KM 4-40 INFRARED ASPHALT RECYCLER SPECIFICATION

Similar documents
Bid Specifications for Thermo-Lay model UD /4 yard truck mounted machine with hydraulic bins & roller DIMENSIONS: Body:

ENTERPRISE HOT DOG CART

E-Z SERIES II 1500 DPSB MELTER APPLICATOR WITH DOUBLE PUMP; DIESEL-FUELED

ECO Seam. Easy, compact and seamless asphalt paving, with an effective ceramic infra red heater

Deluxe Welding Tool Chest

HVAC. Air Blowers Fans Forced Air Heaters Heating Cables & Insulation Infrared & Radiant Heaters

StreetHeat SR-60. Operations Manual

DFG-100 XCEL SERIES GAS CONVECTION OVEN REPLACEMENT PARTS LIST

DELUXE COACH: Extended coach coverage. ULTRAMAX: Bumper to hitch plan.

LIGHTNING BOLT GRILL HOT DOG CART

STEPP SRM 10x120(Asphalt Recycler) SPECIFICATIONS. SRM 10x120 Self Loading

GRAND MASTER HOT DOG CART

Mi-T-M carries a full line of portable heaters, built in the same quality tradition you ve come to expect from us.

YUHUA PRE-HEATER ALWAYS THE RIGHT ANSWER

ANSUL. Twin-Agent Fire Fighting/Securing Systems Specifications. Models 450/50-B, 450/100-B, 900/100-B INDEX SPECIFICATIONS

CORPUS CHRISTI FIRE PREVENTION MOBILE FOOD VENDOR REQUIREMENTS

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

Direct Fired Heater Model AD Specification

Installation and Maintenance Manual Please retain this manual for future reference.

DFG-100 XCEL SERIES GAS CONVECTION OVEN REPLACEMENT PARTS LIST

RC15-T. Owners Manual

GLADIATOR GRILL HOT DOG CART

AM SELECT DISHWASHER STANDARD FEATURES MODEL OPTIONS AT EXTRA COST ACCESSORIES VOLTAGE. Item # Quantity C.S.I. Section AM15

Heating asphalt pavements efficiently Panel heating machine HM 4500

Effective february 9, 2015

Bromic Parts Breakdowns

ECLIPSE INFORMATION GUIDE

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

3 Ton Combo. Owners Manual

MP GS/GD 10 GAS. Toll Free Phone, (US & Canada): (800) Toll Free Fax, (US & Canada): (800)

WSK300 Multifunction Wall Control

Bryan Flexible Water Tube. Ultra-High Efficiency Condensing Hot Water Boilers. 3,000,000 BTUH Natural Gas Fired

OPERATION & MAINTENANCE MANUAL RHS680

Power Locking Installation Manual

PrecisionTemp Shower-Mate

TOP AND CONSOLE PARTS For Models: LGQ9858PW0, LGQ9858PG0 (White/Grey) (Biscuit/Gold)

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) F-1500T DUAL FUEL CONSTRUCTION HEATER

Portable Vertical Air-Conditioning and Heating Systems

Operator: Save these instructions for future use!

REFERENCE INFORMATION

BLAZE 400G TURBO & BLAZE 600D TURBO I & Input BTU/h: 399,000 (400G), 575,000 (600GT & 600GTII) Indirect NG/LP Beckett Burner

Tradesman Tradesman K Norseman Workman Sun Blast Premier Foreman Torches. New

Twin-Agent Fire Fighting/Securing Systems Specifications

S150 S300 CONSTRUCTION HEATERS. Rev: August 15, 2008 SERVICE AND MAINTENANCE MANUAL No PLEASE RETAIN FOR FUTURE REFERENCE PRODUCTS

THC- 355DF (Dual Fuel)

Operator: Save these instructions for future use!

A. Product Data: Include rated capacities, furnished specialties and accessories.

Gas and Electric Convection Ovens

Revision B Printed Fall Elston Manufacturing HC Heater Owners Manual

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) F-1000T DUAL FUEL CONSTRUCTION HEATER

Chapter 26 FIRE PROTECTION

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) F-400T DUAL FUEL CONSTRUCTION HEATER

1800(L) Construction Heater

DIESEL Engine Fire Pump Controllers Features

SECTION AUXILIARY HEATER

CHAPTER 7 PARTS LISTS, SCHEMATIC DIAGRAMS AND WARRANTY

Service life twice as long (6,000 operating hours). Automatic altitude adjustment of the Hydronic M10 / M12 up to 3,500m.

VENTLESS DOOR-TYPE DISHWASHER

MOBILE FOOD VENDING Food Trucks & Trailers

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

Operator: Save these instructions for future use!

THC 85 INDUSTRIAL / COMMERCIAL SPACE HEATER

Pinnacle Climate Technologies

CATALOG OF REPLACEMENT PARTS HSROG SERIES SINGLE RACK OVEN. A product of HOBART CORPORATION 701 S. RIDGE AVENUE TROY, OHIO

Operator: Save these instructions for future use!

FRAME AND CONSOLE PARTS

EVAPORATIVE AIR COOLER Instruction Manual

Fire and Life Safety Review Form

INFRA-RED BURNERS DESCRIPTION USES MODEL: 3207

Line Pressure ( w.c.) Gas Supply Min. Max. Pressure ( w.c.) Natural Gas Propane Gas

Chapter 17 Test. Directions: Write the correct letter on the blank before each question.

HEATING AND VENTILATION

INFRA-RED BURNERS DESCRIPTION USES MODEL: 3207

BIDDING REQUIREMENTS/INFORMATION FOR EQUIPMENT FOR OWOSSO PUBLIC SCHOOLS

TECHNICAL DATA MOBILE WASTE INCINERATOR

Electric Heat - Air Curtains

FOR MORE INFORMATION AND PRODUCTS, VISIT: USER MANUAL TO REMAIN IN VEHICLE

Summary of Chapters NFPA 1911: Standard for the Inspection, Maintenance, Testing, and Retirement of In- Service Automotive Fire Apparatus

THC-175DF INDUSTRIAL / COMMERCIAL SPACE HEATER. Certified to / Certifié à CGA 2.14 M2011 Conforms to / Conforme à ANSI std Z83.

COMMERCIAL STACKED GAS DRYER/WASHER

Reach In Refrigerators Bottom Mount

LAZY SUSANS KITCHEN ACCESSORIES. Wood Kidney Shaped 2 Tray Set With Hardware. Wood Full Circle 2 Tray Set With Hardware

Parts and Service Manual

TOY HAULERS ific Coachworks, Inc. include a one year factory

OPERATION & MAINTENANCE MANUAL AC860

WINTER SALE Karcher Pump 7 year Warranty HUBINGSPRESSUREWASHERS.COM

TOP AND CABINET PARTS For Model: WTW7600XW0 (White)

100% Safety Shutoff Control 40,000 BTUH Input Rating Constant Pilot Propane Gas

INDIRECT FIRED HEATERS

WATLOW ELECTRIC MANUFACTURING COMPANY Installation & Maintenance Manual for ECO-HEAT Heaters I&M MANUAL No: Page: 1 Date: 3/15/2017 Rev: 4

INSTALLATION INSTRUCTIONS

User s Information Manual

TOP AND CABINET PARTS For Model: WTW7340XW2 (White)

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters.

TOP AND CABINET PARTS FOR MODEL: 7MMVWB850WL0 (Mercury Silver)

Gas Fire Patio Heater Kongur-500

IFT-RC150 IntelliFire Touch Remote Control Installation Instructions

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS DU/DUH DUAL OUTPUT RANGE INFRARED TUBE HEATERS

Width: 8.5 ft Length: 24 ft Height: 7.5 ft

Embassy PoolCo A DIVISION OF HOFFINGER INDUSTRIES, INC. Warranty. Sun Cloud Portable Furnace Three years. Safety

Transcription:

Technical Product Specifications KM 4-40 INFRARED ASPHALT RECYCLER SPECIFICATION Table of Contents Item 1 Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Section 11 Section 12 KM International KM 4-40 Infrared Asphalt Recycler General Description Concept Heating System Trailer design Operating Controls Heater Body Design Dimensions Power Source Timed Cycling Blower Casters Paint

COMPLIANCE TO SPECIFICATIONS The bidder shall indicate 100% compliance by checking YES or non-compliance by checking NO for each line item of specification. Any space left blank shall be considered non-compliant. Any deviation from the specification, or where submitted literature does not fully support the meeting of specifications, must be clearly cited in detail, in writing, by the bidder and submitted with the bid. NO verbal interpretations will be accepted! In addition NO deviations below minimum specifications as written will be accepted. BIDDING REQUIRMENTS Section 1 General Description 1.1 This specification is to describe the Infrared Asphalt Recycler unit designed to recycle bituminous pavement surfaces. 1.2 The unit provides a properly trained technician the ability to soften as large as a forty square foot (40 Sq. Ft.) area of standard hot mix surface enabling scarification, re-mixing, and re-compaction of the pavement. 1.3 The unit is equipped with four (4) independent zones that allow for multiple heating configurations. 1.4 The use of the described model for bituminous pavement repair, decorative services, or other use can only be defined per application. Section 2 Concept 2.1 The specified unit generates an infrared wavelength which is absorbed to create heat. 2.2 The infrared is produced by a mixture of vapor withdrawn liquefied petroleum gas with constant air blown through a ceramic blanket. 2.3 Infrared heat is an invisible wavelength of heat energy that is transferred through the air. 2.4 The infrared wavelength will energize the first object it comes in contact with. The specified model KM infrared recycler is designed to soften bituminous surfaces using infrared wavelengths. 2.5 The time required to soften the asphalt surface is dependent primarily on the quality of the existing quality of the road surface. Average heating times will vary from 7 to 10 minutes. Variables including pavement design, aggregate size and type, ambient temperature and conditions, all affect the softening, or recycling time. 2.6 The resulting softened bituminous pavement is then manipulated for repair, or other service, by an experienced technician.

Section 3 Heating System 3.1 The heating system will be a mixture of air and liquefied petroleum gas diffused through a 1" thick ceramic blanket. 3.2 A combination of six (6) blankets will make up four (4) independently controlled heating zones both equaling the total heating area of the specified unit. 3.3 The ceramic heating blanket will be secured by a combination of stainless steel bolts, washers and nuts. 3.4 A framework will secure the outside edges of the ceramic heating blanket. 3.5 Three (3) thirty pound LPG cylinders will provide the fuel for the heating system. 3.6 The cylinders will combine to one manifold. 3.7 A regulator will control the pressure and flow of fuel from the manifold into the heating system. 3.8 A 12 VDC powered solenoid will be controlled by timed sequence allowing on/off cycling of fuel into the heating system. 3.9 An automatic pilot light will ignite the fuel mixture during the on time cycling. 3.10 Manual valves will be supplied to enable the operator control of each of the four (4) independent heating zones. 3.11 Fuel adjustment valves will allow a technician to properly adjust the fuel to air mixture. 3.12 The minimum BTU output will be 300,000. Section 4 Trailer Design 4.1 The trailer design of the infrared asphalt recycler will be permanent to the unit. 4.2 The towing hitch coupling will be a 2". 4.3 The suspension will be spring axle. 4.4 The leaf springs will be four leaf 1,250 lb capacity each. 4.5 The axle will be 2,000 lb. capacity. 4.6 The wheels and tires will be three ply, 580 lbs capacity each. 4.7 Stop, turn and tail lights will be provided. 4.8 Side marker lights will be provided. 4.9 Four wire standard wiring and harness will be supplied to the towing hitch coupling end. 4.10 Dimensions when folded are to measure 8 4 L x 6 x6 W. Section 5 Operating Controls 5.1 An emergency stop "mushroom" type switch will be provided obvious and accessible for the operator. 5.2 A keyed switch only will allow the unit to operate. 5.3 A momentary type on/off push button switch will begin a timed heating sequence. A timed control will provide a maximum heating sequence of ten (10) minutes.

Section 6 Heater Body Design 6.1 The heater body will be folding clam shell design. 6.2 The trailer components will be attached to the bottom shell. 6.3 The top shell will include the heating fuel cylinders and heating controls. 6.4 The top and bottom shells will be of 16 g mild steel. 6.5 A front hood will be attached by a continuous hinge design and protect the interior of the heating unit when in the travel tow position. 6.6 The hood will be attached to the bottom shell and move across the top shell when in the heating position. 6.7 The hood will be made of 20 gauge mild steel. 6.8 The controls will be affixed to the top shell and enclosed within a protective compartment. 6.9 Only the operator controls will be exposed to the outside of the compartment. 6.10 The fuel supply, standard including three (3) thirty pound (30 lb) LPG cylinders will fit the top shell. 6.11 Chain and turnbuckles will secure the fuel cylinders. 6.12 The chain will be minimum 3/16" welded link chain. Section 7 Dimensions 7.1 The units working dimensions (unfolded) measure 5 x8 plus castors. 7.2 The unit s transit dimensions (folded) measure 8 4 x6 6. 7.3 The unit is equipped with four (4) independent heating zones, two (2) zones measure 2 x4, and two (2) zones measure 3 x4. Section 8 Power Source 8.1 A 12VDC Marine style deep cycle battery will power the heating system and controls. 8.2 An onboard 10A Gen 1 Genius sealed marine type on board battery charger is to be included. 8.3 A 2.5W solar ultra-thin charger is included. Solar charger is for battery maintenance and should not be depended on for fully charging battery supply. Section 9 Timed Cycling 9.1 The heating system shall be controlled by an automatic timed on/off heating cycle. 9.2 The heating process must be cycled to prevent the burning of existing asphalt. 9.3 A one shot timer will enact after ten (10) minutes of heating to eliminate the potential overheating of asphalt.

Section 10 Blower 10.1 The unit shall use one (1) 12 VDC blower providing air to the ceramic heating elements through an air channel system. 10.2 The blower will be maintained within the control panel on the top shell. Section 11 Casters 11.1 Four (4) independently maneuvered casters will allow positioning of the unit when heating. 11.2 Each caster will be four inch (4 ) diameter swivel type. 11.3 Each caster will be attached to a swing arm that allows maneuver from side to end. Section 12 Paint 12.1 All pieces exposed will be properly coated. 12.2 All raw materials used in the manufacturing process will be new and unused and properly coated with an industrial two part epoxy equipment primer and industrial urethane equipment paint coating. 12.3 KM International chrome yellow will be the primary exterior coating color.