Presentation to Parks and Open Space Advisory. Committee September 22, 2016

Similar documents
Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

REQUEST FOR PROPOSALS Saint Vrain Creek Watershed Master Planning

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

The Napa River Flood Protection Project

Big Thompson River Restoration Master Plan. Stakeholder Kick off Meeting and Workshop April 12, 2014

Working Group Meeting

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

SECTION 5: REACH RECOMMENDATIONS/MAPS

Stream Corridor Management Plan

STREAM BUFFERS

The Toe Wood Structure

Colorado Watershed Protection Fund - Project Grant Application Fountain Creek Restoration Shryver Park Reach Including Shryver Pond

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

RECONNECTING A COMMUNITY TO THE CREEK

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Recovery to Resilience Flood Tour

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

NYC DEP s Approach to Flood Mitigation: The Local Flood Analysis (LFA) Process

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

Wallkill River. Floodplain Bench Project Phase 1. OCSWCD Kevin Sumner. October 2016 Orange County. Wendell Buckman

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

Biotechnical streambank stabilization

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Balancing Conservation and Development on the Jordan River

Bio-Engineering Techniques to Revegetate Streambanks

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

Alberta policy and regulations for grassland reclamation criteria, evolution of the criteria from the 1995 version to today

STREAM ALTERATION PRACTICES

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Applied Ecological Services, Inc. Sustainable Solutions for Over 30 Years.

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

New Development Stormwater Guidelines

Slope Stability Management Framework

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

Restoration in the Sky Islands:

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Request for an Exception to the Napa County Road and Street Standards

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

Information for File MMJ Main Stem Bassett Creek Restoration Project

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource.

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

Policy & Procedure Effective Date: Parks Department Page of

Riparian Buffer on the Bushkill Creek. Policies

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Draft Rhode Island Stormwater Design and Installation Standards Manual

National Association of Conservation Districts. Kris Hoellen Vice President, Sustainable Programs The Conservation Fund September 19, 2013

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

ENVIRONMENTAL ADVISORY COMMITTEE WEDNESDAY, JANUARY 11, 2017 AT 7:00 P.M. CITY HALL MEETING ROOM C MINUTES

River Restoration Practices:

The following principles guide the development of goals and strategies to protect and promote these amenities:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Montana Stream Permitting

Structural Measures at a Glance

10.14 ERRATA UPDATE SHEET 3

RIVER RECREATION AND CONSERVATION: LESSONS FROM COLORADO S 2013 FLOODS

A. Regional Detention Requirements

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Outfall Retrofit Feasibility Study

CHECKLIST FOR PHASE II DRAINAGE REPORT

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

Lake Nokomis Shoreline Enhancement Project

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Outfall Reconnaissance Inventory & Stream Assessment

MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #1

When planning stormwater management facilities, the following principles shall be applied where possible.

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

4. Contractor (and subcontractors if applicable) certification statement(s)

Town of Peru Comprehensive Plan Executive Summary

MEMORANDUM. September 10, 2018

INTRODUCTION Key Issues and Findings Goals, Objectives, and Policies - Natural Resources - Map M18 - Environmental Resources

Appendix E Preliminary Location Hydraulic Study

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Guidelines for Streambank Protection

4.6. Low Impact and Retentive Grading

D RAFT MEMORANDUM CURRENT PLANTING TECHNIQUES. Technique 1: Bioengineered Brush Layering. To: Date: January 20, 2016

MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #5

Kootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update

Town of Vershire Road Erosion Inventory Report

Regenerative Stormwater Conveyances: Giving Old, Perched Outfalls New Life APWA NC Stormwater Management Division Conference

Hidden Pointe Landscape Master Plan. June, archi terra

Design Review Committee Staff Report Meeting Date: September 14, 2017

Conservation Plan. I. Property Information. II. Objectives. Natural Resource Objectives. Sustainability in Practice (SIP) Certified

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing

Floodplain Technical Memorandum

Chapter 4 - Preparation of Stormwater Site Plans

Bristol Marsh Heritage Conservancy

Transcription:

Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch Presentation to Parks and Open Space Advisory Prepared for: Boulder County, Colorado Committee September 22, 2016 In association with: Otak, THK, ERO, and Blue Mountain

Introductions Introduction History of project Planning area: 3.2 Mile Reach from Canyon to Bridge Project sponsors and funding: DOLA/BCPOS 30% Report and Designs EWP Eligible Construction Project website Information and comment www.bouldercountyopenspace.org/ssv

Matrix Team

Project Schedule Design schedule Notice to proceed: May 2016 Alternative analysis: June 2016 Preferred alternative: July 2016 30% design: September 2016 EWP Permitting and 80% Design: Fall/Winter 2016 EWP Construction: Winter/Spring 2017

Public Engagement Extensive Public Engagement South St. Vrain Working Group May 11 St. Vrain Creek Coalition May 25, June 29, July 20, and August 17 General Public Meetings (Lyons) May 24 and June 30 Individual Land Owner Meetings June 22 Public Preferred Alternative Site Tour July 28 Various on-line comments, phone calls, and field visits Comments since 2013

Pre Flood Aerial: 2012

Post Flood Aerial: 2013

Post Flood Aerial: 2014

Post Flood Aerial: 2015

Pre Flood Aerial: 2012

Post Flood Aerial: 2013

Post Flood Aerial: 2014

Post Flood Aerial: 2015

Pre Flood Aerial: 2012

Post Flood Aerial: 2013

Post Flood Aerial: 2014

Post Flood Aerial: 2015

Project Goals Statement Provide a conceptual design for the entire South Saint Vrain Creek project area that restores and improves the channel and surrounding floodplain areas to a safe, natural, resilient, functioning, and ecologically rich habitat. This project will use qualitative research, quantitative data, and community input to inform resilient design that shall utilize natural system principles and onsite materials to expedite recovery from the 2013 floods and set up for better performance in future flood events. Components to meet goals include incorporating natural channel diversity and character, re-establishing floodplain benches for lateral connectivity, reducing longitudinal connectivity constraints, improving flow conveyance and sediment transport to maintain environmental values, promote naturally functioning stream processes, protect public and private infrastructure, improve public safety, repair unstable erosion scars in high-risk areas, and revegetate denuded areas.

Decision Making Process Comments/Concerns Core Values Project Goals Prioritization Criteria

Prioritization Criteria Alternatives evaluated in matrices to determine most effect (preferred) alternative

Alternative: Floodplain Connectivity

Alternative: Channel Complexity

Alternative: Revegetation Cotton Wood Gallery Wetland/Riparian Bench Grassland Meadow 100 Year Floodplain Shrub/ Grassland Cottonwood Gallery Riparian Woodlands/ Fringe Wetlands Open Water Channel Riparian/ Fringe Wetlands Cottonwood Gallery Shrub/ Grassland Residual Terrace Third Terrace Second Terrace Floodplain Bench Floodplain Bench First Terrace Second Terrace Third Terrace

Alternative: Infrastructure Protection Utility Armoring Root Wad Stabilization Boulder Toe Protection Vegetated Geogrid

Additional Design Aspects Evaluated Existing infrastructure aspects investigated to provide future recommendations Old St Vrain Road Bridge Required capacity and road overtopping Longmont Diversion Relocation of diversion and floodplain conveyance South Ledge/Meadows Ditch Sedimentation issues Woody Vegetation Management

Geomorphology Geomorphic Assessment Data Review Desktop Analysis Field Assessment Sediment Transport Stability Analyses Trajectory determination Structure design What questions are we trying to answer? What are prevailing processes and how do we use them to achieve the project goals? What is the channel trajectory and what does that mean for the project goals? Is the channel stable? Is the design stable?

Geomorphology - Assessment

Geomorphology - Assessment

Geomorphology - Assessment River Styles

Geomorphology Sediment Transport Base Bed Mobility

Geomorphology Sediment Transport Effective Discharge Q eff flow that transports most sediment over time Q h discharge associated with cumulative 50% of sediment yield

Geomorphology Sediment Transport Sediment Transport Capacity and Balance Capacity-Supply Ratio (CSR) Reach capacity/supply 1 is good

Geomorphology Sediment Transport Sediment Transport Capacity and Balance

Geomorphology Sediment Transport Sediment Transport Capacity and Balance 25yr Stream Power

Geomorphology - SEM Stream Evolution Model

Geomorphology - Summary Stream is generally featureless, over-widened and likely to degrade disconnecting further from the existing floodplain Restoration and Flood Mitigation Strategies: Establish equilibrium channel geometries that promote/maintain floodplain connection Control sediment supply with aggressive revegetation Establish geomorphic complexity to manage sediment load, improve habitat

Design Process Understand Hydraulics with Development of Design Models 1-D HEC-RAS Regulatory floodplain modeling 2-D Sedimentation and River Hydraulics Final design parameters and sediment transport Iterative Process EC Topography and Modeling PC Grading and PC Modeling Refine PC Topography Verify Capacity-Supply Ratio Structure and Revegetation Design

30% Design Channel Geometry Function of hydraulic geometry, and constraints Main Channel and Overflow Planform Pre-Flood or Existing Alignments Channel Profile Equilibrium bed slope analysis (0.8 2% range)

30% Design Channel and Floodplain Dimensions Multi-Stage Channel

1.5 and 5 Year Overflow Channels Along Existing and/or Pre-Flood Channel Alignments to stretch implementation funds On Average 25 Bottom Width with Gentle Side Slopes Vegetation Lined and/or Stream Substrate

Riffle Structure Design

Large Woody Material and Vegetation Geomorphic, Biologic and Ecologic Benefits Implementation Guidance Site Visit with Boulder County Emergency Management (OEM) OEM Decision Process Focused on hazard trees in the vicinity of infrastructure National Guidance Documents on the Design of Engineered Log Structures

Large Wood Structure Design

Large Wood Structure Design

Bank Stabilization

Bank Stabilization

Bank Stabilization

Revegetation: Goals Preserve Existing Vegetation Planting Diversity Based Upon Proximity to Water Table (Iterative Design Process) Match existing plant species and ecosystem types to historical character and onsite conditions.

Revegetation Assessment Evaluate onsite plant communities Utilize State and National Resources National Wetland Inventory Wetlands Mapper Colorado Wetland Inventory Mapping Tool The CNHP Field Guide to Wetland and Riparian Plant Associates

Revegetation Recommendations Re-establish upland, riparian, wetland environments through: Seeding (Riparian and Upland) Perennial Tubelings Wetland Sod Tree and Shrub Plantings Willow Staking

Revegetation Results

30% Design Plans and Report Posted to Boulder County Project Website http://www.bouldercounty.org/ssv 30% Design Plans 62 Sheets Plan and Profile of Main and Overflow Channels Channel Design Details Revegetation Plans Revegetation and Bio-Engineering Details Additional Planning Elements 30% Preliminary Basis of Design Report 299 Pages

Next Steps 80% Design Drawings Working with EWP and Boulder County Currently to contract for additional services Permitting 404 CWA, Floodplain, Land Use, Stormwater Construction Bid Support Construction Oversight and Closeout