FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units

Similar documents
Welcome! Today s topic: Small Home Repairs. November 14, 2015

Minor Home Repairs. November 4, County of Henrico Department of Community Revitalization

kk21 installation Kk21-WF21 Things you might need for the installation: vessel sink,

Dimensions: 39 1/2" w x 22" D x 35.5 H. kk25 installation. Things you might need for the installation: vessel sink,

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

8707T Includes seat. 8745T Includes Bowl

3/4.8 AERODYNE 3/4.8L CLASS FIVE+

Installation Manual PS-200 & PS-201

IB 835. Installation Manual. Integrated Bidet Toilet TABLE OF CONTENTS

REVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS 现代型分体座便器 CONTEMPORARY TWO-PIECE TOILET K-17178T-S/K-17178T-SP

installation and operation manual for Hunter Ceiling Fans

SWIVEL HEAD WASTE AND OVERFLOW INSTALL

How To: PREPARATION REPLACE A KITCHEN SINK

3/4 HP Model Trimmer Operating Instructions

Things you might need for the installation: vessel sink, plumber's putty(home depot), liquid nails(home depot), Bucket silicone caulk(home depot),

Page 1 of 18. Part# /5/2013

WIDESPREAD KEEP THIS INSTRUCTION BOOKLET FOR FUTURE REFERENCE

Installation Manual PS-225 & PS-275

Acrylic Claw Foot Tub

Sloan AQUS Installation Instruction, Operation, and Maintenance Guide

ACRYLIC PEDESTAL TUB

Acrylic Claw Foot Tub

Sign Planogram: Plumbing Repair Bay Name: Plumbing Repair 4.1. Toilet Repair. 72" from floor to bottom of AV. Replacing a Fill Valve

BURWELL BIDET TOILET SEAT INSTALLATION

REVIVAL LITE VITREOUS CHINA REVERSE TRAP TOILET

Owner s Guide and Installation Manual

WELLWORTH /HIGHLINE WITH PEACEKEEPER VITREOUS CHINA TOILET

Fixtures Installation

ONE PIECE TOILET LT3. Model: MPN: B0940 INSTALLATION INSTRUCTIONS. Version: 1.0

STAINLESS STEEL TUB INSTALLATION

Things you might need for the installation: vessel sink, plumber's putty(home depot), liquid nails(home depot), Bucket silicone caulk(home depot),

Owner s Guide and Installation Manual

FREELANCE ORDERING INFORMATION NOTES T01-D

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

TARVER SINGLE HOLE FAUCET INSTALLATION

PORTRAIT LITE VITREOUS CHINA REVERSE TRAP TOILET

MEMOIRS VITREOUS CHINA TOILETS

installation and operation manual for Hunter Ceiling Fans

LUDGATE SINGLE HOLE FAUCET INSTALLATION

REVE ORDERING INFORMATION NOTES T01-E INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17178T-S2/K-17178T-SBG2/K-17178T-SP2

MEMOIRSS ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS (4.8L) VITREOUS CHINA ONE-PIECE TOILET(4.8L) K-3451T-*/K-3453T-*

Ariel PlAtinum AnnA tb222m installation guide

CAST IRON PEDESTAL TUB

AUBEREE CENTERSET FAUCET INSTALLATION

STOP RESIN TUB WITH INTEGRAL DRAIN PLANNING BEFORE YOU BEGIN TOOLS AND MATERIALS: GETTING STARTED INSTALLATION INSTRUCTIONS.

ODEON BEFORE YOU BEGIN ORDERING INFORMATION T01-C , 2006 Copyright Kohler China Ltd.,

OVE ORDERING INFORMATION NOTES T01-A INSTALLATION INSTRUCTIONS ELONGATED TWO-PIECE TOILET K-17737T/K-17737T-S

LETA SINGLE HOLE FAUCET INSTALLATION

Installation Instructions

Tips from the Drain Cleaning Pro s

SAN RAPHAEL GRANDE ORDERING INFORMATION NOTES T01-B INSTALLATION INSTRUCTIOINS 4.8L SKIRTED CLASS FIVE ONE-PIECE TOILET 4.

Owner s Guide and Installation Manual

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SUPPLEMENTARY INSTRUCTIONS

WELLWORTH WATERGUARD VITREOUS CHINA SIPHON JET TOILET

INSTALLATION & OPERATING INSTRUCTIONS

BMW E36 Thermostat Removal And Coolant Flush

Owner s Guide and Installation Manual

Installation Instructions

Installation Instructions

GRANITE COMPOSITE SINK

ANTARES ORDERING INFORMATION NOTES T01-G INSTALLATION INSTRUCTIONS

MENZA CENTERSET FAUCET INSTALLATION

EDGEMERE DUAL CONTROL WIDESPREAD LAVATORY FAUCET INSTALLATION INSTRUCTIONS

SAFETY OPERATION & MAINTENANCE MANUAL X-405 CARPET EXTRACTOR This unit is intended for commercial use.

Owner s Guide and Installation Manual

Owner s Guide and Installation Manual

INSTANT HOT WATER DISPENSER

INSTALLATION INSTRUCTIONS

COUTURE ECO-LITE VITREOUS CHINA REVERSE TRAP TOILETS

Owner s Guide and Installation Manual Manual De Propietario

STONE TROUGH CONSOLE SINK

CONSTANT SUCTION UNIT

Dyna-Star HP or HF Pump 35# Pail Kit and Follower Plate

SUBCOURSE EDITION EN5155 US ARMY ENGINEER SCHOOL CLEAR WASTE SYSTEM STOPPAGES PLUMBING VI

BROEG SINGLE HOLE FAUCET INSTALLATION

EDISON DUAL HANDLE VESSEL SINK FAUCET

Standard Downrod for ceilings 8-10 feet high. Longer Downrod for ceilings 10 feet or higher

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

Table of Contents. What to Expect with. Tools Needed. Mounting Options. Blades

BARRINGTON PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET K-4327

HydroCycle Vertical Aeroponic Systems

REACH ORDERING INFORMATION NOTES T01-B

INSTALLATION INSTRUCTIONS

ADAIR ORDERING INFORMATION T01-A

Table of Contents What to Expect with Your Installation. Top Housing. Ceiling Plate. Tools Needed.

GE Monogram. Automatic. Icemaker. Installation Instructions. Models ZDI15 ZDIS15. monogram.com

Dryer. User manual DV22K6800** DV22K A-00_EN (US)_ indd :15:41

PrimePour TM Operation Manual

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

RYLE WIDESPREAD FAUCET INSTALLATION

Viking Installation Guide

INSTALLATION INSTRUCTIONS

Owner s Guide and Installation Manual

Replace a Toilet. How to

Installation Instructions EFS Hand Washing Station

CAOL VESSEL SINK FAUCET INSTALLATION

REFRIGERATOR INSTALLATION INSTRUCTIONS / \ / \

Type 2 Models. Owner s Guide and Installation Manual. English Español

Transcription:

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units CHAPTER 5 UNIT MAINTENANCE INSTRUCTIONS 06 BOH Environmental LLC

This page was intentionally left blank

00 00 UNIT MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units Door assembly and rivet replacement INITIAL SETUP: Materiel/Parts Door Seal Kit Personnel Required One Tools Rags, /4 hp Electric Drill, Pop Rivet Tool, /6 drill bit References None Equipment Condition Latrine Door Seal Repair INSPECT, REPAIR REPAIR OR REPLACE DOOR SEALS. Inspect door seals for cracks or damage.. Prop the door in the open position.. Remove the damaged door seal (). 4. Wipe the rivet surfaces clean with solvent. 5. Apply new self-adhesive seal. 00 00-

00 00 General Rivet Repair WARNING Use proper eye protection when operating a drill.. For rivets, use a / hp electric drill () with a /6 drill bit (), and drill through the center core of the rivet ().. Remove the remainder of any pop rivet debris with needle nose pliers and wipe the hole clean with a rag.. Insure the holes are properly aligned. 4. Insert a new pop rivet, /6 DIA (), through the holes of both items to be secured and into the pop rivet tool (4). 5. Use the pop rivet tool (4) to secure the pop rivet () and item in place. 6. Check for proper alignment and tight attachment of the item. 7. Return the door to the closed position and check the door operation and seal contact. 4 END OF WORK PACKAGE 00 00-

004 00 UNIT MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units Latrine Magnetic Door Latch INITIAL SETUP: Materiel/Parts References Magnetic Door Latch Kit None Personnel Required Equipment Condition One Latrine Door Latch Replacement Tools /4 hp Electric Drill, Pop Rivet Tool,.0 drill bit, Sharpy Marker, /8 and 7/6 Socket Wrench and 5/ Allen Wrench INSPECT, REPLACE, INSTALL Transported Inside 4 Replace. Assemble magnetic door latch () and mounting bracket (), as shown, with the ¼ button head screws () and nuts (4), by using a 5/ Allen wrench and 7/6 socket or wrench. 5. Attach and center striker plate (5) to the magnet, as shown. 004 00-

004 00 Latch Location 5 4. The latch kit is installed on the opposite side of the door hinges.. Mockup the magnet and striker plate assembly (), as shown on upper right, or upper left corner of door (), depending on unit side. The striker plate should be positioned /8 from the top door trim and ¼ from the side door trim as shown.. Mark the pilot hole locations () for rivets and self- tapping screws with the Sharpy marker. 4. Drill holes for rivets and self- tapping screws using the 0.0 drill bit. 5. Remove striker plate (4) from magnet (5) and mounting bracket (6). 6. Assemble striker plate (4) with two provided rivets as shown. Install 6 6 5 5. Install magnet (5) and mounting bracket assembly (6) as shown using two provided #4 selftapping screws and the /8 socket or wrench.. Adjust contact of magnet (5) and striker plate (4) and tighten self-tapping screws until mounting bracket (6) is firmly attached to the header trim.. If existing door retention latch was removed from the door, plug the remaining holes using the additional rivets provided. 4. Test the door retention and adjust the mounting bracket (6) if needed..end OF WORK PACKAGE 004 00-

005 00 UNIT MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units VENT FAN INITIAL SETUP: Materiel/Parts References See Appendix B parts list Appendix B Personnel Required Equipment Condition One Latrine Vent Fan Model 67 Tools Rags, Paint Brush INSPECT, REPAIR NOTE For detailed repair information, refer to Appendix B, BROAN Vent Fan Specification Sheet.. Turn off the vent fan switch off the circuit breaker. Pull down the vent grille ().. Compress the mounting spring clips () to detach the grille. NOTE The grille () is nonmetallic and may be washed with soap and water when there is excessive dirt. 4. Inspect and clean the grille () and internal parts () with the rags and paint brush. 5. Attach the spring clips () and push the grille () back into place. 6. Switch on the circuit breaker and fan switch. END OF WORK PACKAGE 005 00-

This page was intentionally left blank

006 00 UNIT MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units LIGHT FIXTURE INITIAL SETUP: Materiel/Parts New Fluorescent Tube Personnel Required One Tools Rags, Flashlight References Appendix C Equipment Condition Latrine Florescent Light Fixture INSPECT, REPAIR. Switch off the lighting and switch off the circuit breaker.. Release the latches to open the fluorescent light fixture cover (). NOTE Remove and replace defective fluorescent tube () by twisting it in place and ensure contact.. Wipe the cover clean with a damp rag. 4. Wipe off the fluorescent tube with a dry rag. 5. Replace faulty tubes and switch on the circuit breaker and lighting switch. WARNING END OF WORK PACKAGE Fluorescent tubes may contain hazardous material. 006 00-

This page was intentionally left blank

007 00 UNIT MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units TOILET INITIAL SETUP: Materiel/Parts References Toilet repair parts WP 0004 00-4 Personnel Required Equipment Condition One Plumber ARMY MOS K Latrine Toilet Repair Tools Rags, Flashlight, Plunger, Slip Joint Pliers, Bucket, Adjustable Wrench INSPECT, REPAIR Leakage at the floor. With a flashlight, inspect the base for leaks at the floor level ().. Inspect the tank gasket and bowl for leakage ().. Shut off the water supply valve at the floor level (). 4. Turn off the main city water valve (5) 5. Flush and drain the bowl and tank for repair. 6. Remove tank cover (). 7. Check the tank water level. 8. Remove the two retaining nuts and washers at the sides of the toilet. 9. Remove the toilet for base floor leakage. 0. Replace with a wax ring and hardware kit (4).. Reinstall the toilet.. Tighten the retaining nuts and washers.. Reconnect the water supply connection. 4. Open the water supply valve and test the toilet. 5. Replace the tank cover. Example 4 5 OFF Note The Main Shutoff valve (5) is located at the City Water connection. 007 00-

007 00 Leakage between the Tank and Bowl. Shut off the water supply at the floor.. Remove the cover.. Disconnect the fill/float valve supply connection. 4. Flush and drain the tank for repair. 5. Remove the retaining nuts and washer from under the tank and bowl. 6. Replace the tank gasket. 7. Check the fill/float valve nut for tightness and leaks. 8. Replace the gasket if needed. 9. Reinstall the tank; tighten the tank/bowl nuts and washers. 0. Connect the water supply line.. Open the supply valve.. Test the tank by flushing.. Adjust the overflow water level. Example Example Water Continuous Flow. Operate the flush valve to test if water flow will not cease.. Remove the tank lid.. Check and adjust the fill/float valve. 4. Check the flap valve. 5. Replace the fill/float valve. 6. Shut off water supply at the floor. 7. Disconnect the fill/float valve supply connection. 8. Drain the tank. 9. Remove the fill/float retaining nut and gasket. 0. Replace the fill/float valve.. Tighten the retaining nut and gasket.. Open the water supply at the floor.. Test the toilet. END OF WORK PACKAGE 007 00-

008 00 UNIT MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units URINAL INITIAL SETUP: Materiel/Parts References Urinal repair parts and sanitation supplies Appendix A and WP 0004 00-4 Personnel Required Equipment Condition One Plumber ARMY MOSK Latrine Urinal Repair Tools Rags, Flashlight, Plunger, Slip Joint Pliers, Bucket, Adjustable Wrench, /6 Allen Wrench URINAL Clogged Urinal Trap. Use a plunger to forge clog through.. Operate the flush valve () to test.. If clog remains, turn off the urinal water supply valve under the sink in the vanity cabinet. 4. Turn off the urinal water supply valve under the sink in the vanity cabinet. 5. Place a catch bucket under the urinal. 6. Loosen the retaining nuts () on the trap (). 7. Empty the trap () and flush with water. 8. Install or replace the trap () if needed. 9. Ensure the gaskets (4) are in place; tighten the retaining nuts () by hand. 0. Pour some water in the urinal to test for leakage.. Open the water supply valve located under the sink and operate the flush valve () to test. 4 008 00-

008 00 Water Flush Valve. Operate the flush valve several times () to test.. If water flow will not cease, turn off the urinal water supply valve (). NOTE Valve flow adjustment is done with a /6 Allen Wrench. Adjust closing time from to 5 seconds. Operate the flush valve to clear of water. 4. Loosen and pull back both covers for access to the connections. 5. If adjustment fails, loosen the retaining connections and remove the flush valve. 6. Replace the flush valve and tighten the retaining connections. 7. Open the water supply valve. 8. Flush the urinal to test the valve. OFF END OF WORK PACKAGE 008 00-

009 00 UNIT MAINTENANCE INSTRUCTIONS FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units ELECTRICAL SYSTEM INITIAL SETUP: Materiel/Parts Replacement Circuit Breakers Personnel Required One Certified Electrician (Army MOS R) Tools Electrical Tool Set References None Equipment Condition Operational Set Up INSPECT, REPAIR WARNING Only a certified electrician should be permitted to remove and repair the electrical connections and components of the system. The electrical ground must be established first to prevent electrical shock to personnel. Consult DOD 60055.9-STD Chapter 7 Grounding. MAIN and #, #, # and #4 GFCB Circuit Breakers 009 00-

009 00 Electrical System NOTE Circuits have been labeled to match the circuit breakers. Ground Wire Bus on the Left Neutral Wire Bus on the Right NOTE The Ground Rod () is stored in one of the compartments next to the Toilet. 009 00-

009 00 Load Center Wiring Layout GROUND WIRE TO GROUND LUG POWER SOURCE CABLE ENTRY 009 00-

009 00 Container Electrical System Layout END OF WORK PACKAGE 009 00-4