APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Similar documents
Appendix E: Proposed Refinements Visual and Aesthetics Technical Report. Durham-Orange Light Rail Transit Project

Visual and Aesthetics Technical Report

Right-of-Way Acquisitions and Relocations Technical Memorandum

3.5. Visual and Aesthetic Qualities

5.4.6 Cumulative Operational Impacts

APPENDIX H. VISUAL AND AESTHETICS TECHNICAL MEMORANDUM

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

3.5 VISUAL AND AESTHETIC QUALITIES

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Asbury Chapel Subdivision Sketch Plan

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

E c o n o m i c D e v e l o p m e n t

7.5 Impacts on the Section 4(f) Properties

7.0 SECTION 4(F) EVALUATION

5.8 Visual Resources and Aesthetic Qualities

22a. Existing Condition. 22b. Simulation of NE 20th Street Alternative (D3)

4.17 VISUAL QUALITY AND AESTHETICS

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Section 3.16 Visual Quality

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Clairtrell Area Context Plan

WEST LOOP DESIGN GUIDELINES CHECKLIST

Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and Chapel Hill Transit.

The transportation system in a community is an

Glenn Highway MP DSR. Landscape Narrative

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

4.16 Visual Quality and Aesthetics

3.1 AESTHETICS Background and Methodology

Project Purpose. Project Need

A. INTRODUCTION B. PREFERRED ALTERNATIVE

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Public input has been an important part of the plan development process.

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

3.5 VISUAL AND AESTHETIC QUALITIES

The impacts examined herein take into account two attributes of aesthetic values:

DEIS Reasonable Alternatives Visual Impacts Assessment Technical Report

Southern Gateway Project and Public Green

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Environmental Assessment. Appendix E Visual And Aesthetic Conditions Technical Report

BeltLine Corridor Environmental Study

Blue Line LRT Extension

The Capital Design Advisory Committee St. Mary s College of Maryland & Historic St. Mary s City

FINAL MITIGATION PLAN to address

4.1 LAND USE AND HOUSING

4.5 Visual and Aesthetic Resources

V. Gateways GATEWAYS / V-1

Corridor Management Committee. April 14, 2016

Planning Districts INTRODUCTION

East Corridor Final Environmental Impact Statement

Environmental Setting, Impacts, and Mitigation Measures

1.0 Circulation Element

Figure East End of 2 nd Street Tunnel

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Rezoning Transportation Analysis Petition Number: General Location Identifier:

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

B. PROPOSED REFINEMENTS POTENTIALLY AFFECTING URBAN DESIGN AND VISUAL RESOURCES

ALTERNATIVE STATION AREA -

AMEND DMENT H HOSPITAL

I-70 Corridor Enhancement Plan

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

DRAFT SECTION 4(F) EVALUATION STILLWATER MUNICIPAL BARGE FACILITY

Technical Report Visual Quality

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION

ULI St. Louis Technical Assistance Panel

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR

OVERVIEW OF PLANS FOR THE JEFFERSON COUNTY COUNTRYSIDE FARM In the Context of Quality Place Characteristics

Strategic Growth Area #1 Northampton Boulevard Corridor Area

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO

PROPOSED IMPROVEMENTS

Town Center. Block 5 Existing multifamily residential units are expected to remain.

ESTABLISH AN EFFICIENT TOWN CENTER

3.1 AESTHETICS AND VISUAL RESOURCES

Visual and Aesthetic Resources

Capital Projects in and near Odenton Town Center

DRAFT. Draft Addendum 1 to Visual Impact Assessment Technical Report

Appendix D Community Impact Assessment

WESTSIDE SUBWAY EXTENSION PROJECT. Addendum to the Visual and Aesthetic Impacts Technical Report

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Mississippi Skyway Preliminary Engineering Report

(DC1) Direct Development Control Provision DC1 Area 4

The West Vaughan Employment Area Secondary Plan Policies

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Chapter IV: Development Pattern

IV.B. VISUAL RESOURCES

Institutional Overlay Zone (IOZ) Regulatory Framework

FDOT D4 Complete Streets

3.1 Aesthetics, Light, and Glare

Access Management: An Overview

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Northern Branch Corridor SDEIS March 2017

Visual and Aesthetics

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

7.0 DRAFT SECTION 4(f) EVALUATION

Transportation Committee

Existing Conditions. Planning and Design Principles

Section 4(f) Evaluation

Transcription:

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement Durham-Orange Light Rail Transit Project October 2016

1. Introduction The Combined FEIS/ROD summarizes the effects of the D-O LRT Project on visual and aesthetic conditions assessed in the DEIS Section 4.4 and the Visual and Aesthetics Technical Report (DEIS Appendix K15). This memorandum assesses the NCCU Station Refinement of the D-O LRT Project. The assessment presents the viewshed, visual resources, potential change to the effects previously disclosed, and any new effects to visual and aesthetic resources that would be associated with the proposed refinement. Using the same methodology as the Visual and Aesthetics Technical Report, the viewshed for the NCCU Station refinement is defined as the land within 200 feet on either side of the proposed alignment, and 1,000 feet on either side of the alignment, where the alignment is proposed to be elevated. The reevaluation re-assesses Landscape Unit #10 from the DEIS. In order to conduct a visual assessment of the extension of the alignment and new NCCU station, a new landscape unit is established Landscape Unit #11: Industrial Residential. 2. Landscape Unit #10: Urban Industrial Visual conditions and potential visual impacts of the proposed Alston Avenue Station were discussed as part of Landscape Unit #10 in the Visual and Aesthetics Technical Report (DEIS Appendix K15, Section 4.10) and summarized in the Combined FEIS/ROD. The following sections summarize the existing visual conditions and changes in visual impacts resulting from the NCCU Station Refinement. 2.1 Existing Conditions Landscape Unit #10: Urban Industrial (East Durham) included the easternmost portion of the D-O LRT Project viewshed, including the proposed Alston Avenue Station area. The unit is characterized by minor industrial activity, railroad infrastructure, and residential land uses. Existing visual quality in this unit was characterized as low, and visual resources included historic resources (Venable Tobacco Warehouse, Durham Water Tower), large churches, industrial operations along Pettigrew Street and Ramseur Street, and scattered residential neighborhoods. A summary of existing conditions for Landscape Unit #11 is provided in Table 1. Table 1: Existing Visual Conditions Landscape Unit #10 Visual Character Existing railroad tracks with adjacent industrial uses and scattered residential areas Vividness - Intactness - Low Unity - Low Visual quality: Low * Visually-sensitive resources Visual Resources Venable Tobacco Warehouse* Large churches (First Presbyterian Church, St. Phillips Episcopal Church, New Creation United Methodist Church) Durham County Public Health Department Scattered residential neighborhoods* Industrial operations along East Pettigrew Street and Ramseur Street Durham Water Tower* Durham-Orange Light Rail Transit Project October 2016 2

2.2 Impacts Assessment Visual changes would generally be similar to those identified in the technical report and Combined FEIS/ROD, and would include light rail infrastructure and new station. There would be no changes in visual impacts near the Dillard Street Station. The NCCU Station Refinement would change the orientation of the station and surface parking and location of the proposed parking structure. Table 2: Visual Impacts Landscape Unit #10 Viewer Response Viewers Viewer Response Residents- Single-family housing Business owners Children and teachersschool (Girls and Boys Club) Church members Motorists Transit riders High High Low Low Visual Elements Visual Change Degree of Change for Visual Elements D-O LRT Project 1 Degree of Change for Visual Elements NCCU Station Refinement Transit Infrastructure Elevation Minor Minor Displacement of structures Parking area\structure Substantial Substantial View Disruption Minor Minor Removal of existing screens to residential uses Visual changes to parklands - - Blocks scenic features Minor Minor Changes to street scape Removal of vegetation Minor Minor Visual change to historic resources Minor New night lighting 1 Visual and Aesthetics Technical Report (DEIS Appendix K15) Viewer Response: + Visual Changes: = Visual Impacts: Overall visual impacts for the NCCU Station Refinement on Landscape Unit #11 would be moderate. This is a change in visual impacts from what was included in the Combined FEIS/ROD, where visual impacts for Landscape Unit #10 were low. The following sections describe the changes in potential visual impacts in this unit in more detail. Alston Avenue Station Re-configuration of the station as proposed in the NCCU Station Refinement would not change the visual impacts described in the DEIS related to the proposed station. As noted, the construction of the light rail station and infrastructure, and the removal of commercial structures and residences would be a moderate visual change. In the Combined FEIS/ROD, the existing residential properties around the Alston Avenue Station between Pettigrew, Grant, NC 147, and Alston Avenue were planned to be displaced by the Alston Durham-Orange Light Rail Transit Project October 2016 3

Avenue park and ride garage. Under the NCCU refinement, the majority of existing residences in this area would still be displaced by the construction of the Alston Avenue Station and associated park and ride lot. The remaining properties that are commercial or light industrial would not be sensitive to the visual change. For the few remaining residences on Gillette Avenue, the visual changes would be substantial. These residences would have views of the proposed station and park and ride lot to the north instead of views of other residences. Views to the south would include NC 147, as well as new views of the elevated light rail tracks over NC 147. The D-O LRT Project ended approximately 525 feet west of the Durham Water Tower and Valve House, with views of the Project precluded by distance and other buildings; therefore, no visual impacts to this property were anticipated. With the NCCU Station Refinement, a new proposed multi-story parking garage on Pettigrew Street east of Alston Avenue would be constructed adjacent to the Durham Water Tower and Valve House historic property, which is eligible for the National Register of Historic Places (NRHP). The NHRP-eligible boundaries include only the area encompassing the water tower and valve house, which is approximately 0.4 acre, fenced off and maintained, and retains its integrity. North of the NRHP boundary is Pettigrew Street and the NCRR Corridor with railroad tracks. To the east are vacant lots used to store gravel and other materials by the City of Durham, and to the west is vacant property owned by GoTriangle. The parking garage would be constructed on the property owned by GoTriangle. The Federal Transit Administration (FTA), in consultation with the NC Historic Preservation Office (HPO), has made a preliminary determination that there would be an effect to the NHRP-eligible property based on the visual change. The parking deck is expected to rise approximately 60 feet above Pettigrew Street, with no stairways, elevator towers, or other structures more than 60 feet high on the east half of the parking deck. This would minimize visual impacts to the Water Tower, which at 145-feet tall, would be visible about the parking deck. Therefore, FTA, in consultation with NC HPO, has made a preliminary determination that the parking deck and NCCU Station Refinement would have no adverse effect on the Water Tower. Due to the visual change and impact to the NHRP-eligible property, the visual change to historic resources is rated a moderate change. This elevates the overall visual impact of the NCCU Station Refinement on Landscape Unit #10 to moderate. 3. Landscape Unit #11: Industrial Residential In order to conduct a visual assessment of the extension of the alignment and new NCCU station, a new landscape unit is established Landscape Unit #11: Industrial Residential. 3.1 Existing Conditions The Industrial Residential (East Durham) landscape unit (Landscape Unit #11) is characterized by minor industrial activity and single-family residential land uses. This unit abuts the North Carolina Central University Campus. The landscape unit contains mostly single-family homes, a few small businesses, and several stand-alone places of worship. Viewers in this area include motorists and transit riders, church members, residents, business owners, and university employees and students. A summary of existing conditions for Landscape Unit #11 is provided in Table 3; visual resources are shown on Figure 1. Durham-Orange Light Rail Transit Project October 2016 4

Table 3: Existing Visual Conditions Landscape Unit #11 Visual Character Residential area with some commercial properties Vividness - Intactness - Low Unity - Low Visual quality: Low Visual Resources R. Kelly Bryant Pedestrian Bridge NC 147 highway Churches (Russell Memorial Christian Methodist Episcopal Church, Oak Grove UA Free Will Baptist Church, Monument of Faith Church) Single-family and multi-family homes* NCCU Campus * Visually-sensitive resources Durham-Orange Light Rail Transit Project October 2016 5

Figure 1: Landscape Unit #11 Industrial Residential (East Durham) Durham-Orange Light Rail Transit Project October 2016 6

3.2 Impact Assessment Impacts to Landscape Unit #11 are only associated with the NCCU Station Refinement and were not discussed in the Combined FEIS/ROD. The viewers in Landscape Unit #11 would have low to high sensitivity to visual changes, as shown in Table 4. The NCCU Station Refinement would be located on new transportation right-of-way between Pettigrew Street and Alston Avenue, and along the Alston Avenue corridor from NC 147 to Lawson Street. Visual changes would include light rail transit infrastructure and new stations. The proposed NCCU Station would have canopies, pedestrian accommodations, and lighting. A portion of the alignment would be elevated on a bridge to cross over NC 147 and the ramps on the west side of the NC 147/Alston Avenue interchange. Retaining walls would be installed on both sides of the light rail tracks to retain the fill as the tracks descended from the aerial structure down to Alston Avenue. These retaining walls would be approximately 400 feet long, varying in height from approximately 20 feet down to 2 feet. Alston Avenue would be widened to the west to accommodate the light rail alignment in the median. Visual changes in the landscape unit are shown in Table 4. Viewer Response Viewers Residents- Single-family housing Business owners Children and teachers- F. Howard Alston Russell Memorial Child Development Center Church members- Russell Memorial Christian Methodist Episcopal Church Motorists Transit riders University visitors, students, professors, staff Table 4: Visual Impacts Landscape Unit #11 Viewer Response: + Visual Changes: = Visual Impacts: Overall visual impacts would be moderate. The following sections describe the potential visual impacts in this unit in more detail. NC 147 and Alston Avenue Viewer Response High High Low Low Transit Infrastructure Elevation Visual Change Visual Elements Displacement of structures Parking area\structure View Disruption Removal of existing screens to residential uses Visual changes to parklands Blocks scenic features Changes to street scape Removal of vegetation Visual change to historic resources New night lighting Degree of Change for Visual Elements Substantial Substantial Substantial Substantial Minor Minor Minor Substantial Minor Minor South of the Alston Avenue Station, the NCCU Station Refinement would introduce the extension of the light rail alignment. The extension of the alignment is new and was therefore not previously assessed for the Combined FEIS/ROD. Durham-Orange Light Rail Transit Project October 2016 7

The new alignment will rise over NC 147 on retained fill and then on an aerial structure to cross NC 147. The alignment would be elevated over the ramps on the west side of the Alston Avenue/NC 147 interchange, as well as over NC 147. The structure would be higher than the existing Alston Avenue bridge over NC 147 and would be visible from many points in the landscape unit, including for motorists on NC 147 and Alston Avenue, residents in the area of the Alston Avenue Station and along Alston Avenue, and pedestrians/bicyclists using the R. Kelly Bryant, Jr. Pedestrian Bridge and trail. Trees and topography would provide screening of the bridge for residents in the larger residential areas east and west of Alston Avenue, particularly during periods of high foliage. The R. Kelly Bryant, Jr. Pedestrian Bridge opened in 2010 to replace a pedestrian bridge originally constructed in 1973 to connect neighborhoods divided by the construction of NC 147. The pedestrian bridge, approximately 925 feet east of Alston Avenue, has been described as a gateway for Durham and was designed to reflect the character of the surrounding area with brick and metal industrial components. The bridge is lit at night with blue lights on the outside and yellow lights on the inside. There is also a sidewalk connection from the bridge to Alston Avenue just north of the northbound NC 147 exit ramp. From the pedestrian bridge, the light rail aerial structure would be visible behind and above the Alston Avenue bridge. It would also be visible to motorists on NC 147; however, it would not be out of context with other bridges and overpasses along the highway, especially the East End Connector bridges over NC 147 that are under construction approximately two miles east of Alston Avenue. Transit riders would have views of east Durham neighborhoods, industrial areas, the existing rail line, and highways. After crossing over NC 147, the light rail alignment would bridge over the southbound travel lanes of Alston Avenue and transition to existing grade in the median. Approximately 400 feet of the light rail alignment would be on retained fill, with walls on both sides of the alignment. Alston Avenue would be widened to the west to accommodate the light rail alignment, including a center platform station, new traction power substation, signal house, operator restroom and communications room. Properties on the west side of Alston Avenue between NC 147 and Lawson Street would be acquired, and existing businesses or residences would be demolished to allow for the widening of Alston Avenue. The Russell Memorial Christian Methodist Episcopal Church and its associated child development center would have views of the bridge over NC 147, the retained fill section walls, and the light rail infrastructure in the median of Alston Avenue. This would be a substantial visual change for members of the church, and children and teachers at the daycare. Residences on the east side of Alston Avenue would see the wider right-of-way along Alston Avenue, including the light rail infrastructure with the NCCU Station, trackway and overhead catenary system in the median, vehicular travel lanes. It is anticipated that the properties, both commercial and residential, on the western side of the street would be displaced by the widening. Therefore it would be anticipated that the properties on the eastern side would experience the change in viewshed, with the removal of commercial and residential properties on the opposite side of the street. These changes would be a moderate change in views, meaning notable changes would take place and affect the visual quality and existing character of the study area NCCU Station The proposed NCCU Station Refinement would add a new station, known as the NCCU Station. The NCCU Station would be located just north of the intersection at Alston Avenue and Lawson Street, in the median of Alston Avenue with two roadway lanes for vehicular traffic on either side. Alston Avenue Durham-Orange Light Rail Transit Project October 2016 8

would be widened to the west to accommodate the light rail alignment and station. Station infrastructure, as well as lighting, bicycle parking, a restroom building for train operators, communications room, and pedestrian accommodations, would be added. The station would be visible to residents on the east side of Alston Avenue, residents, students, faculty, staff and visitors on the NCCU campus, and motorists traveling along Alston Avenue. Transit riders would have views of the remaining residences along Alston Avenue, as well as the entrance to NCCU s campus at Lawson Street. Visual impacts for this area would be low as it is already a transportation corridor that is heavily traveled by cars and public transit. 4. Findings For the NCCU Station Refinement, visual impacts in Landscape Unit #10 would be moderate. This is a change from the visual impacts identified in the Combined FEIS/ROD for Landscape Unit #10 for the D-O LRT Project, which were expected to be low. This change is due to the addition of a multi-story parking structure on the property adjacent to the Durham Water Tower and Valve House, a National Register resource. Visual impacts for the NCCU Station Refinement for Landscape Unit #11 would be moderate. No visual impacts to this area were anticipated with the D-O LRT Project, as the project did not extend into this area. Table 5 includes a summary of visual impacts resulting from the NCCU Station Refinement for Landscape Units #10 and #11. Table 5: Summary of Visual Impacts Area Existing Visual Quality Viewer Response Visual Change Overall Visual Impact #10 Urban Industrial Low #11 Industrial Residential Low Areas with high visual impacts are summarized in Table 6. Table 6: Summary of High Visual Impacts Area Existing Visual Quality Viewers with High Sensitivity Areas with Substantial Visual Change #10 Urban Industrial Low Residents Residential area near Alston Avenue Station, #11 Industrial Low Alston Avenue just Residential south of NC 147 Substantially Affected Viewers Residents of remaining single-family homes Church members; teachers and children at daycare 5. Mitigation Potential mitigation options for locations where impacts occur are described in Combined FEIS/ROD Table ROD-1. The measures relevant to the NCCU Station refinement include: Coordinate with the City of Durham as well as with affected residents, businesses, neighborhoods, and community facilities to identify strategies to further minimize the visual effects of the project Durham-Orange Light Rail Transit Project October 2016 9

Using interdisciplinary design teams to create aesthetic guidelines and standards in the design of project elements Integrating facilities with area redevelopment plans, such as NCCU s planned business school at the corner of Alston Avenue and Lawson Street Planting appropriate vegetation in and adjoining the project right-of-way Replanting remainder parcels Use source-shielding in exterior lighting at stations and auxiliary facilities to reduce light pollution from new light sources Identify and integrate Art-in-Transit opportunities Incorporate landscaping and aesthetic treatments to the design of elevated or aerial structure in close proximity to residences No additional mitigation measures are required. Durham-Orange Light Rail Transit Project October 2016 10