City of Eugene Stormwater Tour

Similar documents
Potential Green Infrastructure Strategies May 6, 2015 Workshop

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

MILLS PARK & PANTHER CREEK GREENWAY

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Rouge River Gateway Master Plan Update: 2011

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

FY Capital Improvement Program Arroyo Projects

Stormwater Retrofits Made Practical City of Eugene Oregon. Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works

WILLAMETTE FALLS LEGACY PROJECT

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Glenborough at Easton Land Use Master Plan

Welcome to the San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

McDaniel Creek Master Plan

Grand Rounds History

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Welcome to the. Open House

Mid-Town Neighborhood Development Plan

Las Colonias Park Master Plan

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

AREA-WIDE PEDESTRIAN AND BICYCLE CIRCULATION

A G E N D A Council Update Training Room September 26, :45 p.m.

ALTERNATIVE STATION AREA -

What Pioneer Grove Will Look Like?

October 26, :00 pm

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

MCCOYS CREEK RESTORATION 30% DESIGN

ROAD PAVING VARIOUS LOCATIONS LANE KM

Arroyo Grande Creek Flood Control Channel Vegetation Management: A Photo Series

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

Comanche Creek Greenway IMPROVEMENT PROJECT

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Enhance the High Line Canal Projects

Rich Valley Greenway Master Plan. Central Greenway Connectivity Study

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

South Bismarck Watershed Model Update and Stormwater Improvement Project

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

CHAPTER 2 PROJECT DESCRIPTION

Blue Line LRT Extension

Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal

SOUTH PARK. Construction of a Portion of South Park at Fresh Kills Park, Staten Island

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Public Meeting May 20, 2014

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Information for File # SEK

HAZARD MITIGATION GOALS AND OBJECTIVES

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

Promote Compact Urban Development and Efficient Transportation Options

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

The Benefits and Challenges Associated with Green Infrastructure Practices

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32

ITA and Vicinity Master Plan Update

K+P TRAIL EXTENSION FEASIBILITY STUDY PRELIMINARY SITE ANALYSIS PLAN PREPARED FOR THE CITY OF KINGSTON NOT FOR CONSTRUCTION

Fall 2017 Construction Update

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Farmers Investment Co. (FICO) Continental Farms

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

Edgeley Pond + Park Public Meeting

G A R Y G R E E N L I N K APPENDIX A

City of Troutdale South Troutdale Road Storm Drainage Plan

Balancing Conservation and Development on the Jordan River

Bruce Adams, Waste Water Treatment Plant Operations Manager, City of Cortland Chris Bistochi, Public Works Director, City of Cortland

DRAFT. Waterfronts and Open Spaces. 10 The Riverfront Open Space System

Neighborhood One. Location. Existing Land Use

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Obey Creek July 17, Vicinity Map. Concept Plan Submittal. No

5-Year Street Reconstruction Plan ( )

Minto-Brown Island. November 18, City of Salem, Parks & Transportation Services

NORTH DISTRICT. Description

SHEFFIELD PARK Paulding County, GA DRI #588

Meeting Overview. Key Takeaways ~ MERRICK I. Project: Globeville Stormwater System Study. Date and Time: 05/09/2018 from 5:30 pm 7:30 pm

include playgrounds, sports fields, community gardens and picnic areas.

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

Neighborhood Districts

Carolina North Individual Permit Application September 2010 Draft

CITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION

Wildflowers grow in the new community park on Oakwood Road

CITY OF VALPARAISO STORMWATER MASTER PLAN

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA

Westside Creeks. Elmendorf Lake Park and Linear Creekway Trails Project

Mendota-Lebanon Hills Greenway Master Plan Executive Summary. August draft for more information visit

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Stormwater in the Lower Jordan Creek Watershed

Bristol Marsh Heritage Conservancy

Mendota Heights 2040 Comprehensive Plan Draft Vers

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback

LANDSCAPE RESOURCE SURVEY University of Oregon Campus Heritage Landscape Plan Eugene, Lane County, Oregon June 6, 2016

Transcription:

Berntzen Rd. Baxter St. Hyacinth St. Bushnell Ln. Bonvue N. Park Ave. Park Ave. Horn Ln. Lake Dr. Fairway Dr. Ross Ln.. N. Jackson Dr. Ferndale Dr. Dalton Dr. Andersen Ave. Pamell St. Banner St. Manazana St. Manazana Evergreen Dr. Willagillespie Rd. City of Eugene Stormwater Tour Korbel St. Arrowhead St. Lancaster Dr. ARROWHEAD Irvington Dr. 4 Barstow Ave. Spring Creek Lodenquai Ln. Blackfoot Ave. Anchor Ave. TERRA LINDA River Loop 1 Wilkes Dr. River Loop 1 Madison Middle School River Loop 1 WHITELY LANDING (Lane County) *) 1820 Roosevelt Blvd. Alderbrook Ln. Irving School Greenfield Ave. FERNDALE 3 River Loop 1 1) The Polk Street Water Quality Improvment Vault Irving Rd. Kalmia St. Irving Rd. Santa Clara Green Ln. Lone Oak Lp. 2) The Heron Slough Restoration Project MANGAN PETERSEN BARN & Kenmore Taney St. Malabon Prairie Road Maxwell Rd. Hawthorne Ave. Smithoak St. Elmira Rd. Anthony Bramb Bushnell Ln. lewood BRAMBLEWOOD Fairfield Bell Ave. Wood Ave. Beltline Highway WALNUT GROVE Fairfield Ave. Labona Dr. Compton LARK Skipper Ave. Bethel N. Park Ave. Bennett Ln. Gilbert St. Coraly Ave. Colin Kelly Middle School Hatton Ave. Barrett Ave. Nantucket Ave. EMERALD (River Road Park & Recreation District) TRAINSONG GILBERT Maple St. Figueroa St. Seneca Rd. Ruby Ave. RUBY Emerald Park Dr. Northwest Expressway Southern Pacific Railroad Santa Clara Ave. Howard Bell St. Corridor Beebe Ln. Edison St. Silver Ln. Howard Ave. Bethel Dr. North Eugene High School Barton Dr. Harvey Ave. River Rd. Maynard Ave. 2 ROSETTA PLACE Benjamin St. Horn Ln. Lone Oak Way Rosetta Ave. Owosso Dr. Hilliard Ln. Elkay Dr. LONE OAK River Ave. E. Howard Ave. Melvina Way Merry Ln. River Road Roosevelt Blvd. * Copping St. OWOSSO PED/BIKE BRIDGE W i l l a m e t te R i v e r WEST BANK Crest Dr. Lone Oak Ave. River Road Park Annex River Rd. Division Ave. Stults Ave. RASOR Rasor MAURIE JACOBS Chambers St. Beaver St. Kingsley Rd. EAST BANK 3) Drywell Elimination Program Shirley Area 4) Drywell Elimination Program Willowbrook Area Marist High School GREENWAY PED/BIKE BRIDGE Railroad Blvd. Cross 1 N. Polk St. Goodpasture Lakes Lp. Delta Ponds Goodpasture Island Rd. SLADDEN N. Grand St. Cedar St. N. Adams St. Clark St. Delta Hwy. Valley River Dr. Valley River Way Russet Dr. OWEN ROSE GARDEN 1st Ave. (Permit required for bikes) Happy Ln. Fir Acres Dr. Rio Glen Dr. Clinton Dr. Washington/Jefferson Bridge Green Acres Rd. Willagillespie Wi l l a met t e River RIVER PLAY SKINNER BUTTE Wallis St. 5th Ave. SCOBERT GARDENS Blair Blv 2nd Ave. WASHINGTON JEFFERSON 5th Ave.

Polk Street Outfall Project at a Glance 2008 Construction o Multi-year Planning Process Upstream from Willamette River o High Visibility 770 Acre Basin Cleaned 3x Year PW Maintenance Staff $ 1.14 Million Removes Sediment, Oil, Grease, & Trash Storm Outfall can be by-passed to Sanitary Sewer for spill response

Oil Baffle Trash Rack Slide Gates Weir Structure Construction Sediment Chamber Routine Maintenance Post Construction

Heron Slough Project at a Glance 2010-2012 Construction Backwater habitat for juvenile Chinook Salmon Willamette River flow-through (+8000 cfs) Multiple Funding Sources and Construction Phases o ACOE, NOAA, City of Eugene Part of Larger 10+ Yr. Delta Ponds Restoration/Enhancement o See Included Delta Ponds Project Map

2008 2012 2008 2012 2008 2013

January 2014 Aerial Photo Base: Summer 2009 Side Channel Constructed (2010) Shared-Use Path (2003) Bicycle-Pedestrian Bridge (2010) Heron Slough Side Channel Constructed Bicycle-Pedestrian Bridge (2012) Invasive Species Control and Riparian Planting (2009-2011) Parking Lot (2005) Boardwalk Trail (2008) (2005) R Boardwalk Invasive Species Control and Riparian Planting (2010-2012) Trail Bridge Bridge Trail Invasive Species Control and Riparian Planting (2004-2012) Shared-Use Path (2003) Parking Lot Culvert to Allow Flow Under Road (2010) Bridge Bridge Invasive Species Control and Riparian Planting (2004-2012) Shared-Use Bridge and Path (2010) Completed or Planned Enhancements Weir Installed to Allow High Water Flow into Ponds (2005) Gated Culvert to Regulate Flow (August 2007) Shared-Use Path (2003) R Delta Ponds Project Boundary Weir (inlet to ponds from river) Gated Culvert Culvert Excavated Channel (to improve flow within ponds) Riparian Bench (contoured and planted 2008-2011) Parking Lot Pedestrian Trail Planned Pedestrian Trail Bridges (existing or planned) Interpretive Signage Direction of Water Flow Restroom

Drywell Elimination Program Shirley Area Project at a Glance 2012 Construction 16 Drywells Catchment Area 30 Acres Ferndale Park Swale (0.30 acres) New Collection System (4800 pipe) Overflow to existing Lane County system (Spring Creek) $1 million Oregon APWA Environmental Project of the Year 2013

June 2012 September 2012 November 2012 May 2013 Sept 2013 April 2014

Drywell Elimination Program Willowbrook Area Project at a Glance 2013 Construction 7 Drywells Catchment Area 13 Acres Willowbrook Swale (City of Eugene ROW) New Collection System (1370 pipe) Overflow to existing Lane County system (Irvington Rd) $500,000 History of Neighborhood Flooding

Neighborhood Flooding April 2013 July 2013 September 2013 September 2013 March 2014