Drain Cooler Water tempering device

Similar documents
SKR series Steam Humidifier Kit N (Patent Pending)

Electric Steam Humidifier SKE90/100/110/120 Series SKE-XL

SKR series Steam Humidifier Kit N (Patent Pending)

SKR series Steam Humidifier with SDU module (Patent Pending)

Installation and Operating Guide Document No Vacuum Chambers Copyright 2017 Terra Universal Inc. All rights reserved.

STEAM DISTRIBUTORS ASD / BSD / CSD. Installation Manual C

Steam Distribution. Installation Manual. Includes installation instructions for steam distributions ASD/BSD/CSD/RSD/SSD.

ELECTRONIC FAUCETS INSTRUCTION MANUAL. Toll Free: (800) Haul Road Wayne, NJ krowne.

USE AND CARE GUIDE FOR MODEL MEK1, MEK15. Express Cordless Kettle

READ AND SAVE THESE INSTRUCTIONS DRANE-KOOLER. Water Tempering Device. Installation, Operation, and Maintenance Manual

Blade Series Heat Exchanger Operation and Installation

Steam or HTHW to Steam Humidifier SKS Series

Modulating Controls. Principle of Operation

92831 TEL: (714) FAX:

MODEL 925W FEATURES: ELECTRICAL DATA: DIMENSIONS: SHIPPING INFORMATION: FOOD WARMING/ MERCHANDISING CABINET

CLIMAGUARD Air-to-Air Outdoor Heat Exchangers INSTRUCTION MANUAL. Rev. H 2015 Pentair Equipment Protection P/N

Owner s Manual PCS PRO

Quick-Start Operating Guide Document No Acrylic Vacuum Chambers Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

Hot Yoga Climate Tower

UEA BROADVIEW LODGE TERMS AND CONDITIONS Any variation to these standard terms and conditions must be agreed in writing with UEA Broadview Lodge. 1.

ELECTRICAL DATA: FEATURES: SHIPPING INFORMATION: FOOD WARMING/ MERCHANDISING CABINET. 15 Width 7 Width

EOS. Instruction Manual. 120V High Amperage Digital Humidity Controller. Part #

Model NT20e Installation Guide

GTS. User Manual. Gas-to-Steam Humidifier. Affix product label here.

Quick Start Guide. PWW Platinum Pet Fountain

A state-of-the-art humidifier improves indoor air quality, enhances a family's health and comfort while protecting valuable objects in a home!

PROOF BOX (All SD,DD, and TD 99 Models)

AIC Brazed Plate Heat Exchanger Operating and Instruction Manual

Installation and Operations Manual

PROAIR Water-Cooled Air Conditioner. CR43WC Model INSTRUCTION MANUAL

WHEATGRASS JUICER C O M M E R C I A L. INSTRUCTION MANUAL Model No

MODEL 620 ELECTRICAL DATA: FEATURES: DIMENSIONS: SHIPPING INFORMATION: AVAILABLE ACCESSORIES: CONVECTION OVEN 1/4 SIZE PAN

USER S OPERATING AND INSTRUCTION MANUAL

Users Manual. LAURUS Systems, Inc. - Ph: Fax:

THE BARCLAY HUGGER CEILING FAN INSTALLATION INSTRUCTIONS

MIGHTY PRO 1/4 HP CHILLER

OWNERS MANUAL For IN ROOM BREWING SYSTEM MODEL REFILLABLE CAPSULES K901. Includes: Installation Use & Care Servicing Instructions

Read and save these instructions! DRANE-KOOLER. Water tempering device Installation, operation and maintenance manual

Duct Mount. Installation Instructions

DBF 4XL Dryer Booster Fans

installation, operation & Maintenance manual Floor-mounted Induction units

State of the Art. Exceptional Reliability

Laundry Kit With flexi-neck faucet and storage cabinet

4000IS PROFESSIONAL IRONING SYSTEM INSTRUCTION MANUAL

Installation & Operation Manual Ice Cream Freezers

VX SERIES Wireless Thermostat with Occupancy Sensor

IAQ Series. Bosch IAQ Photo Catalytic Oxidizer (PCO) Residential Application. Installation Manual and Owner s Guide

Multi-Steam HDR* SKD-R Series Direct Steam Injection Humidifier with Integrated Re-Evaporator. Installation Instructions and User Manual

Operation, Maintenance and Installation Manual

LV-5 Direct Contact Low Voltage Detector and LV-5/K01 Kit including LV-PT Tester, Holster and Available Accessories

ELSTON 52 CEILING FAN

Tower Fan MODEL# EE-5607

Blue Air. Commercial Refrigeration Inc. Installation & Operation Manual Ice Cream Freezers

THE DAVENPORT CEILING FAN INSTALLATION INSTRUCTIONS

Inline Heater for Solvent or Gas. Installation and Operation Manual

Steam Humidifier. SK300 Series Installation Instructions and User Manual. SK300-ESL docx

POLAR TEMP FARM MORTALITY UNIT OPERATION MANUAL

Installation Manual. THM-0100 Setpoint Thermostat Version THM HBX Control Systems Inc.

2018 Canadian Price List

Instruction Manual for HX-DX and HX-DXHP Heat Exchangers 3 / 2017

Installation & Service Manual

Warranty MyControl Bathing System Signature Series

Desiccant / Pump Dehumidification System. Model Operating Manual

Wax Base Heater & Dispenser

A PROUD HERITAGE OF EXPERIENCE & QUALITY. Beverage Cooler VT-SC-1

SUTTON 52 CEILING FAN

Installation Instructions Model: EB Single-Lever Lavatory Faucet

Xaact Spot. Xaact Hot Spot

DUVAL 52 CEILING FAN MODELS #50201, Español p. 19 LISTED FOR DAMP LOCATION

OWNER S MANUAL. Installation Operation Maintenance. Saturn Equipment

Preventative Maintenance Plan Information PO Box 507 Located at 1009 N. 20 th St. Morehead City, NC Phone: (252) Fax: (252)

Installation and Maintenance Instructions

HANDY/STICK 2-WAY VACUUM INSTRUCTION MANUAL. For Authentic Monster Replacement Parts Call Model #: H055

TOUCHDOWN 48 CEILING FAN

REFRIGERATED DROP-INS (2-6)FT-DI Installation and Operating Manual

MODEL (Single Door) MODEL (2 Door pass through)

Storage Tanks. Instruction Manual. To the Installer: Please attach these instructions next to the water heater.

M3050 Detector Operator s Manual

Note: Please provide valve serial number (stamped on cover of valve) when ordering parts. Thermometer. Hot Water Inlet. Cold Water Inlet G3600LF

Operator s Manual. Cookshack, Inc. Model FEC500 Fast Eddy s Oven. Version 06.2 Serial No:

Table of Contents. Forward Quality Policy Design Parameters Section A Unit Operation Section B Unit Maintenance...

Operation Manual and Parts Directory

Panel Mounted Heat Exchangers by Dantherm, Inc.

Twin Bell Digital Clock

installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35

USER MANUAL IMPORTANT

ENGLISH StageBeam 650/1000W Fresnel V1

MODEL CDB8 INSTALLATION INSTRUCTIONS

TILGHMAN CEILING FAN. LISTED For Damp Location E ITEM # MODEL #WCK52LMW5N WCK52NWZ5N. Español p. 20 ATTACH YOUR RECEIPT HERE

TRAVELMATE. Instruction Manual

USE & CARE INSTRUCTIONS 10- SPEED HAND MIXER FSHM100

ST. KITTS CEILING FAN

IMPORTANT SAFETY INFORMATION:

SH-300, SH-900, SH-1500, SH-1600 and SH-1700 Bimetallic Steam Trap Installation and Operation Manual

Dust Collector. Sizes DC1 and DC2 U S E R G U I D E UGC

Rev. E 2013 Pentair Technical Products P/N Distributed by: McLean Parts

THE NIKKO CEILING FAN INSTALLATION INSTRUCTIONS

WET/DRY VACUUM. QUEST for Continuous Improvement Windsor s Quality Management System is Certified ISO MODEL: T1. Operating Instructions (ENG)

MAYFIELD CEILING FAN LISTED E ITEM # MODEL #BTH44ABZC5C BTH44BNK5C Español p. 20 ATTACH YOUR RECEIPT HERE.

COMMERCIAL REFRIGERATOR INSTRUCTION MANUAL

Transcription:

Water tempering device Installation instructions & user manual READ AND SAVE THESE INSTRUCTIONS DC-EN/151214

Foreword Foreword 1. These installation instructions and operation manual have been developed to facilitate the installation and the operation of the Drain Cooler. The strict application of these instructions will ensure the conformity of your installation and operation as per manufacturer's recommendations. 2. The application of these instructions is one of the conditions for the application of the warranty. 3. The application of these instructions does not ensure at any time conformity to procedures, regulation or local codes, regarding connection to local water supply. 4. 2015: All right reserved, this document cannot be reproduced totally or partially by any means whether, electronic, mechanical, photocopy, recording or other, without prior written authorization of National Environmental Products Ltd. Manufacturer Presentation National Environmental Products Ltd. (NEP) is the owner of the Neptronic brand. NEP develops, manufactures and services a complete line of: Steam humidifiers, Humidistat among the most precise and the most reliable on the market, Actuators to regulate air damper or valves, Electric heaters. Thermostats and other control peripherals used to control HVAC equipment. For more information about our products, visit our web site at www.neptronic.com Each Neptronic product benefits from over 25 years of experience of our qualified staff. From the inspiration to realization, innovation has been the standard in design. As the result of this dedication, NEP Ltd. owns several patents, notably the ENERDRIVE system and the AFEC system. Manufacturing is conducted on the premises of our modern 80,000 sq.ft. (7 000m 2 ) facility in Montreal, Canada. Our quality system is built on the ISO 9001 model. Our vision '' A Customer for Life'' is realized by listening our customers needs and by supplying them with products, which exceed their expectations in quality, functionality and durability. National Environmental Products Ltd. Tel. (Toll free in North America): 1 800 361-2308 Tel.: (1) (514) 333-1433 Fax: (1) (514) 333-3163 Fax Customer service: (514) 333-1091 Business hours: Monday to Friday, 8:00am to 5:00pm (Eastern time) i

General conditions of sale & warranty 1. General Unless otherwise arranged, in writing, the acceptance of the Order Confirmation by the purchaser includes acceptance of the "General Conditions of Sale and Warranty" of National Environmental Products, Ltd hereafter referred to as NEP. 2. Incoterms The international rules for interpretation of trade terms "Incoterms" as defined by the ICC Incoterms publication no. 460 from 1990, shall apply to the commercial terms used herein. 3. Confirmation of Order NEP shall not be deemed to have accepted an order until written "Order Confirmation" from NEP is issued to the purchaser. It is the responsibility of the purchaser to verify that all information concerning his/her order is correct and to notify NEP In writing, of any discrepancy prior to the order being shipped. In the event of a change or correction to an existing order, a second "Order Confirmation" will be issued by NEP. 4. Price Our prices are net, Ex-works Montreal in U.S. Currency, unless stated otherwise. Minimum orders shall be $50.00 minimum. Shipping and Handling charges are $5.00 minimum per order unless the shipment is billed to the purchaser's account or shipped freight collect. NEP reserves the right to adjust accepted prices in the event of alterations in rates of exchange, variations in costs of materials, changes in wages, interference on the part of the Government or similar conditions over which NEP has no control. 5. Payments terms Major credit cards, C.O.D., Prepayment. For open account, invoices are payable within 30 days from the date of invoice without no deduction, unless specify otherwise. An interest charge of 2% per month will be included on all overdue payments. No new order will be process if invoices are not paid within 45 days. 6. Transfer of ownership The goods shall remain the property of NEP until the full payment for the goods has been received by NEP. 7. Delivery terms Shipments are Ex-works 400 Lebeau, St Laurent, Quebec, H4N 1R6, CANADA unless notified otherwise. Unless special instructions, the order will be delivery in the way which NEP deems best without guaranteeing this to be the cheapest way of transport. For International Order, a written designation naming the freight forwarding agent is required and will remain in effect until notified otherwise. Any discrepancy, damage or breakage should be reported in writing both to NEP and to the Carrier within 5 working days from the receipt date. 8. Risk From the moment of delivery, the purchaser shall bear all risks for the goods and NEP shall not be responsible for loss and damage incurred during transportation. 9. Delivery time Delivery time is stated approximately and depends on the product ordered, please allow a minimum of: a) 2 weeks for processing North American order. b) 6 weeks for processing International order. We will make every effort to adhere to our delivery promises, but will not accept order or contract cancellation or any liability for any direct or indirect losses that may arise for any reason whatsoever as a result of our failure to adhere to such promises. 10. Return of good Goods received by the purchaser cannot be returned unless a completed "R.M.A. Form" (Return Material Authorization Form) has been issued by NEP's Customer Service. Any returned goods must be sent to NEP 400 Lebeau, St Laurent, Quebec, H4N 1R6, CANADA, unless stated otherwise by the R.M.A. Form, accompanied with the completed "R.M.A. Form", the R.M.A. number shall be prominently displayed on the shipping box. Unauthorized returns will be refused. Any returned goods must be sent freight prepaid. Any goods that come to us freight collect will be refused and returned to sender unless previously agreed to by us in writing on the "R.M.A. Form". Goods returned for credit shall be in condition for resale in the original box and properly packaged. Units, accessories or components that have been installed are not returnable and not refundable. Credit is subject to an overhead charge of 30% of the invoice plus shipping & handling if returned within 30 days of the invoice date and 50% from 30 to 60 days. Non standard product (SK units with special feature), Multisteam manifolds and any DI unit are not returnable and not refundable. 11. Warranty Provided that the terms of payment are observed, the purchaser is offered a warranty of 24 months from the original purchase date of delivery for any NEP's standard product, provided the equipment has been properly installed and operated in accordance with NEP instructions. The warranty covers faulty manufacture, design and/or defective materials. The warranty shall cease to be valid in the event of misapplication, incorrect installation, improper maintenance or any other incorrect uses or misuse of the product. For the SK series, the warranty furthermore ceases to be valid if the user disconnects or removes any electronic or mechanical components prior disconnecting the input power. NEP assumes no responsibility for repairs made on equipment, unless performed by NEP's authorized personnel. The defective product or component shall be returned in accordance with the paragraph 10 (Returns of goods) as described in this document. NEP agrees under the warranty to repair or replace (at the discretion of NEP) such standard product or component, which upon examination by NEP are found to be defective. Product or component replaced or repaired under warranty will be sent back to the purchaser, standard freight paid by NEP Expenses in connection with travelling time, dismantling and mounting shall not be paid by NEP Guarantee for products or components sold but not manufactured by NEP, is only given to the same extent as given to NEP, however, not exceeding the normal NEP warranty. Parts used for repairs are warranted for the balance of the term of the warranty on the original humidifier or 90 days, whichever is longer. Any repair made, after the original warranty period, at the NEP facilities are warranted for 1 month from the date of repair. 12. Proper law and jurisdiction This contract is and shall be deemed to have been made in the province of Quebec, CANADA, and shall in all respects, be governed by the province of Quebec laws. ii

Table of contents Table of contents Foreword & Manufacturer Presentation.....i General condition of sales & warranty....ii 1. Presentation... 2 2. Definition... 2 2.1. Cooling chamber... 2 3. Mechanical installation... 2 3.1. General recommendations... 2 4. Plumbing connections... 3 4.1. Cold Water supply... 3 4.2. Hot Water Drain inlet... 3 4.3. Tempered Water Drain connection... 3 5. Start up procedure... 4 6. Description of operation of the Drain Cooler... 4 7. Maintenance... 4 7.1. General... 4 7.2. Cooling chamber cleaning... 4 8. Troubleshooting guide... 5 1

User Manual 1. Presentation Thank you for choosing a Neptronic product. The Drain Cooler is a stainless steel cylindrical mixing chamber that blends cold water from a humidifier or condensate of a steam dispersion system. The result is drain water cooled to a temperature below 140 F (60 C). 2. Definition 2.1. Cooling chamber Assembly including the stainless steel cylinder and a cover equipped with a thermostatic valve. Cover Mounting bracket Hot water drain inlet Cold water supply connection Tempered water drain connection Cylinder Thermostatic valve 3. Mechanical installation 3.1. General recommendations IMPORTANT: Mechanical installation should conform to Local and National Codes. Location: Plan a location which is easy to access in order to permit a proper inspection and servicing of the Drain Cooler. Do not install Drain Cooler where failure of the appliance could cause damage to the building structure or to costly equipment. 2

4. Plumbing connections IMPORTANT: Plumbing installation should conform to Local and National Codes. 4.1. Cold Water supply Drain Cooler User Manual Water inlet specifications: Inlet water pressure: 15 to 70 psig (1 to 4,8 bars) IMPORTANT: Risk of malfunction. Do not reduce water supply flow. Do not connect to a supply water line that is dedicated to other appliances. Maximum temperature: 70 F (21 C) 1/2'' (15mm) copper sweat connection To facilitate servicing, a shut off valve (not supplied) should be installed in the water supply line, close to the Drain Cooler. 4.2. Hot Water Drain inlet Hot water inlet specification: Inlet water opening is 1-1/4 I.D. Atmospheric pressure condensate, maximum flow 2 gpm Maximum temperature: 212 F (100 C) Run drain pipe as directly as possible from the condensate outlets of the steam line to the Drain Cooler. 4.3. Tempered Water Drain connection Drain outlet specifications: Drain 3/4 (20mm) copper sweat connection. Water drain temperature: 140 F (60 C) or less. Run a 3/4 pipe as directly as possible from the Drain Cooler to the drain. Cold water supply ½" 8" dia. Hot water inlet 1-¼" Cold water supply ''S'' Trap to drain Drain water inlet 14" 10.63" Water outlet ¾" 2.34" Shut off valve (by others) Drain cooler Tempered water outlet To open drain 3

User Manual 5. Start up procedure Follow this start-up procedure to avoid improper system operation: 1. Ensure that plumbing connections have been done in accordance with the instructions in this manual. a) Verify that the supply and drain water connections are connected. 2. Open the water shut off valve (external to the Drain Cooler). 3. Your Drain Cooler is now fully operational. No other action is necessary; your Drain Cooler will temper the drain water automatically. 6. Description of operation of the Drain Cooler Hot water from a humidifier or condensate of s steam dispersion system enters the Drain Cooler thru the opening on top of the cover. Cold water enters through the thermostatic valve, which ensure the mixing of hot and cold water. Tempered water exits the Drain Cooler at 140 F (60 C) or less. 7. Maintenance 7.1. General IMPORTANT: Failure to perform the required periodic maintenance will void the warranty. The routine service is a cleaning of the cooling chamber. 7.2. Cooling chamber cleaning CAUTION: RISK OF BURN. THE COOLING CHAMBER AND ITS CONTENTS CAN BE HOT, CHECK TEMPERATURE BEFORE HANDLING. 1. Disconnecting the water pipes. a) Shut off the cold water supply valve. b) Unscrew the supply water coupling. c) Unscrew the tempered drain water coupling. 2. Removing the Drain Cooler. a) Remove the Drain Cooler from the piping. 3. Opening the cooling chamber. a) Unfasten the 3 latches located around the cooling chamber. Caution: Risk of injury, latches are tight. It is recommended to use pliers or a screwdriver to unfasten the latches. b) Remove the cover from the cooling chamber. c) Do not misplace the gasket located between the cover and the cylinder. 4. Cleaning the cooling chamber. a) Pour out any remaining water and scale from the bottom of the cooling chamber b) Clean out the remaining scale, use a non-metallic brush and water. Some vinegar or any weak acid for cleaning stainless steel may be required. IMPORTANT: The use of wire brush or any non-recommended acid will void the warranty. c) If the amount of scale to be removed is significant, increase the frequency of maintenance as necessary. Too much scale may impair the normal operation of the Drain Cooler or damage it. 4

User Manual 5. Cleaning the thermostatic valve and cover. a) The cover of the Drain Cooler and thermostatic valve will, in general, not require cleaning. However, if cleaning is required, proceed as per the cleaning of the cooling chamber. IMPORTANT: The use of wire brush or any non-recommended acid will void the warranty. 6. Checking the gasket a) Check the gasket. The gasket should not be cracked. Replace the gasket if required. 7. Reassembling the cooling chamber. a) Rinse out the cylinder and the cover with water. b) Place the gasket inside the cover before installing the cover on the cooling chamber. c) Tighten the three latches around the cover. d) Replace the Drain Cooler to the piping. e) Tighten the tempered water drain and the supply water couplings. f) Open the cold water supply valve. 8. Troubleshooting guide Problem Causes Corrective actions The temperature of the tempered water is exceeding 140 F (60 C) The cold water supply valve is closed. Mineral accumulation inside the cooling chamber. Mineral accumulation on the thermostatic valve. Malfunction of the thermostatic valve. Inadequate cold water flow to the Drain Cooler. Open the cold water supply valve. Do maintenance of the Drain Cooler (section 7). Replace the thermostatic valve. Water is leaking thru the top opening of the cover. Mineral accumulation inside the cooling chamber, the tempered drain opening is blocked. Do maintenance of the Drain Cooler (section 7). 5