AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

Similar documents
Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Analyzing Air Handling Unit Efficiency. Michael Rosenberg, PE, CEM

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( )

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Digital Precise Air Control - DPAC

To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE. CC: Tim Ellingson, CEE. Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014.

Civil Engineering Building

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

Reference Guide for Microprocessor Controller

DIGI-VAV APPLICATIONS

Verasys System Operation Overview Technical Bulletin

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

Your Home. Jacco & Assoc.

York 25-Ton VAV Rooftop Unit

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma


Reference Guide for Microprocessor Controller

DX-9100 Applications from Engineering Services

SEQUENCE OF OPERATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Continuous Commissioning of Commercial Kitchen and Dining Facilities Case Study

Reference Guide for Microprocessor Controller

1.0 Digital Controller

ASHRAE Guideline 36 Advanced HVAC Control Sequences

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

Feature Summary. I. System

BAS Point Trend Data Guidance

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

IAQ: Re-tuning Commercial Buildings

AHU Air Handling Unit Fundamentals. j.ilangumaran

American University Design Standards

Continuous Commissioning Report

TEC Controller VAV 0-10V Fan Control with Hot Water Heat, Application Application Note Building Technologies

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER

Your Home. Jacco & Assoc. Fan on with call for heating or cooling Heating on with call from space thermostat Stage as

INSTALLATION INSTRUCTIONS MODELS RXRD-01MDDAM3 VERTICAL AIRFLOW ECONOMIZERS

UNT Applications. Using UNT Applications...3. Introduction Key Concepts UNT Controller Applications Fan Coil Units...

MicroTech Self-Contained Air Conditioning System

Physical Plant Complex

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

McQuay BACnet Solution: Microtech II Self-contained Unit Controller with Discharge Air Control (DAC)

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

COMMERICAL SPLIT SYSTEM KITS AND ACCESSORIES /2012 Supersedes

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

Auburn University Basketball Arena:

Job Name Control Systems Description Date

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

Product Data. Features/Benefits. AirManager Control. 33AM Comfort System

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

An HVAC Audit of the Canberra Institute of Technology

Welsh Commissioning Group, Inc.

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

Implementation of the Laboratory Air Handling Unit Systems (LAHU)

Terminal. Las Vegas, NV. Technical

Harrington Tower Building

ExactLogic BACnet Communicating Thermostat EXL01627 Sequence Datasheet Fan Coil with Modulating Fan and Heat or Cool Floating Heating and Cooling

BACnet PTEC Controller VAV 0 to 10V Series Fan and 3- Stage Electric Heat, Application 6657

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Computing Services Center

TEC210x-2 Series Networked Thermostats

Point-to-Point Verification of Monitored Sensors at Reynolds Army Clinic and Hospital Final Report

1.0 Digital Controller

TEC3000 Series Field-Selectable BACnet MS/TP or N2 Networked Thermostat Controllers

Application of Direct Digital Temperature Control Systems for Maximum System Efficiency on VAV Systems

Table of Contents. W2W Open

MicroTech II Vertical Self-Contained Unit Controller

L SERIES UNITS 505,191M. 4/2006 Supersedes 504,908M

Technical Assignment 3 11/15/04. Executive Summary

Advanced Installation and Configuration Instructions

Evaporative Cooling in a Hot-Dry Climate

Displacement Ventilation in Classrooms

Rooftop Unit, Heat Pump and Indoor Air Quality Application Guide

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

I/O ZONE 560/583 USERS GUIDE

Product Data. Features/Benefits. 33CS Carrier Comfort System Variable Volume and Temperature (VVT )

ASHRAE JOURNAL ON REHEAT

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP 100% OUTSIDE AIR

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

Energy Recovery Ventilators

M2 Series Startup Form

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

Small Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment.

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

ExactLogic BACnet Communicating Thermostat EXL01622 Sequence Datasheet

L SERIES UNITS 504,908M. 10/2004 Supersedes 9/2004

Metasys Integrator TITUS Application

MicroTech Rooftop/RMC

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

Transcription:

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1

AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The operations shown were typical of six 35,000 cfm AHUs that served an office building located in the Midwest. 2. The charts were part of a retro-commissioning investigation that resulted in extensive sequencing modifications at a low cost and high savings. 3. Trending multiple processes and evaluating the interactive impacts allows for integrated approach toward retrocommissioning 4. The charts indicate non optimized economizer control, non operative demand control ventilation control of minimum outside air dampers, excessive pre-heat load due to non optimized mixed air control of mixed air dampers. 5. The charts indicate how each deficiency has a related impact on other control processed such as elevated ventilation rates during cold outside air temperatures due to inefficient control of outside air dampers resulting in increased return fan energy for building relief and excessive heating loads.

AIR HANDLING UNIT SEQUENCE OF OPERATIONS Scheduled occupancy control that starts AHUs at 6:00 a.m. and shut off at 5:00 p.m. Supply fan VFD is controlled to maintain a fixed static pressure setpoint of 2.0 inches W.C. The supply fan monitors supply fan airflow CFM. Return fan VFD is controlled to maintain a CFM offset value from the supply fan airflow CFM. The return fan monitors return fan airflow CFM. Economizer control has points for both Dry Bulb and enthalpy based control. The Dry Bulb Economizer is enabled based on a fixed outside air setpoint of 55ºF (adj.) The Enthalpy Economizer is enabled based on a comparison between the return air and outside air enthalpy. Chilled water valve controls to maintain a fixed discharge air temperature setpoint of 58-60 deg. F (adj.). The chilled water valve is locked out at an outside air temperature setpoint of 50 deg. F. Two sets of outside air dampers; minimum outside air damper and mixed air damper. The air handler mixed air damper controls to maintain a fixed mixed air temperature of 55 deg. F. The air handler minimum outside air damper controls to maintain a CO2 setpoint of 1,000 ppm. Preheat control valve is commanded to a 100% open position at an outside air temperature enable of 45ºF (adj.). Relief air damper command tracks the mixed air damper command. Each AHU has an associated building/ space static pressure sensor. It is undetermined whether the return air fan or relief air damper has any control to maintain building static. The morning warm-up is enabled based on an Outside Air Temperature setpoint of 40ºF (adj.). 3

RETRO-CX MEASURE #1 OPTIMIZE ECONOMIZATION OPERATIONS Observations: When TEMP-ECON is ON and ENTH-ECON is OFF, the mixed air dampers modulate to maintain mixed air temperature setpoint. When TEMP-ECON is OFF and the ENTH-ECON is ON, the mixed air damper command is closed. Enthalpy control capability is not active. Economization control is dry bulb only Economization is only active from a 55ºF outside air temperature and less. Proposed Modification: Modify economizer control to use the enthalpy comparison for economization. Modify the Dry Bulb control to be a comparison between RAT and OAT (less 2ºF). Raise the economizers dry bulb setpoint from 55ºF outside air temperature to 67ºF. 4

RETRO-CX MEASURE #1 OPTIMIZE ECONOMIZATION OPERATIONS 120 110 Mixed Note: air temperature Mixed air temperature control controls is to maintain to 55ºF 55 F while RAT RATY averages averages 73 F 73ºF and and DAT is generally 9ºF 9 F higher higher than mixed than air. MAT. 200% 180% Air Temperatures, deg. F 100 90 80 70 60 Mixed air 50 Note: damper Mixed air opens damper to opens 60% up to to maintain 60% to 40 maintain fixed fixed 55 F 55ºF MAT MAT setpoint. setpoint. Simultaneously 30 the Simultaneously minimum OAD is 100% the open. minimum Ambient OA 20 temperatures OAD is were open generally 100%. less Ambient than 20ºF 10 during OA period temps of analysis. were less than 20 F. 0 1/27/2010 12:00 1/27/2010 15:00 1/27/2010 18:00 1/27/2010 21:00 1/28/2010 0:00 1/28/2010 3:00 1/28/2010 6:00 1/28/2010 9:00 1/28/2010 12:00 1/28/2010 15:00 1/28/2010 18:00 1/28/2010 21:00 1/29/2010 0:00 1/29/2010 3:00 1/29/2010 6:00 1/29/2010 9:00 DA-T.Trend (deg F) MA-T (deg F) RA-T (deg F) MINOA-Damper (% open) MADamper (% open) 160% 140% 120% 100% 80% 60% 40% 20% 0% Mixed Air/ Minimum OAD Position ion 5 Prepared by Critical Systems Testing, Inc.

RETRO-CX MEASURE #2 MODULATING PRE-HEAT CONTROL Observations: The preheat control valve is enabled at an outside air temperature setpoint of 50ºF. At the outside air enable temperature condition, the pre-heat control valve is commanded to a 100% open position. Taking control of the pre-heat valve will provide finer temperature control capability. Proposed Modification: Modify control sequencing to reset the pre-heat air temperature setpoint to maintain 1 deg. F below the discharge air setpoint. Modify the control logic to provide PID control of the pre-heat control valve. Reduce the pre-heat enable setpoint to 45ºF. 6

RETRO-CX MEASURE #2 MODULATING PRE-HEAT CONTROL Air Temperatures, deg. F 90 85 80 75 70 65 60 55 50 45 40 35 30 1/27/2010 12:00 1/27/2010 15:00 Control of AHU provides a pre-heat enable setpoint of 45 F that commands open the Note: Control of unit has a pre-heat enable setpoint of 45ºF that appears to open the pre-heat valve 100% and pre-heat valve 100% and heats the mixed air approximately 10 F. heats mixed air temp by about 5-10ºF. Any method to reduce the use of outside air will reduce heating loads. 1/27/2010 18:00 1/27/2010 21:00 Fixed delta T between MAT and DAT 100% pre-heat command below 50 deg. F outside air temperature 1/28/2010 0:00 1/28/2010 3:00 1/28/2010 6:00 1/28/2010 9:00 1/28/2010 12:00 1/28/2010 15:00 1/28/2010 18:00 1/28/2010 21:00 1/29/2010 0:00 1/29/2010 3:00 1/29/2010 6:00 1/29/2010 9:00 400% 375% 350% 325% 300% 275% 250% 225% 200% 175% 150% 125% 100% 75% 50% 25% 0% Pre-heat valve position DA-T.Trend (deg F) MA-T (deg F) PreHeat-Temp (deg F) Pre-Heat-Valve (% open) 7

200% 180% 160% Prepared by Critical Systems Testing, Inc. 140% 120% 100% Pre-heat valve position RETRO-CX MEASURE #2 MODULATING PRE-HEAT CONTROL 90 80 70 60 50 Fixed delta T between MAT and DAT 8 80% 60% 40% 20% ratures, deg. F 40 30 Air Temper 20 10 100% pre-heat command below 50 deg. F outside air temperature 0 0% 1/27/2010 10:48 1/27/2010 15:36 1/27/2010 20:24 1/28/2010 1:12 1/28/2010 6:00 1/28/2010 10:48 1/28/2010 15:36 1/28/2010 20:24 1/29/2010 1:12 1/29/2010 6:00 1/29/2010 10:48 DA-T.Trend (deg F) MA-T (deg F) PreHeat-Temp (deg F) Pre-Heat-Valve (% open)

RETRO-CX MEASURE #3 MIXED AIR TEMPERATURE RESET Observations: Mixed air temperature controls to maintain 55ºF while RAT averages 73ºF and DAT is generally 13ºF higher than mixed air. Mixed air damper modulates to maintain a fixed 55ºF mixed air temperature setpoint Minimum OAD is simultaneously open to a 100% During the trending period the ambient outside air temperatures were generally less than 20ºF. The fixed mixed air temperature is intended to supplement economizer control. A fixed mixed air temperature places an excessive heating load and unnecessary steam usage on the pre-heat coil as it gets colder outside. As is gets cooler outside there needs to be a means to exit economization. With100% a pre-heat command on the pre-heat coil resulting in a 64ºF-66ºF discharge air temperature through the current inefficient pre-heat control, then it is assumed that temperature is adequate for discharge air temperature delivery. Proposed Modification: Provide a mixed air reset strategy to set the mixed air setpoint to be 1ºF less than the discharge air temperature. The modified mixed air temperature setpoint should allowing the mixed air damper to control and track to the discharge air temperature along with a modified discharge air reset control strategy. 9 This control strategy will force the mixed air damper control to a more closed position during colder ambient conditions and reduce air handler heating loads.

Prepared by Critical Systems Testing, Inc. Mixed Air Damper Position RETRO-CX MEASURE #3 MIXED AIR TEMPERATURE RESET 200% 90 10 180% 80 160% 70 140% 120% 100% 80% 60% 40% 60 50 40 30 20 Note: Mixed air damper opens up to 60% to maintain fixed 55ºF MAT setpoint. Mixed air damper opens to 60% to maintain fixed 55 F MAT setpoint. Air Temperatures, deg. F 20% 10 0% 0 1/27/2010 12:00 1/27/2010 15:00 1/27/2010 18:00 1/27/2010 21:00 1/28/2010 0:00 1/28/2010 3:00 1/28/2010 6:00 1/28/2010 9:00 1/28/2010 12:00 1/28/2010 15:00 1/28/2010 18:00 1/28/2010 21:00 1/29/2010 0:00 1/29/2010 3:00 1/29/2010 6:00 1/29/2010 9:00 DA-T.Trend (deg F) MA-T (deg F) RA-T (deg F) MINOA-Damper (% open) MADamper (% open)

RETRO-CX MEASURE #4 CO2 CONTROL ON MINIMUM OAD Observations: Air handling unit(s) each have return air mounted CO 2 sensors. Trend logs and random checks show CO2 in the order of 500-600 ppm (Occupied). Unoccupied CO 2 level of approximately 420 ppm. Metasys has a 1,000 ppm CO2 setpoint. During all operating conditions, the minimum outside air damper remains 100% open. Based on the trend logs and visual observations, the demand control sequence of operation is inactive. Reductions in ventilation airflow delivery through effective CO 2 control will facilitate decreased cooling and heating loads during non-economization and mixed air modes of operation. Proposed Modification: Provide a functioning CO 2 control sequence that will modulate the minimum outside air damper position in order to maintain CO 2 setpoint during non-economizer modes of operation. 11

RETRO-CX MEASURE #4 CO2 CONTROL ON MINIMUM OAD 700 600 The CO2 setpoint is 1,000 ppm. Trend log demonstrates a maximum level of 580 ppm during occupied hours with a minimum OA damper continuously. Coupled with inefficient mixed Note: CO2 setpoint is 1,000 ppm. Maximum level of CO2 is 580 ppm with minimum OAD 100% continuously. Couple air control the impact is excessive pre-heat energy to pre-heat cold air, excessive cooling with inefficient mixed air control, this results in excessive heating energy on outside air during heating and cooling during the summer months and excessive fan energy to provide building pressure relief. season. 200% 180% 160% Carbon Dioxide, ppm 500 400 300 200 100 0 1/27/2010 12:00 1/27/2010 15:00 1/27/2010 18:00 1/27/2010 21:00 1/28/2010 0:00 1/28/2010 3:00 1/28/2010 6:00 1/28/2010 9:00 RA-CO2 (ppm) 1/28/2010 12:00 1/28/2010 15:00 1/28/2010 18:00 1/28/2010 21:00 1/29/2010 0:00 MINOA-Damper (% open) 1/29/2010 3:00 1/29/2010 6:00 1/29/2010 9:00 140% 120% 100% 80% 60% 40% 20% 0% Minimum OAD Position 12

IMPACT OF EXCESSIVE OUTSIDE AIR ON RELIEF FAN SPEED AND POWER CONSUMPTION Observations: Increased in outside air through the mixed air dampers has a direct correlation to relief fan speed and power consumption. Modified mixed air control as described in in Retro-Cx Measures #3 and #4. 27.5 Return air fan power (kw) increases as the mixed air damper position modulates to a more open position in order to relieve space pressure. 200% 25 Note: Return air fan kw increases as the mixed air damper position modulates to a more open position in order to relieve space static pressure. Prepared by Critical Systems Testing, Inc. 180% 22.5 160% 20 140% 17.5 120% Return fan kw 15 100% 12.5 80% 10 60% 7.5 5 40% 2.5 20% 0 0% Mixed/ Relief air damper position Return fan VFD speed command 1/29/2010 9:00 1/29/2010 6:00 1/29/2010 3:00 1/29/2010 0:00 1/28/2010 21:00 1/28/2010 18:00 1/28/2010 15:00 1/28/2010 12:00 1/28/2010 9:00 1/28/2010 6:00 1/28/2010 3:00 1/28/2010 0:00 1/27/2010 21:00 1/27/2010 18:00 1/27/2010 15:00 1/27/2010 12:00 Relief-Damper (% open) RF-SPD (% Cmd) MADamper (% open) RFVFD.RF-KW 5 per. Mov. Avg. (RFVFD.RF-KW) 13

RETRO-CX MEASURE #5 DISCHARGE AIR TEMPERATURE RESET Observations: The discharge air temperature setpoint for the air handlers is a fixed 58ºF. During functional testing of the air handling units, it was noted that the chilled water valve closed and the pre-heat valve full open that the measured discharge air temperature was 64-66ºF. The sequence of operations locks out the chilled water valve based on outside air temperature. The objective should be to use the mixed air dampers more efficiently to maintain a mixed air/ discharge air temperature condition. Proposed Modification: Provide a discharge air temperature reset strategy based on outside air temperature or zone feedback Maintain the current chilled water valve lockout. The discharge air temperature reset is necessary for successful operation of the mixed air control strategy described in Observation 3. 14

RETRO-CX MEASURE #6 MODIFY VAV SETPOINT CONTROL Observations: Typical zone temperature Common Setpoint on the Johnson control interface is 72 F. with a deadband of 4 F, The zone thermostats are Johnson Control NS-BTN700x model temperature only wall mounted devices with a Warmer/Cooler adjustable dial that provides tenants with temperature override capability. All zones are provided the ability to adjust the Common Setpoint +/- 5.0 F. The Warm/Cool Adjust adds/subtracts the received local adjustment to the deadband built into the heating/cooling control as described above. If a local adjustment is made through the dial to set the warm/cool adjust parameter to the full -5.0 F swing; the maximum cooling setpoint will adjust to 69 F with an effective setpoint of 67 F placing an excessive cooling load on the system and forces the air handling unit to work harder to maintain duct static pressure. Proposed Modification: Objective should be to modify the override capability in the zones to prevent wide swings in VAV operations and uncontrollable air handler fan speeds. Alternate A Develop a group of 2-3 zone based Warmer/Cooler Adjust limits for each of the zone types. Interior zones might be provided with the maximum flexibility of a Warm/Cool Adjust of 2 F. Exterior and conference spaces might be provided with and limited to 1 F adjustments to temperature. Corridors and common areas might be provided with no adjustment ability. Alternate B Remove all override capabilities within the building. Track complaints and provide 1-2 F increments on Warm/Cool Adjust based on those complaints to facilitate limited, direct control by the tenants. Establish rules for the maximum allowable Warm/Cool Adjust parameters. 15

RETRO-CX MEASURE #7 STATIC PRESSURE RESET Observations: During cold outside air temperatures VFD speeds on several air handling units operate in the range of 90% to 100%. Typical VAV operation is expected to modulate to a minimum position during moderate and heating modes of operation with reduced supply air fan speed and power consumption. Frequent period of supply fan speed greater than 90% and for a period at 100% speed are observed. High motor power consumption at higher supply and return fan operating speeds/ flow rates. The return fan is controlled to maintain a fixed airflow differential from the supply fan. Any means implemented to reduce supply fan speeds and motor usage will have a correlating reduction in return fan speeds and power usage. Proposed Modification: Have a T&B technician review the set-up and establish an appropriate static pressure setpoint. Verify sensor locations and move down to 2/3 down longest duct and relocate, if necessary. Implement supply static pressure reset function based on zone VAV conditions. Balancing system air flow requirements to match the zone level airflow requirements should be the objective of an efficient air delivery system. Static pressure reset will help facilitate this objective. 16

Prepared by Critical Systems Testing, Inc. RETRO-CX MEASURE #7 STATIC PRESSURE RESET 3 100% 2.5 90% 2 80% 1.5 70% SF VFD Speed Command 60% 50% 40% 30% 20% 10% 17 1/29/2010 10:48 1/29/2010 6:00 1/29/2010 1:12 Supply fan Supply fan controls to maintain 2.0 inch W.C. maintain 2.0 fixed stratic pressure inch W.C. fixed setpoint. static pressure setpoint. 1 0.5 0 Static Pressure (inches W.C.) 0% 1/27/2010 10:48 1/27/2010 15:36 1/27/2010 20:24 1/28/2010 1:12 1/28/2010 6:00 1/28/2010 10:48 1/28/2010 15:36 1/28/2010 20:24 DA-SP (in wc) SF-O. (% Cmd)

RETRO-CX MEASURE #7 STATIC PRESSURE RESET 45 40 35 Supply fan kw 30 25 20 15 10 5 0 10,000 12,000 14,000 High relief fan VFD speed and kw due to inefficient mixed air damper control and elevated space static pressure. 16,000 18,000 20,000 22,000 24,000 High supply fan VFD speed and kw due to high static pressure setpoint and T&B issues. 26,000 28,000 30,000 SFVFD.SF-KW RFVFD.RF-KW Poly. (RFVFD.RF-KW) Poly. (SFVFD.SF-KW) 18

RETRO-CX MEASURE #7 STATIC PRESSURE RESET 45 Supply fan kw 40 35 30 25 20 15 10 5 0 10,000 12,000 14,000 High relief fan VFD speed and kw due to inefficient mixed air damper control and elevated space static pressure. 16,000 18,000 20,000 22,000 24,000 High supply fan VFD speed and kw due to high static pressure setpoint and T&B issues. 26,000 28,000 30,000 SFVFD.SF-KW RFVFD.RF-KW Poly. (RFVFD.RF-KW) Poly. (SFVFD.SF-KW) 19

RETRO-CX MEASURE #8 TEST & BALANCE Observations: Supply fan airflow for AHU-3W was measuring 29,980 cfm to maintain 2.0 inches. Fixed offset value is -6740 cfm establishing a return airflow setpoint of 23240 cfm. Actual return fan airflow at the DDC was measuring 10,870 cfm (12,370 cfm differential). Upper Figure shows the operating characteristic for the supply and return fan with supply fan operating in the area of 70% speed and return fan operating at 100% speed. Lower Figure shows the fan kw versus CFM. The capacity of the return fan is limited to provide any additional airflow to maintain the required offset between the supply and return fan. Proposed Modification: The issues observed with airflows may have to do with the balance and setup of the fan(s) and/or sheave settings between the fan and the motor. In addition, to the balancing requirements associated with RCX #2, it would be of value to rebalance the air handling units along with the sequencing changes. 20

INTEGRATED IMPACT OF RETRO-CX MEASURES #3, #4 AND #7 45 40 High supply Excessive fan fan VFD speeds speed and during cold outside air kw due to high static pressure ambient conditions. setpoint and T&B issues. 35 Supply fan kw 30 25 20 15 10 5 0 20% Modified fan power due to static pressure reset during heating season. 30% Modified discharge air static pressure reset operating range during heating season. Modified mixed air reset control and implementation of proper CO2 control. Modified mixed air reset control and implementation of proper CO2 control. 40% 50% 60% SFVFD.SF-KW RFVFD.RF-KW Poly. (RFVFD.RF-KW) Poly. (SFVFD.SF-KW) 70% 80% High relief fan VFD speed High VFD and speed kw and due kw to due inefficient to mixed air damper control and air damper control higher space static. and elevated space static pressure. 90% 100% 21

RETRO-CX MEASURE #9 CALIBRATE OUTSIDE AIR TEMPERATURE SENSOR Observations: The outside air temperature sensor is deviated from an independent measurement by 10 F. Chilled water valve lockout is controlled based on outside air temperature. Pre-heat control is controlled based on outside air temperature. Proposed Modification: Calibrate or replace outside air drybulb sensor in order to provide the proper feedback for chilled water valve lockout and pre-heat valve enable/ disable. 22

ECONOMICS OF RETRO-COMMISSIONING Retro-Commissioning Measure RCX #1 RCX #2 RCX #3 RCX #4 RCX #5 RCX #6 RCX #7 Optimize Economization Operations Modulating Pre- Heat Control Mixed Air Temperature Reset Control CO2 Control on Minimum OAD Discharge Air Temperature Reset Modify VAV Setpoint Control Static Pressure Reset RCX #8 Test & Balance of AHUs RCX #9 Outside air temperature sensor calibration Commissioning of RCX #10 systems Energy (kwh) Utility Savings Steam, MMBtu Chilled Water, ton-hr Electric ($) Cost Savings Steam ($) Chilled Water ($) Total ($) Payback - - 136,220 $ - $ - $ 13,030 $ 13,030 $ 7,500 0.6 years - 300 - $ - $ 3,279 $ - $ 3,279 $ 5,000 1.5 years - 280 - $ - $ 3,070 $ - $ 3,070 $ 5,000 1.6 years - 200 62,330 $ - $ 550 $ 1,050 $ 1,600 $ 5,000 3.1 years 75,000 - - $ 3,510 $ - $ - $ 3,510 $ 5,000 1.4 years Cost 75,000 100 5,000 $ 3,510 $ 1,090 $ 480 $ 5,080 $ 5,000 1.0 years 133,540 60 59,350 $ 6,240 $ 4,910 $ 5,330 $ 16,480 $ 5,000 0.3 years - - - $ - $ - $ - $ - $ 10,200 N/A - 100 25,000 $ - $ 1,093 $ 2,393 $ 3,486 $ 3,500 1.0 years - - - $ - $ - $ - $ - $ 16,250 N/A Total 283,540 1,040 287,900 $ 13,260 $ 13,992 $ 22,283 $ 49,535 $ 67,450 1.4 years 23

CONCLUSIONS & FINAL OBSERVATIONS 1. System operational or control deficiencies can have an integrated response on other system control sequences. 2. Understanding the overall process of control of all of the system sequence of operations provides an overall system corrective strategy. 3. All of the measures identified in this case study had the potential to provide $49,535 in savings at cost of $67,450, including re-sequencing, test & balance and commissioning verification for 1.4 year payback period. 4. Retro-Commissioning existing controls provides the best means for system performance enhancements with the best payback scenario. 5. Following all retro-commissioning measure implementation activities it is imperative that the system upgrades be properly commissioned. 24