NB/ 0695/MFFS/P 17A Feb 18 REQUEST FOR INFORMATION (RFI) FOR SUPPLY AND INSTALLATION OF MAGAZINE FIRE FIGHTING SYSTEM

Similar documents
QUESTIONNAIRE FOR DETAILS IN RESPECT OF MAGAZINE FIRE FIGHTING SYSTEM

NOTICE INVITING TENDER

PRE-QUALIFICATION OF FIRE SAFETY AUDITORS

Supply & Installation of Fire Protection System at STPI- Nashik. Tender No. STPI/P/PUR/07/14-15 Date Signature of Bidder

NATIONAL BANKING GROUP WEST-1

Purchase: (Fire Fighting) May 26, Sub: Quotation for AMC of Fire Fighting Systems

UCO BANK INDEX S.N. PARTICULARS PAGE NO. 1 INVITATION FOR TENDER OFFERS INSTRUCTIONS TO BIDDERS AND GENERAL TERMS & CONDITIONS 4-5

CHENNAI METRO RAIL LIMITED ADDENDUM-1. for

11 CONTRACT AWARD FOR SECURITY SERVICES

Subject: Tender for Comprehensive Annual Maintenance Contract (AMC) for CCTV System

SPECIFICATIONS FOR TENDER # SUPPLY OF A FIRE ALARM SYSTEMS SERVICE AGREEMENT FOR WESTERN HEALTH

UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE SPECIFICATION FOR LED HEADLAMP, FIREFIGHTER

TENDER NOTICE FOR SUPPLY, INSTALLATION AND MAINTENANCE OF FIRE EXTINGUISHERS AT BRANCHES / OFFICES IN NCR AND ADJOINING AREAS

Request For Quotations. For The. Fire Sprinkler Retrofit Program For Licensed Small Or Rural Retirement Homes. October 11, 2017

INTER - UNIVERSITY ACCELERATOR CENTRE (An Autonomous Centre of UGC) Aruna Asaf Ali Marg, New Delhi

* To be remitted only through DD/Banker Cheque, in favour of Bank of Baroda, payable at Bhopal.

BANK OF BARODA ZONAL OFFICE, MP & CG ZONE BHOPAL TENDER NOTICE

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose

Detail Notice Inviting Expression of Interest for Survey & Fire Safety Audit

TENDER NO: MR 92/2017 SUPPLY OF HIGH VOLTAGE PROXIMITY DETECTORS

TENDER NOTICE FOR RATE CONTRACT FOR SUPPLY, INSTALLATION AND REFILLING OF FIRE EXTINGUISHERS AT BRANCHES / OFFICES IN NCR AND ADJOINING AREAS

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems

इ ड यन ओव रस ज ब क Indian Overseas Bank. क ष त र य क य ऱय, Regional Office, Chandigarh

EXPRESSION OF INTEREST CONSULTANCY SERVICES FOR GIVING FACELIFT TO BHEL GATES & LAND SCAPING OF SOUTH AVENUE AT BHEL-R.C.

OFFICE OF THE PRINCIPAL GOVERNMENT ENGINEERING COLLEGE JAGDALPUR (C.G.)494005

REQUEST FOR INFORMATION(RFI) FOR DUAL TECHNOLOGY MINE DETECTORS

The Singapore Fire safety Engineering Guidelines (SFEG)

BANK OF BARODA BIHAR REGIONAL OFFICE, 4 TH FLOOR, ANAND VIHAR, West Boring Canal Road, Patna TENDER NOTICE

Abu Dhabi Conformity Assessment Scheme for Fire Pumps

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.

CERTIFICATION SAFETY & BEYOND

RFP # FIRE STATION ALERTING SYSTEM FOR THE CITY OF BLOOMINGTON FIRE DEPARTMENT

Date of Start and downloading the tender 12 sep 2018

STAR HOUSE BANK OF INDIA NATIONAL BANKING GROUP NORTH-I H-2 CONNAUGHT CIRCUS Middle/Outer Circle, Phone No

INVITATION TO BID SUPPLY OF VARIOUS PORTABLE FIRE EXTINGUISHERS

THIS ADDENDUM MUST BE ACKNOWLEDGED.

CORRIGENDUM NO: 2 TO REQUEST FOR QUOTATION CRFQ NO E-Tender Ref. No: 9093

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

TENDER NOTICE FOR SUPPLY, INSTALLATION AND MAINTENANCE OF FIRE EXTINGUISHERS AT BRANCHES / OFFICES IN KARNATAKA & ANDHRA PRADESH ZONE

Fire Detection and Alarm System (FDAS) & Fire Detection and Suppression Systems (FDSS) for Buses - Requirements

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

CITY OF EAU CLAIRE, WISCONSIN REQUEST FOR PROPOSALS

Relationship beyond banking

Technical Specification For Design and supply of Water Mist cum CAFS (Compressed Air Foam System) Backpack Fire Fighting System

Cable Ties JULY The electronic pdf version of this document found through is the officially binding version

TENDER CRFQ NO (E-TENDER REF NO.13020)

Ravi Malik General Manager

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 66/2014/TT-BCA Hanoi, December 16, 2014 CIRCULAR

GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES


INDUSTRIAL EXTENSION BUREAU

Proforma for Surveillance of Recognized Environmental Laboratory under the Environment (Protection) Act, 1986

PART 3 REQUIREMENTS FOR SPRINKLER SYSTEMS and SPRINKLER INSTALLERS

Request for Bid Proposal For Repair of Sprinkler Systems Iowa Veterans Home Marshalltown, Iowa

Majis Industrial Services SAOC TENDER NO. MISCP/09/2014

CCDC EXPANSION PROJECT

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

EMPANELMENT DOCUMENT NOTICE FOR EMPANELMENT OF SUPPLIERS AND SERVICE PROVIDERS.

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

Time Extension: Tender submission deadline is extended up to 12:00 Hrs. of

Due to large sum and BG processing time it is requested to offer 15 Working days instead of 7 working days.

SPECIFICATIONS FOR TENDER # SUPPLY OF DUCTLESS MINI-SPLIT AIR CONDITIONING SYSTEMS FOR WESTERN HEALTH

TENDER DOCUMENT FOR SUPPLY OF EPOXY MIXING & POURING PLANT

REQUEST FOR INFORMATION (RFI) FOR MODERNISATION OF NAVAL AIRCRAFT YARDS AT GOA AND KOCHI

A Study into the Standardization of Using Fire Detectors in Rail Vehicles for China

ENGINEERING STANDARDA FOR FIRE FIGHTING HOSE BOX AND SHELTER FIRST EDITION APRIL 2015

CONTRACTOR WHS HAZARD STANDARD LASER SAFETY EXTERNAL USE ONLY

TENDER FOR EMPANELMENT OF VENDORS FOR REFILLING AND SUPPLY OF NEW FIRE EXTINGUISHERS FOR BRANCHES AND OFFICES IN ZONE UNDER

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Tender document for Supply/ Installation of New Fire extinguishers & Refilling TENDER NOTICE

TENDER FOR EMPANELMENT OF VENDORS

Requirements for ships carrying hydrogen and compressed natural gas vehicles

Bank of Baroda Zonal Office, Tamil Nadu and Kerala Zone, Baroda Pride, New No.-41, Luz Church Road, Mylapore, Chennai

Annual Fire Systems and Backflow Preventers Testing

Fire alarm provisions for alerting the Fire Service

BANK OF BARODA BARODA CORPORATE CENTRE MUMBAI

CITY OF MILTON INVITATION TO BID (THIS IS NOT AN ORDER)

Keren Kayemeth LeIsrael Jewish National Fund KKL-JNF

Eligibility Criteria for Participation [Qualification Requirement (QR)]

FIRE PROTECTION PROGRAM

NOTICE TO CONTRACTORS

How to Use Fire Risk Assessment Tools to Evaluate Performance Based Designs

IFLA Regional Office for Latin America and the Caribbean: Call for Applications to host the Regional Office

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

MINIMUM PERFORMANCE REQUIREMENT FOR AIR FORCE FLIGHTLINE FIRE EXTINGUISHERS:

NIT NO. BSRDCL-2039/ TENDER DOCUMENT INSTALLATION, CONFIGURATION, TESTING, COMMISSIONING AND TRAINING OF SMOKE DETECTION FIRE ALARM SYSTEM

The Delivery, Installation, Removal and Disposal of Electric Water Heaters

INITIAL FIRE SAFETY ASSESSMENT

SCHEDULE 2 - EXHIBIT 1 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and THE CONNECTION AND USE OF SYSTEM CODE

Centexbel. General certification regulations. Construction products

ROSWELL INDEPENDENT SCHOOL DISTRICT P.O. Box 1437 Roswell, New Mexico General Bid Conditions

Procedure for the Approval of New Fire Detection and Alarm Technologies

Y. ORMIERES. Fire risk analysis method for nuclear installations

RULEBOOK ON ELECTROMAGNETIC COMPATIBILITY

AS/NZS :2008

New Requirements for Placing of Medical Devices on the Market: Conformity Assessment to the Technical Regulations

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

Finalized Draft AUTOMOTIVE INDUSTRY STANDARD

ODISHA POWER TRANSMISSION CORPORATION LIMITED OFFICE OF THE GENERAL MANAGER EHT (O&M) CIRCLE, BIDYUTPURI COLONY, BERHAMPUR

Transcription:

Tele: +91-11-23793514 Fax: +91-11-23793514 Directorate of NBCD Integrated Headquarters of Ministry of Defence (Navy) 15, A - Block Hutments Dalhousie Road New Delhi 110011 NB/ 0695/MFFS/P 17A Feb 18 REQUEST FOR INFORMATION (RFI) FOR SUPPLY AND INSTALLATION OF MAGAZINE FIRE FIGHTING SYSTEM 1. The Ministry of Defence, Government of India, intends to procure an Automatic Magazine Fire Fighting System (MFFS) for seven warships under construction at two different shipyards in India. The salient characteristics of the magazine fire fighting system are as follows:- Ser Description Equipment Requirements (a) Detection and prevention of fire in magazines of a ship (b) Types of magazines A magazine is a compartment, within the ship s structure, which is specially designed and constructed for the safe, permanent stowage of explosives or ammunition. These compartments are required to be continuously monitored for change in temperature, pressure and radiation. In case of change in compartment conditions or on occurrence of spark/smoke/fire, an alarm is to be generated along with activation of magazine fire fighting system automatically. The magazines would be classified into two types namely:- (i) Ready Use. Temporary stowage of explosives stores to facilitate quick supply when the relevant weapon is required to be in a high state of operational readiness. (ii) Main Magazines. Designed for permanent stowage of the whole or part of the ship s outfit of the designated explosive stores. (c) Methodology (i) The Magazine Fire Fighting System would have fire detection and monitoring system which would work on the combination of temperature,

2 (d) (e) Applicable Standards Applicable Certification pressure and infrared sensors logic. (ii) These sensors would continuously monitor the magazine for any change in temperature, pressure and radiation. The output of sensors would be used for activation of Automatic Magazine Fire Fighting System. Whenever any symptom of fire is detected, following systems would activate automatically:- (aa) Audio Visual Alarm and Feedback. The system shall be capable of providing indications and warnings in the main control panel and mimic panel by way of audio and visual alarm and feedback which would be activated at various stages of fire detection and operation of system including prewarning. (ab) Sprinkler System. The sprinkling system would be designed and developed to cool and protect ordnance stored in the magazine from external fire and to extinguish incipient fires within the magazines. The principle of fire prevention in the magazines is to reduce the temperature of the ammunition. A magazine sprinkling system would have a network of pipes and sprinklers located at different locations so that the water spray covers all areas of the magazine. (ac) Inhibitor System. The inhibitor system would be an automatic gas based firefighting system. The fire suppression agent would form a curtain at the hatch opening to prevent entry of fresh air into the compartment. (iii) All the detection system would be coupled with the control system for interfacing with various other sub-systems for activation of Magazine Fire Fighting System. The system should be designed in accordance with DEFSTAN 00-101 Part 1 and equivalent Military Standards. Should have at least one certification from an IACS (Internationally Accredited Classification Society) or

3 a reputed Fire Test Laboratory that conducts similar test for warships. (f) Product Life Not less than 25 years. (g) Product support Not less than 25 years. 2. This Request for Information (RFI) consists of two parts as indicated below: - (a) Part I. This part of the RFI incorporates operational characteristics and features that should be met by the equipment. Few important technical parameters of the proposed equipment are also mentioned. (b) Part II. This part of the RFI states the methodology of seeking response of the vendors. Submission of incomplete response format would render the vendor liable for rejection. PART I 3. Important Parameters. (a) Intended Use. The term magazine is a compartment used for stowage of explosives or ammunition. These compartments are required to be continuously monitored for change in temperature, pressure and radiation. In case of change in compartment conditions or on occurrence of fire, an alarm is to be generated and the magazine fire fighting system is activated. The magazine fire fighting system would have fire detection and monitoring system which would be a combination of temperature, pressure and infrared sensors. (b) These sensors would continuously monitor the magazine for any change in temperature and pressure. The output of the sensors would be used for activation of Automatic Magazine Fire Fighting System. Whenever any symptom of fire is detected, following systems would activate automatically:- (i) Audio Visual Alarm. The system must be capable of providing indications and warnings in the main control panel and mimic panel by way of audio and visual alarm and feedback which would be activated at various stages of fire detection and operation of system including pre-warning. (ii) Sprinkler System. The sprinkling system would be designed and developed to cool and protect ordnance stored in the magazine from external fire and to extinguish incipient fires within the magazines. The principle of fire prevention in the magazines is to reduce the temperature of the ammunition. A magazine sprinkling system would have a network of pipes and sprinklers located at different locations so that the water spray covers all areas of the magazine. (iii) Inhibitor System. The inhibitor system would be an automatic gas based firefighting system. The fire suppression agent would form a

4 curtain at the hatch opening to prevent entry of fresh air in to the compartment. (c) All the detection system would be coupled with the control system for interfacing with various other sub-systems for activation of Magazine Fire Fighting System. (d) Technical Parameters. A questionnaire to solicit information regarding technical and functional parameters for the Magazine Fire Fighting System is placed at Appendix A. (e) Overall Costing. The cost of product would be taken into account for determining the L1 vendor. Vendors are required to provide complete elements of costing. (f) Option Clause. An option clause may be exercised in the procurement case. Vendors must express their willingness or otherwise for option clause, including the duration for which the option clause would be valid. (g) The vendors are required to indicate whether the equipment has been supplied to any other company in India. (h) Vendors would also be required to provide an operational manual with details of precautions in operation and side effects if any. (j) The deliveries of the Magazine Fire Fighting System would need to commence as per a stipulated time period post conclusion of contract. (k) The vendors are required to indicate their willingness to the terms of payment as per DPP 2013. (l) The vendors are required to indicate compliance or otherwise to the conditions of the RFI and respond to the queries pertaining to the operational and technical requirements placed at Appendix A. (m) Vendors may consider RFI as advance information to obtain requisite government clearances. (n) Ability of the vendors to comply with all provisions of DPP 13 is to be indicated. If not, then the relevant Para/clause of DPP 13 which cannot be agreed to along with reasons is to be indicated. (p) Additional literature/equipment details may be submitted along with the response to the RFI. (q) Certification. Certification regarding conformity to an accredited Laboratory needs to be submitted. (r) User Evaluation Trials. Trials will consist of Factory Acceptance Trials and HATs/SATs. FATs will consist of Design Verification, Functional Tests, Test

5 Equipment Study, Calibration Procedure and Pass/Fail criteria. Ship based trials would be full functional trials to ascertain all operational parameters of the system. 4. Vendors should confirm to the under mentioned conditions in accordance with Chapter 5 read in conjunction with Appendix C of Defence Procurement Procedure 2016 (DPP-2016): - (a) The solicitation of offer would be as per Single Stage Two Bid System. It would imply that a Request for Proposal would be issued soliciting technical and commercial offers together, but in two separate sealed envelopes. The validity of commercial offers should be at least 12 months from the date of submission of offers. (b) The technical offers would be evaluated by a Technical Evaluation Committee (TEC) to check its compliance with RFP. (c) The equipment of all TEC cleared vendors would be put through a Field Evaluation Trial (FET) in India on a No Cost No Commitment basis. A staff evaluation would be carried out by SHQ to analyse the result of field evaluation and shortlist the equipment for introduction into Service. (d) Amongst the vendors cleared by the staff evaluation, a Commercial Negotiation Committee (CNC) would decide the lowest cost bidder (L1) and conclude the appropriate contract. (e) The vendor would be required to accept the standard conditions of contract given in DPP - 16. PART II 5. Procedure for Response. (a) Vendors must fill the form of response as given in Appendix B. Apart from filling details about company, details about the exact product meeting our generic technical specifications should also be carefully filled. Additional literature on the product could also be attached with the form. (b) The response to the RFI Forms at Appendix B, duly filled, should be dispatched at the under mentioned address:- The Principal Director of NBCD Integrated Headquarters of Ministry of Defence (Navy) Room No 15 & 15A A - Block Hutments Dalhousie Road New Delhi 110011 Fax: +91 11 23793514 Email ID: dnbcd-navy@nic.in

6 (c) Last date of acceptance of filled form is 05 Mar 18. The vendors short listed for issue of RFP would be intimated. 6. The Government of India invites responses to this request only from Original Equipment Manufacturer(OEM)/Vendors authorised by OEMs/Government Sponsored Export Agencies (applicable in the case of countries where domestic laws do not permit direct export by OEMs). The end user of the equipment is the Indian Navy. 7. This information is being issued with no financial commitment and the Ministry of Defence reserves the right to change or vary any part the Magazine Fire Fighting System at any stage. The Government of India also reserves the right to withdraw it should it be so necessary at any stage. The acquisition process would be carried out under the provisions of DPP 2016.

7