BAHAGIAN A Pengesahan Kerjasama* Adalah disahkan bahawa projek penyelidikan tesis ini telah dilaksanakan melalui kerjasama antara dengan

Similar documents
AIR CONDITIONING STUDY FOR AUTOMOTIVE APPLICATION ALAUDDIN HAFIZ BIN YUSOF UNIVERSITI MALAYSIA PAHANG

IMPROVEMENT OF BUS ROOF SECTION

THERMAL PERFORMANCE OF POTTED PLANTS IN MITIGATING INDOOR TEMPERATURE IN TROPICAL CLIMATE SHAHRUL BIN CHE ON UNIVERSITI TEKNOLOGI MALAYSIA

GEOGRAPHICAL ANALYSIS OF LIBYAN AIRPORTS AND THEIR POTENTIAL AS A HUB OF AIR TRANSPORTATION FOUAD D S ABDULWAFI UNIVERSITI TEKNOLOGI MALAYSIA

NAZANEEN AHMED NASROULLA

Comparison Simulation between Ventilation and Recirculation of Solar Desiccant Cooling System by TRNSYS in Hot and Humid Area

ANALYSIS OF HEAT GAIN AGAINST COOLING CAPACITY AT OCCUPIED BUILDING KOH KELVIN

POROSITY ARCHITECTURE IN ECOLOGICAL DESIGN TAN KWON CHONG

DYNAMIC ANALYSES OF COMPOSITE FOOTBRIDGES EXCITED BY PEDESTRIAN INDUCED LOADS FARAZ SADEGHI UNIVERSITI TEKNOLOGI MALAYSIA

A COMPARISON BETWEEN TRADITIONAL PAVEMENT REHABILITATION METHOD AS COMPARED TO RECYCLING METHOD SITI MAZZUANA BINTI SHAMSUDDIN

ASSESSMENT OF URBAN GREEN SPACE BASED ON LANDSCAPE ECOLOGICAL PRINCIPLES SITI SYAMIMI BINTI OMAR

APPLICATION OF BIM IN EARLY STAGE DESIGN COST ESTIMATION

GREEN HIGHWAY ECOLOGY AND ECOSYSTEM PRESERVATION AND RESTORATION MUDATHIR OMER ADAM ARBAB

EFFECT OF FINE AGGREGATE ANGULARITY ON RUTTING RESISTANCE OF ASPHALT CONCRETE AC10

VISUAL REPRESENTATION OF NATURE IN THE LIBRARY SOMAYEH ROUSTAEI SADRY UNIVERSITI TEKNOLOGI MALAYSIA

EVALUATION OF CRACK RELIEF LAYER FOR ROADS AND HIGHWAYS KHAIRUL HAFIZ BIN MUSTAFA

ASSESSMENT OF PARKING DEMAND IMPACT ON ADJOINING ROADWAY NETWORK WAN NUR ALIFFA WAN RAMLI

NAZANEEN AHMED NASROULLA

INSTRUCTION: This section consists of SIX (6) structure questions. Answer FOUR (4) questions only.

SMART GARDEN SYSTEM NURSHAHNEEM BINTI MOHD SAID

A STRUCTURED CRITICAL SUCCESS FACTORS MODEL FOR THE IMPLEMENTATION OF GREEN RETROFIT PROJECTS REHMAASHINI JAGARAJAN UNIVERSITI TEKNOLOGI MALAYSIA

STUDY OF INTERNAL HEAT EXCHANGER EFFECTS ON CAR AIR CONDITIONING SYSTEM CHAN HONG KET

DESIGN FACTORS THAT INFLUENCE THE EFFECTIVE USE OF MEYDAN IN IRAN REIHANEH SADAT HAJMIRSADEGHI UNIVERSITI TEKNOLOGI MALAYSIA

Feasibility of a Liquid Desiccant Application in an Evaporative. Cooling Assisted 100% Outdoor Air System

PERFORMANCE OF SOLID DESICCANT COOLING WITH SOLAR ENERGY IN HOT AND HUMID CLIMATE

FLOOD MAPPING FOR SUNGAI BUNUS MOHD IRSYAM NOORFAWANA BIN MASRI

A Suitable Development Trend in Linear City Based On Smart Growth A Case Study in Lanzhou Urban Area ZHOU WEI

Moisture removal rate in a solar liquid desiccant air conditioning system

EARHTHING PERFORMANCE OF HV/MV SUBSTATION AND ITS EFFECT ON NEARBY STRUCTURES NORNIKMAN BIN RAHIMIN

Feasibility of Controlling Heat and Enthalpy Wheel Effectiveness to Achieve Optimal Closed DOAS Operation

PERFORMANCE OF FORCED CONVECTION EVACUATED TUBE SOLAR GRAIN DRYER. BOOKER ONYANGO OSODO B. Ed.(TECH); M. Phil (Tech. Ed) (J98/25749/2011)

ANALYSIS PERFORMANCE OF WAJA CAR AIR-CONDITIONING SYSTEM MUHAMAD AMIRUDIN BIN KAMALRUL BADRI

UNIVERSITI TEKNOLOGI MARA

IDENTIFICATION OF AUDIO AND ROOM PARAMETERS FOR OPTIMUM SPEECH INTELLIGIBILITY IN ROOM NG TSING CHUN UNIVERSITI TEKNOLOGI MALAYSIA

Heat pump and energy recovery systems

Recent Advances in Energy, Environment and Economic Development

Performance Optimization of the Evaporative Condenser Design

INSTRUCTION: This paper consists of SIX [6] structured questions. Answer any FOUR [4] questions.

ME 410 MECHANICAL ENGINEERING SYSTEMS LABORATORY MASS & ENERGY BALANCES IN PSYCHROMETRIC PROCESSES EXPERIMENT 3

Final Year Project Report

CHAPTER 1 INTRODUCTION

Impact of Multi-Stage Liquid Desiccant Dehumidification in a Desiccant and Evaporative Cooling-Assisted Air Conditioning System

Samsiah binti Mohamad

Institute of Aeronautical Engineering (Autonomous) Dundigal, Hyderabad B.Tech (III II SEM) MECHANICAL ENGINEERING

SUSTAINABILITY ASSESSMENT OF COMPACT-CITY DEVELOPMENT USING GEODESIGN APPROACH AHMED ABDULHAFEDH OWAID UNIVERSITI TEKNOLOGI MALAYSIA

PRELIMINARY STUDY ON BRICKS DRYING PROCESS USING MICROWAVE TECHNOLOGY SALEM SALAH ABDULLAH BAGABER UNIVERSITI TEKNOLOGI MALAYSIA

Available online at Energy Procedia 6 (2011) MEDGREEN 2011-LB

Role of Nano-technology for improving of thermal performances of vapour compression refrigeration system (VCRS): An Overview

EME 431 Refrigeration & Air Conditioning [Penyejukan & Penyamanan Udara]

GAS LEAKAGE MONITORING OVER THE NET WITH RASPBERRY PI MOHD FAEZ BIN AHMAD RAZLI

MODELLING AND OPTIMIZATION OF DIRECT EXPANSION AIR CONDITIONING SYSTEM FOR COMMERCIAL BUILDING ENERGY SAVING

solution, due to the partial vapor pressure difference between the air and the desiccant solution. Then, the moisture from the diluted solution is rem

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

CHAPTER 7 PERFORMANCE ANALYSIS OF VAPOUR COMPRESSION REFRIGERATION SYSTEM IN HYBRID REFRIGERATION SYSTEM

HEAT TRANSFER CHARACTERISTICS OF A HEAT EXCHANGER JAMIATUL ADAWIAH BT AB. SIDEK UNIVERSITI TEKNIKAL MALAYSIA MELAKA

URBAN REGENERATION ISSUES OF SECTION 13 PETALING JAYA KHAIRUL NISA BINTI HARON UNIVERSITI TEKNOLOGI MALAYSIA

Design Procedure for a Liquid Dessicant and Evaporative Cooling Assisted 100% Outdoor Air System

Feasibility study on an energy-saving desiccant wheel system with CO 2 heat pump

Subscripts 1-4 States of the given system Comp Compressor Cond Condenser E Evaporator vol Volumetric G Gas L Liquid

ANALYSIS AND MEASUREMENT FIBER OPTIC FAULT BY USING OPTICAL TIME DOMAIN REFLECTROMETER (OTDR) AKWANIZAM BIN AZMI

EVALUATION OF HEAT REJECTION STRATEGIES FOR LIQUID DESICCANT AIR-CONDITIONING SYSTEMS

Comfort and health-indoor air quality

4th International Conference on Sensors, Measurement and Intelligent Materials (ICSMIM 2015)

SIMULATION ANALYSIS ON THE FRESH AIR HANDLING UNIT WITH LIQUID DESICCANT TOTAL HEAT RECOVERY

A SIMPLE ID DETECTION USING INFRARED SENSORS NOOR FARHANA HALIL BT ABDUL RAZAK

ME 410 MECHA ICAL E GI EERI G SYSTEMS LABORATORY

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

Optimization of Moisture condensation rate of Liquid Desiccant Dehumidifier through Genetic Algorithm

Waste Heat Utilization of Vapor Compression Cycle for Operation of Vapor Absorption System

UNIVERSITI PUTRA MALAYSIA INTEGRATING PUBLIC ART IN MALAYSIAN URBAN LANDSCAPE

MOTORCYCLE ANTI-THEFT SYSTEM (MATS) MUHAMAD ALIF BIN ABU

A Statistical Analysis of a Liquid Desiccant Dehumidifier/Regenerator in an Air Conditioning System

Feasibility Analysis of Regeneration of Silica Gel Used in Dehumidification Process of Air Conditioning by the Condenser Waste Heat of Air Conditioner

EVALUATION OF REFRIGERANT R290 AS A REPLACEMENT TO R22

ME Mechanical Engineering Systems Laboratory. Experiment 3 - Mass and Energy Balances in Psychrometric Processes

PHYSICAL ATTRIBUTES ON PLACE ATTACHMENT IN MALAYSIAN URBAN PARKS HADI EBADI UNIVERSITI TEKNOLOGI MALAYSIA

Energy Consumption Reduction of AHU using Heat Pipe as Dehumidifier

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road AUTONOMOUS QUESTION BANK (DESCRIPTIVE) UNIT I

SIMULATION ANALYSIS OF BUILDING HUMIDITY CONTROL AND ENERGY CONSUMPTION FOR DIFFERENT SYSTEM CONFIGURATIONS USA

UNIVERSITI TEKNOLOGI MARA THE CONDITION OF OUTDOOR SCULPTURES IN ASEAN SCULPTURE GARDEN KUALA LUMPUR: A CONSERVATION STUDY NORA SOFIA MOHAMED YURAN

Performance Of The Dehumidification Cycle Of A 3-Fluid Liquid Desiccant Membrane Air-Conditioning System

K.F. Fong *, C.K. Lee, T.T. Chow

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

THE RELEVANCE OF TRANSIT-ORIENTED DEVELOPMENT FOR TRANSIT STATION COMMUNITY IN MALAYSIA ZAINUDDIN BIN AB RAHMAN

INSTITUTE FOR ENVIRONMENTAL RESEARCH & SUSTAINABLE DEVELOPMENT NATIONAL OBSERVATORY OF ATHENS (NOA)

Thermodynamics II Chapter 5 Refrigeration

Experimental study on mass transfer comparison of two liquid desiccants aqueous solutions

Experimental Performance of Solar Collector cum Regenerator for Coupling with a Liquid Desiccant Cooling System

WIRELESS Temperature Monitoring System for Blood Bank using Zigbee. Keywords: Temperature monitoring system; ZigBee; LabVIEW; internet; alarm

UNIVERSITI PUTRA MALAYSIA

Experimental investigation of Hybrid Nanofluid on wickless heat pipe heat exchanger thermal performance

R07. Answer any FIVE Questions All Questions carry equal marks *****

3. (a) Explain the working of a rotary screw compressor. [10] (b) How the capacity control is achieved in refrigerant compressor?

seasons in regions with hot, humid climates. For this reason, a dehumidification system with a radiant panel system needs to be developed. In a former

Performance Measurement of R32 Vapor Injection Heat Pump System

USCI. PHYSICS Workshop Success is depend on your mind and your will. You are the one, who decide it. PROVE IT!! Speaker : Thong KS

Adsorption refrigeration system using waste heat

Effect of Operating Parameters on the Performance of Direct Evaporative Cooler

International Journal of Engineering Research (IJOER) [Vol-1, Issue-3, June- 2015]

REVIEW OF DESIGN OF SINGLE EFFECT SOLAR POWERED VAPOUR ABSORPTION AIR CONDITIONING SYSTEM

Transcription:

BAHAGIAN A Pengesahan Kerjasama* Adalah disahkan bahawa projek penyelidikan tesis ini telah dilaksanakan melalui kerjasama antara dengan Disahkan oleh: Tandatangan :... Tarikh :... Nama :... Jawatan :... (Cop rasmi) * Jika penyediaan tesis/projek melibatkan kerjasama. BAHAGIAN B Untuk Kegunaan Pejabat Pusat Pengajian Siswazah Tesis ini telah diperiksa dan diakui oleh: Nama dan Alamat Pemeriksa Luar : Prof. Dr. Masjuki Bin Hassan Director Energy Sciences Research Centre Faculty of Engineering... University of Malaya... 50603 KUALA LUMPUR.. Nama dan Alamat Pemeriksa Dalam : Prof. Dr. Mat Nawi Bin Wan Hassan... Faculty Kejuruteraan Mekanikal... UTM, Skudai... Nama Penyelia Lain (jika ada) :......... Disahkan oleh Penolong Pendaftar di SPS: Tandatangan :... Tarikh :... Nama : KHASIM BIN ISMAIL

ENHANCEMENT AND ANALYSIS OF A HYBRID LIQUID DESICCANT BASED-COOLING SYSTEM ELHADI BADAWI MAHGOUB A thesis submitted in fulfilment of the requirements for the award of the degree of Doctor of Philosophy (Mechanical Engineering) Faculty of Mechanical Engineering Universiti Teknologi Malaysia JULY 2007

iii To the spirits of my father and mother, to my wife Ghada, beloved sons Mohamed, Badawi, and Majdi, to my brother Mohamed and sisters.

iv ACKNOWLEDGEMNT All praises and glory to almighty Allah subhaanahu wa Ta ala for bestowing me health, knowledge and patience to complete this thesis. Peace and blessing of Allah be upon his Prophet Mohamed (Sallallaho Alaihi Wa salla) My sincere thanks to my supervisors Prof. Dr. Farid Nasir Hj Ani and Prof. Dr. K. S. Kannan for their guidance, encouragement, and support throughout the course of this research. They continuously provided advice as well as constructive criticism. I am also grateful to the staff of Faculty of Mechanical Engineering UTM for their support and encouragement. Technical assistance and help from the staff of thermodynamic laboratory UTM is appreciated. My sincere thanks to my international colleagues for their contribution. My special thanks and gratitude to my colleagues from SUDAN whom their continuous support and care give me the momentum to finish this thesis. I am indebted to UTM, AL-IMAM AL-MAHDI UNIVERSITY, and the Ministry of Science, Technology and Innovation for their financial support and for giving me this opportunity to study. I owe my sincere thanks and gratefulness to my wife Ghada, sons Mohamed, Badawi, and Majdi, to my brother Mohamed, and my sisters for their continuing encouragement, patience, and support financially and morally. Last but not least to ALLAH, and to the spirit of my father and mother I dedicate this thesis.

v ABSTRACT Air conditioning has traditionally been achieved by vapour compression equipment, which is considered very efficient when handling loads characterised by high sensible load fraction. These machines would perform poorly when they process air with high latent load fraction as in the case of humid climates. Global energy concern has accelerated the research on alternative technology options to replace traditional method or improve their performance. Hybrid liquid desiccant system has been proposed as an energy saving alternative to reduce the vapour compression unit size used in air conditioning application, and improve its performance. A hybrid system consisting of vapour compression unit, a liquid desiccant system consisting of an absorber and a regenerator, both of which are identical packed spray towers built from fibre glass with a cross sectional area of 600 x 600 mm from five pieces each. Each piece having a height of 200 mm to facilitate testing different heights of packing material, and a flat plate solar hot water collector with an auxiliary electrical heater to be used as supplement when solar energy is not enough or not available. This hybrid system was designed, fabricated and tested with emphasis on liquid desiccant sub-system. In this study, the performance of the absorber and the regenerator, which are the main items in the liquid desiccant system, was studied in terms of effectiveness. Both units were tested over a range of different inlet liquid desiccant concentration of 20% to 40% by weight, and inlet temperature of 20 o C, 25 o C, and 30 o C for the absorber, and 20%, 25% and 30% liquid desiccant concentration at temperature range of 35 o C to 55 o C for the regenerator. Both components were tested at liquid desiccant flow rate between 3.76 to 5.01 l/min with different air inlet flow rate 4.9 to 6.4 m 3 /min. Experimental results were recorded using a complete data acquisition system to collect and log the data of the desiccant sub-system and the vapour compression unit, which enables thermocouples readings. From the data collected, the coefficient of performance of the vapour compression unit was obtained using both refrigerant enthalpy and air enthalpy methods. Absorber effectiveness was found to be between 0.5 and 0.7, while the regenerator effectiveness was found to be between 0.2 and 0.6. A 800 mm packing height is found to be the breaking limit with both air supply either fully through the desiccant or partly (50% through the desiccant), would result in an improvement in the performance of the vapour compression unit ranging from 17.9 % to 54%, which indicate the hybrid system potential for energy savings. Improving indoor air quality by controlling humidity, killing effect of bacteria and fungus by using liquid desiccant are among other benefits realised.

vi ABSTRAK Penghawadinginan biasanya dilakukan oleh alat mampatan wap, yang boleh dianggap cekap apabila mengelolakan beban yang berciri pecahan beban ketara yang tinggi. Mesin ini akan berkelakuan dengan tidak memuaskan apabila memproses udara dengan pecahan beban pendam yang tinggi seperti dalam kes iklim lembab. Kebimbangan global tenaga telah mempercepatkan penyelidikan keatas opsyen teknologi alternatif untuk menggantikan kaedah tradisional atau meningkatkan prestasinya. Sistem pengering cecair hibrid yang telah dicadangkan sebagai penjimatan tenaga alternatif untuk mengurangkan saiz unit mampatan wap yang digunakan untuk penghawa dingin serta memperbaiki prestasi. Sistem hibrid mengandungi unit wap mampatan, sistem pengering cecair yang mengandungi penyerap dan penjana semula, kedua-duanya adalah menara penyembur padat yang serupa dibina daripada kaca gantian dengan luas keratan rentas 600 x 600 mm dari lima kepingan dimana setiap kepingan dengan ketinggian 200 mm untuk memudahkan ujian pada ketinggian berlainan bahan padat, dan satu pengumpul air panas suria plat rata dengan pemanas elektrik untuk digunakan sebagai tenaga tambahan sekiranya tenaga suria tidak mencukupi atau tidak ada. Sistem hibrid ini direkakan, dibina dan diuji dengan tumpuan kepada sub-sistem pengering cecair. Dalam kajian ini, prestasi penyerap dan penjana semula yang menjadi komponen utama dalam sistem pengering cecair dikaji dari segi sebutan keberkesanan. Keduaduanya diuji pada julat kepekatan pengering cecair pada salur masuk yang berlainan dari 20% hingga 40% secara berat dan suhu salur masuk 20 o C, 25 o C dan 30 o C bagi penyerap dan kepekatan pengering cecair 20%, 25% dan 30% pada julat suhu dari 35 o C ke 55 o C bagi penjana semula. Kedua-dua komponen diuji pada kadar aliran pengering cecair diantara 3.76 dan 5.01 l/min, dengan kadar aliran salur masuk udara dari 4.9 hingga 6.4 m 3 /min. Keputusan ujikaji direkod dengan menggunakan sistem pengumpulan data yang lengkap untuk mengumpul dan menyimpan data subsistem pengering serta unit mampatan wap yang mencatat bacaan termogandingan. Dari data yang dikumpul, pekali prestasi unit mampatan wap telah diperolehi dengan kedua-dua kaedah entalpi penyejukan dan udara. Keberkesanan penyerap didapati antara 0.5 dan 0.7, manakala keberkesanan penjana semula didapati antara 0.2 dan 0.6. Padatan setinggi 800 mm adalah dikenalpasti sebagai had pecahan dengan kedua-dua bekalan udara samada sepenuhnya melalui pengering atau sebahagiannya (50% melalui pengering) yang akan mengakibatkan peningkatan prestasi unit mampatan wap berjulat dari 17.9% hingga 54%. Ini menandakan potensi sistem hibrid bagi penjimatan tenaga. Peningkatan kualiti udara dalaman dengan mengawal kelembapan, membunuh bakteria dan fungus dengan menggunakan pengering cecair adalah antara faedah lain yang terhasil.

vii TABLE OF CONTENTS CHAPTER TITLE PAGE DECLARATION ii DEDICATION iii ACKNOWLEDGMENT iv ABSTRACT v ABSTRAK vi TABLE OF CONTENTS vii LIST OF TABLES xi LIST OF FIGURES xx LIST OF SYMBOL xxv LIST OF APPENDICES xxvi 1 INTRODUCTION 1 1.1 Background 1 1.2 Global Warming and Refrigerants 2 1.3 Market Forces 3 1.4 Problem Statement 4 1.5 Research Scope 5 1.6 Research Objectives 6 1.7 Thesis Outline 6 2 LITERATURE REVIEW 8 2.1 Introduction 8 2.2 Solar Assisted Desiccant Systems 8 2.3 Gas Fired Solid Desiccant Systems 12 2.4 Other Desiccant Related Work 15

viii 2.5 Liquid Desiccant 16 2.6 Regeneration of Liquid Desiccant 16 2.6.1 Regeneration Using Solar Energy 17 2.6.2 Regeneration Using Waste Heat Recovery 19 2.6.3 Regeneration Using Gas Boiler 19 2.7 Hybrid Liquid Desiccant Systems 19 2.8 Desiccant Aided Chilled Ceiling 23 2.8.1 Advantages of Desiccant Aided Chilled Ceiling 24 2.8.1 Disadvantages of Desiccant Aided Chilled Ceiling 25 3 THEORETICAL FRAMEWORK 27 3.1 Introduction 27 3.2 Needs for Air Conditioning 27 3.3 Air Conditioning Loads 28 3.4 Common Air Conditioning Systems 29 3.4.1 Vapour Compression Equipment and Cycle 29 3.5 Dehumidification 34 3.5.1 The Dehumidifier 36 3.5.2 The Cooling Unit 37 3.5.3 Regeneration Heat Source 38 3.6 Desiccant Dehumidification 38 3.7 Desiccants 39 3.8. Types of Desiccants 39 3.19 Liquid Absorbents 40 3.10 Desiccant Cycle 42 3.11 Common Desiccant Applications 45 3.12 Desiccant Characteristics for Commercial Dehumidifying 45 3.13 Advantages of Desiccant Systems over Conventional Methods 46 3.14 Advantages of Liquid Desiccants over Solid Desiccants 47 3.15 Coefficient of Performance Calculated Based on Refrigerant Enthalpy 48

ix 3.16 Coefficient of Performance Calculated Based on Air Enthalpy 49 3.17 Calculating Absorber Effectiveness 50 3.18 Calculating Regenerator Effectiveness 51 4 EXPERIMENTAL RIG AND RESEARCH METHODOLOGY 52 4.1 Introduction 52 4.2 Description of The Test Rig 52 4.2.1 Description of The Liquid Desiccant Sub-System 53 4.2.1.1 Desiccant Flow 53 4.2.1.2 Air Flow 61 4.2.1.3 Cooling and Heating Water Flow 62 4.2.2 Description of The Vapour Compression Unit 62 4.2.3 Flat Plate Solar Hot Water Collector 63 4.3 Research Procedure 64 4.4 Instrumentation and Data Collection 64 4.4.1 Design Variables 65 4.4.2 Independent Variables 67 4.4.3 Dependent Variables 67 4.4.4 Other Variables 68 4.5 Method of Testing The Hybrid Desiccant Cooling System 68 5 RESULTS AND DISCUSSIONS 71 5.1 Introduction 71 5.2 Packing Height Results and Discussion 71 5.3 Liquid Desiccant and Air Flow Rate Results and Discussion 120 5.4 Absorber Dehumidification Effectiveness 131 5.5 Regenerator Effectiveness Results 136 5.6 Benefit of Using A Liquid Desiccant In The Hybrid System 142 5.7 Contribution of The Study 142 5.8 Comparison With Other Results in The Literature 143

x 6 CONCLUSIONS AND RECOMMENDATIONS 144 6.1 Conclusions 144 6.2 Recommendations for Future Work 146 REFERENCES 148 Appendices 1-6 155-164

xi LIST OF TABLES TABLE NO. TITLE PAGE 5.1 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 1000 mm packing height 73 5.2 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 1000 mm packing height 74 5.3 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 1000 mm packing height 74 5.4 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 1000 mm packing height 75 5.5 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 1000 mm packing height 75 5.6 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 1000 mm packing height 76 5.7 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 1000 mm packing height 76 5.8 Test result of C. O. P. calculated based on refrigerant Enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow

xii rate of 4.39 l/min. at 1000 mm packing height 77 5.9 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 1000 mm packing height 77 5.10 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 800 mm packing height 78 5.11 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 800 mm packing height 78 5.12 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 800 mm packing height 79 5.13 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 800 mm packing height 79 5.14 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 800 mm packing height 80 5.15 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 800 mm packing height 80 5.16 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 800 mm packing height 81 5.17 Test result of C. O. P. calculated based on refrigerant Enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 800 mm packing height 81 5.18 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate at 5.01 l/min. at 800 mm packing height 82 5.19 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 600 mm packing height 82

xiii 5.20 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 600 mm packing height 83 5.21 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 600 mm packing height 83 5.22 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 600 mm packing height 84 5.23 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 600 mm packing height 84 5.24 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 600 mm packing height 85 5.25 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 600 mm packing height 85 5.26 Test result of C. O. P. calculated based on refrigerant Enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 600 mm packing height 86 5.27 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 600 mm packing height 86 5.28 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 400 mm packing height 87 5.29 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 400 mm packing height 87 5.30 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 400 mm packing height 88 5.31 Test result of C. O. P. calculated based on refrigerant

xiv enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 400 mm packing height 88 5.32 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 400 mm packing height 89 5.33 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 400 mm packing height 89 5.34 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 400 mm packing height 90 5.35 Test result of C. O. P. calculated based on refrigerant Enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 400 mm packing height 90 5.36 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 400 mm packing height 91 5.37 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 200 mm packing height 91 5.38 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 200 mm packing height 92 5.39 Test result of C.O.P. calculated based on refrigerant enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 200 mm packing height 92 5.40 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 200 mm packing height 93 5.41 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 200 mm packing height 93 5.42 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow

xv rate of 5.01 l/min. at 200 mm packing height 94 5.43 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 200 mm packing height 94 5.44 Test result of C. O. P. calculated based on refrigerant Enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 200 mm packing height 95 5.45 Test result of C. O. P. calculated based on refrigerant enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 200 mm packing height 95 5.46 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 1000 mm packing height 96 5.47 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 1000 mm packing height 96 5.48 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 1000 mm packing height 96 5.49 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 1000 mm packing height 97 5.50 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 1000 mm packing height 97 5.51 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 1000 mm packing height 97 5.52 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 1000 mm packing height 98 5.53 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 1000 mm packing height 98

xvi 5.54 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 1000 mm packing height 98 5.55 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 800 mm packing height 99 5.56 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 800 mm packing height 99 5.57 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 800 mm packing height 99 5.58 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 800 mm packing height 100 5.59 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 800 mm packing height 100 5.60 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 800 mm packing height 100 5.61 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 800 mm packing height 101 5.62 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 800 mm packing height 101 5.63 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 800 mm packing height 101 5.64 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 600 mm packing height 102 5.65 Test result of C. O. P. calculated based on air enthalpy

xvii At air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 600 mm packing height 102 5.66 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 600 mm packing height 102 5.67 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 600 mm packing height 103 5.68 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 600 mm packing height 103 5.69 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 600 mm packing height 103 5.70 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 600 mm packing height 104 5.71 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 600 mm packing height 104 5.72 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 600 mm packing height 104 5.73 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 400 mm packing height 105 5.74 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 400 mm packing height 105 5.75 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 400 mm packing height 105 5.76 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow

xviii rate of 3.76 l/min. at 400 mm packing height 106 5.77 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 400 mm packing height 106 5.78 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 400 mm packing height 106 5.79 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 400 mm packing height 107 5.80 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 400 mm packing height 107 5.81 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 400 mm packing height 107 5.82 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 3.76 l/min. at 200 mm packing height 108 5.83 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 4.9 m 3 /min. and desiccant flow rate of 4.39 l/min. at 200 mm packing height 108 5.84 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 4.9 m 3 /min. and desiccant flow rate of 5.01 l/min. at 200 mm packing height 108 5.85 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 3.76 l/min. at 200 mm packing height 109 5.86 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 5.7 m 3 /min. and desiccant flow rate of 4.39 l/min. at 200 mm packing height 109 5.87 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 5.7 m 3 /min. and desiccant flow rate of 5.01 l/min. at 200 mm packing height 109

xix 5.88 Test result of C. O. p. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 3.76 l/min. at 200 mm packing height 110 5.89 Test result of C. O. P. calculated based on air enthalpy At air flow rate of 6.4 m 3 /min. and desiccant flow rate of 4.39 l/min. at 200 mm packing height 110 5.90 Test result of C. O. P. calculated based on air enthalpy at air flow rate of 6.4 m 3 /min. and desiccant flow rate of 5.01 l/min. at 200 mm packing height 110

xx LIST OF FIGURES FIGURE NO. TITLE PAGE 3.1 Vapour compression component and cycle. 30 3.2 The general p-h representation of vapour refrigeration cycle. 31 3.3 Psychrometric schematic of supply air state in vapour compression cycle 32 3.4 Different methods of dehumidification 35 3.5 Desiccant cooling system principles 36 3.6 General liquid desiccant system integrated with vapour compression system. 41 3.7 General desiccant cycle 43 3.8 Pressure enthalpy diagram of the vapour compression cycle 48 4.1 The integrated tested rig diagram 54 4.2a The absorber of liquid desiccant system 55 4.2b The regenerator of the liquid desiccant system 56 4.2c The flat plate solar hot water collector with auxiliary heater 57 4.2d The vapour compression unit with the conditioned chamber 58 4.3 Back view of the test rig 59

xxi 4.4 Front and side view of the test rig 59 4.5 Flat plate solar hot water collector 60 4.6 CIO-EXP 32 and CIO-DAS 08 data acquisition cards 60 5.1a Coefficient of performance at air volume of 4.9 m 3 /min and 3.76 l/min liquid desiccant flow rate. 111 5.1b Coefficient of performance at air volume of 4.9 m 3 /min and 3.76 l/min liquid desiccant flow rate. 111 5.2a Coefficient of performance at air volume of 4.9 m 3 /min and 4.39 l/min liquid desiccant flow rate. 112 5.2b Coefficient of performance at air volume of 4.9 m 3 /min and 4.39 l/min liquid desiccant flow rate. 112 5.3a Coefficient of performance at air volume of 4.9 m 3 /min and 5.01 l/min liquid desiccant flow rate. 113 5.3b Coefficient of performance at air volume of 4.9 m 3 /min and 5.01 l/min liquid desiccant flow rate. 113 5.4a Coefficient of performance at air volume of 5.7 m 3 /min and 3.76 l/min liquid desiccant flow rate. 114 5.4b Coefficient of performance at air volume of 5.7 m 3 /min and 3.76 l/min liquid desiccant flow rate. 114 5.5a Coefficient of performance at air volume of 5.7 m 3 /min and 4.39 l/min liquid desiccant flow rate. 115 5.5b Coefficient of performance at air volume of 5.7 m 3 /min and 4.39 l/min liquid desiccant flow rate. 115 5.6a Coefficient of performance at air volume of 5.7 m 3 /min and 5.01 l/min liquid desiccant flow rate. 116 5.6b Coefficient of performance at air volume of 5.7 m 3 /min and 5.01 l/min liquid desiccant flow rate. 116 5.7a Coefficient of performance at air volume of 6.4 m 3 /min and 3.76 l/min. liquid desiccant flow rate. 117 5.7b Coefficient of performance at air volume of 6.4 m 3 /min and 3.76 l/min. liquid desiccant flow rate. 117 5.8a Coefficient of performance at air volume of 6.4 m 3 /min and 4.39 l/min liquid desiccant flow rate. 118 5.8b Coefficient of performance at air volume of 6.4 m 3 /min

xxii and 4.39 l/min liquid desiccant flow rate. 118 5.9a Coefficient of performance at air volume of 6.4 m 3 /min and 5.01 l/min liquid flow rate. 119 5.9b Coefficient of performance at air volume of 6.4 m 3 /min and 5.01 l/min liquid flow rate. 119 5.10 C.O.P. of the vapour compression unit when using all air through desiccant at 1000 mm packing height illustrating the different air flow rates of 4.9, 5.7, and 6.4 3 /min. V. C. stands for vapour compression alone. 123 5.11 C.O.P. of the vapour compression unit when using 50% air through desiccant and 50% from ambient at 1000 mm packing height, illustrating the different air flow rates of 4.9, 5.7, and 6.4 m 3 /min. V.C. stands for vapour compression alone. 124 5.12 C.O.P. of the vapour compression unit when using all air through desiccant at 800 mm packing height, illustrating the different air flow rates of 4.9, 5.7, and 6.4 m 3 /min. V.C. stands for vapour compression alone. 125 5.13 C.O.P. of the vapour compression unit when using 50% air through desiccant and 50% from ambient, at 800 mm packing height, illustrating the different air flow rates of 4.9, 5.7, and 6.4 m 3 /min. V.C. stands for vapour compression alone. 126 5.14 C.O.P. of the vapour compression unit when using all air through desiccant, at 600 mm packing height, illustrating the different air flow rates of 4.9, 5.7, and 6.4 m 3 /min. V. C. stands for vapour compression alone. 127 5.15 C.O.P. of the vapour compression unit when using 50% air through desiccant and 50% from ambient, at 600 mm packing height, illustrating the different air flow rates of 4.9, 5.7, and 6.4 m 3 /min. V.C. stands for vapour compression alone. 128

xxiii 5.16 C.O.P. of the vapour compression unit when using all air through desiccant, at 400 mm packing height, illustrating the different air flow rates of 4.9, 5.7, and 6.4 m 3 /min. V.C. stands for vapour compression alone. 129 5.17 C.O.P. of the vapour compression unit when using 50% air through desiccant and 50% from ambient, at 400 mm packing height, illustrating the different air flow rates of 4.9, 5.7, and 6.4 m 3 /min. V.C. stands for vapour compression alone. 130 5.18 Absorber effectiveness at air flow rate of 4.9 m 3 /min. and at solution temperature of 20 C. 132 5.19 Absorber effectiveness at air flow rate of 4.9 m 3 /min. and at solution temperature of 25 C 132 5.20 Absorber effectiveness at process air flow rate of 4.9 m 3 /min and at solution temperature of 30 C 133 5.21 Absorber effectiveness at air flow rate of 5.7 m 3 /min. and at solution temperature of 20 C. 133 5.22 Absorber effectiveness at air flow rate of 5.7 m 3 /min. and at solution temperature of 25 C. 134 5.23 Absorber effectiveness at air flow rate of 5.7 m 3 /min. and at solution temperature of 30 C. 134 5.24 Absorber effectiveness at air flow rate of 6.4 m 3 /min. and at solution temperature of 20 C. 135 5.25 Absorber effectiveness at air flow rate of 6.4 m 3 /min. and at solution temperature of 25 C. 135 5.26 Absorber effectiveness at air flow rate of 6.4 m 3 /min. and at solution temperature of 30 C. 136 5.27 Regenerator effectiveness at liquid desiccant concentration of 20 % by weight and at process air flow volume of 4.9 m 3 /min. 138 5.28 Regenerator effectiveness at liquid desiccant concentration of 25 % by weight and at process air flow volume of 4.9 m 3 /min. 138 5.29 Regenerator effectiveness at liquid desiccant

xxiv concentration of 30 % by weight and at process air flow volume of 4.9 m 3 /min. 139 5.30 Regenerator effectiveness at liquid desiccant concentration of 20 % by weight and at process air flow volume of 5.7 m 3 /min. 139 5.31 Regenerator effectiveness at liquid desiccant concentration of 25 % by weight and at process air flow volume of 5.7 m 3 /min. 140 5.32 Regenerator effectiveness at liquid desiccant concentration of 30 % by weight and at process air flow volume of 5.7 m 3 /min. 140 5.33 Regenerator effectiveness at liquid desiccant concentration of 20 % by weight and at process air flow volume of 6.4 m 3 /min. 141 5.34 Regenerator effectiveness at liquid desiccant concentration of 25 % by weight and at process air flow volume of 6.4 m 3 /min. 141 5.35 Regenerator effectiveness at liquid desiccant concentration of 30 % by weight and at process air flow volume of 6.4 m 3 /min. 142

xxv LIST OF SYMBOLS C - Concentration of liquid desiccant (% by weight) C.O.P - Coefficient of performance (dimensionless) cp - Specific heat (kj/kg. o k) h - Enthalpy (kj/kg) m - Air mass flow rate (kg/s) P - Pressure (kpa) P e - Corresponding water vapour pressure (kpa) T - Temperature of dry air or refrigerant ( o C) Tb - Wet bulb temperature of air ( o C) V - Volumetric flow rate of air (m 3 /s) W - Humidity ratio (kg of water/kg of dry air) W e - Electricity consumption (kw) Subscript atm - Atmospheric e - Electrical equ - Equilibrium Greek Symbol β - Regenerator effectiveness (dimensionless ) Є - Absorber effectiveness (dimensionless ) ρ - Density (kg/m 3 )

xxvi LIST OF APPENDICES APPENDIX TITLE PAGE 1 Standard specification of thermocouple changeover Switch (RS-506-E) 155 2 Standard specification of an electronic temperature Indicator (RIN-500) 156 3 Results of effect of liquid desiccant flow rate and air flow rate 157 4 Absorber effectiveness 160 5 Regenerator effectiveness 162 6 Publications 164

CHAPTER 1 INTRODUCTION 1.1 Background The 1990s and 1980s were challenging decades for the Heating, Ventilation and Air- Conditioning (HVAC) industry. The need for ever more efficient heating, cooling, ventilation and dehumidification technologies was more urgent than during the energy crisis of the 1970s. Energy resources were more depleted and the energy demands of a growing global population continued to increase with the increase in the demand for comfort cooling even in the developing countries, due to the present modernisation. Mankind are continuously endeavouring to improve their surroundings and make the working and residential environment more comfortable and healthy to the human beings. Started with the first fire set at the mouth of a cave, people have created heating systems to remain comfortable when outside conditions turn cold. However, only within the last century has mechanical cooling equipment been used to provide comfort in buildings. Comfort in buildings can be more than a luxury; a recent study by Rensselaer Polytechnic Institute suggests that comfortable working environment can lead to a 2% improvement in job performance (Bobenhausen, W. 1994). Furthermore is the reduction in absentees due to a reduction in Sick Building Syndrome (S.B.S.). The introduction of the ASHRAE code to increase the ventilation air requirement in building so as to improve Indoor Air Quality (IAQ), ASHRAE - Standard 62-1989 Minimum ventilation rates for acceptable indoor air quality even

2 makes the situation worse for conventional air conditioning equipment. Their capacities need to be increased to accommodate the newly imposed loads. However, with the increased efficiency of the vapour compression equipment the additional sensible load can be easily handled. But the additional latent load is the remaining problem bearing in mind that the ventilation air contributes about 60% of the principal source of moisture load especially in commercial buildings (Harriman, L. G. et al 1999) that adds to the latent load required to be removed. Traditionally air conditioning has been achieved by vapour compression equipment, that are usually very efficient in handling air conditioning load which is characterised by high sensible heat ratio. These equipment performed poorly when a situation of low sensible heat ratio arises (high latent heat ratio). In this case they use the technique of lowering the dew point temperature of the process air to a degree that satisfies the latent heat load removal by condensing the water vapour out of the process air. This dew point temperature will be below the desired temperature level, then reheat or if possible mixing with the re-circulating air to bring the supply air temperature to the desired level. This process of sub-cooling followed by reheat is an energy consuming process which increase the operational costs as well as the capital cost due to the purchase of the reheat equipment. 1.2 Global Warming and Refrigerants The development of more efficient HVAC technology is much constrained now than it was 30 years ago. In recent years, ozone layer depletion and greenhouse effect have created considerable public concern. The fully halogenated chloroflourocarbons CFCs which have provided much needed refrigeration and air-conditioning for about 60 years, are among the gases responsible for the depletion of ozone layer, and for creating global warming. These CFCs must be phased out by now, but in fact they are still being produced and about 65 % produced annually are being used only to replace the leaked out CFCs and the remaining 35 % are used in manufacturing new refrigerators, air-conditioners and other cooling appliances. Knowing that these CFCs have an average lifetime of 100 years in the atmosphere

3 and today s emission will continue to affect the ozone layer for another century or so, one can realise how it is important to find other refrigerants or other methods for cooling that did reduce the use of the refrigerant while meeting the same cooling load. This leads to a considerable research for new refrigerants and the adaptation of the existing machinery to the alternative refrigerant. Also efforts have been devoted to the development of alternative methods of refrigeration and air-conditioning and one of these alternative methods is desiccant cooling. It is unlikely that a single cooling and dehumidification technology will emerge as the perfect solution to today s CFCs /HCFCs systems in all applications. And in order to find a solution to this situation, designers, owners, and manufactures have to examine other options or systems that can solve this to eliminate or reduce the emission of these CFCs / HCFCs, independently or by integration with the conventional methods. One of the most attractive option is the desiccant based cooling system. Desiccants are materials that have strong affinity for water, they adsorb/ absorb water from the air when brought into direct contact with them, hence, the air become drier and warmer and requires to be cooled by other conventional method before being delivered into the conditioned space. The desiccant becomes saturated or diluted after adsorbing/ absorbing the moisture from the air, and needs to be regenerated by adding heat to drive-off the adsorbed/ absorbed moisture. Any integration of desiccant based cooling system with the vapour compression system will result in a hybrid system, which will benefit from the characteristics of both systems (vapour compression system is very efficient in handling the sensible load, while the desiccant system has the superiority of handling the latent load effectively) and hence, separating the load between them. This also results in high coefficient of performance of the vapour compression system, because it s evaporator will work at higher temperature, making the size of the unit to be used smaller. 1.3 Market Forces In the late 1980s a number of market forces accelerate the demand for desiccant based cooling system equipment, these forces are:

4 (i) Indoor Air Quality (IAQ): The application of new ASHRAE standard (ANSI/ASHRAE STANDARD 62-1989, Ventilation for acceptable indoor air quality) to address the IAQ problems, increased the ventilation air on average from 5 cfm per person to 15-20 cfm per person, increasing the latent load fraction that the HVAC system should handle (McGahey, K.1998). (ii) Demand for comfort: Controlling the humidity level has shown a great effect on some air conditioning application economics, typical applications are hotels, hospitals, clean rooms (McGahey, K.1998). (iii) New economics of air conditioning: The economic cost involved in some applications that require tight control of humidity accelerated the implementation of desiccant based cooling system to address the high cost in such applications, typical applications are museums, libraries, and others (McGahey, K.1998). 1.4 Problem Statement Desiccant systems (solid and liquid) are available for around 30 years or so, but surprisingly their full potential is yet to be realised. Part of that is due to the precedence that they can only be used in special applications mainly in industrial process and industrial air conditioning which resulted in a lack of knowledge within the Heating, Ventilating, and Air Conditioning (HVAC) engineers about their potential applications in the area of residential and commercial air conditioning, especially when integrated with other technologies. Questions like the following have to be answered:

5 i) How can these systems be operated to achieve their optimal working conditions (with emphasis on liquid desiccant)? ii) What are the main components of the liquid desiccant system that need special consideration to help achieve such goal? iii) What is the benefit of using liquid desiccant in the air conditioning field and how they can be integrated with the most common technology like vapour compression equipment? iv) What kind of improvement is expected from such proposed system? Vapour compression units are well known for their superiority in the applications characterised with or dominated with higher sensible load fractions, and the desiccants are known for their ability to tackle humid air and they are superior in terms of dehumidification compared to the vapour compression. Based on these facts the proposed hybrid system consisting of vapour compression unit and a liquid desiccant sub-system may offer better performance and have to be proven practically, hence the research problem/hypothesis can be formulated as: What a hybrid liquid desiccant cooling system would offer in terms of improvement in the performance, and what are the optimal working conditions for the liquid desiccant sub-system in order to achieve such improved performance in terms of coefficient of performance and better humidity control. 1.5 Research Scope The scope of this research is to study of a hybrid desiccant based cooling system. This system containing vapour compression system is integrated with a liquid desiccant system and a flat plate solar hot water collector. Development of the system and testing its performance and operational potential is undertaken to reduce the use of the conventional air conditioning methods with more emphasis on the

6 liquid desiccant sub-system. Different liquid desiccant system arrangement and different modes of operation will be studied to find the optimal system configuration and hence to determine the available and economical method for regeneration (solar energy, waste heat reclaim) that is to be used to obtain improvement in the system coefficient of performance. Also the effect of liquid desiccant on the coefficient of performance of the vapour compression unit will be studied. 1.6 Research Objectives The objectives of the research can be summarised in the following points: i. To determine the effect of liquid desiccant-based cooling system on the performance of the vapour compression system when both systems are integrated together (hybrid system). ii To determine the working condition for the absorber and the regenerator of the liquid desiccant sub-system. iii To determine the methods and options of regeneration process (solar energy, waste heat recovery) and selecting the proper option to reduce energy consumption and hence reduce the system operating cost. iv To determine the improvement in the coefficient of performance of the vapour compression unit when it works at higher evaporator temperature. 1.7 Thesis Outline Chapter Two covers the literature review and work done in the field of desiccant application in the air-conditioning field. Solar cooling and solar energy usage related to the same field are also given in Chapter Two with applications in

7 regeneration of desiccant materials with more emphasis on applications in liquid desiccant regeneration Chapter Three gives the theoretical framework of different air-conditioning cycles and systems, mainly the vapour compression cycle and the desiccant systems, and the principles of how desiccant sub-system works when integrated with the above mentioned cycle. More theory about what desiccant materials are and how they work, their cycle, and their classifications are also explained. Chapter Four is devoted to the methodology and system configuration and the setting of the testing facility with full description. Data logging system and its features and limitations are also given. Independent and dependent variables and all measurable values with details of how these measurements were conducted are fully explained. Chapter Five deals with the results and calculations carried out with the discussion given. Also Absorber effectiveness and regenerator effectiveness were calculated and discussed and the benefits from using desiccant sub-system are given. Six. Conclusions and recommendations for future work are discussed in Chapter

REFERENCES Abdul Wahab, S. A., Zurigat, Y. H., and Abu-Arabi, M. K. (2004). Prediction of Moisture Removal Rate and Dehumidification Effectiveness for Structured Liquid Desiccant Air Dehumidifier. Energy: 19-34. Albers, W. F., Beckman, J. R., Farmer, R. W., and Gee, K. G. (1991). Ambient Pressure, Liquid Desiccant Air Conditioner. ASHRAE Transactions. 97 (2): 603-608. ASHRAE. (1993). Sorbents and Desiccants. In: ASHRAE Handbook-Fundamentals, American Society of Heating, Refrigerating, and Air- Conditioning Engineers Inc.: Atlanta, USA. ASHRAE. (1985). Sorbents and Desiccants. In: ASHRAE Handbook-Fundamentals. American Society of Heating, Refrigerating, and Air- Conditioning Engineers, Inc.: Atlanta, USA. ASHRAE. (1977). Sorbents and Desiccants. In ASHRAE Handbook-Fundamentals. American Society of Heating, Refrigerating, and Air- Conditioning Engineers, Inc.: Atlanta, USA. ASHRAE. (1979). Sorption Dehumidification and Pressure Drying Equipment. In: ASHRAE Handbook-Fundamentals. American Society of Heating, Refrigerating, and Air-conditioning Engineers, Inc.: Atlanta, USA.

149 Badawi, E. M. (1998) Properties and Performance Characteristics of Liquid Desiccant. Universiti Teknologi Malaysia: Master of Engineering. Thesis. Banks, N. J. (1990). Desiccant Dehumidifiers in Ice Arena. ASHRAE Transactions. 96 (1): 1269-1272. Banks, N. J. (1992). Field Test of a Desiccant-Based HVAC System for Hotels. ASHRAE Transactions. 98 (1): 1303-1310. Bobenhausen, W. (1994). Simplified Design of HVAC Systems. New York, U.S.A: John Wiley & Sons Inc. Burns, P. R., Mitchell, J. W., and Beckman, W. A. (1985). Hybrid Desiccant Cooling Systems in Supermarket Applications. ASHRAE Transactions. 91 (1B): 457-467. Chung, W. T., Ghosh, T. K., Hines, A. L. and Novosel, D. (1993) Removal of Selected Pollutants From Air During Dehumidification By Lithium Chloride And Triethylene Glycol Solutions. ASHRAE Transactions. 99: 834-841. Collier, R. K. and Cohn, B. M. (1991). An Analytical Examination of Methods for Improving The Performance of Desiccant Cooling Systems. Journal of Solar Energy Engineering. 113: 157-163. Cohn, B. M. and Slosberg, R. B. (1988). Application of Gas-Fired Desiccant Cooling Systems ASHRAE Transactions, 94 (1); 525-536. Dai, Y. J., Wang, R.Z., Zhang, H. F., and Yu, J.D. (2001). Use of Liquid Desiccant Cooling to Improve The Performance of Vapor Compression Air Conditioning. Applied Thermal Engineering. 21: 1185-1202. Dhar,P. L., Kaushik, S. C., Jain, S., Pahwa, D., and Kumar, R. (1995). Thermodynamic Analysis of Desiccant Augmented Evaporative Cooling Cycles for Indian Conditions. ASHRAE Transactions. 101 (1): 735-749.

150 Gandhidasan, P. (1984). Comparative Study of Two Types of Solar Regenerators for Liquid Absorption Dehumidification System. ASHRAE Transactions. 90 (2A): 78-84. Gandhidasan, P. (1983). Theoretical Study of Tilted Solar Still as a Regenerator for Liquid Desiccants. Energy Convers. Mgmt. 23 (2): 97-101. Goswami, D. Y.,Ek, G., Leung, M., Jotshi, C. K., and Sherif, S. A. (2001). Effect of Refrigerant Charge on the Performance of Air conditioning Systems. Interntional Journal of Energy Research. 25: 741-750. Halliday, S. P., Beggs, C. B., and Sleigh, P. A. (2002). The Use of Solar Desiccant Cooling in The UK: A Feasibility Study. Applied Thermal Engineering. 22: 1327-1338. Harriman, L. G., Czachorski, M., Witte, M. J., and Kosar, D. (1999). Evaluating Active Desiccant Systems For Ventilating Commercial Buildings. ASHRAE Journal. 42 (10): 28-37. Henning, H-M., Erpenbeck, T., Hindenburg, C., and Santamaria, I. S. (2001). The Potential of Solar Energy Use in Desiccant Cooling Cycles. International Journal of Refrigeration. 24: 220-229. Hollands, K. G. T. (1963). The regeneration of Lithium Chloride Brine in a Solar Still. Solar Energy. 7 (2): 39-43. Jain, S., Dhar, P. L., and Kaushik, S. C. (1995). Evaluation of Solid Desiccant-Based Evaporative Cycles for Typical Hot-Humid Climates. International Journal of Refrigeration. 18 (5); 287-296. Jain, S., Dhar, P. L., and Kaushik, S. C. (2000). Experimental Studies on The Dehumidifier and Regenerator of a Liquid Desiccant Cooling System. Applied Thermal Engineering. 0: 253-267.