INTER-AGENCY COORDINATION MEETING

Similar documents
ENVIRONMENTAL ENGINEERING LAND SURVEYING

ALIGNMENT SEGMENTS & OPERATIONALLY INDEPENDENT SECTIONS

Prospective Applicants for an Exterior Vehicle and Equipment Wash Wastewater General Permit

Town of West Point Plan of Development

Rule D Wetland and Creek Buffers

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

SOIL EROSION AND SEDIMENT CONTROL

CHECKLIST FOR PHASE II DRAINAGE REPORT

KING GEORGE COUNTY BOARD OF SUPERVISORS. Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Monitoring and Maintenance Permit Process

Stormwater Program Coordinator: Title: Office Phone #: Emergency Phone #: Public Notice Coordinator: Title: Office Phone #: Emergency Phone #:

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

Erosion & Sediment Control Plan Application Form & Checklist

Master Land Use Plan Application

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Florence County Small Commercial Land Disturbance Permit Application

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

DRAFT MAP AMENDMENT FLU 04-4

Table of Contents for the REGULATION (EU) 2017/745 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2017

ROANOKE STREET IMPROVEMENTS CHRISTIANSBURG, VIRGINIA VDOT PROJECT # U R24 UPC #:

4. Contractor (and subcontractors if applicable) certification statement(s)

64 Mineral Extraction Area Rules

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Chapter 4 - Preparation of Stormwater Site Plans

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST


City of Waco Stormwater Management Regulations

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

ARTICLE VI: SITE PLAN REVIEW

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Northern Branch Corridor DEIS December 2011

Draft Rhode Island Stormwater Design and Installation Standards Manual

City of Shady Cove Riparian Ordinance Ordinance XXX

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

ZONING COMPLIANCE PERMIT APPLICATION

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Understanding Drainage Options What s Feasible and Legal. February 2019

Stormwater Management Resource Type:

Old Mill Community Association Bioretention Facility

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

APPENDIX 2 NORTHEAST AIR ALLIANCE. SMOKE MANAGEMENT PLAN For Butte, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama

DRIVEWAY REGULATIONS

Project Memo. IDNR State Revolving Fund

Courthouse East vision and policy plan

Please highlight flow chart where applicable and return with Form 2 and Form 3 (tab 1) to the City of St. Charles Engineering Department.

Severn River Sub-Watershed: BMP 09-Retrofit

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

TOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE

Non-Metallic Mining Reclamation Checklist

Gloucester County PLAN SUBMITTER'S CHECKLIST

Huntington Stormwater Utility

17.18 SENSITIVE AREAS

Gadsden County Planning Commission Agenda Request

Information for File # JTF

SECTION 4(f) DE MINIMIS DOCUMENTATION

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

FORM 3150-PM-BWEW0036A Joint Application for Pennsylvania

4 Residential and Urban Living Zones

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Environment and Sustainability. Environment and Sustainability

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

CIVIL ENGINEERING PERMIT APPLICATION

NORTHEAST AIR ALLIANCE. SMOKE MANAGEMENT PLAN For Butte, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

SEMSWA s Role in the Land Development Process

Biodiversity Conservation

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

15. Wetlands Chapter Overview Introduction

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

Chapter 1: General Program Information

The University of Washington Nanofabrication Facility (WNF) at Fluke Hall 125 Fluke Hall Seattle, WA 98195

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

WASHINGTON COUNTY OREGON

RESPIRABLE CRYSTALLINE SILICA PARAGRAPHS (C) THROUGH (J)

Public Notice. Applicant: The City of Fort Worth Permit Application No.: SWF Date: June 6, 2014

Note: Staff reports can be accessed at Zone: I-3. Tier:

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Information for File # SEK

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Reevaluation of Categorical Exclusion

LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

Appendix I. Checklists

Chapter 3 Site Planning and Low Impact Development

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS

Chapter 2 - Post-Construction Stormwater Management in New Development and Redevelopment

Major Development Order Approval Process. Introduction. In This Handout. Pre-Application Meeting. Meetings

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3

OSHA Table 1

Transcription:

Virginia Department of Transportation INTER-AGENCY COORDINATION MEETING Joint Permit Application DEQ COE VMRC I. VDOT PROJECT INFORMATION PERMIT #: PRE-APP#: Route: VDOT Project Number: City/County: Contract Type: Planned Ad UPC#: USGS Quadrangle: VDOT City/County Code: Project Charge: Designer: II. TYPE OF SCOPING/COORDINATION: Permit Coordination Permits Required US Corps of Engineers: VDEQ: VMRC: TVA: [ ] SPGP VWPP: [ ] VGP-1 [ ] 26a [ ] Reporting Nationwide [ ] Individual [ ] Standard Permit [ ] Maintenance Exemption [ ] Non-Reporting Nationwide [ ] WP1 [ ] WP3 [ ] Regional [ ] WP2 [ ] WP4 [ ] LOP-1 [ ] Individual III. VDOT CONTACTS Permit Coordinator (VDOT District Contact) District Environmental Manager (Authorized Agent) Name: Name: Name: Address: Address: Address: Phone #: Phone #: Phone #: IV. PERMITTED ACTIVITY VDOT (Applicant) The proposed project is located in Albemarle County, VA on Route 743 in the community of Advance Mills. This project will be constructed on existing location and involve the replacment of the existing one lane truss bridge with new bridge consisting of two, 11' travel lanes and two, 4' shoulders. This project will result in 726 cubic yards of excavation, 738 cubic yards of fill, 1517 square feet of stream impacts, 772 square feet of shading and 6' of stream impacts. There are no wetland impacts assoicated with this project. V. ENVIRONMENTAL ASSESSMENT(Avoidance and Impacts are described in greater detail in section VI and VII.) Present Impacts Present Impacts Federal Threatened/Endangered Species No No of the U.S No No State Threatened/Endangered Species No No Wetlands No No Anadromous fish No No Riffle Pool Complexes No No Trout No No Other Special Aquatic Sites No No Shellfish No No 1 Year Floodplain No No Public Supply No No Historic/Archeological Resources No No Scenic Rivers No No Air Quality Nonattainment Area No No Navigable s No No Tidal s/wetlands: No No Open > 1. Acre No No Page 1 of 5

VI. SUMMARY OF DETAILED ENVIRONMENTAL IMPACT INFORMATION This project has one jurisdictional crossing. General: Latitude: ' " Longitude: ' " FEMA FIRM number: Nearest Community: Surrounding Land Use: Basin: Sub-basin: Hydrologic Unit Code: Engineering data for impacts to s of the US: PERMIT #: PRE-APP#: OHW elevation (feet): 391.62 Dredging/Excavation Filling (Permanent): Filling (Temporary): MLW elevation (feet): N/A Streams Open Wetlands Streams Open Wetlands Streams Open Wetlands Area (feet 2 ) Quantity (yd 3 ) below OHW Quantity (yd 3 ) below MLW Construction Method Stream Information: Stream Name(s): Drainage Area (miles 2 ): Pool/Riffle/Flat ratio: Average Depth (feet): Substrate: Average Width (feet): DGIF Classification: Cowardin Classification: DEQ Classification: Section #: Special Standards: Linear Feet of Stream Impacts: Perennial- Intermittent- Ephemeral- Riffle/Pool- Conceptual Stream Mitigation: Wetland Information: N/A Species identified: Cowardin Classification(s): Primary Secondary Temporary Amount Disturbed(area -feet 2 ) Emergent Scrub/Shrub Forested Totals Non-Tidal Tidal Non-Tidal Tidal Non-Tidal Tidal Non-Tidal Tidal Conceptual Wetland Mitigation: Page 2 of 5

PERMIT #: PRE-APP#: Other Natural Resource Information: Cowardin Classification(s): Permanent Temporary Amount of Impacts L.F S.F Non-Tidal Tidal Non-Tidal Tidal Conceptual Other Mitigation: VII. PROJECT NARRATIVE: Project purpose, need, and description: The purpose of this project is to replace the existing one lane truss bridge with new bridge consisting of two, 11' travel lanes and two, 4' shoulders. The need for this project is based on the closure of the existing bridge and need to re-establish this vital connection to the traveling public. Additionally, there are geometric and capcity/safety defeciencies, including sight issues at its approaches and its connection with Route 641. Proposed construction schedule: The advertisement date for this project is January 29 with an expected construction start of March 29. This project has an anticipated completion date of November 29. Project impacts (include a description of all impacts, permanent and temporary): This project will result in 726 cubic yards of excavation, 738 cubic yards of fill, 1517 square feet of stream impacts, 772 square feet of shading and 6' of stream impacts. Construction of the proposed bridge will NOT require the use of temporary causeways or work bridges. Please see attached Notes to Accompany Permit Drawings. T&E Species: Based upon a review of the DGIF database search and DCR Natural Heritage Conservation Site Maps for the project area, Threatened or Endangered species collections/records are within the required search distance for the project. Project will require mussel survey if any instream work is proposed and if the bridge is widened more than two feet. Project will also require coordination for anadromous fish if any instream work is proposed.. Project will require mussel survey if any instream work is proposed and if the bridge is widened more than two feet. Project will also require coordination for... See Attachment A. Cultural Resources: VDOT Effect Determination: ADVERSE EFFECT. The proposed project will remove a contributing element (Advance Mills Bridge 2-541) to the National Register listed historic district and replace it with a modern steel truss bridge. Final Effect Determination: ADVERSE EFFECT. DHR Concurrence... See Attachment A. VIII. PROJECT MITIGATION: Project mitigation efforts including AVOIDANCE, MINIMIZATION, AND COMPENSATION: Avoidance: Minimization: Compensation (include functional assessment when applicable): No compensation is proposed for this project. Page 3 of 5

IX. EROSION AND SEDIMENT CONTROLS: An erosion and sediment control plan will be prepared and implemented in compliance with the Erosion and Sediment Control Law, the Erosion and Sediment Control Regulations, and the annual erosion and sediment control standards and specifications approved by the Department of Conservation and Recreation. X. STORMWATER MANAGEMENT STATEMENT: Design of this project will be in compliance with the Stormwater Management Act, the Stormwater Management Regulations, and the annual stormwater management standards, and specifications approved by the Department of Conservation and Recreation. XI. MATERIALS ASSESSMENT: All fill material shall be clean and free of contaminants in toxic concentrations or amounts in accordance with all applicable laws and regulations. XII. FEMA STATEMENT: The design of this project will be in compliance with all applicable FEMA-approved state or local floodplain management requirements. XIII. DREDGE MATERIAL MANAGEMENT PLAN: All dredge material will be removed to an approved, contained, upland location. The disposal area will be of sufficient size and capacity to properly contain the dredge material, to allow for adequate dewatering and settling out of sediment, and to prevent overtopping. The disposal area will be properly stabilized prior to placement of dredge material. XIV. NEPA DOCUMENTATION: Document type: XV. CERTIFICATION (for SPGP/VWPP only): PERMIT #: 8-494 PRE-APP#: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Applicant Signature: Name of person signing above: (print or type) Title: Authorized Agent Signature: Name of person signing above: (print or type) Title: Page 4 of 5

d PERMIT #: 8-494 PRE-APP#: XVI. ATTACHMENTS (Include all that apply): [ X ] Narratives Continuation (See Attachment A) [ ] Vicinity Map [ ] Topographic Map [ X ] FEMA Map [ X ] Permit Sketches (Plan views, section views including temporary and permanent impacts) [ X ] Hydraulic Commentary [ ] Cultural Resources Information [ ] Threatened and Endangered Species Information (including VDOT T&E Report) [ ] Jurisdictional Determination Form Page 5 of 5