KEY PLAN NOTE: SHADED AREAS INCLUDED IN SET RAMP LEVEL NORTH SOUTH PUMP ROOM PUMP ROOM KEY PLAN NOTE: SHADED AREAS INCLUDED IN SET ARRIVALS LEVEL

Similar documents
PRAIRIE VIEW A&M UNIVERSITY AUSTIN GREAUX ENGINEERING BUILDING CHANCELLOR'S RESEARCH INITIATIVE RENOVATION PRAIRIE VIEW, TEXAS 77445

RTU 02 S x14. 16x16. 18x20 RTU x20. 10x14 S-1. MAU 01 12x12

ADDENDUM No. 1. OPSB Central Office Relocation & Renovation

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

1/2" [15mm] HANGER ROD SECURED TO STRUCTURE ABOVE (TYP) BOSS FOR HANGER ROD WELDED. [1200mm] CC SPACING (TYP)

Vista Underground Distribution Switchgear Outdoor Distribution. Pull Box Specifications for UnderCover Style

F890. Relcom Installation Instructions. 8 Segment Redundant Fieldbus Power Supply for use with non-proprietary cabled systems

THE QPL UFH EXTENSION KIT

F892. Relcom Installation Instructions. 8 Segment Redundant Fieldbus Power Supply for use with non-proprietary cabled systems

UNDERGROUND FEEDER 120/240V - 1C + G EXISTING STORAGE BARN CONCRETE SLAB AT DOORWAY SLOPE AWAY FROM NEW FOUNDATION REMOVE

Installation, Operation and Maintenance Manual

INT 69 YF Diagnose. Application. Functional description

INDEX OF LANDSCAPING PLANS

Stainless Steel Range

Bulk Handling of Paraplex and Plasthall Plasticizers

Maple Grove, Minnesota

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

FREE & FORCED CONVECTION HEAT TRANSFER

DUCT INSTALLATION 2. INSTALL DUCTS ACCORDING TO SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE" UNLESS OTHERWISE INDICATED.

5383 Cambie Street AL-2 FF Path of Travel Width April 26, 2017 Project Address Title/Descriptor Initial Submission Date

FIRE ALARM: BY OTHERS, IF REQUIRED.

Gas burner controls. Building Technologies HVAC Products

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

General. Mode of operation and application. Input

FIRE ALARM: BY OTHERS, IF REQUIRED.

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

Tenney Seri LRE.com

W. DAYTON ST. L-001 LANDSCAPE PLAN LAYOUT 30" 15" " 24" MADISON, W I. GENERAL NOTES:

BUTTE REGIONAL TRANSIT OPERATIONS CENTER Tenant Improvement

SECTION ELECTRICAL GENERAL PROVISIONS

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

DONALD H. BERG, ARCHITECT

Measuring & Order Guide

Temperature and humidity ranges. Operating the GC within the recommended ranges insures optimum instrument performance and lifetime.

Gas Burner Controls. Building Technologies HVAC Products

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

PANIC EXIT HARDWARE DX-200 Serie

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

DIVISION 16 ELECTRICAL

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

Building Technologies Division

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Element D Services Electrical

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

Product Data. FH4C Base Series Fan Coil Sizes 001 thru 004 AIR HANDLER TECHNOLOGY AT ITS FINEST

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

Sinumerik 808D Service Guide

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

SECTION INSPECTION AND TESTING OF WORK

(12) Patent Application Publication (10) Pub. No.: US 2009/ A1

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

FIRE SUPPRESSION SPRINKLER SYSTEM

SECTION FAN COIL UNITS

b. For Clarification: Added Dimming Zone number next to each fixture in Computer Classroom 102.

Gas fired, Low Intensity Infrared Unitary Infrared Heating Systems Installation, Operating, Maintenance and Parts Manual

(12) United States Patent (10) Patent No.: US 8,181,474 B2

Gas Station & C Store SECTION CWM Job No

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

REMKO ATK 25. Automatic oil heater with built-in oil burner, tank and exhaust gas connection. Operation Technology Spare Parts.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

MEDIUM, LOW AND CONTROL VOLTAGE CABLES

Rheem High Efficiency Air Handler

FIRE & LIFE SAFTEY STANDARD

ORDINANCE NO

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Gas burner controls. Building Technologies

PROPOSED NEW BUILDING

Building Technologies Division Infrastructure & Cities Sector

Rheem High Efficiency Air Handler

1. SYSTEM DESIGN PER NFPA 72 AND LIFE SAFETY SYSTEM SHALL HAVE 24 HR BACKUP BATTERIES

SECTION WET-PIPE SPRINKLER SYSTEMS

Dear Concessionaire,

(N) LONDON PLANE STREE TREE WITH ROOT BARRIER (TYP.).INSTALL PER SMMC ,126 sf landscape (N)JAPANESE MAPLE COURTYARD TREE (TYP.

SECTION ELECTRICAL IDENTIFICATION

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN


TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

SI 3080 / SI 3100 / SI 3200

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

DESIGN & CONSTRUCTION GUIDELINES

FTM-L SERIES SINGLE OR TWIN DIRECT STEAM MIXER KETTLE COMPLETE WITH HYDRAULIC POWER TILT BRIDGE INSTALLATION - OPERATION - MAINTENANCE

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

CHAPTER 20 SERVICE EQUIPMENT

2. Welding Materials and Procedures shall conform to the ASME Code.

Installation Instructions

SECTION ELECTRIC-DRIVEN, FIRE PUMPS

Port of Portland Conveying Equipment Guidelines

SECTION ISOLATED POWER SYSTEMS

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

1.1 This section applies to air handling units for HVAC Systems.

G Series SAVE THESE INSTRUCTIONS. (Model B) Convector Heater for Hazardous Locations GENERAL! INSTALLATION

Transcription:

A2 B2 D A TERMINAL B TERMINAL A D2 C2 E2 DALLA FORT WORTH INTERNATIONAL AIRPORT E KEY PLAN NOTE: HADED AREA INCLUDED IN ET RAMP LEVEL CONTRACT NO. : 956 PERMIT NO. : A7-37B IUED FOR BID: OCTOBER, 27 PUMP ROOM OUTH PUMP ROOM D TERMINAL C - DFW AIRPORT, TEXA 7526 KEY PLAN NOTE: HADED AREA INCLUDED IN ET ARRIVAL LEVEL TERMINAL E DALLA / FT. WORTH INTERNATIONAL AIRPORT IT CONULTING, LLC COPPELL WWW.CONULTING.COM I.T. CONULTING, LLC T E O F T E XA IRVING EE IN FE GRAND PRAIRIE DALLA 9796 C E NED I ON A L ENG LI R MARTIN R. TORRE P RO ARLINGTON TA COLLEYVILLE EULE BEDFORD OUTHLAKE //7 THE APPEARING ON THI DOCUMENT WA AUTHORIZED BY MARTIN R. TORRE, P.E. 9796 ALTERATION OF A ED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE REPONIBLE ENGINEER I AN OFFENE UNDER THE TEXA ENGINEERING PRACTICE ACT FT. WORTH TBPE Reg #F35 282 West 7th treet uite 4 Fort Worth, Texas 767 TBPE Reg #F35 TARRANT COUNTY DALLA COUNTY AIRPORT LOCATION MAP MULTATECH TBAE# BR265 282 West 7th treet uite 4 Fort Worth, Texas 767

ARCHITECTURAL YMBOL ABBREVIATION XXX A A. KEYNOTE REVIION ECTION MARK ENLARGED PLAN/ DETAIL REFERENCE COLUMN CENTERLINE A/C AIR CONDITIONER A.F.F. ABOVE FINIHED FLOOR B.O. BOTTOM OF BLDG. BUILDING CJ CONTRUCTION JOINT CLO. CLOET CLR. CLEAR CMU CONCRETE MAONRY UNIT CONC. CONCRETE CONT. CONTINUOU EA. EACH EQ. EQUAL EQUIP. EQUIPMENT EXIT. EXITING EXP. EXPANION F.F.E. FINIHED FLOOR ELEVATION F.R.T. FIRE REITANT TREATED PLYWOOD GA GAGE GYP. BD. GYPUM BOARD HP HIGH ERVICE PUMP TATION IBC INTERNATIONAL BUILDING CODE IMPREG. IMPREGNABLE MAX. MAXIMUM MFG. MANUFACTURER MIN. MINIMUM M.O. NOMINAL MAONRY OPENING MTL. METAL N.I.C. NOT IN CONTRACT NOM. NOMINAL N.T.. NOT TO CALE O.C. ON CENTER O.D. OVERFLOW DRAIN O.H. OPPOITE HAND PLAM PLATIC LAMINATE PJ PANEL JOINT PVMT PAVEMENT R.D. ROOF DRAIN RM. ROOM IM. IMILAR.F. QUARE FEET TL. TEEL TOR. TORAGE T.O. TOP OF TYP. TYPICAL U.N.O. UNLE NOTED OTHERWIE U.L. UNDERWRITER LABORATORY VIF VERIFY IN FIELD WRB WEATHER REITANT BARRIER FIRE RATED WALL HEAD AEMBLY LIP TRACK B.O.DECK 24'-" (2) 4" PLUMBING LINE TO REMAIN. PROVIDE FIRE RATED PENETRATION, TYP ARCHITECTURAL GENERAL NOTE CONTRACTOR TO HOLD PRE-INTALLATION CONFERENCE IN THE FIELD WITH DFW REPREENTATIVE PRIOR TO WORK. CONFIRM LOCATION OF NEW WALL AND COORDINATE ANY TEMPORARY DIRUPTION TO BUILDING YTEM. A. THEE DRAWING ILLUTRATE THE GENERAL CONDITION OF THE EXITING BUILDING. THE CONTRACTOR HALL FIELD VERIFY THE LOCATION, AEMBLIE AND DIMENION OF ALL EXITING BUILDING CONDITION PRIOR TO COMMENCEMENT OF WORK AND NOTIFY THE ARCHITECT WITH ANY DICREPANCIE. B. G.C. HALL PLAN, CHEDULE AND COORDINATE ALL DEMOLITION WORK A WELL A NEW WORK TO AVOID INTERRUPTION TO ELECTRICAL, HVAC, PLUMBING AND ERVICE A NECEARY. C. CONTRACTOR HALL NOT CALE THEE DRAWING FOR CONTRUCTION PURPOE. IN THE EVENT OF CONFLICT, DICREPANCIE, OR OMIION OF NECEARY DIMENION OR INFORMATION, CONTRACTOR HALL NOTIFY THE ARCHITECT. WRITTEN CALE APPLY ONLY TO FULL IZE DRAWING. FIGURED AND CALCULATED DIMENION TAKE PRECEDENCE OVER CALED MEAUREMENT. D. BEFORE UBMITTING A PROPOAL, THE CONTRACTOR HALL VIIT THE ITE AND BECOME FAMILIAR WITH THE NATURE AND COPE OF THE WORK AND THE DIFFICULTIE THAT ATTEND TO IT EXECUTION. E. ALL PLAN DIMENION ARE FACE OF FINIH TO FACE OF FINIH AT NEW AND EXITING CONTRUCTION, U.N.O. F. ALL KEYNOTE ARE HEET PECIFIC G. VERIFY ALL DIMENION WITH ARCHITECTURAL DRAWING. CONTRACTOR HALL VERIFY ALL ACTUAL DIMENION AND BE REPONIBLE FOR THEM. ALL DIMENIONAL DICREPANCIE HALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. H. VERIFY IZE, LOCATION, AND CHARACTERITIC OF ALL EQUIPMENT AND FIXTURE TO BE FURNIHED WITH MANUFACTURER OR UPPLIER BEFORE BEGINNING CONTRUCTION I. CONTRACTOR HALL COORDINATE THEIR WORK WITH OTHER TRADE AND REPORT DICREPANCIE, PRIOR TO THEIR CONTRUCTION, TO THE ARCHITECT FOR REVIEW AND CLARIFICATION OR ACTION. J. G.C. HALL MAINTAIN A CLEAN AND ORDERLY WORK AREA THROUGHOUT ALL PHAE OF DEMOLITION AND CONTRUCTION O A TO NOT DIRUPT EXITING BUILDING AND IT CLIENTELE FROM DOING BUINE. K. G.C. HALL MAINTAIN ACCE FOR ALL, TAFF, ERVICE PERONNEL, AND THE PUBLIC THROUGH AND AROUND THE AREA INVOLVED IN CONTRUCTION AND DEMOLITION AND HALL AURE THAT ALL FACILITIE, EQUIPMENT AND ERVICE ARE UNINTERRUPTED AND FULLY OPERATIONAL DURING BUINE HOUR A REQUIRED. COORDINATE WITH /TENANT REPREENTATIVE. L. EXIT HALL BE KEPT READILY ACCEIBLE AND UNOBTRUCTED AT ALL TIME. M. (NOT UED). N. FOR CONTRUCTION DETAIL NOT HOWN, UE THE MANUFACTURER' TANDARD DETAIL OR APPROVED HOP DRAWING / DATA HEET IN ACCORDANCE WITH THE PROJECT PECIFICATION. O. CEILING HEIGHT HOWN ON THE ROOM FINIH CHEDULE ARE TAKEN FROM THE FINIHED FLOOR ELEVATION. P. ADD UFFICIENT BLOCKING IN TUD WALL TO UPPORT ANY ITEM OR EQUIPMENT HOWN OR PECIFIED TO BE ATTACHED TO THE WALL. PROVIDE ADDITIONAL TRUCTURAL UPPORT (ANGLE, CHANNEL, ETC.) WITHIN WALL WHERE THE HEIGHT OF ATTACHED ITEM OR EQUIPMENT EXCEED METAL TUD CAPACITIE. PROVIDE BLOCKING FOR FURNIHED OR INTALLED ITEM. Q. ALL PRODUCT UTILIZED IN CONTRUCTION HALL BE ABETO FREE. ALL MATERIAL LOCATED IN RETURN AIR PLENUM HALL BE NON-COMBUTIBLE PLENUM RATED MATERIAL. R. TRANITION OF DIFFERENT FLOORING MATERIAL AT DOORWAY HALL OCCUR AT CENTERLINE OF DOOR TYPICALLY.. PAINT ALL WALL URFACE, DOOR FRAME, BULKHEAD AND CEILING IN ROOM WHERE INDICATED ON ROOM FINIH CHEDULE. PAINT BEHIND ALL MOVEABLE ITEM ADJACENT TO WALL RECEIVING PAINT AND RELOCATE ITEM. T. IGN REQUIRED AT ALL ELECTRICAL ROOM, MECHANICAL ROOM, PRINKLER CONTROL VALVE ROOM, JANITOR CLOET, CLOET AND IMILAR ROOM. ALL IGN ARE TO HAVE A MINIMUM OF ONE-INCH LETTERING ON A CONTRATING BACKGROUND. LETTERING HALL HAVE A MINIMUM TROKE WIDTH OF /8" AND BRAILLE. U. THE WORK HALL CONFORM TO THE REQUIREMENT OF THE "AMERICAN WITH DIABILITIE ACT" (ADA),"TANDARD FOR ACCEIBLE DEIGN." V. HOP DRAWING: THE CONTRACTOR HALL UBMIT TO THE ARCHITECT DETAILED HOP DRAWING TOGETHER WITH AMPLE OF MATERIAL AND FINIHE FOR ACCEPTANCE PRIOR TO THE TART OF ANY CONTRUCTION OR FABRICATION. ALL HOP DRAWING, AMPLE OR FINIHE ACCEPTED BY THE ARCHITECT HALL UPERCEDE ANY ORIGINAL DRAWING. THE CONTRACTOR HALL AUME REPONIBILITY FOR ANY ERROR OR OMIION IN THE DRAWING WHICH AFFECT THE INTEGRITY OF THEIR FABRICATION. W. UBTITUTION MAY NOT BE MADE FOR ANY MATERIAL, CONTRUCTION COMPONENT OR EQUIPMENT UNLE PREVIOULY UBMITTED TO AND ACCEPTED BY THE ARCHITECT IN WRITING. X. THE CONTRACTOR HALL OBTAIN AND PAY FOR ANY FEE FOR BUILDING DEPARTMENT PERMIT AND ANY OTHER PERMIT REQUIRED BY AUTHORITIE HAVING JURIDICTION OVER THE WORK. FEE HALL BE PAID AND PERMIT OBTAINED PRIOR TO THE COMMENCEMENT OF WORK. Y. ANY CLAIM FOR ADDITIONAL COT UNDER THI CONTRACT HALL BE UBMITTED TO THE ARCHITECT IN WRITTEN FORM WITHIN A REAONABLE TIME BEFORE THE WORK I TARTED. CLAIM FOR EXTRA WORK HALL BE UBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL BY THE /TENANT. NOTE: THI DETAIL DOE NOT REPREENT ALL INTANCE OF PENETRATION IN THE NEW WALL. GENERAL CONTRACTOR HALL URVEY EXITING CONDITION AND PROVIDE FIRE-RATED AEMBLIE AT ALL PENETRATION EXITING DUCT TO BE TEMPORARILY REMOVED A REQUIRED TO FACILITATE INTALLATION OF NEW DRYWALL PARTITION. THI WORK HALL BE CONDUCTED IN AN EXPEDITIOU MANNER AND CHEDULED WITH DFW TO CAUE THE LEAT DIRUPTION TO AIRPORT FUNCTION..5" PRINKLER LINE TO REMAIN. PROVIDE FIRE RATED PENETRATION, TYP (2) 8" FIRE LINE TO REMAIN. PROVIDE FIRE RATED PENETRATION, TYP NEW -HOUR FIRE RATED PARTITION, UL-U49, REFER TO PECIFICATION. PROVIDE 5/8" TYPE X GYP. BD. BOTH IDE ON 6" 2 GA. METAL TUD @ 6" O.C. K:\25\553.8 DFW_TermDDryPipeprinkler_EXP\6_CAD\ARCH\AE--.dwg 22 May 27 Chicago, IL 66 TBPE Reg #F35 282 West 7th treet uite 4 Fort Worth, Texas 767 5/8" TYPE 'X' GYP. EA. IDE OF 6" METAL TUD AT 6" O.C. 6" METAL TUD BOX HEADER ANT JOINT ALL IDE EXITING HOLLOW METAL DOOR FRAME RELOCATED EXITING DOOR FRAME RELOCTED MULTATECH TBAE# BR265 5/8" TYPE 'X' GYP. EA. IDE OF 6" METAL TUD AT 6" O.C. DOUBLE TUD AT EACH JAMB ANT JOINT ALL IDE NEW D.W. DOOR ANCHOR EXITING HOLLOW METAL DOOR FRAME RELOCATED WALL ECTION DOOR HEAD DETAIL DOOR JAMB DETAIL 3 "= '-" 3"= '-" 2 3"= '-" ARCHITECTURAL KEYPLAN D D2 C B A A2 //7 IUE FOR BID IUE FOR BID //27 CONTRACT NO. 956 NEW FLOOR BAE TO MATCH EXITING BOTTOM TRACK FIN. FLR. '-" AE--.DWG MULTATECH MULTATECH ARCHITECTURAL - YMBOL, NOTE & DETAIL AE--

KEYNOTE A EXITING CONTRUCTION TO REMAIN. A EXITING PARTITION TO REMAIN. A3 EXITING ED CONCRETE FLOOR TO REMAIN. A A4 EXITING DOOR AND FRAME TO BE RELOCATED TO NEW LOCATION A INDICATED. TAKE ALL CARE TO PROTECT WALL FRAMING AT JAMB. REPAIR A NECEARY TO FACILITATE INTALLATION OF NEW GYP. BD. A5 NEW DRYWALL PARTITION. REF. TO HEET AE-- FOR ADDITIONAL INFORMATION. A6 PATCH AND REPAIR WALL AT EXITING DOOR LOCATION TO CREATE CAED OPENING. TAPE, BED, TEXTURE AND PAINT TO MATCH URROUNDING WALL. PROVIDE RUBBER BAE TO MATCH BAE ON ADJACENT WALL. A9 A7 ACTUAL LOCATION OF NEW WALL I INTENDED TO AVOID LARGE EXITING TRUNK DUCT. FIELD VERIFY EXACT LOCATION OF DUCT FOR PLACEMENT OF NEW WALL AEMBLY. A4 A8 A9 RELOCATE EXITING DOOR, FRAME AEMBLY AND ALL AOCIATED DOOR HARDWARE TO LOCATION IN NEW WALL. ALVAGE AND RELOCATED DOOR TOP. A A NEW 48" HIGH CORNER GUARD BOTH CORNER OF JAMB IN CAED OPENING. PROVIDE CONTRUCTION PECIALTIE, INC., CO-8 ERIE, OR APPROVED EQUAL, MECHANICALLY FATENED. A RELOCATED DOOR TOP A2 ALIGN DOOR A ARCHITECTURAL - DEMOLITION PLAN - ARRIVAL LEVEL - OUTH FIRE PUMP ROOM /4"= '-" GENERAL NOTE: A. CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF EXITING PIPING AND DUCTWORK PRIOR TO ERECTION OF NEW WALL AEMBLY. B. ALL PENETRATION OF NEW PARTITION HALL BE ED WITH FIREPROOFING MATERIAL A 3'-2" MIN. CLR. A A A5 A A2 A3 K:\25\553.8 DFW_TermDDryPipeprinkler_EXP\6_CAD\ARCH\AE2--.dwg 22 May 27 Chicago, IL 66 TBPE Reg #F35 282 West 7th treet uite 4 Fort Worth, Texas 767 MULTATECH TBAE# BR265 A6 A A ARCHITECTURAL FLOOR PLAN - ARRIVAL LEVEL - OUTH FIRE PUMP ROOM 2 /4"= '-" A A8 A5 3 AE-- A7 A3 8'-6" V.I.F. ARCHITECTURAL KEYPLAN D D2 C B A A2 //7 IUE FOR BID IUE FOR BID //27 CONTRACT NO. 956 AE2--.DWG MULTATECH MULTATECH ARCHITECTURAL - ARRIVAL LEVEL- OUTH FIRE PUMP ROOM AE2--

ELECTRICAL LEGEND GENERAL NOTE: GENERAL POWER NOTE: LT. MATERIAL AND WORKMANHIP HALL BE IN ACCORDANCE WITH THE MOT RECENT EDITION OF THE NATIONAL ELECTRIC CODE ADOPTED BY THE AUTHORITY HAVING JURIDICTION AND WITH LOCAL REQUIREMENT.. CIRCUIT NUMBER INDICATED ARE FOR IDENTIFICATION PURPOE ONLY. CONTRACTOR HALL VERIFY THE EXACT CIRCUIT NUMBER IN THE FIELD. CONTRACTOR HALL RUN ALL CIRCUIT TO EXITING PANEL L2ND UNLE OTHERWIE NOTED. J 5 T T 2. POWER AND LIGHTING CIRCUIT HALL BE IN CONDUIT. PROVIDE A MINIMUM OF ONE EQUIPMENT GROUNDING CONDUCTOR FOR EACH CONDUIT. 3. PROVIDE A DEDICATED NEUTRAL FOR EACH INGLE POLE CIRCUIT. 4. CIRCUIT ARE HOWN CHEMATICALLY, FINAL ROUTING DECIION ARE BY THE CONTRACTOR. 5. MINIMUM CONDUIT IZE FOR POWER CIRCUIT I 3/4". 6. LEAVE PULL TRING IN EMPTY CONDUIT. PLUG OR CAP END OF EMPTY CONDUIT. 7. THE MINIMUM CONDUCTOR IZE I #2 AWG FOR POWER AND LIGHTING CIRCUIT. 8. UE AWG CONDUCTOR FOR 2 AMP, 2 VOLT BRANCH CIRCUIT LONGER THAN 75 FEET. 9. UE AWG CONDUCTOR FOR 2 AMP, 277 VOLT BRANCH CIRCUIT LONGER THAN 2 FEET.. PROVIDE EACH BRANCH AND FEEDER CIRCUIT WITH A GROUND CONDUCTOR IZED PER ARTICLE 25 OF THE NATIONAL ELECTRICAL CODE (NFPA 7) WHERE A CONDUIT CONTAIN MULTIPLE BRANCH CIRCUIT, PROVIDE A INGLE GROUND CONDUCTOR UNLE OTHERWIE NOTED.. THERE HALL BE NO PLICE OF WIRE INIDE PANELBOARD OR DICONNECT WITCHE. ONLY ONE WIRE HALL BE TERMINATED TO ANY INGLE LUG ON A CIRCUIT BREAKER. 2. WHERE PENETRATION ARE MADE THROUGH A REQUIRED FIRE-REITIVE WALL, FLOOR, OR PARTITION FOR THE PURPOE OF RUNNING RACEWAY CARRYING ELECTRICAL, TELEPHONE, TELEVIION, OR LOCAL COMMUNICATION AND/OR IGNALING CIRCUIT, THE OPENING AROUND THE RACEWAY HALL BE FIRE TOPPED. COORDINATION WITH THE GENERAL CONTRACTOR HALL BE MAINTAINED TO ENURE THAT THI FIRE TOPPING I ACCOMPLIHED. UE APPROVED AEMBLIE UCH A THE FOLLOWING: CONDUIT PENETRATION OF HOUR GYP BOARD WALL - U.L.#WL, CONDUIT PENETRATION OF HOUR CONCRETE OR BLOCK WALL - U.L.#CAJ, CONDUIT PENETRATION OF HOUR CONCRETE FLOOR - U.L.#CAJ. 3. ARRANGE FOR ALL INPECTION WHEN THEY BECOME DUE, AND HALL NOT COVER ANY WORK UNTIL APPROVED BY THE AUTHORITY HAVING JURIDICTION (AHJ). 4. CLEARLY MARK ALL JUNCTION BOXE COVER TOP INDICATE THE CIRCUIT WITHIN THE JUNCTION BOX. 5. COORDINATE PHAING OF WORK AND ELECTRICAL POWER HUT-DOWN() WITH. 6. DO NOT PLACE OUTLET BOXE AT OPPOITE IDE OF PARTITION OR WALL BACK TO BACK. 7. VERIFY, COORDINATE AND MAKE PROVIION FOR FURNIHED ITEM AND EQUIPMENT, INCLUDING BUT NOT LIMITED TO DELIVERY, TORING, INTALLATION, FINAL HOOK-UP, AND TETING. 8. AT THE COMPLETION OF WORK, PROVIDE UPDATED COMPLETE, ACCURATE, TYPED PANELBOARD DIRECTORIE AT EXITING MODIFIED ELECTRICAL PANEL. 9. VERIFY CAPACITY OF PANEL FOR NET ADDITION OF LOAD PRIOR TO ROUGH-IN. 2. PROVIDE NEW CIRCUIT WIRING IN CONDUIT TO MATCH EXITING WIRING METHOD. FIELD VERIFY EXACT REQUIREMENT. 2. MAINTAIN CONTINUITY IN ALL EXITING CIRCUITRY TO REMAIN WHICH I AFFECTED BY THE COPE OF WORK. CONTRACTOR TO FURNIH AND INTALL ALL NECEARY WIRE, CONDUIT AND JUNCTION BOXE REQUIRED TO KEEP CONTINUITY FOR EXITING DEVICE AND CONTRACTOR HALL FURNIH AND INTALL ALL REQUIRED CONDUIT, WIRE, AND BOXE TO ENERGIZE NEW EQUIPMENT INDICATED. 3. ALL BRANCH WIRING HALL BE CONCEALED IN WALL AND ABOVE HUNG CEILING, U.O.N. WHERE THERE I NO HUNG CEILING CONDUIT HALL BE RUN IN A NEAT AND ORDERLY MANNER PARALLEL AND PERPENDICULAR TO HVAC DUCTWORK AND PRINKLER PIPING. NO FLEXIBLE CONDUIT I PERMITTED IN AREA WERE IT WILL BE EXPOED. 4. COORDINATE WITH OTHER TRADE AND FIELD CONDITION FOR CONDUIT ROUTING ELECTRICAL CONNECTION TO OTHER TRADE EQUIPMENT. 5. THE ELECTRICAL CONTRACTOR HALL PATCH, PAINT, AND RETORE EXITING CEILING, OFFIT, WALL, AND OTHER FINIHE THAT WERE DITURBED AND/OR DAMAGED DUE TO THEIR WORK. 6. ALL RECEPTACLE OUTLET HALL BE LABELED WITH CIRCUIT NUMBER AND PANEL DEIGNATION UING P-TOUCH TYPE LABEL. 7. UNLE OTHERWIE NOTED PROVIDE 2 AMP 2V INGLE POLE CIRCUIT BREAKER FOR NEW CIRCUIT OF THE AME TYPE AND INTERRUPT RATING A EXITING ELECTRICAL PANEL. 8. UNLE OTHERWIE NOTED POWER CIRCUIT WILL BE #2,#2N,#2G,3/4" CONDUIT. K:\25\553.8 DFW_TermDDryPipeprinkler_EXP\6_CAD\ELEC\EP--.dwg 22 May 27 Chicago, IL 66 TBPE Reg #F35 282 West 7th treet uite 4 Fort Worth, Texas 767 P R O F E T A T E I O OF 9796 N A L T EX MARTIN R. TORRE L I C E N E D E A N G N I E E R THE APPEARING ON THI DOCUMENT WA AUTHORIZED BY MARTIN R. TORRE, P.E. 9796 //7 ALTERATION OF A ED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE REPONIBLE ENGINEER I AN OFFENE UNDER THE TEXA ENGINEERING PRACTICE ACT ELECTRICAL KEYPLAN D D2 C B A A2 //7 IUE FOR BID IUE FOR BID //27 CONTRACT NO. 956 EP--.DWG MULTATECH MULTATECH ELECTRICAL - YMBOL & NOTE EP--

E4 E E E3 K:\25\553.8 DFW_TermDDryPipeprinkler_EXP\6_CAD\ELEC\EP2--.dwg 22 May 27 ELECTRICAL - ARRIVAL LEVEL - OUTH FIRE PUMP ROOM /4"= '-" Chicago, IL 66 TBPE Reg #F35 282 West 7th treet uite 4 Fort Worth, Texas 767 P R O F E T A T E T EX MARTIN R. TORRE L I I O OF 9796 C E N N A L E D E A N G N I E E R THE APPEARING ON THI DOCUMENT WA AUTHORIZED BY MARTIN R. TORRE, P.E. 9796 //7 ALTERATION OF A ED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE REPONIBLE ENGINEER I AN OFFENE UNDER THE TEXA ENGINEERING PRACTICE ACT ELECTRICAL KEYPLAN D D2 C B A A2 //7 IUE FOR BID IUE FOR BID //27 CONTRACT NO. 956 " 2'-" 4'-" 8'-" 2'-" CALE: /4" = '-" EP2--.DWG MULTATECH MULTATECH ELECTRICAL - ARRIVAL LEVEL- OUTH FIRE PUMP ROOM EP2--

E E E3 E4 K:\25\553.8 DFW_TermDDryPipeprinkler_EXP\6_CAD\ELEC\EP2--.dwg 22 May 27 ELECTRICAL - ARRIVAL LEVEL - FIRE PUMP ROOM /4"= '-" Chicago, IL 66 TBPE Reg #F35 282 West 7th treet uite 4 Fort Worth, Texas 767 P R O F E T A T E T EX MARTIN R. TORRE L I I O OF 9796 C E N N A L E D E A N G N I E E R THE APPEARING ON THI DOCUMENT WA AUTHORIZED BY MARTIN R. TORRE, P.E. 9796 //7 ALTERATION OF A ED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE REPONIBLE ENGINEER I AN OFFENE UNDER THE TEXA ENGINEERING PRACTICE ACT ELECTRICAL KEYPLAN D D2 C B A A2 //7 IUE FOR BID IUE FOR BID //27 CONTRACT NO. 956 " 2'-" 4'-" 8'-" 2'-" CALE: /4" = '-" EP2--.DWG MULTATECH MULTATECH ELECTRICAL - ARRIVAL LEVEL - FIRE PUMP ROOM EP2--

E E K:\25\553.8 DFW_TermDDryPipeprinkler_EXP\6_CAD\ELEC\EL2--.dwg 22 May 27 ELECTRICAL - ARRIVAL LEVEL - OUTH FIRE PUMP ROOM /4"= '-" Chicago, IL 66 TBPE Reg #F35 282 West 7th treet uite 4 Fort Worth, Texas 767 P R O F E T A T E T EX MARTIN R. TORRE L I I O OF 9796 C E N N A L E D E A N G N I E E R THE APPEARING ON THI DOCUMENT WA AUTHORIZED BY MARTIN R. TORRE, P.E. 9796 //7 ALTERATION OF A ED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE REPONIBLE ENGINEER I AN OFFENE UNDER THE TEXA ENGINEERING PRACTICE ACT ELECTRICAL KEYPLAN D D2 C B A A2 //7 IUE FOR BID IUE FOR BID //27 CONTRACT NO. 956 " 2'-" 4'-" 8'-" 2'-" CALE: /4" = '-" EL2--.DWG MULTATECH MULTATECH ELECTRICAL - ARRIVAL LEVEL- OUTH FIRE PUMP ROOM EL2--

ABBREVIATION: (ALL ABBREVIATION HOWN ARE NOT NECEARILY UED ON DRAWING) LEGEND: GENERAL NOTE: COPE OF WORK: \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz--.dwg 22 May 27 A ABV ABOVE AC ALTERNATING CURRENT ADJ ADJUTABLE AFF ABOVE FINIHED FLOOR AL ALUMINUM AMD AIR MAINTENANCE DEVICE AP AUTO PURGE YTEM ARCH ARCHITECT, ARCHITECTURAL AUX AUXILIARY AWG AMERICAN WIRE GAUGE B BKR BREAKER BOP BOTTOM OF PIPE BLDG BUILDING C C CONDUIT CFCI CONTRACTOR FURNIHED CONTRACTOR INTALLED CLG CEILING CKT CIRCUIT CL CEILING LINE CLO CLOET CP CONTROL PANEL CU COPPER D DEMO DEMOLIH DFW INTL. AIRPORT DIA DIAMETER DN DOWN DWG DRAWING E EA EACH ELEC ELECTRICAL EMT ELECTRICAL METALLIC TUBING ENCL ENCLOURE EQUIP EQUIPMENT EXIT EXITING F FE FIRE EXTINGUIHER FLEX FLEXIBLE FLT FLIGHT FNPT FEMALE NATIONAL PIPE THREAD G GA GAUGE GALV GALVANIZED G,GND GROUND H HH HAND HOLE I ID INIDE DIAMETER IG IOLATED GROUND INT INTRUCTOR INTL INTERNATIONAL J JAN JANITOR CLOET J-BOX JUNCTION BOX K K KITCHEN KVA KILO VOLT AMPERE KW KILOWATT L LB POUND LF LINEAR FEET LTG LIGHTING M MACH MACHINE MAINT MAINTENANCE MAX MAXIMUM MEP MECHANICAL ELECTRICAL PLUMBING MIN MINIMUM MFG MANUFACTURER MT MOUNTED MNPT MALE NATIONAL PIPE THREAD Chicago, IL 66 N NITROGEN N/A NOT APPLICABLE N.C. NORMALLY CLOED NEC NATIONAL ELECTRIC CODE NEMA NATIONAL ELECTRIC MANUFACTURER AOCIATION NFPA NATIONAL AOCIATION NIC NOT IN CONTRACT N.O. NORMALLY OPEN NOM. NOMINAL NPT NATIONAL (TANDARD) PIPE THREAD N.T. NOT TO CALE O O.A.R. AUTHORIZED REPREENTATIVE O.C. ON CENTER OD OUTIDE DIAMETER OFCI FURNIHED CONTRACTOR INTALLED OFOI FURNIHED INTALLED OH OVERHEAD P PNL PANEL PVC POLYVINYL CHLORIDE PWR POWER Q QTY QUANTITY R RCP REFLECTED CEILING PLAN REQD REQUIRED REV REVIED, REVIION, REVIE RG RIGID GALVANIZED TEEL RVN REVENUE ECT ECTION F QUARE FEET HT HEET IM IMILAR LC IGNALING LINE CIRCUIT PEC PECIFICATION Q QUARE TD TANDARD TOR TORAGE UP UPEND VC ERVICE T TBD TO BE DETERMINED TET TETING TGB TELECOMMUNICATION GROUND BUBAR THRU THROUGH TR TELECOMMUNICATION ROOM TRIP TERMINAL RENEWAL AND IMPROVEMENT PROGRAM TMGB TELECOMMUNICATION MAIN GROUNDING BUBAR TA TRANPORTATION ECURITY ADMINITRATION U U/F UNDERFLOOR U/G UNDERGROUND UL UNDERWRITER LABORATORIE, INC. UNPROG UNPROGRAMMED UP UNINTERRUPTIBLE POWER UPPLY UNO UNLE NOTED OTHERWIE U/ UNDERLAB UTP UNHIELDED TWITED PAIR V V VOLT VA VOLT-AMPERE VAV VARIABLE AIR VOLUME V/E VIUAL EVACUATION VERT VERTICAL VET VETIBULE VIP VERY IMPORTANT PERON VND VENDING W W/ WITH WC WATER CLOET W/O WITHOUT WP WEATHERPROOF IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC PIPE TAG: [ -6 ]* * D B,4 EXITING PIPE NEW PIPE POINT OF CONECTION - NEW PIPE TO EXITING PIPE 9 ELBOW, 9 TURNING DOWN, 9 TURNING UP TEE, TEE TURNING DOWN, TEE TURNING UP CONCENTRIC REDUCER PIPE UNION GLOBE VALVE BALL VALVE NITROGEN PURGE VENT NITROGEN GENERATOR AIR COMPREOR REFRIGERATED AIR DRYER NITROGEN PURITY MONITOR NEW UPRIGHT PRINKLER DEMO UPRIGHT PRINKLER PAVE PEAKER B = URFACE MOUNT 4 = WATT TAP ETTING FIRE ALARM TROBE 5 = CANDELLA ERVICE NP = NITROGEN PURGE DPA = DRY PIPE - AUTOMATIC PRINKLER DP = DRY PIPE - FIRE HOE TANDPIPE WM = WATER UPPLY MAIN CA = COMPREED AIR PIPE ELEVATION AFF (FT-IN BOP) NOMINAL PIPE DIAMETER *NOTE: PIPE ELEVATION ARE PROVIDED FOR GENERAL GUIDANCE AND FOR BIDDING PURPOE ONLY. ACTUAL INTALLED HEIGHT AND ROUTING OF THE NITROGEN UPPLY PIPING I THE CONTRACTOR' REPONIBILITY.. DRAWING ARE DRAWN TO CALE UNLE OTHERWIE NOTED. CONTRACTOR I REPONIBLE FOR COORDINATING EXACT ROUTING OF ALL ERVICE WITH EXITING CONDITION AND WITH ALL OTHER TRADE. 2. IN THE INTALLATION OF THI WORK, THE CONTRACTOR HALL COMPLY IN EVERY WAY WITH THE REQUIREMENT OF LOCAL LAW AND ORDINANCE, THE LAW OF THE TATE OF TEXA AND THE NATIONAL ELECTRICAL CODE. 3. CAREFULLY EXAMINE THE PREMIE TO DETERMINE THE EXTENT OF WORK AND THE CONDITION UNDER WHICH IT MUT BE DONE. IF THERE ARE ANY QUETION REGARDING THE PROJECT, THE CONTRACTOR I REPONIBLE FOR OBTAINING CLARIFICATION FROM THE DEIGN OR THEIR DEIGNATED REPREENTATIVE BEFORE PROCEEDING WITH WORK OR RELATED WORK IN QUETION. 4. ANY DICREPANCIE BETWEEN THEE PLAN AND ACTUAL FIELD CONDITION MUT BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEER OR THEIR DEIGNATED REPREENTATIVE FOR CLARIFICATION. 5. ALL WORK HALL BE DONE IN A THOROUGH AND CONCIENTIOU MANNER ACCORDING TO INDUTRY TANDARD AND HALL BE UBJECT TO INPECTION AND ACCEPTANCE. WORK THAT I DEEMED UB-TANDARD OR NOT TO INDUTRY TANDARD WILL BE UBJECT TO REPLACEMENT OR REPAIR AT NO ADDITIONAL COT TO THE OR GENERAL CONTRACTOR. 6. THE CONTRACTOR HALL REVIEW ALL CONTRACT DOCUMENT RELATED TO THI PROJECT. THEE DOCUMENT ARE DIAGRAMMATIC AND ARE INTENDED TO HOW THE GENERAL ARRANGEMENT OF THE FIRE ERVICE WATER MAIN, CONTROL VALVE, RIER, AND AOCIATED APPURTENANCE FOR BIDDING PURPOE ONLY. 7. THE CONTRACTOR HALL PROVIDE ALL MATERIAL AND LABOR NECEARY TO MAKE THE YTEM FULLY OPERABLE AND IN COMPLIANCE WITH ALL APPLICABLE CODE. WORK HALL BE IN ACCORDANCE WITH THE CITY OF DALLA FIRE CODE, LOCAL AMENDMENT AND APPLICABLE TANDARD INCLUDING, BUT NOT LIMITED TO NFPA TANDARD 3, 4 AND 24. 8. UBMIT TO THE ENGINEER, THE AUTHORITY HAVING JURIDICTION AND WITH THE ' INURANCE CARRIER, AND HOP DRAWING FOR REVIEW ALONG WITH PRODUCT DATA COMPLETE WITH MANUFACTURER NAME, FIGURE NUMBER OR OTHER MEAN OF IDENTIFICATION FOR ALL FIRE PROTECTION EQUIPMENT PROPOED TO BE INTALLED AND ALL OTHER MATERIAL REQUIRED TO COMPLETE THE WORK. UBMIT TO THE ENGINEER ONLY AFTER APPROVAL BY OTHER AUTHORITIE. 9. PIPE IZE, DIMENION & ELEVATION INDICATED ON PLAN ARE FOR PACE COORDINATION AND REFERENCE ONLY. CONTRACTOR I REPONIBLE FOR FINAL IZING & PHYICAL ARRANGEMENT OF ALL YTEM PIPING AND EQUIPMENT. ALL EQUIPMENT, PIPING AND RELATED ITEM HALL BE UL- LITED AND/OR FM APPROVED FOR ERVICE.. THE CONTRACTOR I REQUIRED TO PROPERLY FIRETOP ANY PENETRATION OF FIRE-RATED WALL, FLOOR AND OTHER PARTITION BY RELATED PIPING WITH APPROVED FIRETOPPING YTEM ACCORDING TO LOCAL AND NATIONAL CODE. 2. COORDINATE ALL WORK AND WORK CHEDULE WITH THAT OF OTHER TRADE AFFECTED BY THE ENTIRE COPE OF THE PROJECT O THAT ALL WORK MAY BE INTALLED IN THE MOT DIRECT AND WORKMANLIKE MANNER AND O THAT INTERFERENCE WITH DUCTWORK, PIPING, EQUIPMENT, ELECTRICAL, ARCHITECTURAL AND TRUCTURAL COMPONENT AND OTHER WORK I AVOIDED. ROUTING OF PRINKLER MAIN, BRANCHE AND HEAD HALL BE THOROUGHLY COORDINATED WITH OTHER TRADE AND BUILDING TRUCTURE PRIOR TO UBMIION OF COORDINATED HOP DRAWING. 3. CONTRACTOR AND UBCONTRACTOR HALL COOPERATE AND BEAR ALL COT TO REPREENT INTALLED COMPONENT WITHIN THI COPE OF WORK. 4. PRIOR TO TARTING THE INTALLATION, THE AIGNED INTALLATION UPERVIOR OR LEAD TECHNICIAN HALL PARTICIPATE IN A WALK THROUGH OF THE PROJECT LOCATION WITH THE DEIGN, OR THE DEIGNATED AUTHORIZED REPREENTATIVE, TO REVIEW THE PROJECT COPE. 5. THE CONTRACTOR HALL PROVIDE ALL PERMIT REQUIRED FOR THE WORK INCLUDING ALL FEE OR EXPENE INCURRED. 6. DO NOT INTERRUPT PRINKLER OR FIRE ALARM ERVICE TO OCCUPIED AREA UNLE PERMITTED BY THE AHJ. THE CONTRACTOR HALL UBMIT A FIRE YTEM IMPAIRMENT REQUET AT LEAT 48 HOUR IN ADVANCE. YTEM IMPAIRMENT WILL NOT BE ALLOWED DURING WEEKEND AND HOLIDAY. 7. CONTRACTOR TO MAINTAIN COMPREED-AIR FUNCTIONALITY TO EACH DRY-PIPE RIER OR MANIFOLD UNTIL THE NITROGEN PREURIZATION YTEM I TETED AND ACCEPTED. HOULD ANY PRINKLER YTEM BE IMPAIRED DURING CONTRUCTION, A FIRE-WATCH WITH HOURLY ROUND MUT BE IMPLEMENTED IN THE AFFECTED AREA FOR THE DURATION OF THE IMPAIRMENT. FIREPROOFING NOTE (WHERE REQUIRED). WHERE POIBLE INTALL ALL HANGER, CLAMP, AND BRACING FOR THE NITROGEN PREURIZATION YTEM PRIOR TO THE APPLICATION OF FIREPROOFING ON TRUCTURAL MEMBER. 2. FATEN ALL HANGER, CLAMP, AND BRACING TO THE TOP OR BOTTOM FLANGE OF ANY JOIT REQUIRING FIREPROOFING. DO NOT ATTACH PIPING OR HANGER COMPONENT TO ANY OTHER PART OF A JOIT. 3. ANY DAMAGE TO FIREPROOFING ON THE BUILDING TRUCTURE A A REULT OF THE FIRE ALARM YTEM INTALLATION HALL BE REPAIRED BY A QUALIFIED FIREPROOFING CONTRACTOR. REPAIR HALL MATCH THE ADJACENT FIREPROOFING MATERIAL, THICKNE & RATING. ALL DAMAGE AND REPAIR OF FIREPROOFING HALL BE REPORTED TO AND COORDINATED THROUGH THE GENERAL CONTRACTOR. THE NITROGEN PREURIZATION CONTRACTOR HALL BE REPONIBLE FOR ALL FIREPROOFING REPAIR AT NO ADDITIONAL COT TO THE. 4. VERIFY LOCATION OF ALL FIREPROOFING, PRIOR TO THE INTALLATION OF ANY NITROGEN PREURIZATION EQUIPMENT OR PIPING. 5. PENETRATION IN FIRE RATED AEMBLIE REULTING FROM THE REMOVAL OF EXITING FIRE PROTECTION YTEM EQUIPMENT, PIPING, OR CONDUIT HALL BE FIRE TOPPED PER THE LATET EDITION OF THE UL FIRE REITANCE DIRECTORY. REFER TO THE DETAIL PLAN FOR EXTENT AND TYPE OF FIREPROOFING. FIRETOP NOTE. ALL THROUGH-PENETRATION OF FIRE-RATED WALL AND FLOOR HALL BE FIRE-TOPPED TO MEET THE MINIMUM REQUIRED RATING FOR EACH CONDITION. 2. FIRE-RATED GYPUM BOARD WALL CONTRUCTED A DECRIBED IN THE INDIVIDUAL U3 OR U4 ERIE DEIGN IN THE U.L. FIRE REITANCE DIRECTORY (GENERALLY DOUBLE THICKNE WALLBOARD) HALL BE FIRE-TOPPED WITH U.L. W-L- YTEM OR APPROVED EQUAL. 3. ALL REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT CONCRETE FLOOR OR WALL, AND ALL U.L. CLAIFIED CONCRETE BLOCK WALL HALL BE FIRE-TOPPED WITH U.L. C-AJ-45 YTEM OR APPROVED EQUAL. THE PURPOE OF THEE DOCUMENT I TO DECRIBE THE INTALLATION OF A NEW NITROGEN GENERATION YTEM IN FOR THE PREURIZATION OF 25 AUTOMATIC DRY-PIPE PRINKLER AND FIRE HOE YTEM ON THE RAMP LEVEL. NITROGEN WILL REPLACE COMPREED AIR A THE MEDIUM FOR AUTOMATIC DRY-PIPE YTEM UPERVIION. THE NITROGEN GENERATION YTEM CONIT OF TWO INTER-CONNECTED GENERATOR; ONE WILL BE LOCATED IN THE OUTH FIRE PUMP ROOM AND THE OTHER WILL BE LOCATED IN THE FIRE PUMP ROOM. NITROGEN PURITY WILL BE MONITORED VIA AUTOMATIC PURGE VENT INTALLED ON EACH OF THE 25 EXITING DRY-PIPE YTEM. THE WORK ALO INCLUDE THE INTALLATION OF AN ENTRANCE PORT ON EACH OF THE 25 AUTOMATIC DRY-PIPE PRINKLER AND FIRE HOE YTEM ON THE RAMP LEVEL. THE ENTRANCE PORT WILL ENABLE PERIODIC VIDEO-GRAPHIC INPECTION OF YTEM PIPE INTERIOR FOR CORROION CONTROL. THE CONTRACTOR HALL BE REPONIBLE FOR REVIEWING ALL EXITING CONDITION AOCIATED WITH THE WORK PRIOR TO COMMENCEMENT OF WORK ACTIVITIE. GENERAL NOTE - CORING. CONTRACTOR HALL VERIFY LAB TYPE AND PROPOED LOCATION OF CORE. 2. CAN FOR REBAR AND INDICATE LOCATION OF OBTRUCTIONON THE DECK PRIOR TO CORING. 3. FOR COMPOITE TEEL DECK CONTRUCTION VERIFY THAT CORE ARE NOT LOCATED OVER TEEL BEAM. 4. FOR CONCRETE JOIT CONTRUCTION VERIFY THAT CORE ARE NOT LOCATED OVER JOIT OR CONCRETE BEAM. 5. WHERE FIELD CONDITION INDICATE POIBLE INTERFERENCCE WITH BEAM OR JOIT, NOTIFY ' REPREENTATIVE THAT CORE NEED TO BE RELOCATED. 6. ALL NEW PENETRATION THROUGH RATED AEMBLIE HALL BE ED WITH FIRE RATED ANT AND HALL MAINTAIN THE RATING OF THE PARTITION OR FLOOR AEMBLY. GENERAL NOTE - BAGGAGE HANDLING YTEM. CONTRACTOR HALL MAINTAIN THE FOLLOWING MINIMUM CLEARANCE FOR PIPE INTALLATION: A. DRIVABLE AREA: 7'-6" ABOVE FINIHED FLOOR B. BAGGAGE BELT: 3'-" ABOVE BELT URFACE C. CATWALK: 6'-" ABOVE CATWALK DECK 2. CONTRACTOR HALL CALL BAGGAGE CONTROL AT (972) 973-9 TO REQUET BAGGAGE BELT TOPPAGE. CONTRACTOR I REPONIBLE FOR LOCK-OUT / TAG-OUT OF THE BELT CONVEYOR MOTOR. IUED FOR BID- //27 CONTRACT NO. 956 GENERAL NOTE AND YMBOL LEGEND FZ--

FZ2-- FIRE PUMP ROOM \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz--.dwg 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC OVERALL PLAN - ARRIVAL LEVEL "= 8' FZ2-- OUTH FIRE PUMP ROOM KEYPLAN C3 D3 E3 F3 G3 H3 I3 I4 I5 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 4' OVERALL PLAN - ARRIVAL LEVEL FZ-- 8' 6'

KEYNOTE UMMARY E PROVIDE " DIAMETER PIPE ROUTED BETWEEN THE OUTH PUMP ROOM AND PUMP ROOM TO INTERCONNECT NITROGEN GENERATOR. NEARLY THE ENTIRETY OF THE INTERCONNECT PIPING ON RAMP LEVEL ROUTE THROUGH THE BAG BELT CONVEYOR TUNNEL. THE CONRTRACT HALL NOTE THAT ACCE TO THI AREA FOR PIPING INTALLATION I LIMITED TO HOUR FROM :PM TO 3:AM DAILY. [ -6 ] [ -6 ] [ -6 ] [ -6 ] [ -6 ] D [ -6 ] [ -6 ] [ -6 ] C (INTERCONNECT) (INTERCONNECT) (INTERCONNECT) [ 6-4 ] [ 6-4 ] [ 6-4 ] (INTERCONNECT) [ - ] [ 9- ] \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-.dwg 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC B A [ 9- ] [ -6 ] [ - ] [ - ] [ - ] [ - ] OVERALL PLAN - RAMP LEVEL "= 8' [ -6 ] [ -6 ] [ -6 ] [ -6 ] 2 KEYPLAN C3 D3 E3 F3 G3 H3 I3 I4 I5 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 4' OVERALL PLAN - RAMP LEVEL FZ-2-8' 6'

3.22 3.32 3.42 3.6 3.7 4. 4. 4.2 4.3 4.4 4.5 4.6 4.7 5. 5. 5.2 MATCHLINE: ECTOR B MATCHLINE: ECTOR A L. FZ2-2-3 L.2 [ - ] L.3 [ -6 ] [ -6 ] [ -6 ] L.4 FZ2-2-4 L.49 M.8 MATCHLINE: ECTOR A MATCHLINE: ECTOR A MATCHLINE: ECTOR A2 M2 M.3 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-a.dwg 22 May 27 ECTOR PLAN - RAMP LEVEL - A /6"= '-" Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC MATCHLINE: ECTOR A KEYPLAN C3 D3 E3 F3 G3 H3 I3 I4 I5 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 8' 6' 32' ECTOR PLAN - RAMP LEVEL - A FZ-2-A

5.3 5.4 5.5 MATCHLINE: ECTOR A2 5.6 L. FZ2-2- L.2 5.7 6. 6. 6.2 6.3 6.4 6.5 6.6 6.7 7. 7. 7.2 7.3 7.4 7.5 7.58 FZ2-2- L.3 [ -6 ] [ -6 ] L.4 L.49 M.8 MATCHLINE: ECTOR A MATCHLINE: ECTOR A2 MATCHLINE: ECTOR A2 M2 M.3 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-a2.dwg 22 May 27 ECTOR PLAN - RAMP LEVEL - A2 /6"= '-" Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC MATCHLINE: ECTOR A2 KEYPLAN C3 D3 E3 F3 G3 H3 I3 I4 I5 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 8' 6' 32' ECTOR PLAN - RAMP LEVEL - A2 FZ-2-A2

3.22 3.32 3.42 3.6 3.7 4. 4. MATCHLINE: ECTOR C MATCHLINE: ECTOR B 4.2 4.3 4.4 4.5 4.6 4.7 I.4 KEYNOTE UMMARY PROVIDE " DIAMETER PIPE ROUTED BETWEEN THE OUTH PUMP ROOM AND PUMP ROOM TO INTERCONNECT NITROGEN GENERATOR. NEARLY THE ENTIRETY OF THE INTERCONNECT PIPING ON RAMP LEVEL ROUTE THROUGH THE BAG BELT CONVEYOR TUNNEL. THE CONRTRACT HALL NOTE THAT ACCE TO THI AREA FOR PIPING INTALLATION I LIMITED TO HOUR FROM :PM TO 3:AM DAILY. I.5 (INTERCONNECT) J. [ - ] [ 9- ] " NITROGEN INTERCONNECT DOWN TO OUTH PUMP ROOM J.2 " NITROGEN UPPLY DOWN TO OUTH PUMP ROOM \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-b.dwg 22 May 27 MATCHLINE: ECTOR B ECTOR PLAN - RAMP LEVEL - B /6"= '-" Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC FZ2-2-6 [ - ] [ 9- ] [ - ] [ - ] MATCHLINE: ECTOR B MATCHLINE: ECTOR A FZ2-2-5 KEYPLAN C3 D3 E3 F3 G3 H3 I3 I4 I5 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 5. J.3 J.4 5. J.5 5.2 K. MATCHLINE: ECTOR B 8' 6' 32' ECTOR PLAN - RAMP LEVEL - B FZ-2-B

3.22 3.32 3.42 3.6 3.7 4. 4. MATCHLINE: ECTOR D 4.2 4.3 4.4 4.5 4.6 4.7 MATCHLINE: ECTOR C KEYNOTE UMMARY PROVIDE " DIAMETER PIPE ROUTED BETWEEN THE OUTH PUMP ROOM AND PUMP ROOM TO INTERCONNECT NITROGEN GENERATOR. NEARLY THE ENTIRETY OF THE INTERCONNECT PIPING ON RAMP LEVEL ROUTE THROUGH THE BAG BELT CONVEYOR TUNNEL. THE CONRTRACT HALL NOTE THAT ACCE TO THI AREA FOR PIPING INTALLATION I LIMITED TO HOUR FROM :PM TO 3:AM DAILY. G.2 G.3 G.4 G.5 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-c.dwg 22 May 27 MATCHLINE: ECTOR C ECTOR PLAN - RAMP LEVEL - C /6"= '-" Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC MATCHLINE: ECTOR C MATCHLINE: ECTOR B (INTERCONNECT) (INTERCONNECT) [ 6-4 ] [ 6-4 ] KEYPLAN C3 D3 E3 F3 G3 H3 I3 I4 I5 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 H.3 I.2 I.3 MATCHLINE: ECTOR C 8' 6' 32' ECTOR PLAN - RAMP LEVEL - C FZ-2-C H. H.2 H.4 H.5 I.

3.22 3.32 3.42 3.6 3.7 4. 4. 4.2 4.3 4.4 4.5 4.6 4.7 5. 5. 5.2 MATCHLINE: ECTOR E MATCHLINE: ECTOR D D.5 FZ2-2-7 KEYNOTE UMMARY PROVIDE " DIAMETER PIPE ROUTED BETWEEN THE OUTH PUMP ROOM AND PUMP ROOM TO INTERCONNECT NITROGEN GENERATOR. NEARLY THE ENTIRETY OF THE INTERCONNECT PIPING ON RAMP LEVEL ROUTE THROUGH THE BAG BELT CONVEYOR TUNNEL. THE CONRTRACT HALL NOTE THAT ACCE TO THI AREA FOR PIPING INTALLATION I LIMITED TO HOUR FROM :PM TO 3:AM DAILY. E. E.2 [ -6 ] E.3 E.4 E.5 MATCHLINE: ECTOR D [ -6 ] FZ2-2-8 FZ2-2-9 F. MATCHLINE: ECTOR D [ -6 ] " NITROGEN UPPLY DOWN TO PUMP ROOM F.2 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-d.dwg 22 May 27 ECTOR PLAN - RAMP LEVEL - D /6"= '-" Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC MATCHLINE: ECTOR D MATCHLINE: ECTOR C [ -6 ] (INTERCONNECT) [ 6-4 ] KEYPLAN C3 D3 E3 F3 G3 H3 I3 J3 K3 L3 M3 " NITROGEN INTERCONNECT DOWN TO PUMP ROOM E E2 C4 D4 D E4 F4 G4 C H4 I4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 I5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 F.3 F.4 IUED FOR BID- //27 CONTRACT NO. 956 F.5 G. 8' 6' 32' ECTOR PLAN - RAMP LEVEL - D FZ-2-D

MATCHLINE: ECTOR E 3.22 3.32 3.42 3.6 3.7 4. 4. 4.2 4.3 4.4 4.5 4.6 4.7 5. 5. 5.2 MATCHLINE: ECTOR E MATCHLINE: ECTOR E MATCHLINE: ECTOR E2 C.32 C.4 C.52 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-e.dwg 22 May 27 ECTOR PLAN - RAMP LEVEL - E /6"= '-" Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC MATCHLINE: ECTOR E MATCHLINE: ECTOR D FZ2-2- [ -6 ] [ -6 ] KEYPLAN C3 D3 E3 F3 G3 H3 I3 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 I4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 I5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 8' 6' 32' ECTOR PLAN - RAMP LEVEL - E FZ-2-E D. D.2 D.3 D.4

7.4 7.5 7.58 MATCHLINE: ECTOR E2 C. 5.3 5.4 5.5 5.6 5.7 6. 6. 6.2 6.3 6.4 6.5 6.6 6.7 7. 7. 7.2 7.3 C.2 MATCHLINE: ECTOR E MATCHLINE: ECTOR E2 MATCHLINE: ECTOR E2 C.3 C.4 C.52 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz-2-e2.dwg 22 May 27 Chicago, IL 66 FZ2-2- [ -6 ] [ -6 ] FZ2-2-2 ECTOR PLAN - RAMP LEVEL - E2 /6"= '-" IT CONULTING, LLC WWW.CONULTING.COM D.4 I.T. CONULTING, LLC MATCHLINE: ECTOR E2 FZ2-2-3 KEYPLAN C3 D3 E3 F3 G3 H3 I3 I4 I5 J3 K3 L3 M3 E E2 C4 D4 D E4 F4 G4 C H4 B J4 K4 L4 M4 C5 D5 E5 F5 G5 H5 J5 K5 L5 M5 C6 D6 L6 A A2 M6 C7 D7 L7 M7 IUED FOR BID- //27 CONTRACT NO. 956 D. D.2 D.3 8' 6' 32' ECTOR PLAN - RAMP LEVEL - E2 FZ-2-E2

4.5 KEYNOTE UMMARY PROVIDE NEW NITROGEN PURITY MONITOR. DEMO EXITING THREADED TEE AND PRIG UP AND PRINKLER. INTALL TWO NEW UPRIGHT PRINKLER ON EITHER IDE OF THE NEW WALL. PROVIDE NEW AIR COMPREOR. 2 EXITING PAVE PEAKER AND FIRE ALARM TROBE TO REMAIN. 3 4 PROVIDE NEW REFRIGERATED AIR DRYER ON A HELF ABOVE THE AIR COMPREOR A HOWN. PROVIDE NEW NITROGEN GENERATOR. 3 INTALL NEW PAVE PEAKER AND FIRE ALARM TROBE. MOUNT PAVE PEAKER AT FT A.F.F. MOUNT FIRE ALARM TROBE AT 84 IN A.F.F. EXTEND CIRCUIT FROM NEARET EXITING DEVICE. RELOCATE EXITING END-OF-LINE REITOR TO NEW DEVICE LOCATION A NECEARY. 5 6 7 8 DOMETIC WATER UPPLY AND METER LOOP (EXITING). FIRE PUMP CONTROLLER (EXITING). FIRE PUMP AND JOCKEY PUMP ON HOUEKEEPING PAD (EXITING). PREURE REDUCING VALVE MANIFOLD (EXITING). 4 REMOVE CEILING TILE AND GRID TO FACILITATE INTALLATION OF THE NITROGEN UPPLY PIPING ABOVE THE CEILING. REINTALL AND/OR REPLACE UPENDED CEILING GRID AND TILE A NECEARY AT THE CONCLUION OF INTALLATION AND ACCEPTANCE TETING. 9 NITROGEN UPPLY & GENERATOR INTERCONNECT PIPING. REFERENCE /FZ2-- FOR CONTINUATION. 8'-4" W x 3'-" D x '-3 2" H CAT-IN-PLACE CONCRETE HOUEKEEPING PAD. EE DETAIL 5 ON HEET FZ5-- FOR ADDITIONAL INFORMATION. 2 3 B 5 B,4 5 4.4 4.5 " NITROGEN UPPLY UP TO RAMP LEVEL " NITROGEN INTERCONNECT UP TO RAMP LEVEL J.2 OUTH FIRE PUMP ROOM - LIFE AFETY YTEM 3 /2" = '-". 4 ( INTERCONNECT) (INTERCONNECT) 3 8 J.3 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2--.dwg 22 May 27 Chicago, IL 66 6'-" NITROGEN EQUIPMENT ELEVATION 2 " = '-". IT CONULTING, LLC WWW.CONULTING.COM 4 I.T. CONULTING, LLC 3 /2" 6'-8" (INTERCONNECT) /FZ2-- OUTH FIRE PUMP ROOM - NITROGEN EQUIPMENT PLAN /4"= '-" 7 5 6 9 3 4 IUED FOR BID- //27 CONTRACT NO. 956 J.4 2' ARRIVAL LEVEL - OUTH FIRE PUMP ROOM FZ2-- 4' 8'

KEYNOTE UMMARY PROVIDE NEW NITROGEN PURITY MONITOR. PROVIDE NEW AIR COMPREOR. 3 PROVIDE NEW REFRIGERATED AIR DRYER ON A HELF ABOVE THE AIR COMPREOR A HOWN. 4 PROVIDE NEW NITROGEN GENERATOR. 4.4 4.5 4.6 5 DOMETIC WATER UPPLY AND METER LOOP (EXITING). 6 FIRE PUMP CONTROLLER (EXITING). 7 FIRE PUMP AND JOCKEY PUMP ON HOUEKEEPING PAD (EXITING). 8 PREURE REDUCING VALVE MANIFOLD (EXITING). 9 NITROGEN UPPLY & GENERATOR INTERCONNECT PIPING. REFERENCE /FZ5-- FOR CONTINUATION. 7'-6" W x 4'-4" D x '-3 2" H CAT-IN-PLACE CONCRETE HOUEKEEPING PAD. EE DETAIL 5 ON HEET FZ5-- FOR ADDITIONAL INFORMATION. F. 3 ( INTERCONNECT) \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2--.dwg 6'-8" 6'-" 2 FIRE PUMP ROOM ELEVATION "= '-" 4 3 /2" " NITROGEN UPPLY UP TO RAMP LEVEL " NITROGEN INTERCONNECT UP TO RAMP LEVEL FIRE PUMP ROOM PLAN /4"= '-" 6 7 8 5 /FZ2-- 4 3 9 (INTERCONNECT) F.2 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 ARRIVAL LEVEL - FIRE PUMP ROOM FZ2--

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2- FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. FCA 6-2-W DVH-6-2- DVA-6A-2-D DVA-6-2-D 6" UPPLY DOWN TO LEVEL /FZ2-2- D7A2 MECHANICAL 6-2-W 6-2- 6A-2-D 6-2-D " NITROGEN UPPLY 6-2- 4" - DP \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-.dwg 22 May 27 Chicago, IL 66 6" - WM 4" - WPA 4" - DP AIR COMPREOR - RIER MOUNTED - EXIT. ROOM D7A2 - RIER MANIFOLD - ELEVATION 2 " = '-" IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC /2" - CA AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) * AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING /2" GLOBE VALVE AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) " GLOBE VALVE "X/2" CONC. REDUCER ERCURE AMDs TO WALL WITH UNITRUT CHANNEL AND PIPE CLAMP. ROOM D7A2 - RIER MANIFOLD PLAN /4" = '-" IUED FOR BID- //27 CONTRACT NO. 956 6A-2-D 6-2-D 2' VALVE ROOM D7A2 FZ2-2- 4' 8'

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2- FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. DVH-3-2- FCA-6A-2-W DVA-3-2-D 3 REMOVE CEILING TILE AND GRID TO FACILITATE INTALLATION OF THE NITROGEN UPPLY PIPING ABOVE THE CEILING. REINTALL AND/OR REPLACE UPENDED CEILING GRID AND TILE A NECEARY AT THE CONCLUION OF INTALLATION AND ACCEPTANCE TETING. 6" UPPLY D8A25 MECHANICAL /FZ2-2- 6" WATER UPPLY MAIN 3-2-D 6A-2-W 3-2- " NITROGEN UPPLY \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-.dwg 2 6" - WM 4" - WPA 4" - DP AIR MAINT. DEVICE W/ PRE. REGULATOR - EXIT. ROOM D8A25 - RIER MANIFOLD - ELEVATION " = '-" /2" - CA * " GLOBE VALVE "X/2" CONC. REDUCER AIR COMPREOR - TANK MOUNTED - EXIT. 4" - DP ROOM D8A25 - RIER MANIFOLD PLAN /4"= '-" 3-2-D 3-2- 3 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D8A25 FZ2-2-

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-3 FOR CONTINUATION OF NITROGEN UPPLY PIPING. 8-2-D REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 8-2-D 6" WATER UPPLY MAIN " NITROGEN UPPLY \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-3.dwg 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM AIR COMPREOR - RIER MOUNTED - EXIT. 6" - WM /2" - CA * /2" GLOBE VALVE " GLOBE VALVE "X/2" CONC. REDUCER AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING ROOM D4A223 - RIER MANIFOLD - ELEVATION 2 " = '-" I.T. CONULTING, LLC 4" - DP DVA-8-2-D 6" UPPLY /FZ2-2-3 D4A223 JANITOR ROOM D4A223 - RIER MANIFOLD PLAN /4"= '-" IUED FOR BID- //27 CONTRACT NO. 956 2' VALVE ROOM D4A223 FZ2-2-3 4' 8'

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-4 FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 3 REMOVE CEILING TILE AND GRID TO FACILITATE INTALLATION OF THE NITROGEN UPPLY PIPING ABOVE THE CEILING. REINTALL AND/OR REPLACE UPENDED CEILING GRID AND TILE A NECEARY AT THE CONCLUION OF INTALLATION AND ACCEPTANCE TETING. " NITROGEN UPPLY 3A-2-D 6" WATER UPPLY MAIN \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-4.dwg 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC 2 AIR COMPREOR - TANK MOUNTED - EXIT. 4" - DP 6" - WM * /2" - CA /2" GLOBE VALVE ROOM D6A24 - RIER MANIFOLD - ELEVATION "= '-" " GLOBE VALVE. "X/2" CONC. REDUCER AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING 6" UPPLY D6A24 VALVE ROOM ROOM D6A24 - RIER MANIFOLD PLAN /4"= '-" /FZ2-2-4 DVA-3A-2-D 3 IUED FOR BID- //27 CONTRACT NO. 956 3A-2-D 2' VALVE ROOM D6A24 FZ2-2-4 4' 8'

2A-2- KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-5 FOR CONTINUATION OF NITROGEN UPPLY PIPING. 2A-2-D REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 4" - DP 6" WATER UPPLY MAIN 36A-2-W 8A-2-D 6" WATER UPPLY MAIN 2A-2-D 2A-2-36-2-D /FZ2-2-5 6" UPPLY 36-2-D \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-5.dwg 22 May 27 " NITROGEN UPPLY " GLOBE VALVE "X/2" CONC. REDUCER /2" UNION Chicago, IL 66 AIR MAINT. DEVICE W/ PRE. WITCH (EXIITING) AIR COMPREOR - RIER MOUNTED - EXIT. AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) 6" - WM 4" - WPA /2" GLOBE VALVE /2" UNION * ERCURE AMD's TO WALL WITH UNITRUT CHANNEL AND PIPE CLAMP. ROOM D7A23 - RIER MANIFOLD - ELEVATION 2 3/4" = '-" IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC 6" - WM /2" - CA 4" - DP 8A-2-D ROOM D7A23 - RIER MANIFOLD PLAN /4"= '-" DVA-36-2-D DVH-2A-2- DVA-2A-2-D FCA-36A-2-W DVA-8A-2-D 6" UPPLY D7A23 MECHANICAL IUED FOR BID- //27 CONTRACT NO. 956 2' VALVE ROOM D7A23 FZ2-2-5 4' 8'

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-6 FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 3 REMOVE CEILING TILE AND GRID TO FACILITATE INTALLATION OF THE NITROGEN UPPLY PIPING ABOVE THE CEILING. REINTALL AND/OR REPLACE UPENDED CEILING GRID AND TILE A NECEARY AT THE CONCLUION OF INTALLATION AND ACCEPTANCE TETING. 8-2-D 8-2- 6" WATER UPPLY MAIN DVA -8-2-D 6" UPPLY DVH-8-2- D22A289 JANITOR 3 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-6.dwg AIR COMPREOR - RIER MOUNTED - EXIT. 4" - DP /2" - CA 6" - WM * /2" GLOBE VALVE " NITROGEN UPPLY " GLOBE VALVE "X/2" CONC. REDUCER /2" UNION AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING ROOM D22A289 - RIER MANIFOLD - ELEVATION ROOM D22A289 - RIER MANIFOLD PLAN 2 " = '=" /4"= '-" 8-2- 8-2-D 4" - DP 4" - FH 4" - DP /FZ2-2-6 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D22A289 FZ2-2-6

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-7 FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. " NITROGEN UPPLY \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-7.dwg AIR COMPREOR - RIER MOUNTED - EXIT. 3A-2-D " GLOBE VALVE /2" - CA "X/2" CONC. REDUCER * 4" - WM /2" GLOBE VALVE 4" WATER UPPLY MAIN AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING ROOM D27A22 - RIER MANIFOLD - ELEVATION 2 " = "-" 3A-2-D D27A22 DFW DVA-3A-2-D 4" UPPLY /FZ2-2-7 ROOM D27A22 - RIER MANIFOLD PLAN /4"= '-" 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D27A22 FZ2-2-7

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-8 FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 6" WATER UPPLY M 7-2- 9A-2-D 7-2-D 9A-2-D " NITROGEN UPPLY \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-8.dwg AIR COMPREOR - RIER MOUNTED - EXIT. AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) " GLOBE VALVE "X/2" CONC. REDUCER ERCURE AMDs TO WALL WITH UNITRUT CHANNEL AND PIPE CLAMP. 6" - WM 4" - DP AIR MAINT. DEVICE W/ PRE. WITCH (EXIITING) /2" - CA ROOM D29A228-A - RIER MANIFOLD - ELEVATION 2 " = '-" * /2" GLOBE VALVE /2" - CA 7-2-D 7-2- 4" - DP DVA-7-2-D DVA-9A-2-D DVH-7-2- ROOM D29A228-A - RIER MANIFOLD PLAN /4" = '-" 6" UPPLY /FZ2-2-8 D29A228 MECHANICAL 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D29A228-A FZ2-2-8

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-9 FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 4.2 4.3 37-2-D 37-2-D 3A-2-D 3A-2-W 6" WATER UPPLY MAIN " NITROGEN UPPLY F.2 \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-9.dwg 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC /2" GLOBE VALVE * AIR MAINT. DEVICE W/ PRE. WITCH (EXIITING) /2" - CA 4" - WPA ROOM D29A228-B - RIER MANIFOLD - ELEVATION 2 " = '-" 6" - WM " GLOBE VALVE "X/2" CONC. REDUCER AIR COMPREOR - RIER MOUNTED - EXIT. /2" UNION AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) ERCURE AMDs TO WALL WITH UNITRUT CHANNEL AND PIPE CLAMP. 3A-2-D /FZ2-2-9 D29A228 MECHANICAL DVA-37-2-D DVA-3A-2-D FCA-3A-2-W 6" UPPLY ROOM D29A228-B - RIER MANIFOLD PLAN /4"= '-" IUED FOR BID- //27 CONTRACT NO. 956 2' VALVE ROOM D29A228-B FZ2-2-9 F.3 4' 8'

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2- FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. D33A2 TIRE/JACK TOR. " NITROGEN UPPLY /FZ2-2- \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-.dwg AIR COMPREOR - RIER MOUNTED - EXIT. 2 9-2-D " GLOBE VALVE. /2" - CA "X/2" CONC. REDUCER * /2" GLOBE VALVE 6" - WM 6" WATER UPPLY MAIN AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING ROOM D33A2 - RIER MANIFOLD - ELEVATION " = '-" ROOM D33A2 - RIER MANIFOLD PLAN /4"= '-" DVA-9-2-D 6" UPPLY 9-2-D 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D33A2 FZ2-2-

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2- FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 3-2-D " NITROGEN UPPLY \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-.dwg AIR COMPREOR - RIER MOUNTED - EXIT. 3-2-D " GLOBE VALVE. /2" - CA "X/2" CONC. REDUCER * /2" GLOBE VALVE 6" - WM 6" WATER UPPLY MAIN AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING ROOM D36A4-D2 - RIER MANIFOLD - ELEVATION 2 " = '-" D36A4-D2 ROOM D36A4-D2 - RIER MANIFOLD PLAN /4"= '-" DVA-3-2-D /FZ2-2- 6" UPPLY 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D36A4-D2 FZ2-2-

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-2 FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 3 REMOVE CEILING TILE AND GRID TO FACILITATE INTALLATION OF THE NITROGEN UPPLY PIPING ABOVE THE CEILING. REINTALL AND/OR REPLACE UPENDED CEILING GRID AND TILE A NECEARY AT THE CONCLUION OF INTALLATION AND ACCEPTANCE TETING. 5A-2-D 6" WATER UPPLY MAIN 5A-2-D 7A-2-W " NITROGEN UPPLY " GLOBE VALVE \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-2.dwg AIR COMPREOR - RIER MOUNTED - EXIT. 6" - WM 4" - WPA * "X/2" CONC. REDUCER AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) AIR MAINT. DEVICE W/ PRE. WITCH - EXIITING /2" GLOBE VALVE 6" UPPLY DVA-5A-2-D FCA-7A-2-W D36A24 MECHANICAL ROOM D36A24 - RIER MANIFOLD - ELEVATION ROOM D36A24 - RIER MANIFOLD PLAN 2 " = '-" /4" = '-" 3 /FZ2-2-2 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D36A24 FZ2-2-2

KEYNOTE UMMARY REFER TO DETAIL 2/FZ2-2-3 FOR CONTINUATION OF NITROGEN UPPLY PIPING. REFER TO DETAIL 3/FZ5-- FOR AUTOPURGE VENT INTALLATION DETAIL. 5B-2-D 5-2-D 6" WATER UPPLY MAIN 6" RIER MAINIFOLD 5-2-D 8A-2-W 5-2- 5B-2-D PRV TET HEADER " NITROGEN UPPLY 4" - WPA 4" - DP " GLOBE VALVE \\moye.local\production\autocad\projects\exp\exp6 - terminal d dry pipe sprinkler repair\ - heets\fz2-2-3.dwg AIR COMPREOR - RIER MOUNTED - EXIT. 6" - WM /2" - CA ROOM D38A26 - RIER MANIFOLD - ELEVATION 2 " = '-" AIR MAINT. DEVICE W/ PRE. WITCH - EXIT. * /2" - CA "X/2" CONC. REDUCER AIR MAINT. DEVICE - NEW (TYCO AMD- OR EQ.) ECURE AMDs TO WALL WITH UNITRUT CHANNEL AND PIPE CLAMP. 5-2- D38A26 MECHANICAL ROOM D38A26 - RIER MANIFOLD PLAN /4" = '-" DVA-5B-2-D 4" - DP DVH-5-2- FCA-8A-2-W /FZ2-2-3 DVA-5-2-D 6" UPPLY DWN TO LEVEL 2' 4' 8' 22 May 27 Chicago, IL 66 IT CONULTING, LLC WWW.CONULTING.COM I.T. CONULTING, LLC IUED FOR BID- //27 CONTRACT NO. 956 VALVE ROOM D38A26 FZ2-2-3