Varsity Exposed Shower Systems

Similar documents
Varsity Concealed Shower System

Kinetic. Logic. Astin. THERMOSTATIC INLINE CONTROL SHOWER VALVES Installation & aftercare instructions. Please retain for future reference

BASIN MIXERS INSTALLATION & AFTERCARE INSTRUCTIONS

RM530WC+ DIAL EXPOSED THERMO SHOWER VALVE INSTALLATION INSTRUCTIONS

Inta City Shower Mixing Valve CT20010CP

Deluge Shower Mixing Valve 10045CP

Puro Mini Dual Control Shower Mixer PU90010CP

Thermostatic Bar Valves

INSTALLATION INSTRUCTIONS

CONCEALED THERMOSTATIC SHOWER MIXER VALVE installation & aftercare instruction

Dual Control Concealed & Exposed Thermostatic Shower Valve

Technical Specifications: Your product has a high quality finish and should be treated with care to preserve the visible surfaces.

Mio Concealed Shower Mixing Valve MI40010CP

Enzo and Enzo Deluxe Safe Touch Thermostatic Shower EN10031CP & EN10035CP

Deluge Concealed Shower Mixing Valve DL40010CP

CONCEALED THERMOSTATIC TOUCH SHOWER MIXER VALVE Installation & Aftercare Instructions (1) (2) PLEASE READ BEFORE INSTALLATION

Telo Shower Mixing Valve TL10016CP

Inta City Concealed Shower Mixing Valve CT80010CP

Plus Bath Shower Mixing Valve CP and PL30020CP

Enzo Safe Touch Thermostatic Shower EZ20011CP & EZ20012CP

GENERAL FITTING GUIDE THERMOSTATIC BAR SHOWER MIXER with RIGID RISER KIT

Kiko Bath Shower Mixing Valve KK90015CP

Installation Instructions & Maintenance Guide 6 Refit Nuts (19) and tighten.

Kiko Concealed Shower Mixing Valve KK80010CP

Basin Mixer. Installation & Aftercare Instructions. Please retain for future reference.

INSTALLATION INSTRUCTIONS

Enzo Concealed Shower Mixing Valve

Enzo Safe Touch Thermostatic Shower EZ10010CP & EZ10014CP

Airfield Industrial Estate Hixon Staffordshire ST18 0PF

INSTALLATION INSTRUCTIONS

Self-help Temperature Adjustment

Prism Thermostatic Recessed Shower with Integral 2 Outlet Diverter

Intatherm Safe Touch Basin Tap IT1008CP

INSTALLATION INSTRUCTIONS

Twin & Triple Exposed Thermostatic Shower Valve Installation & Operating Guide

INSTALLATION INSTRUCTIONS

Artisan Thermostatic Bath Filler

Concealed Twin & Triple Thermostatic Shower Valve with Diverter. Installation & Operating Guide

Installation Instructions. Hansgrohe S 15721XXX

Installation Instructions

Installation Instructions. Starck

INSTALLATION INSTRUCTIONS

Aqueous Thermostatic Surface Mounted Bar Shower Valve With Fast Fit Connections

Traditional Rigid Riser With Eight Inch Rose

Installation Instructions Flute Tap Range

Installation Instructions and User Guide. Thermostatic Recessed Dual Control Shower Valve. Models covered: CAS SHCVO C, COB SHCVO C, ORB SHCVO C,

OWNER S GUIDE SEQUENTIAL THERMOSTATIC SHOWER VALVE. 150mm Inlet Pipe Centres. Shower Control. Handles and. may differ depending.

Installation Instructions and User Guide Thermostatic Recessed Dual Control Shower Valve

Thermostatic Concealed Shower Valve

BLADE BATH SHOWER MIXER DECK MOUNTED CHR WITH KIT INSTALLATION INSTRUCTIONS P BS-E A/2

INTA ION MODERN BAR / BATH SHOWER MIXER CP

Bar valve with fixed and adjustable shower heads. Installation guide. Midas Plus installation instructions Page 1

Parenzo Range. Basin Mixer, Bath Filler & Bath Shower Mixer. Assembly instructions

Please tape down. NewTeam Ltd. Customer Service Dept. Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW

Please tape down. NewTeam Ltd. Customer Service Dept. Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW

AQ150:Midas 10/9/15 14:50 Page 1 AQ150. Thermostatic bar mixer valve with adjustable head. Installation guide

Atmos Energy. Thermostatic Concentric Mixer Valve with Overhead. Fitting Instructions

Installation Instructions and User Guide. Thermostatic Recessed Dual Control Shower Valve with Integral Diverter

BELLISIMO concentric exposed thermostatic mixer shower

SINGLE LEVER CERAMIC DISC MANUAL SHOWER VALVE

Bath Shower Mixer

EDEN Thermostatic Bar Mixer Shower with Diverter

Dene Bath Shower Mixer

EXPOSED BATH SHOWER MIXER INSTRUCTION MANUAL W INST 300. Please note: Tap heads shown is for illustration purposes only.

DART concentric exposed thermostatic mixer shower with fixed showerhead Installation and operating instructions

Installation, Operating and Maintenance Guide

ASANA mini exposed sequential thermostatic mixer shower

Installation Instructions and User Guide

EDEN Concentric Thermostatic Mixer Shower

Thermostatic shower valve with 2 way diverter, brass faceplate and handles - V51

Installation, Operating and Maintenance Guide

257mm 181mm mm

THAMES mini exposed sequential thermostatic mixer shower Installation and operating instructions

Wave. BATH SHOWER MIXER MONOBLOC With Kit Deck Mounted

MIDAS. Installation instructions 110/220

Thermostatic bar mixer valve with adjustable head Installation guide

EDEN sequential exposed/built-in thermostatic mixer shower

Infra Red Thermostatic Wall Mixer

Francis Pegler Memento Single Sequential Exposed Thermostatic Shower

Thermostatic shower valve with 3 way control, brass faceplate and handles - V52

VALDI Thermostatic vertical mixer shower

Florino thermostatic mixer shower

Installation Instructions and User Guide

AIRE. Thermostatic bath shower mixer. Installation and Operating Instructions INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

ECO EDEN Concentric Thermostatic Mixer Shower

DART concentric mixer shower

Blitz Tap Range. Installation Instructions & User Guide. Please keep these instructions for future reference and request of replacement parts

Thermostatic exposed shower valve and bath/shower mixer systems Installation guide

INSTALLATION INSTRUCTIONS

ELINA inclusive concentric exposed thermostatic mixer valve

FIXATE mini exposed sequential thermostatic mixer shower

THERMOSTATIC SHOWER CONCEALED VALVE - TWIN WITH DIVERTER & TRIPLE WITH DIVERTER

EXCELLENTE Thermostatic mixer shower and diverter Installation and operating instructions

s y ens Av Avensys FIN EST RUS SLO RUS UAE

SENATA thermostatic bar mixer shower

Capri Tap Range. Installation Instructions & User Guide. Please keep these instructions for future reference and request of replacement parts

Decade Tap Range. Installation Instructions & User Guide. Please keep these instructions for future reference and request of replacement parts

TYNE. Installation and Operating Instructions. Thermostatic bath shower mixer. Installers please note these instructions are to be left with the user

HART concentric mixer shower

Bar Mixer Shower With Diverter

Transcription:

VARSITY EXPOSED SHOWER SYSTEM Installation & aftercare instructions Please retain for future reference Varsity Dual Function Exposed Shower System Product code SVA1712 Varsity Single Function Exposed Shower System Product code SVA1813 Varsity Exposed Shower Systems Installation & aftercare instructions Please retain for future reference Customer Services Tavistock, Brassmill Lane Trading Estate, Bath, BA1 3JF t. 01225 787 870 e. info@tavistock-bathrooms.co.uk w: www.tavistock-bathrooms.co.uk REF: JS 07.14 V1.00

Introduction Your exposed shower valve is a thermostatic mixer which incorporates a thermo-regulating cartridge to assure users of consistent showering temperatures. The valve has been designed & manufactured to comply with BS EN 1111:1999. This valve complies with the requirements of the above regulations and installation should be carried out in strict compliance with them. Operating Conditions of Use Before installation the operating conditions of use must be checked. The table below contains details of the necessary conditions of operation. This valve is suitable for use with the following systems Gravity fed Hot & Cold (balanced pressures) Gravity fed Hot & mains Cold (balanced pressures) Unvented systems Gas combination boiler Pumped system Note: On gravity systems the minimum Vertical distance (Drop) from the underside of the cold water storage tank to the shower valve must be 3 metres for single function showers and 5 metres for dual function showers. If water supply is fed by gravity then supply pressure should be verified to ensure the conditions of use are appropriate for the valve HIGH PRESSURE Maximum Static Pressure - BAR 10 Flow Pressure, Hot & Cold - BAR 0.3 to 5 Hot Supply Temperature - C 55 to 65 Cold Supply Temperature - C Equal to or less than 25 C Recommended outlet temperatures The BuildCert TMV scheme recommends the following set maximum mixed water outlet temperatures for use in all premises: 41 C for showers; The mixed water temperatures must never exceed 46 C. The maximum mixed water temperature can be 2 C above the recommended maximum set outlet temperatures. Note: 46 C is the maximum mixed water temperature from the bath tap. The maximum temperature takes account of the allowable temperature tolerances inherent in thermostatic mixing valves and temperature losses in metal baths. It is not a safe bathing temperature for adults or children. The British Burns Association recommends 37 to 37.5 C as a comfortable bathing temperature for children. In premises covered by the Care Standards Act 2000, the maximum mixed water outlet temperature is 43 C. The thermostatic mixing valve will be installed in such a position that maintenance of the TMV and its valves and the commissioning and testing of the TMV can be undertaken. The fitting of strainers is recommended as close as is practicable to the water supply inlets of the thermostatic mixing valve. 2 11

Maintenance Valve Installation Guidelines and Compliance We advise that the valves, check valves and filters be regularly serviced particularly in hard water areas. The check valves along with the filters are contained in the retaining nut. The water supplies must be isolated remotely from the valve before removal. Valves should be tested against the original set temperature results once a year. When testing is due the following performance checks shall be carried out. 1. 2. Measure the mixed water temperature at the outlet. Carry out the cold fail-safe shut off test by isolating the cold water supply to the TMV, wait for 5 seconds if water is still flowing check that the temperature is below 46 degrees C. 3. If there is no significant change to the set outlet temperature (+/- 2 C or less change from the original setting) and the fail safe shut off is functioning, then the valve is working correctly and no further service work is required. If further maintenance should be required contact Roper Rhodes for details. Please see contact details on the back page of this document. The valve must be installed so that it is readily accessible for commissioning and maintenance. The valve must be installed with isolation valves on both the hot and cold water systems as close as possible to the valve; so as to allow the valve to be commissioned and tested correctly. The valve is fitted with integral check valve cartridges which command the water supply, therefore the thermostatic valve is protected against cross-flow due to unbalanced line pressures as required by the Water Supply (Water Fittings) Regulations 1999. Most problems associated with the operation of thermostatic shower valves are caused by debris in the new pipe work getting into the thermostat. These problems are easily avoided by thoroughly flushing the pipe work BEFORE the shower valve is fitted. General Dimension 200 Dual Function 10 Year Guarantee We have complete confidence in this Tavistock product and as such it is offered with a 10-year guarantee against defects in manufacture. This valve must be fitted by a competent installer. If in doubt seek advice from a qualified professional. The guarantee requires that this product be used in the manner for which it was intended and that it is installed & maintained in accordance with the fitting instructions and local water bylaws. The guarantee covers products in domestic use only. Always ensure this product is fully tested before concealing valves into the wall. On installation ensure that the valve and valve inlet threads can be removed or serviced in accordance with UK regulations. The guarantee is invalidated should the valve be damaged by water borne debris. Make sure that supply pipes are clear of any debris prior to installation, this is particularly important on new plumbing installations. In the unlikely event that this product should fail during the guarantee period we will either replace the faulty part or the complete unit as appropriate. This guarantee excludes normal wear and tear. This guarantee covers failure of the thermostatic cartridge within the first 2 years of purchase only. Replacement cartridges are available to purchase by contacting the Tavistock Customer Service team. Failure to follow the terms outlined above will invalidate this guarantee. Proof of purchase will be required to validate any guarantee claims. 148 340 148mm - 155mm Single Function 200 215 148 148mm - 155mm 10 3

Product Components Setting Temperature (Continued) Should you require any replacement components for this product please contact Tavistock using the contact details on the back page of this instruction document Plastic Block Limit Stop Trim Cover Flow Control Handle 5. Turn on the water 6. Slowly turn the spindle by hand until the required max temperature is achieved Trouble-shooting Fixing Screw PROBLEM SOLUTION Shower will not run hot enough when first installed Check for debris Check hot water temperature and boiler function Cold water running back through the valve into the hot water system. Check the filters and check valves are functioning correctly. Shower only runs cold. Check hot and cold pipework is installed to correct inlet on the valve If you require further assistance beyond the guide below contact the help line on 01225 787 870 Nut Hot Inlet Elbow 4 7. Without rotating the temperature spindle, replace the limit stop so that its arm is positioned to the right of the wall of the plastic block inside the valve. 8. Replace the trim cover and refit and tighten the handle. Make sure the arm of limit stop is positioned to the right of the plastic block Cartridge Cover Plate Cold Inlet Elbow Flow Control Handle Temperature Control Handle Grub Screw Aftercare Instructions Whilst this item has a high quality durable finish, it should nevertheless be treated with care. Surfaces should be cleaned using only a soft damp cloth and clean water & dried using a soft cotton cloth. Bath / shower cleaning products, even non-scratch ones could damage the finished surface. 9

Commissioning Valve Installation It is important that incoming water supplies conform to the requirements specified for pressure and temperature. Assure that supply water conditions satisfy any guidance information for the control of bacteria and that the designation of the supplied valve suits the application. Do not continue commissioning until supplies are correct and stable considering variation caused by other service users. Use a calibrated thermometer for testing incoming and mixed water. 1. 2. 3. 4. Record temperature of the incoming hot and cold supply. Record temperature of mixed discharge at maximum draw off rate. Record temperature of mixed discharge at minimum draw off rate. Isolate the cold water supply and measure the mixed water temperature as the cold water failure device reacts. This should deviate by no more than + 2 C of the initial maximum set point. Restore the cold supply and measure the stabilised mixed water temperature. This must not deviate by more than + / - 2 C of the initial set recorded result. Record these findings. 5. Record the measuring equipment used for the measurements. 1. Select the valve position considering the overall height of the system including the rigid riser rail and head 2. Prepare the water pipes at 150mm centres 3. The ends of the pipe should be cut 20-35mm out from the wall face 4. Remove the compression nuts and the cover plates from the inlet elbows of the valve 5. Line up the valve with the hot and cold inlet pipes ensuring hot inlet is on the left and cold inlet os on the right 6. Whilst holding the valve in position, mark the drill hole positions through the back plate of the valve body 7. Remove the valve and drill 4X8mm holes into the wall to a depth of 45mm and insert wall plugs. 8. Slide the cover plates over the pipes to cover the hole around the pipework 9. Secure the valve to the wall with the fixings supplied and connect the valve to the pipework using the compression fitting and PTFE tape if required 10. Test for leaks Hot Inlet Pipe Cover Plate The above records must be retained and updated during the service life of the valve. If there is a residual flow during the commissioning or the annual verification (cold water supply isolation test), then this is acceptable providing the temperature of the water seeping from the valve is no more than 2 C above the designated maximum mixed water outlet temperature setting of the valve. Temperature readings should be taken at the normal flow rate after allowing for the system to stabilise. The sensing part of the thermometer probe must be fully submerged in the water that is to be tested. Any TMV that has been adjusted or serviced must be re-commissioned and re-tested in accordance with the manufacturers' instructions. Nut The installation of thermostatic mixing valves must comply with the requirements of the Water Supply (Water Fittings) Regulations 1999. Setting Temperature The temperature control handles on this product are factory set and should require no adjustment. However, if for any reason the handles and/or the cartridge is removed it is important the following procedure is followed. Cold Inlet Pipe Limit Stop Handle Trim Cover Ceramic Indices and metal cap 1. Remove the handle by unscrewing the metal cap and the internal screw holding the handle in place. Grub Screw 2. Turn off the water 3. By hand remove the trim covers from the valve body 4. Remove Limit Stop by unscrewing the grub screw 8 5

with the water bye-laws. For further details refer to the latest copy of Water Bye-laws guide or your local water authority. Accessory Installation 1. Prepare the water supply pipes (hot on Please theon wall plugs supplied the leftnote andthat cold the right) at theare only suitable for solid stone / brick walls. For plasterboard walls use specialist wall plugs. identified height with a width of 150mm centers. 2. Make the ends of pipes 20-25mm out from the face of wall. 3. Remove the compression nuts and the back plates from the inlet elbows of valve. 4. Line up the valve with the hot and cold inlet pipes making sure the correct elbow meet the correct pipe (refer to diagram) 5. Whilst holding the valve in position, mark where the holes are on the wall. 6. Remove the valve and drill 4X8mm holes into the wall where you marked to a depth of 45mm and insert wall plugs. 7. Slide the cover plates under the compression nuts and position each pipe with the cover plate and nuts against the wall. 8. Push the valve over each pipe and make 1. This rail can be adjusted in height by them into backtoplate. cutting the the rail tube the preferred 9.length. Tighten the two nuts on both inlets. Do so BEFORE assembly. Nut Screw Nut Arm Washer and Nut 4. The arm can also be adjusted in length by dissassembling the elbow fixing and cutting the arm to the preferred length. 5. Re-insert the arm and screw the backplate tight to the wall (WITH DUAL FUNCTION VALVE MAKE SURE HANDSET HOLDER IS PUT ONTO THE RAIL BEFORE FIXING IN PLACE) Operating 1. Turn the water flow control handle to increase/decrease the flow and turn on/off. 2. Turn the temperature control handle to increase/decrease the water temperature 3. The temperature control knob is pre-set to auto stop at above 44 C to avoid scalding. However, if for any reason the setting is removed it is important to follow Temperature Setting procedure to reset. Mark on Wall Washer Arm Wall plug Washer Shower Head Flow Control Handle Temperature Control Handle Backplate Rail 2. Secure the rail to the valve using the compression fitting at the valve body 3. Assemble the rail to the wall bracket fixing and mark up the fixing holes for wall attachment Handset Flow Control Handle 6 7