY PENALTY FEES 5

BUILDING FEE CALCULATION Fees for permits, inspections, certificates shall be paid to the Building Official as set forth herein. This Fee Schedule shall become effective January 1, 2009, as adopted by the Hamilton County Board of County Commissioners pursuant to Sections 307.37 ORC. To calculate a fee using a Permit Fee Multiplier, you need the building gross area (total of all floors), type of construction (page 3) and the permit fee multiplier. FORMULA A: Building Permit and HVAC application combined Permit Fee = Gross Area X 108.9 X Construction X Multiplier X 1.25 = FORMULA B: Building Permit Only (no HVAC) Permit Fee = Gross Area X 108.9 X Construction X Multiplier = FORMULA C: HVAC Permit Only (no building) Permit Fee = Gross Area X 108.9 X Construction X Multiplier X.25 = FORMULA D: One and Two and Three Family Residential Building Permit and HVAC application combined Permit Fee = Building Gross Area X $.22 (Building Gross Area includes occupied garage, basement, finished or unfinished) MINIMUM PERMIT USE/TYPE EACH FRONT FEE MULTIPLIER CO/CC 1 st 30 DAYS REVISION BUILDINGS AND STRUCTURES REGULATED BY THE HCBC - 1-2-3 DWELLING UNITS BUILDINGS AND STRUCTURES REGULATED BY THE HCBC & RCO (ADD OBBS ASSESSMENT FEE - 1%) 1. New Dwellings (Formula D) -- $298 $298 -- $ 44 $112 $112 2. Additions (Formula D) -- $298 $298 -- $ 44 $112 $112 (Includes ductwork only) (To add or replace HVAC units, add fees from line 6) 3. Industrialized Dwellings (Includes all HVAC) $259 $298 -- -- $ 44 $112 $112 4. Alterations and Fire Repair $101 ea. $200 $200 -- $ 44 $112 $112 (To add or replace HVAC units, floor add fees from line 6) (Total loss by fire or natural disaster reviewed as New Dwelling) 5. Accessory Structures (over 200 sf) $200 $244 -- -- $ 44 $112 $112 6. Mechanical Additions & Replacements A. Heating or air conditioning $ 74 $ 98 -- -- $ 24 -- -- B. Combined (includes ductwork) $141 $165 -- -- $ 24 -- -- 7. Decks and Ramps without Roofs $151 $195 -- -- $ 44 $112 $112 (Attached or Detached) 8. Partial Permits (when granted) $200 $224 -- -- $ 24 -- -- 9. Moving $200 $224 -- -- $ 24 -- -- 10. Pools A. Above Ground $122 $166 -- -- $ 44 $112 $112 B. In-Ground $298 $342 -- -- $ 44 $112 $112 11. Retaining Walls (up to 300 ft.) $5.91/lf $101 $101 -- $ 24 -- $112 (301 ft. and above) $3.01/lf 12. Towers $101 $125 -- -- $ 24 $112 13. Wrecking $44/1000 sf TOTAL $ 65 -- $ 24 -- 2

MINIMUM PERMIT USE/TYPE EACH FRONT FEE MULTIPLIER CO/CC 1 st 30 DAYS REVISION BUILDINGS AND STRUCTURES REGULATED BY THE OBC (ADD OBBS ASSESSMENT FEE - 3%) 1. New Buildings -- $495 $495.0019 $143 $224 $224 2. Additions -- $495 $495.0019 $143 $224 $224 3. Industrialized (includes all HVAC) $259 $402 -- -- $143 $224 $224 4. Alterations and Fire Repair A. Entire building, floor, fire -- $495 $495.0043 $143 $224 $224 repair alterations B. Minor Alterations (as determined $359 $495 $495 -- $143 $224 $224 by the Building Official) C. Change of Use (No building or mechanical work included) $49 $637 -- -- $143 -- $224 D. Minor Alterations and Change of Use (as determined by the Building Official) sq.ft. over $495 $495 $495.0043 $143 $224 $224 10,000 shall be calculated at 10,000 sq. ft. 5. Partial Permits (conditional permits) A. Footing and foundation $396 $420 -- -- $ 24 -- $224 B. Shell (Formula B) -- $495 $495.0019 $ 24 -- $224 C. Interior Build-out of Shell -- $495 $495.0019 $143 $224 $224 6. Utility/Miscellaneous Structure -- $343 $200.0019 $143 $224 $224 7. Awnings, Canopies and Marquees A. Light Construction $101 $125 -- -- $ 24 -- $112 B. Heavy Construction $200 $343 -- -- $143 $224 $112 8. Decks and Ramps without Roofs $222 $366 -- -- $143 $224 $112 (Attached or detached 9. Kitchen Exhaust Hoods $53.00/lf $200 $200 -- $ 24 -- $112 10. Membranes -- $298 $436.0019 $143 $224 $224 11. Moving $200 $224 -- -- $ 24 -- -- 12. Pools $394 $537 -- -- $143 $224 $112 13. Re-Roofing $.041/sf TOTAL $279 -- $ 24 -- -- 14. Retaining Walls and Monuments $ 5.91/lf $101 $101 -- $ 24 -- $112 (301 ft. and above) $ 3.01/lf 15. Signs A. Permanent Ground Supported $200 $224 -- -- $ 24 -- $112 (over 3 sf B. Wall, Projecting and Roof $ 81 $105 -- -- $ 24 -- -- (over 22 sf) C. Single Sign Face Change $ 81 $102 -- -- $ 24 -- -- (Multiple Face Changes on $ 24 ea. add=l. same site) 16. Spray Booths $162 $305 -- -- $143 -- $112 17. Temporary Structures - under 180 $101 $101 $101 -- $143 -- B days (See Section 624.0) $ 24 ea. additional 18. Tents $101 $101 $101 -- $143 -- -- $ 24 ea. additional 19. Wrecking $44/1000 sf TOTAL $ 65 -- $ 24 -- -- 20. Gas Line (per meter) $ 81 $105 -- -- $ 24 -- $112 21. Other Building Service Piping $ 81 $105 -- $ 24 $112 (refrigeration lines) FIRE PROTECTION SYSTEMS, Regulated by the OBC (Add OBBS Assessment Fee) 1. Inside suppression work-including limited area A. New $.062/sf $206 $182 -- $ 24 -- $112 B. Alteration (arm-overs only) $.01/sf $206 $182 -- $ 24 -- $112 2. Outside Fire Line Work $180 $206 -- -- $ 24 -- $112 3. Gravity and Pressure Tanks $101 $125 -- -- $ 24 -- $112 4. Fire Pumps $101 $125 -- -- $ 24 -- $112 5. Standpipes - House or FD hose system $44/story/standpipe $224 $200 -- $ 24 -- $112 3

MINIMUM PERMIT USE/TYPE EACH FRONT FEE MULTIPLIER CO/CC 1 ST 30 DAYS REVISION FIRE PROTECTION SYSTEMS, Regulated by the OBC (ADD OBBS Assessment Fee - 3%) 6. Hoods - Suppression System Only $101 $125 -- -- $ 24 -- $112 7. Fire Alarms A. New (Use Groups E, I and R) $.02 per sf $322 $298 -- $ 24 -- $112 (All other Use Groups) $.0147 per sf $322 $298 -- $ 24 -- $112 B. Alterations (Use Groups E, I and R) $.0147 per sf $322 $298 -- $ 24 -- $112 (All other Use Groups) $.0051 per sf $322 $298 -- $ 24 -- $112 HEATING, VENTILATION AND AIR CONDITIONING, REGULATED BY THE OBC (Add OBBS Assessment Fee 3%) 1. HVAC Equipment Replacement Only (Single or Combined Unit) A. Includes Ductwork $200 $224 -- -- $ 24 -- $112 B. Without Ductwork, Unit Only $143 $167 -- -- $ 24 -- -- C. Ductwork Only $143 $167 -- -- $ 24 -- -- 2. New/Additions/Alterations* -- $224 $200.0019 $ 24 -- $112 (Formula C) 3. Alterations to Buildings** -- $224 $200.005 $ 24 -- $112 (Formula C) 4. HVAC work related to permits using $143 $224 $200.005 $ 24 _ $112 Calculation as per 4.D (Formula C); Sq. ft. over 10,000 shall be calculated at 10,000 sq ft * When building permit work necessitates mechanical work. ** When a new mechanical system is installed in an existing building as regulated by OMC. TYPE OF CONSTRUCTION FACTOR * USE GROUP 1A 1B 2A 2B 3A 3B 4 5A 5B A-1 Assembly, theaters 1.78 1.73 1.69 1.60 1.51 1.50 1.56 1.40 1.36 A-2 Assembly, nightclubs, 1.27 1.23 1.20 1.13 1.05 1.05 1.09 0.96 0.93 restaurants, bars, banquet halls A-3 Assembly, churches, general, 1.27 1.23 1.20 1.13 1.05 1.05 1.09 0.96 0.93 community halls, libraries, museums A-4/A-5 Assembly, arenas 1.25 1.22 1.17 1.11 1.03 1.03 1.08 0.93 0.91 B Business 1.20 1.15 1.11 1.04 0.93 0.93 1.00 0.82 0.79 E Educational 1.28 1.23 1.20 1.13 1.04 1.01 1.08 0.91 0.88 F-1 Factory and industrial, moderate hazard 0.76 0.73 0.68 0.64 0.55 0.57 0.62 0.47 0.45 F-2 Factory and industrial, low hazard 0.75 0.71 0.68 0.63 0.55 0.55 0.61 0.47 0.43 H-1 High Hazard, explosives 0.73 0.70 0.66 0.61 0.54 0.54 0.59 0.45 N.P. H-2 -H-4 High Hazard 0.73 0.70 0.66 0.61 0.54 0.54 0.59 0.45 0.42 H-5 HPM 1.20 1.15 1.11 1.04 0.93 0.93 1.00 0.82 0.79 I-1 Institutional, supervised environment 1.22 1.17 1.14 1.07 0.99 0.99 1.07 0.90 0.87 I-2 Institutional, incapacitated 1.77 1.73 1.69 1.62 1.50 N.P. 1.57 1.39 N.P. I-3 Institutional, restrained 1.39 1.34 1.30 1.23 1.13 1.11 1.19 1.02 0.96 I-4 Institutional, day care facilities 1.22 1.17 1.14 1.07 0.99 0.99 1.07 0.90 0.87 M Mercantile 0.97 0.93 0.88 0.83 0.74 0.75 0.79 0.65 0.63 R-1 Residential, hotels/motels 1.32 1.28 1.25 1.18 1.10 1.09 1.17 1.01 0.97 R-2 Residential, multiple family 1.11 1.06 1.03 0.97 0.89 0.88 0.96 0.80 0.76 R-3 & IRC Residential, one- and two-family 0.92 0.89 0.86 0.82 0.78 0.78 0.81 0.73 0.68 R-4 Residential, care/assisted living facilities 1.22 1.17 1.14 1.07 0.99 0.99 1.07 0.90 0.87 S-1 Storage, moderate hazard 0.72 0.68 0.63 0.60 0.51 0.52 0.58 0.43 0.41 S-2 Storage, low hazard 0.71 0.67 0.63 0.59 0.51 0.51 0.56 0.43 0.39 U Utility/Miscellaneous 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 4

HAMILTON COUNTY ADMINISTRATIVE FEES 1. Certificate of Occupancy (CO) where required A. Buildings and structures regulated by the HCBC $ 44 B. Buildings and structures regulated by the OBBC $141 C. Certificate of Completion of Permit (CC) - for all permits where a CO is not required $ 24 2. Certificate of Temporary Occupancy (TCO) A. Buildings and structures regulated by the HCBC $112-1 st 30 days + $58 ea addn l 30 days If addn 1 TCO is required $224 1 st 30 days + $112 ea addn l 30 days B. Buildings and structures regulated by the OBC $224-1 st 30 days + $112 ea addn l 30 days If addn 1 TCO is required $445 1st 30 days + $224 ea addn l 30 days C. Occupying w/o TCO, penalty fee = Residential-$224 Commercial-$445 to be paid in addition to TCO fee. D. Occupying w/o a Certificate of Occupancy Residential = $224 Commercial = $445 3. Refund of Permit Fee (Section HC.A108.4). If granted, shall be in the amount of half the entire permit fee, after deducting the Up-Front Fee and the Zoning Certificate Fee. 4. Time Extensions (Section HC.A105.6) each $100 5. Unspecified Permit Fee - for any permit type, not specifically listed in this Fee Schedule, the fee shall be calculated to the most similar permit type, use group and type of construction to be determined at the discretion of the Building Official. 6. Scanning fee for Permit Applications reviewed under OBC for paper documents submitted without a digital copy in an approved format Documents up to 82 x 14 (including Specs.) $ 2.02/side Documents larger than 82 x 11 (B) size $ 5.91/sheet 7. Field Inspection and Processing Fee (non building permit related) Commercial $143 Residential $112 8. After Hours Inspection (OBC Permits) $136 per hour Minimum fee $533 to be paid at time of scheduling inspection 9. Plan Review Fee - Accessed at 3 rd review for each hour thereafter Residential $112 hr (no fractions thereof - rounded up) Commercial $224 hr (no fractions thereof - rounded up) Hourly time to include Plan Examiner, Supervisors and Department Head time involved. 10. Board of Building Appeals Residential $170 Commercial $334 11. Fences over 6 in height requiring a permit Commercial $143 Residential $112 4. Re-inspection Fee - Not Ready and Failed Inspections shall result in a Re-inspection Fee $136 5. Violations Penalties (Section HC.A113) -Violations issued under the Code shall be punishable by a fine of not more than $300.00 for each offense as provided in Ohio Revised Code Section 307.37 and 307.99(C). -Violations issued for offenses to ORC Chapters 3781 and 3791 shall not be more than $1000.00 -Each day that any such violation or failure continues shall be deemed a separate offense. HAMILTON COUNTY PENALTY FEES 1. Starting Without a Permit - (See Section HC.A105.1.1) - Permit fee + 200% penalty fee 2. Rescinding a Revoked Permit Fee - (Section HC.A110.6) - $298.00 or original fee, whichever is less 3. Missed Inspection Fee - Failure to schedule a Acalled-for@ inspection before proceeding to cover the work shall result in a Missed Inspection Fee $224 5