Case Study and 700 HP Steam Boilers - Scale

Similar documents
WELCOME TO THE AWT REGIONAL TRAINING PROGRAM

Volume 10 Summer Understanding Terminology Key to Treatment Program Success

Water Treatment Improves Your Bottom Line DAVE PICOU WATER CARE SERVICES DIVISION JOHN SCHULTZ TEXTILE CARE DIVISON

TEMPLATE ASSISTED CRYSTALLIZATION. Presented By Ryan Lessing 11/13/2014

Steam Ancillary Equipment. Primary Steam System, Water Treatment and Auxiliary Steam System Equipment

Residential Application

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

COOLING SYSTEM ECONOMICS. How much is my water treatment really costing? Is Bon Aqua treatment the right choice?

MONARCH SCALEOUT MONARCH WATER

EXCALIBUR SOFT-TEC - PRETREATMENT CHEMICAL REMOVAL SYSTEM AND WATER CONDITIONER SCALE CONTROL SYSTEMS

Water Quality in Hydronic Systems April 16, 2015 with Guest Speaker Jim Poehling, P.E., LEED AP Q&A Documentation

PUROTAP easy. Installation Function Operation Service. fast efficient safe. Demineralised heating water perfect for every system

Novel Press Fabric Cleaning Method Increases Productivity in a Sustainable Manner

Protective Chemistry for Steam Boiler Wet Layup posted to DPS client area on:

Typical damages to Boilers & Economizers

TECHNICAL MANUAL ASGX

Refrigeration air dryer

Water Quality in Hydronic Systems March 10, Q&A Documentation

Descaler & Prevention

BOILER SYSTEM CHEMICAL TREATMENT 101

INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16

Carry Out Maintenance Procedures

OWNER S MANUAL. Premium Series Two Tank 1-PLUS-1 Water Conditioner & Whole House Filters

9.0 Systems For Domestic Water Installations

CHAPTER 6. HEATING PRODUCTION EQUIPMENT AND SYSTEMS

.03 ATMOSPHERIC DEAERATOR

150 & 200 RT MG-SERIES GAS FIRED DOUBLE-EFFECT EFFECT ABSORPTION CHILLER-HEATER

TYPE.005 DA-2C. Deaerating Boiler Feed Pumps. SHIPCO Deaerators can save you money!!! BULLETIN 149 Revised 8/09

Chanson Water USA, INC. Installation Guide for SCF-3000/SCF-6000

Akiki Engineering Est.

Pipe: ASTM B88, hard drawn copper, Type K. Fittings: ASTM B16.22 Wrought copper and copper alloy.

EVAP Project BACKGROUND EVAP UNIT

1850 Series TRIPLE TREAT Operation Manual

Boiler Basics. Design and operation

TYPE.005 DA-STP TYPE.005 DA-STP-2T. Spray Tray Deaerating Pressurized Boiler Feed Pumps. and. when separate surge tank is utilized

ProMoss TM Plant-Based Water Treatment Solves Problems in Tobacco Manufacturing Plant Air Washer Systems

.005 ATMOSPHERIC DEAERATOR

Spectrum TM. Installation, Service & Operation Manual O FLO. SoftH 2. Water Softener. Table of Contents

Unit 5: Soil - Stages of Soil formation

STORAGE WATER HEATERS

DEAERATORS .005 ATMOSPHERIC DEAERATOR

If your soil has a high salinity content, the plants

HydroBlend TM Water Treatment Product Characteristics

Owner s Manual / 5600 Econominder

Silhouette. Feedwater Heater. Boiler Feedwater

SuperStor Glass Lined Storage Tank

Water Distillation System Instruction Manual Nutriteam TC-501

Niles Steel Tank Hot Water Generator Installation and Operation Manual

SuperStor Ultra Stainless Steel Storage Tank

DEP NYC TRIAL Disintegration of Struvite Molecule Using Merus Oscillation Technology Year 2007/8 NYC Water Pollution Control Plant Rockaway

Strategies in Optimizing Condensate Return

Diocese of Cleveland Facilities Services Corporation

BASIC BOILERS NAME :- DATE :-

Evaporative Cooling products

Additional Information for the Proposed Methodology Energy Saving by Introduction of High Efficiency Once-through Boiler

Akiki Engineering Est.

THE CONDENSATE STORY. Patrick Rogers Nalco Company Spokane, Washington

Boiler Condensate Return Basics. Presented by Steve Connor February 24, 2016

The Electronic Anti-Scale System Condominiums and Large Buildings

Developing and Implementing a Fertilizer Program. Marc van Iersel. mixed with substrate components before planting

Glass Door Merchandiser Refrigerator and Freezer

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-315(C)

3.1 Deaerator Systems

S. P. THERMAL SYSTEMS INC.

ZEROwaste HX PERC SYSTEM USER MANUAL. AIR QUALITY LABORATORIES Seattle, Washington

PIPING APPLICATION GUIDE

How to Build A State-of-the-Art, High Yielding Aeroponic Growing System

Maintenance regulations Service intervals SCA

Installation & Operation Manual Models:

Scale Stopper Plus Installation & Start-Up Guide

OPERATING AND MAINTENANCE MANUAL

Technical Bulletin Developed with Glow-worm

Desiccant Breathers: A Front Line Defense in the War on Contamination

DewPoint 6210 Start-Up Checklist

Basic information about quick steam generators/boilers System GEKA Heat Technology Gottfried Kneifel

High Carbon Wood Fly Ash as a Biochar Soil Amendment

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

Installation and Operations Guide

Ice Machine Preventative Maintenance

CARE & HANDLING. Optimal Relative Humidity (RH) should be between 75% 90%. Wet pack and dry pack flowers can both be stored at the same RH.

GROWMAX WATER Perfect Water for Plants and Gardens

Solid Door Top Mount Reach-In Freezer

Custom Design TYPE SHM Steel Horizontal Make-up Boiler Feed Pumps and Custom Design TYPE SHEM. BULLETIN 107 Revised 5/17

ANNEX 6. Refinery No. 1 New Area. Problems Existing in the Current Condensate Return System of the New Area of Refinery No.1

7800 Neutralizer Installation & Start-Up Guide

Page 1 of 6. Machine Serial No. Model Pump Size PRELIMINARY INSPECTION. Service and Connections

Soils and Fertilizers. Leo Espinoza Soils Specialist

WM-450-PT WM-900-PT Commercial Wall Mounted Reverse Osmosis

Boiler MACT Webinar Q/A

Installation Instructions and Owner s Manual. FSN Series. Nitrate Removal Water Softening System

The NEW advanced electrolytic scale inhibitor with intelligent LED monitoring technology from Sentinel

BOILER HOUSE PRODUCTS GMS

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS:

Understanding the Balance

INSTALLATION and OPERATION MANUAL DIRECT STEAM KETTLES MOUNTED ON ELECTRIC BOILER BASE CABINET MODELS: EMT-6 EMT-10 EMT-12 EMT-6-6 EMT-10-6 EMT-10-10

ACE. HydroStream Model HC-100. Evaporative Humidification (100 lbs/hr) Produces Already Humidified Air Information Specifications...

123FILTER ELECTRONIC WATER CONDITIONER MODEL: ED2000

lindab we simplify construction Lindab Modular air handling units Connection, start-up and commissioning manual

Owner's Manual. WS Series. Water Softener

Transcription:

Case Study - 600 and 700 HP Steam Boilers - Scale Case study updated on June 10, 2013 Installer: MBI Water Solutions - HydroFLOW Master Distributor in the US Pacific Northwest. Customer: Chemical Plant in Wapato, Washington, USA. Please contact Rudy Nicacio, Manager of MBI Water Solutions, in order to receive the customer s contact information. Phone: (509) 453-3326 Email: rudy@mbiyakima.com Application: 600 and 700 horse power low pressure diesel steam boilers. Installed units: One HydroFLOW 60i unit was installed on the water line, after the softener, which provides make-up water to the DA tank. Two HydroFLOW 60i units were installed on the incoming water line feeding each steam boiler. Water source: Well water with a hardness of approximately 200PPM of calcium carbonate. Note: The water softener reduces the hardness to around 80PPM. Chemicals: Anti-scalant, anti-corrosive and iron inhibitor chemicals. Installation date: January 30, 2013 Background: Due to excessive lime scale accumulation, the diesel steam boilers were on the verge of being decommissioned for a week in order to be acid cleaned; a process which typically costs over $15,000. In addition, there was a strong possibility the steam boilers required replacement ($350K each). The head of maintenance decided to evaluate HydroFLOW s ability to clean the steam boilers and possibly avoid acid cleaning. Success factor: Remove scale deposits from the steam boilers, DA tank and pipes without the need to acid clean and lose a week s worth of production time.

HydroFLOW 60i System Configuration To other plant equipment Return steam to DA Tank Chemicals Outgoing steam to plant DA Tank make-up line DA Tank HydroFLOW 60i Pump Water line from softener 700 HP Steam Boiler HydroFLOW 60i Pump 600 HP Steam Boiler

DA Tank HydroFLOW 60i on water line from softener

600 HP Steam Boiler HydroFLOW 60i on pipe feeding the steam boiler

700 HP Steam Boiler HydroFLOW 60i on pipe feeding the steam boiler

Lime scale from steam boiler blow-down Results Within a few days, soft chunks of grayish and reddish scale and putty (wet calcite crystals) began washing out via blow-down. Immediately following installation and after consulting with the manufacturer of the steam boilers; the maintenance supervisor increased blow-down frequency to every two hours for the initial 2.5 months. Increasing the blow-down frequency accelerated the removal of scale deposits from the system. Currently, the steam boilers are being blown-down 3 times a day. The water softener was bypassed less than a month after installation, which led to acceleration in the removal of scale from the system. Chemicals are yet to be reduced. Note: Following a water analysis by a HydroFLOW representative, some chemical reduction can be achieved. See below Steam Boiler Questions & Answers and Water Test Requirements for additional information. Within 2.5 months, the stack temperature of each steam boiler reduced from approximately 650 to 400 degrees F, indicating increased efficiency. Within 2.5 months, fuel consumption went down from 400 to 275 gallon per day; which translates to roughly $150K savings annually (return on investment of 2-3 months). Due to the great results, the customer decided to delay the possible replacement of the steam boilers ($350K each). Quote from the maintenance supervisor: I m very pleased with HydroFLOW s results. Instead of dreading it, I m actually looking forward to the next state inspection!

Low Pressure Steam Boiler Questions & Answers What are the basic guidelines for steam boiler applications? Customer to provide HydroFLOW USA with DA/condensate tank feed water analysis, current chemical usage data and picture documentation of the steam boiler s tubes and internal cavity. Install a HydroFLOW water conditioner before each boiler and condensate tank. Continue with the regular chemical regimen. An ROI of roughly 6 months will be achieved thanks to heat transfer efficiency gain, which is attributed to lessened fuel consumption due to scale removal. Water softener should be bypassed and chemicals should be reduced ONLY after the initial 3 month inspection proves the HydroFLOW device is operating properly. HydroFLOW USA will work with customer to determine which chemicals can be reduced. Periodic inspections should be conducted in order to locate a problem, and correct it, before it becomes severe. How is it possible to know if the water conditioner is having a positive effect? A visual inspection of the steam boiler s tubes and internal cavity should be performed in 3 month intervals. The purpose of the inspections is to verify that the water conditioner is removing and/or preventing lime scale accumulation. As lime scale deposits will begin to remove; stack temperature is expected to gradually drop due to lessened fuel consumption. In new or recently cleaned boilers; stack temperature is expected not to significantly increase. If applicable, a gas/fuel meter feeding the steam boiler can be monitored in order to verify lessened fuel consumption. Note: It is very important to obtain photo documentation of the steam boiler s baseline conditions prior to the installation and during each inspection. The purging of lime scale can last up to one year if the existing lime scale deposits inside the steam boiler are extreme. Possible negative effects? Negative effects are not expected but the following side effects may occur: Removal of lime scale flakes could accumulate in the bottom of the steam boiler s cavity and should be discarded if they impede the steam boiler s operation. During the initial months of operation, lime scale debris may begin to clog the pump screen of the condensate tank or accumulate inside the condensate tank itself. The accumulation of debris will gradually decrease and eventually stop over time. Blown-down water may be reddish with rust and include lime scale particles that are being removed. Over time, the water will become clearer.

After installation, should the standard blow-down schedule be maintained? The blow-down schedule should be increased by 50% during the initial purging stage of 3 ~ 6 months in order to assist in the removal of lime scale. Customer should consider implementing automatic blow-down in all steam boilers and introduce standardized boiler blow-down and maintenance procedures. Is periodic water testing necessary? Yes, refer to the HydroFLOW Water Test Requirements for Steam Boilers document. What routine maintenance does the water conditioner require? The water conditioner has no moving parts and typically lasts well over 10 years if maintained properly and installed with an adequate surge protection device. Weekly preventative maintenance inspections should include a visual check to ensure the mounting hardware is fastened securely, the red and green lights are glowing brightly, the ferrite ring is intact, the polymer screws are tight and the unit is clean.

Water Test Requirements Make-up water test requirements (from city or well) - water sample to be taken before the water softener and chemical injector. - Total Hardness in PPM (parts per million) [1] - Hardness as Calcium Carbonate (CaCO3) in PPM - Magnesium (Mg) in PPM - Silica or Silicon Dioxide (SiO2) in PPM - Iron (Fe) in PPM [2] - Chloride (CI) in PPM - Dissolved Oxygen [3] - ph [4] - Alkalinity - Conductivity - Ferrous metal corrosion rate in MPY (mils per year) [1] Following proper installation of the HydroFLOW water conditioner on the steam boiler s incoming water line; the water softener should be bypassed and the use of scale inhibiting and anticorrosive chemicals can be discontinued. [2] HydroFLOW water conditioners have no effect on iron. Consult with your chemical provider if iron levels are over 0.1 PPM (for low pressure steam boilers) or 0.05-0.02 PPM (for medium to high pressure steam boiler). [3] HydroFLOW water conditioners have no effect on dissolved oxygen. A deaerator and/or oxygen scavenger chemicals may be required if the oxygen level is over 0.04 PPM (for low pressure steam boilers) or 0.007 PPM (for medium to high pressure steam boilers). [4] Low ph (acidic water) may be harmful for steam boilers. Consult with your chemical provider if the ph is below 7.5. Blow-down water test requirements. - ph [1] - Conductivity [2] - Ferrous metal corrosion rate in MPY (mils per year) [3] [1] It is recommended to contain a ph level of over 9. Chemicals may be required and blow-down may need to be reduced in order to increase the level of ph. [2] HydroFLOW water conditioners are designed to work at high conductivity levels. It is recommended to follow the steam boiler s manufacturer instructions (typically 3,000 μs/cm). It is recommended to increase blow-down by 50% during the initial purging stage of 3 ~ 6 months in order to assist in the removal of limescale. As conductivity levels stabilize, the blow-down schedule can be reduced according to water testing parameters. [3] Typically, although the actual corrosion rate is reducing, the measured corrosion rates (i.e. the amount of iron in the water) will increase following the installation of a HydroFLOW water conditioner due to the system being purged of existing limescale and corrosion deposits. Gradually, the measured corrosion rate will decrease and stabilize at roughly 30% less than what is was prior to the installation of the water conditioner.