C 330 ECO - C 630 ECO

Similar documents
EMC-M 24 EMC-M 24/28 MI EMC-M 30/35 MI EMC-M 34/39 MI

GAS 610 ECO PRO. The new Remeha. Condensing Boiler Range REMEHA GAS 310/610 ECO PRO

Innovens Pro. Wall-hung gas condensing boilers MCA Installation and Service Manual A

CALORA TOWER GAS 15S EX CALORA TOWER GAS 25S EX CALORA TOWER GAS 35S EX

MCR 24 MCR 24/28 MI MCR 30/35 MI MCR 34/39 MI

WELCOME TO REMEHA, THE EXPERT CHOICE INTRODUCING THE REMEHA GAS 310/610 ECO PRO RANGE FEATURES AND BENEFITS

WHE 2.24 / WHE 2.24 FF

Vivadens. Wall-hung gas condensing boilers MCR 24/28 BIC. User Guide B

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

Quinta Pro Range. The New Remeha. Condensing Boilers REMEHA QUINTA PRO RANGE. High efficiency wall hung condensing boiler with ultra low NOx emission

PRODUCT CATALOGUE

Superior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw

MCR-P 24 MCR-P 24/28 MI MCR-P 30/35 MI MCR-P 34/39 MI

DTG Eco / V130

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO

WALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) MODELS 34,8 kw (depotenziata) 50 C

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

Installation and maintenance instructions

Operating instructions

MCA 15 - MCA 25 MCA 25/28 MI

Installation instructions. Pump Group. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)

Operating instructions

1 VICTRIX ZEUS Superior kw I features

Remeha. Fuel oil/gas boilers P 420. Installation and Service Manual

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

Installation and maintenance instructions

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw

PowerVent. Installation manual (GB) English. Store this document in a safe place UK

EDD61 & EDD91 Extractors

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

Installation, operating and servicing instructions

INSTALLATION AND MANINTENANCE INSTRUCTIONS

De Dietrich C230 ECO-A Series

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Operating instructions

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

Light oil / kerosene burner

HIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler

Innovens. Wall-hung gas condensing boilers MCA 25/28 BIC. Installation and Service Manual

WOLF GAS CONDENSING BOILERS COMFORTLINE

BG2000S PRE-MIX GAS BURNER

WELCOME TO REMEHA, THE EXPERT CHOICE REMEHA QUINTA RANGE FEATURES AND BENEFITS

WELCOME TO REMEHA, THE EXPERT CHOICE INTRODUCING THE REMEHA GAS 110 ECO RANGE FEATURES AND BENEFITS

INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS BG 2000-S (V13) RU PL DE IT ES NL EN 1 662Y0600 A

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

SOLNEO SGC 24 SOL. User Guide. Gas fired condensing boiler C

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

INSTRUCTION MANUAL FOR OIL BURNER MODELS

R e m e h a P Technical Information. Remeha P 300. Pressurized boiler. Heat output: kw

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 21 to 39 kw

NANEO EMC-M WALL-HUNG GAS CONDENSING BOILERS

LEIHDC70SC - LEIHDC70BB LEIHDC70BC. Instructions Manual.

INDEX RECOMMENDATIONS AND SUGGESTIONS... 4 CHARACTERISTICS... 5 INSTALLATION... 6 USE... 9 MAINTENANCE... 11

INSTALLATION, USER AND SERVICE MANUAL

Euron. Compact Wall Mounted Gas Fired Condensing Boilers and Combis with Outputs 24kW - 30kW BOILERS

TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw /17 Subject to modification

Operating instructions

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

INSTRUCTION MANUAL FOR OIL BURNER MODELS

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l

CAST IRON PREMIX HIGH EFFICIENCY GAS FIRED BOILER kw BRILEY DESIGN MANUAL

Technical information. Remeha P200. Pressurized boiler. Heat output: kw

AWHP-2 MIT-IN-2 isystem

VICTRIX Superior kw Export VICTRIX Superior kw X Export

WALL-HUNG GAS CONDENSING BOILERS MCR-P 24/28 BIC. HOMOLOGATION B 23P - C 13x - C 33x - C 93x -C 53 - C 43x - C 83x *

FLOOR STANDING GAS CONDENSING BOILERS HOMOLOGATION C 630- ECO: B 23 - B 23P - C 33 - C 53 - C 63 - C 83 - C 93

Remeha Gas 610 ECO. Technical information. Remeha Gas 610 ECO. High efficiency condensing. boiler with low NO X emission. Heat outputs: kw

Light oil - kerosene burner

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw

Operating instructions

PMC-M WALL-HUNG GAS CONDENSING BOILERS

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

United Kingdom. Heat pump. Gas HP 35 A (LT/HT) After Sales Service guide. renewable technologies

FLOOR STANDING GAS CONDENSING BOILERS CONDITION OF USE CLASSIFICATION

Forced draught gas burner

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

4FLOOR-STANDING GAS CONDENSING BOILERS

ZENA PLUS EASYLIFE WALL-HUNG GAS BOILERS

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors

TABLE OF CONTENTS TECHNICAL DOCUMENTATION 03. Technical Data

STREBEL S-CB + Cascade Kits

VICTRIX 50 1 SPECIFICATIONS. Wall mounted condensing boilers

RVA /109. Heating Circuit ZONE Controller. Instructions for the INSTALLER

24V dc Terminals X4. 230Vac Terminals X V dc Electrical connections Volt free Room thermostat on/off

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

HeatMaster. Assembling and installation instructions. 201 Booster. HeatMaster. HeatMaster. 200N (Gas) Booster ENGLISH FRANCAIS NEDERLANDS ESPAÑOL

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

VIESMANN. Installation instructions VITOMAX 200-HW. for contractors

RS /E-EV C01 SERIES

Gas fired condensing boiler C 230 ECO. User Guide C

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

PCH/new Series. High performance, total flexibility

The competent brand for energy saving systems NEW. Gas-combi boiler CGG-1K-24/28

PHRIE / PHIE InvERTER monoblock air To water HEaT PumP medium TEmPERaTuRE

VIESMANN. Installation and service instructions VITOCELL 340-M/360-M. for contractors. Vitocell 340-M/360-M Type SVKA Type SVSA

Operating instructions Oil condensing boiler

Transcription:

EN Gas fired floor-standing condensing boiler C 330 ECO - C 630 ECO Installation, User and Service Manual 760053-01

EG declaration of conformity The device complies with the standard type described in the EG declaration of conformity. It was manufactured and commissioned in accordance with European directives. The original of the declaration of compliance is available from the manufacturer.

Contents 1 Introduction...6 1.1 Symbols used...6 1. Abbreviations...6 1.3 General...7 1.3.1 Manufacturer's liability...7 1.3. Installer's liability...7 1.3.3 User's liability...7 Safety instructions and recommendations...9.1 Safety instructions...9. Recommendations...9 3 Technical description...11 3.1 General description...11 3. Homologations...11 3..1 Certifications...11 3.. Equipment categories...1 3..3 Data plate...1 3..4 Factory test...1 3.3 Main parts...13 3.3.1 Boiler type C 330 ECO...13 3.3. Boiler type C 630 ECO...14 3.3.3 System pump...14 3.3.4 Regulation of the water temperature...15 3.3.5 Protection against a shortage of water...15 3.3.6 Maximum temperature protection...15 3.3.7 Air differential pressure switch...15 3.4 Technical specifications...16 3.4.1 Boiler type C 330 ECO...16 3.4. Boiler type C 630 ECO...17 4 Installation...19 4.1 Regulations governing installation...19 4. Package list...19 4..1 Standard delivery...19 4.. Accessories...19 4.3 Installation options...0 4.3.1 Transport...0 31/05/01-760053-01 1

Contents 4.3. Location of the boiler...1 4.3.3 Main dimensions...7 4.4 Hydraulic connections...9 4.4.1 Flushing the system...9 4.4. Connection of the heating circuit...9 4.4.3 Connecting the condensate discharge pipe...30 4.5 Gas connection...30 4.6 Connections for the air and exhaust pipes...31 4.6.1 Classification...3 4.6. Outlets...3 4.6.3 Lengths of the air/flue gas pipes...3 4.6.4 Additional Directives...35 4.6.5 Connection of the combustion gas exhaust pipe...36 4.6.6 Connection of the air intake pipe...36 4.7 Electrical connections...37 4.7.1 Control unit...37 4.7. Recommendations...38 4.7.3 Standard control PCB...38 4.7.4 Connecting the on/off control...40 4.7.5 Connecting modulating controller...40 4.7.6 Shutdown input...40 4.7.7 Release input...40 4.7.8 System pump...41 4.7.9 PC/Laptop connection...41 4.7.10 Connection possibilities for the PCB (SCU- D4)...41 4.8 Optional electrical connections...4 4.8.1 Connection possibilities for the PCB (SCU- S05)...4 4.9 Electrical diagram...47 4.10 Filling the system...47 4.10.1 Water treatment...48 4.10. Filling the siphon...49 4.10.3 Filling the system...49 5 Commissioning...50 5.1 Control panel...50 5. Check points before commissioning...50 5..1 Preparing the boiler for commissioning...50 5.. Gas circuit...51 5..3 Hydraulic circuit...51 5..4 Connections for the air and exhaust pipes...51 5..5 Electrical connections...51 5.3 Commissioning the boiler...51 5.3.1 DIEMATIC isystem control panel...51 31/05/01-760053-01

5.3. IniControl control panel...5 5.4 Gas settings...53 5.4.1 Setting the air/gas ratio (Full load) (Diematic isystem)...53 5.4. Setting the air/gas ratio (Part load) (Diematic isystem)...54 5.4.3 Setting the air/gas ratio (Full load) (IniControl)...55 5.4.4 Setting the air/gas ratio (Part load) (IniControl)...56 5.5 Checks and adjustments after commissioning...57 5.5.1 Finalizing work...57 5.6 Reading out measured values...58 5.7 Changing the settings...58 6 Switching off the boiler...59 6.1 Installation shutdown...59 6.1.1 Diematic isystem...59 6.1. IniControl...59 6. Frost protection...59 6..1 Diematic isystem...60 6.. IniControl...60 7 Checking and maintenance...61 7.1 General...61 7. Standard checks...61 7..1 Checking the hydraulic pressure...6 7.. Checking the ionization current...6 7..3 Check the water quality...6 7..4 Checking the air supply connections and flue gas discharge connections...63 7..5 Checking the gas filter for pollution...63 7..6 Checking combustion...63 7..7 Check the air supply hose...64 7..8 Check the dirt trap...64 7..9 Check the air box...65 7..10 Check the air pressure differential switch PS...65 7..11 Check the gas leakage control VPS...67 7..1 Check the minimum gas pressure switch Gps...69 7.3 Specific maintenance operations...69 7.3.1 Clean the fan and the venturi...70 7.3. Clean and inspect the non-return valve...71 7.3.3 Replacing the ionization/ignition electrode...71 7.3.4 Cleaning the gas filter...7 7.3.5 Cleaning the burner...73 31/05/01-760053-01 3

Contents 7.3.6 Clean the burner area...73 7.3.7 Checking the heat exchanger...74 7.3.8 Cleaning the condensate collector...75 7.3.9 Cleaning the siphon...75 7.3.10 Assembling the boiler...76 7.3.11 Put the boiler back into operation...76 8 Troubleshooting...77 8.1 Troubleshooting...77 9 Spare parts...78 9.1 General...78 9. Spare parts...78 9..1 Casing...79 9.. Heat exchanger and burner...80 9..3 Fan...81 9..4 Control panel...8 9..5 Spare parts C630 ECO...83 9..6 Spare parts list...84 31/05/01-760053-01 4

31/05/01-760053-01 5

1. Introduction C 330 ECO - C 630 ECO 1 Introduction 1.1 Symbols used In these instructions, various danger levels are employed to draw the user's attention to particular information. In so doing, we wish to safeguard the user's safety, obviate hazards and guarantee correct operation of the appliance. DANGER Risk of a dangerous situation causing serious physical injury. WARNING Risk of a dangerous situation causing slight physical injury. CAUTION Risk of material damage. Signals important information. 1. Abbreviations ¼ Signals a referral to other instructions or other pages in the instructions. 4 Interscenario switch: Home automation switch that can be used to centralise and control several scenarios 4 Hi: Lower heating value LHV (Nett) 4 Hs: Higher heating value HHV (Gross) 4 PPS: Polypropylene hardly inflammable 4 PCU: Primary Control Unit - PCB for managing burner operation 4 PSU: Parameter Storage Unit - Parameter storage for PCBs PCU and SU 4 SCU: Secondary Control Unit - Extended control PCB 4 SU: Safety Unit - Safety PCB 4 3WV: 3-way valve 6 31/05/01-760053-01

C 330 ECO - C 630 ECO 1. Introduction 1.3 General 1.3.1. Manufacturer's liability Our products are manufactured in compliance with the requirements of the various applicable European Directives. They are therefore delivered with [ marking and all relevant documentation. In the interest of customers, we are continuously endeavouring to make improvements in product quality. All the specifications stated in this document are therefore subject to change without notice. Our liability as the manufacturer may not be invoked in the following cases: 4 Failure to abide by the instructions on using the appliance. 4 Faulty or insufficient maintenance of the appliance. 4 Failure to abide by the instructions on installing the appliance. 1.3.. Installer's liability The installer is responsible for the installation and inital start up of the appliance. The installer must respect the following instructions: 4 Read and follow the instructions given in the manuals provided with the appliance. 4 Carry out installation in compliance with the prevailing legislation and standards. 4 Perform the initial start up and carry out any checks necessary. 4 Explain the installation to the user. 4 If a maintenance is necessary, warn the user of the obligation to check the appliance and maintain it in good working order. 4 Give all the instruction manuals to the user. 1.3.3. User's liability To guarantee optimum operation of the appliance, the user must respect the following instructions: 4 Read and follow the instructions given in the manuals provided with the appliance. 4 Call on qualified professionals to carry out installation and initial start up. 4 Get your installer to explain your installation to you. 4 To carry out inspections and maintenance required by a qualified professional. 4 Keep the instruction manuals in good condition close to the appliance. 31/05/01-760053-01 7

1. Introduction C 330 ECO - C 630 ECO This appliance is not intended to be used by persons (including children) whose physcial, sensory or mental capacity is impaired or persons with no experience or knowledge, unless they have the benefit, through the intermediary of a person responsible for their safety, of supervision or prior instructions regarding use of the appliance. Care should be taken to ensure that children do not play with the appliance. 8 31/05/01-760053-01

C 330 ECO - C 630 ECO. Safety instructions and recommendations Safety instructions and recommendations.1 Safety instructions DANGER If you smell gas: 1. Do not use a naked flame, do not smoke, do not operate electrical contacts or switches ( doorbell, light, motor, lift, etc..).. Shut off the gas supply. 3. Open the windows. 4. Trace possible leaks and seal them immediately. 5. If the gas leak is before the gas meter, contact the gas supplier. DANGER If you smell flue gases: 1. Switch the appliance off.. Open the windows. 3. Trace possible leaks and seal them immediately.. Recommendations WARNING 4 Installation and maintenance of the boiler must be carried out by a qualified professional in compliance with prevailing local and national regulations. 4 When working on the boiler, always disconnect the boiler from the mains and close the main gas inlet valve. 4 After maintenance or repair work, check all installations to ensure that there are no leaks. CAUTION The boiler must be installed in a frost-free environment. Store this document in the document wallet on the inside of the boiler casing (Underneath the instrument panel). Casing components 31/05/01-760053-01 9

. Safety instructions and recommendations C 330 ECO - C 630 ECO Only remove the casing for maintenance and repair operations. Put the casing back in place after maintenance and repair operations. Instructions stickers The instructions and warnings affixed to the appliance must never be removed or covered and must remain legible during the entire lifespan of the appliance. Immediately replace damaged or illegible instructions and warning stickers. Modifications Modifications may only be made to the boiler after the written permission of De Dietrich Thermique to do so. 10 31/05/01-760053-01

C 330 ECO - C 630 ECO 3. Technical description 3 Technical description 3.1 General description Gas fired floor-standing condensing boiler 4 High efficiency heating. 4 Low pollutant emissions. 4 Heat exchanger made of cast aluminium sections. 4 Transport wheels as standard. 4 Left or right-hand version of the water and flue gas side connections possible. 4 Separable for assembly in boiler room. 4 DIEMATIC isystem or IniControl control panel Boiler type: 4 Type C 330-80 Eco: Output 8 kw 4 Type C 330-350 Eco: Output 353 kw 4 Type C 330-430 Eco: Output 47 kw 4 Type C 330-500 Eco: Output 499 kw 4 Type C 330-570 Eco: Output 573 kw 4 Type C 330-650 Eco: Output 647 kw Boiler type: The C 630 condensing boiler corresponds to a cascade composed of individual boilers (C 330). 4 Type C 630-560 Eco: Output 564 kw 4 Type C 630-700 Eco: Output 706 kw 4 Type C 630-860 Eco: Output 854 kw 4 Type C 630-1000 Eco: Output 998 kw 4 Type C 630-1140 Eco: Output 1146 kw 4 Type C 630-1300 Eco: Output 194 kw 3. Homologations 3..1. Certifications CE identification no PIN 0063CL3613 NOx classification 5 (EN 97 pr A3, EN 656) Type of connection Chimney: B 3, B 3P Flue gas outlet: C 33, C 53, C 63, C 83, C 93 31/05/01-760053-01 11

3. Technical description C 330 ECO - C 630 ECO 3... Equipment categories 3..3. Data plate The identification plate is located behind the boiler casing on the frame, near the syphon connection. It contains the boiler serial number and important boiler specifications, such as the model and the gas category. T003475-F 3..4. Factory test Before leaving the factory, each boiler is set for optimum performance and tested to check the following items: 4 Electrical safety 4 Adjustment (CO ) 4 Water tightness 4 Gas tightness 4 Parameter settings 1 31/05/01-760053-01

C 330 ECO - C 630 ECO 3. Technical description 3.3 Main parts 3.3.1. Boiler type C 330 ECO 13 14 7 15 8 1 16 9 3 4 5 6 7 8 1 11 10 9 17 18 19 1 3 5 0 4 6 30 3 34 36 37 38 39 31 33 35 T004014-D 1 Flow connection (1) 1 Return sensor Air differential pressure switch Gas filter 3 Flue gas discharge pipe 3 Data plate 4 Return connection 4 Siphon 5 Outlet for measuring combustion gases 5 Transport wheels 6 Flue gas thermostat (Accessory) 6 Jacking bolt 7 Condensate collector sealant cap 7 Gas connection 8 Pivoting castor 8 Gas pressure measurement point 9 Jacking bolt 9 Control panel 10 Base frame 30 Location for optional features or a control unit 11 Second return connection (Accessory) 31 Pressure measurement point 1 Heat exchanger insulation 3 Sight glass 13 Boiler casing 33 Non-return valve 14 Combustive air inlet 34 Fan 15 Burner 35 Extension piece 16 adapter 36 Venturi 17 Ignition/ionization electrode 37 Gas block 18 Heat exchanger 38 Air inlet hose 19 Inspection hatch 39 Document holder 0 Heat exchanger sensor (1) ¼ For more details about the devices in the flow pipe, please see "Connection of the heating circuit", page 9 31/05/01-760053-01 13

3. Technical description C 330 ECO - C 630 ECO 3.3.. Boiler type C 630 ECO 13 14 7 1 1 15 16 8 9 3 4 5 6 7 8 11 10 9 17 18 19 0 1 3 4 5 6 30 31 3 33 34 35 36 37 38 39 T004015-E 1 Flow connection (1) 1 Return sensor Air differential pressure switch Gas filter 3 Flue gas discharge pipe 3 Data plate 4 Return connection 4 Siphon 5 Outlet for measuring combustion gases 5 Transport wheels 6 Flue gas thermostat (Accessory) 6 Jacking bolt 7 Condensate collector sealant cap 7 Gas connection 8 Pivoting castor 8 Gas pressure measurement point 9 Jacking bolt 9 Control panel 10 Base frame 30 Location for optional features or a control unit 11 Heat exchanger insulation 31 Pressure measurement point 1 Flue gas collector 3 Sight glass 13 Boiler casing 33 Non-return valve 14 Combustive air inlet 34 Fan 15 Burner 35 Extension piece 16 adapter 36 Venturi 17 Ignition/ionization electrode 37 Gas block 18 Heat exchanger 38 Air inlet hose 19 Inspection hatch 39 Document holder 0 Heat exchanger sensor (1) ¼ For more details about the devices in the flow pipe, please see "Connection of the heating circuit", page 9 3.3.3. System pump The boiler does not have a built-in pump. A system pump can be installed on the connector of the standard control PCB. This can be an on/off pump or a modulating pump (with 0-10 V control). 14 31/05/01-760053-01

C 330 ECO - C 630 ECO 3. Technical description ¼ For more information on controlling a modulating pump, See paragraph: "Electrical connections", page 37. If noises caused by flow in the system can be heard: 4 First of all, vent the heating system. 4 Reduce the maximum pump speed (Parameter MAX.PUMP SPEED on DIEMATIC isystem - Parameter p44 on IniControl). If circulation in the radiators is too weak or the radiators do not fully heat up: 4 Increase the minimum pump speed (Parameter MIN.PUMP SPEED on DIEMATIC isystem - Parameter p43 on IniControl). ¼ See the manual for the control panel. 3.3.4. Regulation of the water temperature The boiler is equipped with electronic temperature control based on flow, return, and boiler block temperature sensors. The flow temperature can be set between 0 C and 90 C. The boiler reduces its power when the set outlet-temperature is attained. The cutout temperature is the set heating outlet-temperature + 5 C. 3.3.5. Protection against a shortage of water The boiler is fitted with a safety device to prevent the shortage of water based on temperature measurements (Temperature difference between flow and return). If ΔT = 5 K is reached (factory setting), the boiler reduces its output by modulating to remain in operation as long as possible. If ΔT 5 K the boiler goes into part load. If ΔT > 5 + 5 K the boiler goes into a normal control stop (blocking). 3.3.6. Maximum temperature protection The maximum protection switches the boiler off if the water temperature is too high (110 C) and locks it on the control box. Once the fault has been rectified, the boiler can be reset by pressing the J button for seconds. 3.3.7. Air differential pressure switch Before a start and when the boiler is in operation, the air pressure differential switch PS measures the difference in pressure between the measuring points at the rear of the heat exchanger p + and the air box p -. If the pressure difference is greater than 6 mbar, then the boiler will lock out. Once the fault has been rectified, the boiler can be reset by pressing the J button for seconds. 31/05/01-760053-01 15

3. Technical description C 330 ECO - C 630 ECO 3.4 Technical specifications 3.4.1. Boiler type C 330 ECO Boiler type C 330 ECO Unit 80 350 430 500 570 650 General Number of sections - - 5 6 7 8 9 10 EC indentification no. PIN 0063CL3613 Flow rate setting Adjustable Modulating, Start/Stop, 0-10 V Nominal output (Pn) (80/60 C) Nominal output (Pn) (50/30 C) Nominal input(qn) (Hs) Nominal input (Qn) (Hi) minimum maximum (1) kw 51 61 65 37 79 395 9 461 106 530 119 601 maximum (1) kw 79 350 45 497 574 651 minimum maximum (1) minimum maximum (1) Full load water efficiency (Hi) (80/60 C) % 98,0 98,1 98, 98,3 98,4 98,5 Full load water efficiency (Hi) (50/30 C) % 104,8 105, 105,6 106,0 106,4 106,8 Low load water efficiency (Hi) (Return temperature 60 C) Data on the gases and combustion gases Gas consumption G0 (Gas H) Gas inlet pressure G0 (Gas H) minimum maximum minimum maximum kw kw 60 95 54 66 75 369 68 333 96 445 8 40 105 50 95 469 11 598 109 539 135 677 1 610 % 94,7 95,3 95,8 96,3 96,8 97,3 Flue gas losses %,3,3,3,3,3,3 Mass flue gas flow rate Flue gas temperature minimum maximum minimum maximum m 3 /h mbar 5,7 8,1 17 30 kg/h 91 448 7, 35, 17 30 114 560 8,7 4,5 17 100 138 676 C 30 80 Maximum residual fan duty for flue gas Pa 130 10 130 150 150 150 Characteristics of the heating circuit Water content - l 49 60 71 8 93 104 Water operating pressure minimum bar 0,8 Water operating pressure (PMS) maximum bar 7 Water temperature maximum C 110 Operating temperature Water resistance ( T = 0K) Water resistance ( T = 11K) Electrical characteristics minimum 0 maximum C 90 Factory setting 80 10,1 49,6 17 100 160 789 11,5 57,0 17 100 183 907 1,9 64,6 17 50 05 106 mbar 113 110 10 110 15 130 kpa 11,3 11 1 11 1,5 13,0 mbar 374 364 397 364 413 435 kpa 37,4 36,4 39,7 36,4 41,3 43,5 Power supply voltage VAC/Hz 30/50 Fuse (30 VAC) (1) Factory setting () For a room sealed operation F Circuit-breaker AT 10 F1 control PCB AT 16 31/05/01-760053-01

C 330 ECO - C 630 ECO 3. Technical description Boiler type C 330 ECO Unit 80 350 430 500 570 650 Power consumption - Full load maximum W 79 334 46 543 763 73 Power consumption - Part load maximum W 46 46 58 61 6 55 Power consumption - Standby maximum W 6 6 6 6 6 7 Electrical protection index IP X1B () Other characteristics Weight (empty) Total kg 364 398 433 495 531 568 Acoustic level at 1 metre (). db(a) 61 61 65 65 65 65 Ambient temperature maximum C 40 (1) Factory setting () For a room sealed operation 3.4.. Boiler type C 630 ECO Boiler type C 630 ECO Unit 560 700 860 1000 1140 1300 General Number of sections - - x5 x6 x7 x8 x9 x10 EC indentification no. PIN 0063CL3613 Flow rate setting Adjustable Modulating, Start/Stop, 0-10 V Nominal output (Pn) (80/60 C) Nominal output (Pn) (50/30 C) Nominal input(qn) (Hs) Nominal input (Qn) (Hi) minimum maximum (1) kw 69 5 87 654 13 790 1 9 148 1060 158 10 maximum (1) kw 558 700 850 994 1148 1303 minimum maximum (1) minimum maximum (1) kw kw 80 590 7 53 101 738 91 666 14 890 18 804 141 1040 17 938 170 1196 170 1078 Full load water efficiency (Hi) (80/60 C) % 98,0 98,1 98, 98,3 98,4 98,5 180 1354 16 10 Full load water efficiency (Hi) (50/30 C) % 104,8 105, 105,6 106,0 106,4 106,8 Low load water efficiency (Hi) (Return temperature 60 C) Data on the gases and combustion gases Gas consumption G0 (Gas H) Gas inlet pressure G0 (Gas H) minimum maximum minimum maximum % 94,7 95,3 95,8 96,3 96,8 97,3 m 3 /h mbar 7,6 56, 17 30 9,6 70,4 17 30 13,5 85,0 17 100 13,4 99, 17 100 16, 114,0 Flue gas losses %,3,3,3,3,3,3 Mass flue gas flow rate Flue gas temperature minimum maximum minimum maximum kg/h 18 896 8 110 76 135 C 30 80 30 1578 17 100 366 1814 Maximum residual fan duty for flue gas Pa 130 10 130 130 130 130 Characteristics of the heating circuit Water content - l 98 10 14 164 186 08 Water operating pressure minimum bar 0,8 Water operating pressure (PMS) maximum bar 7 Water temperature maximum C 110 Operating temperature (1) Factory setting () For a room sealed operation minimum 0 maximum C 90 Factory setting 80 17, 19, 17 50 410 05 31/05/01-760053-01 17

3. Technical description C 330 ECO - C 630 ECO Boiler type C 630 ECO Unit 560 700 860 1000 1140 1300 Water resistance ( T = 0K) Water resistance ( T = 11K) Electrical characteristics mbar 113 110 10 110 15 130 kpa 11,3 11 1 11 1,5 13 mbar 374 364 397 364 413 435 kpa 37,4 36,4 39,7 36,4 41,3 43,5 Power supply voltage VAC/Hz 30/50 Fuse (30 VAC) F Circuit-breaker AT 10 F1 control PCB AT Power consumption - Full load maximum W 558 668 85 1086 156 1446 Power consumption - Part load maximum W 9 9 116 1 14 110 Power consumption - Standby maximum W 1 1 1 1 1 14 Electrical protection index IP X1B () Other characteristics Weight (empty) Total kg 707 771 837 957 105 1095 Acoustic level at 1 metre (). db(a) 64 64 68 68 68 68 Ambient temperature maximum C 40 (1) Factory setting () For a room sealed operation 18 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation 4 Installation 4.1 Regulations governing installation WARNING Installation of the appliance must be done by a qualified engineer in accordance with prevailing local and national regulations. 4. Package list 4..1. Standard delivery 4 Boiler delivered assembled (without control panel) 4 Complete siphon 4 Filling and drainage valve 4 Gas filter 4 Boiler installation, use and maintenance manual 4 Water quality instructions 4... Accessories Only use the original or recommended accessories. Description package nd return for boiler Preassembled in the factory low water pressure switch S101784 Gas valve unit sealing control - 5 to 9 sections 10000456 Gas valve unit sealing control - 10 sections S10174 Min gas pressure switch for gas valve unit - 5 to 9 sections S10037 Min gas pressure switch for gas valve unit - 10 sections S101805 Air intake filter 10000454 Pressure regulator 8807177 Flue gas sensor S10303 Adapter flange from 4 to 8 holes for pump S101775 Return coupling header xc330 - DN80 S101799 Coupling header nd return xc330 - DN65 S101800 Cleaning knife (lenghth 560 mm) 10000455 Condensates neutralisation station - Boilers from 10 to 350 kw 83877010 Condensates neutralisation system - 83877011 31/05/01-760053-01 19

4. Installation C 330 ECO - C 630 ECO Description package Condensates neutralisation system 819776 Condensates neutralisation system 8197771 10 kg refill of granulats to neutralisation station 945601 Flue gas system connection adapter from C310 to C330 S10711 Reduction Ø 50 to Ø 00 57718 Flue gas connection kit for xc330 S103118 Vertical forced flue in galvanised aluminium - Ø 00/300 mm 510 Vertical forced flue in galvanised aluminium - Ø 50/350 mm 5103 Flashing for flat roof - Ø 300 mm 46157 Flashing for flat roof - Ø 350 mm 46158 4.3 Installation options 4.3.1. Transport For C 630 ECO boilers: The features and instructions described are for each boiler module. Boiler type C330 ECO L (mm) 80 L 800 1810 350 430 500 570 650 190 30 T003980-B The boiler is supplied fully assembled on a pallet. See the diagram and table for the dimensions. The base of the packaging is a pallet 80 cm wide. This means that the crate can be transported with a pallet truck or four-wheel transport boards. Without the packaging, the boiler is 70 mm wide (700 mm without casing) and the boiler will fit through standard doors. The boiler has integrated wheels, so that it can easily be moved around once the packaging has been removed.. 0 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation CAUTION The wheels are designed for transport purposes only and not for use when the boiler is in its final position. If required for internal transport, the boiler can be dismantled into smaller parts for transport. The boiler can be stripped of: 4 Casing components 4 Gas/air components 4 The frame section on the instrument panel side L 700 1107 See the diagram and table for the dimensions of the largest remaining transport part (Frame section with heat exchanger and water connections). Boiler type C330 ECO L (mm) 1000 1000 T003676-B 80 350 430 500 570 650 1160 1469 ¼ For information on fitting the parts, refer to the assembly instructions delivered with the boiler. 4.3.. Location of the boiler Boiler type C 330 ECO L Left version L I R I Right version Inspection hatch I R T003785-C 31/05/01-760053-01 1

4. Installation C 330 ECO - C 630 ECO The service side with the inspection hatch on the heat exchanger is considered to be the front of the boiler. The boiler is available in both a 'left-hand' and 'right-hand' version. This means that the hydraulic connections and the flue gas discharge are situated on either the left or the right-hand side of the boiler. The control panel is on the front as standard, but can easily be rotated so that it is on the short side. 55 55 55 663 1,5 To make the boiler level and to raise the wheels off the floor, the adjustment bolts must be used. Turn the adjustment bolts out as soon as the boiler is placed in the correct position. The picture shows the support surface of the boiler (This is the position of the adjustment bolts). A Boiler type C330 ECO 80 350 430 500 570 650 A (mm) 73 103 673 55 55 531 87,5 T003474-B 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation C + 1100* 800* 300 C + 600 C 300 1670* 800* 70 150 300 C + 1100* C + 600 C 300 800* 3190* 800* 70 150 70 800* C + C1 + 00* 1670* 800* 70 150 800* 800* C + C1 + 100 300 C1 600 C 300 T003499-B * = Spacing required if this is operating side. ¼ For the dimensions of C/C1, see paragraph: "Main dimensions", page 7 A technical clearance of at least 80 cm is required at the front (service side) of the boiler. However, we recommend that the clearance is at least 100 cm. We recommend a clearance of at least 40 cm above the boiler (If the air supply filter is used, there must be a clearance of at least 65 cm). A minimum of 30 cm is required on the side of the flue gas discharge, and a minimum of 30 cm is also required on the other side (or 80 cm, if this is operating side). 31/05/01-760053-01 3

4. Installation C 330 ECO - C 630 ECO Boiler type C 630 ECO The boiler is not available with a choice between 'left-hand' and 'righthand' versions. The control panel is on the front as standard, but can easily be rotated so that it is on the short side. To make the boiler level and to raise the wheels off the floor, the adjustment bolts must be used. Turn the adjustment bolts out as soon as the boiler is placed in the correct position. The picture shows the support surface of the boiler (This is the position of the adjustment bolts). Boiler type C630 ECO 560 700 860 1000 1140 1300 A (mm) 73 103 T003784-C 663 663 1,5 55 1,5 55 55 55 673 A 55 55 55 87,5 55 55 531 55 531 55 87,5 T003767-D 4 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation C + 1100* 3050* 800* 800* 1450 800* C + 600 300 C 300 800* 300 3050* C 600 C 300 D E* 800* 155* 800* 1450 800* T003768-E * = Spacing required if this is operating side. ¼ For the dimensions of C, see paragraph: "Main dimensions", page 7. A technical clearance of at least 80 cm is required at the front (service side) of the boiler. However, we recommend that the clearance is at least 100 cm. We recommend a clearance of at least 40 cm above the boiler (If the air supply filter is used, there must be a clearance of at least 65 cm). A minimum of 30 cm is required on the side of the flue gas discharge, and a minimum of 30 cm is also required on the other side (or 80 cm, if this is operating side). 31/05/01-760053-01 5

4. Installation C 330 ECO - C 630 ECO Rotate instrument panel The control panel is on the front as standard, but can easily be rotated so that it is on the short side. 1 4 3 x 1. Unscrew the 4 lateral holding screws in the control panel.. Remove the protective cover. 3. Unscrew the bottom plate socket screws. 4. Lift up the instrument panel with the bottom plate. 5. Turn the instrument panel and the bottom plate into position on the short side. 6. Slide the lips of the bottom plate into the appropriate slots. 7. Tighten the bottom plate socket screws. 8. Refit the protective cover. 9. Screw the 4 lateral holding screws back in. 90º 5 8 9 x 7 6 T00408-E 6 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation 4.3.3. Main dimensions Boiler type C 330 ECO Ø 50 Ø 80 103 1500 130 366 30 353 1310 59 447 Ø 65 Ø 65 Ø 50 C B L 90 155 706 310 716 193 1477 A T00347-H C330 ECO A (mm) B (mm) C (mm) L (mm) Symbol Fittings 80 1833 1635 186 1490 { Heating circuit flow, Flange NW 80 (DIN 576) 350 1833 1635 186 1490 z Heating circuit return, Flange NW 80 (DIN 576) 430 1833 1635 186 1490 Gas / Gaz Gas connection, G" (Female thread) 500 14 1944 17 1800 j 570 14 1944 17 1800 i Flue gas discharge pipe, Ø 50 mm 650 14 1944 17 1800 h Air intake, Ø 50 mm d Second return (optional), Flange NW 65 (DIN 576)) 31/05/01-760053-01 7

4. Installation C 330 ECO - C 630 ECO Boiler type C 630 ECO C L 641 176 1500 130 59 59 90 8 353 353 8 7 1460 B A 894,5 Ø 80 103 366 30 1477 1310 Ø 65 Ø 65 155 310 193 1760 T003766-G C630 ECO A (mm) B (mm) C (mm) L (mm) Symbol Fittings 560 1833 1635 186 1490 { Heating circuit flow, Flange NW 80 (DIN 576) 700 1833 1635 186 1490 z Heating circuit return, Flange NW 80 (DIN 576) 860 1833 1635 186 1490 Gas / Gaz Gas connection, G" (Female thread) 1000 14 1944 17 1800 j 1140 14 1944 17 1800 i Flue gas discharge pipe, Ø 350 mm 1300 14 1944 17 1800 h Air intake, Ø 50 mm Air supply collector (Option), Ø 350 mm d Second return (optional), Flange NW 65 (DIN 576) 8 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation 4.4 Hydraulic connections 4.4.1. Flushing the system Installation must be carried out in accordance with the prevailing regulations, the codes of practice and the recommendations in these instructions. Installing the boiler in new installations (installations less than 6 months old) 4 Clean the installation with a universal cleaner to eliminate debris from the appliance (copper, hemp, flux). 4 Thoroughly flush the installation until the water runs clear and shows no impurities. Installing the boiler in existing installations 4 Remove sludge from the installation. 4 Flush the installation. 4 Clean the installation with a universal cleaner to eliminate debris from the appliance (copper, hemp, flux). 4 Thoroughly flush the installation until the water runs clear and shows no impurities. 4.4.. Connection of the heating circuit For the connection(s) of the boiler C 630 ECO: The features and instructions described are for each boiler module. CAUTION The heating pipe must be mounted in accordance with prevailing provisions. 1. Remove the dust cap on the central heating flow connection Ù.. Remove the dust cap on the central heating return connection Ú. 3. Connect the heating water outlet pipe to the connection Ù. 4. Connect the heating water return pipe to the connection Ú. 5. Connect a safety valve to the boiler's flow connection. 6. Connect the pump to the boiler's return connection. Always connect the boiler in a way that will guarantee the water flow through the unit during operation. When the boiler is used in a system with two return pipes, the return pipe must be used as a lowest temperature return. The second return pipe (accessory) is then used as a higher temperature return. Refer to the instructions supplied with the product. Please contact us for further information. 31/05/01-760053-01 9

4. Installation C 330 ECO - C 630 ECO 6 1 3 4 5 T003476-C The flow pipe is fitted with the following components: 1 Tube pocket for a temperature sensor for an external control ( ½" ). Vent device (⅛"). 3 Connection for safety valve (1½"). 4 Pressure gauge (½"). 5 Flow sensor (M6). 6 High-limit thermostat (M4). 4.4.3. Connecting the condensate discharge pipe For the connection(s) of the boiler C 630 ECO: The features and instructions described are for each boiler module. Discharge the condensed water directly into the drain using a syphon. In view of the acidity level (ph to 5), only use plastic material for the discharge pipe. 1. Install a plastic drain pipe on the syphon (dia. 3 mm or larger, connected to a drain). CAUTION Do not make a fixed connection in order to prevent an overpressure in the siphon. 4 The condensate drain must be connected openly to the drain. 4 Set the discharge pipe at a gradient of at least 5-10 mm per metre, maximum horizontal length 5 metres. 4 Do not drain condensation water into a roof gutter at any time. 4 Connect the condensate discharge pipe in accordance with prevailing standards. 4.5 Gas connection For the connection(s) of the boiler C 630: The features and instructions described are for each boiler module. 30 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation WARNING 4 Close the main gas valve before starting work on the gas pipes. 4 Also fit a gas cock near the boiler. 4 Eliminate debris and dust from the gas pipes. The boiler is fitted with a gas filter as standard. 1. Remove the dust cap on the gas connection ß.. Connect the gas inlet pipe (Please refer to local rules). 4.6 Connections for the air and exhaust pipes ¼ The boiler is suitable for the following types of flue gas connections. See chapter: "Certifications", page 11 Follow applicable local guidelines when connecting the flue gas discharge and air supply pipes to the boiler. The diameters of the pipes must be defined in accordance with the standards in force in your country. The total resistance of the flue gas discharge and air supply must not exceed the maximum acceptable resistance. ¼ To determine the maximum length of the air pipes and flue gas pipes. See chapter: "Lengths of the air/flue gas pipes", page 3 With room sealed operation, make sure the dirt trap in the boiler air supply remains accessible. For example, fit a T piece with an inspection hatch in the air supply pipe directly above the boiler. With a flue gas connection of two or more C 330 ECO boilers, certain fan speeds need to be changed. Change the values of parameters p18, p19 and p0 for each boiler in the flue gas connection. Set them to the values as specified in the parameter table for the C 630 ECO boiler. ¼ See the manual for the control panel. 31/05/01-760053-01 31

4. Installation C 330 ECO - C 630 ECO 4.6.1. Classification The table specifies this classification in detail according to [. Type Execution Description B3 Open flue 4 Without fire-stop approval. B3P (1) 4 Exhaust of combustion gases above the roof. 4 Air in the installation room. B33 Open flue 4 Without fire-stop approval. 4 Common exhaust of combustion gases above the roof. 4 Common exhaust of combustion gases mixed in the air, air in the installation room (special construction). C33 Room sealed flue 4 Exhaust of combustion gases above the roof. 4 The opening for the air-supply inlet is located in the same pressure zone as the vent (For example, a concentric passage to the roof). C53 Room sealed flue 4 Closed equipment. 4 Separate channelling for the air-supply. 4 Separate channelling for the combustion gases. 4 Air-supply inlet and flue gas outlet are located in different pressure zones. C63 Room sealed flue 4 The manufacturer delivers this type of equipment without a supply or exhaust system. C83 () Room sealed flue 4 The equipment can be connected on a so-called semi-clv system (with common combustion gas exhaust). C93 (3) Room sealed flue 4 Channel for the air-supply and exhaust fumes in a duct or surrounded by a sleeve: - Concentric. - Eccentric; Air supply from the shaft. - Exhaust of combustion gases above the roof. - The opening for the air-supply inlet is located in the same pressure zone as the vent. (1) Including the pressure classification P1 () An under pressure of 4 mbar is possible (3) Ask your supplier for minimum dimensions of duct or sleeve 4.6.. Outlets The boilers can be used in room-ventilated or room-sealed operation. The air supply connection kit must be used for closed configurations (This is available as an accessory). The flue gas pipes must be calculated conforming to EN 13384 (parts 1 & ). For open exhaust of combustion gases above the roof, the vent must always be provided with a suitable stainless steel wire grill. 4.6.3. Lengths of the air/flue gas pipes 4 To define the maximum final length, you must deduct the pipe length in accordance with the reduction table. 4 The boiler is also suitable for longer chimney lengths with diameters other than those indicated in the table. Please contact us for further information. 3 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation Open flue (B3, B3P) If using an open flue version, the air supply opening remains open; only the combustion gas opening is connected. The boiler then takes in the combustion air required directly from the premises in which it is installed. For the application of air discharge and combustion gas discharge piping with a diameter other than 50 mm, a reducer should be used. CAUTION 4 If the boiler, in room ventilated operation, has been set up in a (very) dusty room, use the air supply filter (Accessory). 4 Use of the air supply filter is compulsory when the boiler is exposed to building dust. CAUTION 4 The air supply opening must remain open. 4 The premises in which the appliance is installed must be fitted with the necessary air supply openings. They must not be reduced or closed. L = R000363-A C 330 ECO Boiler type Chimney length for the open flue version with a Ø of 150 mm Maximum length (L) (1) with a Ø of 180 mm with a Ø of 00 mm with a Ø of 50 mm 80 0 m 50 m 50 m 50 m 350 11 m 30 m 50 m 50 m 430 8 m m 39 m 50 m 500 7 m 18 m 3 m 50 m 570 5 m 13 m 4 m 50 m 650 5 m 1 m 1 m 50 m (1) Calculated with rigid pipe and Outlet without hood (open 'free') L = R000361-A C 630 ECO Chimney length for the open flue version Boiler type Maximum length (L) (1) with a Ø of 50 mm with a Ø of 300 mm with a Ø of 350 mm 560 50 m 50 m 50 m 700 31 m 50 m 50 m 860 0 m 50 m 50 m 1000 11 m 39 m 50 m 1140 5 m 6 m 50 m 1300 5 m 6 m 50 m (1) Calculated with rigid pipe and Outlet without hood (open 'free') 31/05/01-760053-01 33

4. Installation C 330 ECO - C 630 ECO Room sealed flue (C33, C63, C93) If using a room sealed version, it is necessary to connect both the combustion gas exhaust and the air-supply opening (parallel). For the application of air discharge and combustion gas discharge piping with a diameter other than 50 mm, an adapter should be used. L = + R000358-A C 330 ECO Chimney length for room sealed operation Boiler type Maximum length (L) (1) with a Ø of 00 mm with a Ø of 50 mm with a Ø of 300 mm 80 4 m 50 m 50 m 350 1 m 50 m 50 m 430 13 m 50 m 50 m 500 10 m 50 m 50 m 570 5 m 34 m 50 m 650 4 m 30 m 50 m (1) Calculated with rigid pipe and Outlet without hood (open 'free') L = + R00036-A C 630 ECO Chimney length for room sealed operation Boiler type Maximum length (L) (1) with a Ø of 300 mm with a Ø of 350 mm with a Ø of 400 mm 560 50 m 50 m 50 m 700 43 m 50 m 50 m 860 6 m 50 m 50 m 1000 13 m 35 m 50 m 1140 5 m 16 m 4 m 1300 5 m 18 m 8 m (1) Calculated with rigid pipe and Parallel roof feed-through 350 mm (Accessory) (C53, C83) connection Combustion air supply and combustion gas discharge are possible in various pressure zones, semi-clv systems. With the exception of coastal areas. The maximum permissible difference in height between the combustion air supply and the combustion gas discharge is 36 m. L = + R000359-A C 330 ECO Chimney length in the various pressure zones Boiler type Maximum length (L) (1) with a Ø of 50 mm 80 50 m 350 50 m 430 50 m 500 50 m 570 49 m 650 40 m (1) Calculated with rigid pipe and Elbow 90º and Outlet without hood (open 'free') 34 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation L = + R000360-A C 630 ECO Chimney length in the various pressure zones Boiler type Maximum length (L) (1) with a Ø of 350 mm with a Ø of 400 mm 560 50 m 50 m 700 50 m 50 m 860 50 m 50 m 1000 33 m 50 m 1140 - m 1300 8 3 m (1) Calculated with rigid pipe and Elbow 90º and Outlet without hood (open 'free') Reduction table Pipe reductions per element used Diameter Elbow 45 Elbow 90 Pipe reduction Pipe reduction 150 mm 1, m,1 m 180 mm 1,4 m,5 m 00 mm 1,6 m,8 m 50 mm,0 m 3,5 m 300 mm,4 m 4, m 350 mm,8 m 4,9 m 400 mm 3, m 5,6 m 4.6.4. Additional Directives 4 Please refer to the manufacturer's instructions for the material in question when installing the flue gas discharge and air supply materials. If the flue gas discharge and air supply materials are not installed according to the instructions (e.g. they are not leakproof, not clamped in place etc.), this may cause hazardous situations and/or result in bodily injury. After assembly, check at least all flue gas and air carrying parts for tightness. 4 Connection of the combustion gas exhaust directly to the buildings brick chimneys or flues is forbidden for condensation reasons. 4 Always clean the ducts thoroughly in cases where lining pipes are used and/or a connection of the air-supply. 4 It must be possible to inspect the flue or chimney. 4. 4 For long, aluminium, combustion-gas exhaust pipes it is initially necessary to consider the relatively high quantity of corrosive products which are brought together with the condensate from the exhaust pipe. The siphon on the equipment requires regular cleaning or, preferably, an additional condensate collector can be installed above the equipment. 31/05/01-760053-01 35

4. Installation C 330 ECO - C 630 ECO 4 The combusted gas discharge pipe must be sufficiently inclined towards the boiler (at least 50 mm per metre) and an adequate condensate collection tank and discharge system constructed (at least 1 m before the boiler opening). The elbows fitted must be at more than 90 to guarantee the provision of an adequate gradient and tightness on the lip rings. 4.6.5. Connection of the combustion gas exhaust pipe The boiler is equipped with a mechanical flue gas non-return valve as standard. This prevents flue gas travelling back up into the boiler when it is not in operation. (E.g. for cascade systems). Mounting 1. Fit the combustion product discharge conduit.. Fit together the combustion gas exhaust pipes, without welding. 4 The pipes must allow no leakage of flue gases and be resistant to corrosion. 4 Connect the pipes together without stress between the sections. 4 Maximum bracket distance from vertical pipes is m. 4 Maximum tilt of vertical pipes is 0 mm/m. 4 The pipes must not rest on the boiler or flue gas adapter. 4 The horizontal sections need to be constructed with a gradient of 50 mm per metre: Boiler orientation. 4 Use a bracket at each connection from horizontal pipes. 4.6.6. Connection of the air intake pipe Mounting 1. Fit the air-intake conduit.. Fit the air-intake conduits together without welding. 4 The pipes must be airtight and corrosion-resistant. 4 Connect the pipes together without stress between the sections. 4 Maximum bracket distance from vertical pipes is m. 4 Maximum tilt of vertical pipes is 0 mm/m. 4 The pipes must not rest on the boiler or air supply adapter. 4 The horizontal sections need to be constructed with a gradient: Downwards in the direction of the supply opening. 4 Use a bracket at each connection from horizontal pipes. 36 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation Material A rigid wall aluminium/stainless steel (1) Flexible (1) The materials used must comply with the prevailing regulations and standards 4.7 Electrical connections For the connection(s) of the boiler C 630 ECO: The features and instructions described are for each boiler module. 4.7.1. Control unit PW Pre-wired in the boiler Mains N L F1 PUMP N L ON/OFF OT M Three wired power cord The boiler has a detection phase. The boiler is fully pre-wired. The boiler is suitable for a 30 V / 50 Hz power supply with live/neutral/ earth. Other connection values are only acceptable if an isolating transformer is installed. Connect the wires of the mains lead to the appropriate terminal block. This can be found to the left underneath the connector MAINS. (The mains lead is not supplied). PW CAUTION 4 In the case of a fixed connection to the power cord, you must always install a main bipolar switch with an opening gap of at least 3 mm. F The main characteristics of the control unit are described in the table below. M T003486-E Power supply voltage Rating of the main fuse F (30 VAC) Fuse rating F1 (30 VAC) Maximum power consumption of the pump 30 VAC/50Hz 10 AT AT 300 VA WARNING The following boiler components are at a voltage of 30V: 4 Electrical connection of the heating pump (Central heating) (if used). 4 Electrical connection of the combined gas valve unit. 4 Fan. 4 The majority of components in the control panel. 4 Ignition transformer. 4 Connection of the power supply cable. 31/05/01-760053-01 37

4. Installation C 330 ECO - C 630 ECO CAUTION Keep to the polarity shown on the terminals: phase (L), neutral (N) and earth *. The boiler has a unique boiler code. This, together with other data, incl. boiler type, counter readings, etc. is stored in a (PSU) that belongs with the boiler. If the control unit is replaced, the counter readings remain stored in it. It is possible to connect various control, safety and regulation systems to the boiler. The heat output of the boiler can be controlled as follows: 4 Adjustable control: The output varies between the minimum and maximum value on the basis of the value determined by the controller. 4 Analogue setting : Where the heat output or the temperature is controlled by a 0-10V signal. (Standard with Diematic isystem - Only possible with the SCU-05 or IF01 control board with IniControl). 4 On/Off setting: where the heat output modulates between the minimum and maximum value based on the flow temperature set in the boiler. 4.7.. Recommendations WARNING 4 Only qualified professionnals may carry out electrical connections, always with the power off. 4 The boiler is entirely pre-wired. Do not modify the connections inside the control panel. 4 Earth the appliance before making any electrical connections. Make the electrical connections of the boiler according to: 4 The instructions of the prevailing standards. 4 The instructions on the electrical diagrams provided with the boiler. 4 The recommendations in the instructions. CAUTION 4 Separate the sensor cables from the 30 V cables. 4 Outside the boiler: Use pipes or cable guides at least 10 cm apart. 4.7.3. Standard control PCB The protection PCB SU, which protects the boiler, is connected to the standard control PCB PCU-06. 38 31/05/01-760053-01

ON/OFF C 330 ECO - C 630 ECO 4. Installation Various thermostats and controllers can be connected to the standard control PCB (PCU-06). The possible connections on the standard control PCB are described in the following paragraphs. A clearance of 0 cm is required above the instrument panel to allow the front cover to open fully. Access to the connector block: 1. Unscrew the 4 lateral holding screws in the control panel.. Remove the protective cover. 3. The detachable screw connectors are now accessible. 4. Secure cable(s) using the traction clip and the cable clamps (The cable clamps are supplied separately). 5. Firmly retighten the cable clamps and close the control panel. Mains N L PUMP N L OT BL RL T003477-D Accessing the PCBs behind the control panel: 3 1. Unscrew the 4 lateral holding screws in the control panel.. Remove the protective cover. 3. Open the front cover. 4. Use both thumbs to press the top of the control panel downwards a little. 5. While maintaining some of the pressure you are applying to the top of the control panel, use both hands to tip the casing forwards and upwards. 4x 1 4 4 + 5 T004637-B 31/05/01-760053-01 39

4. Installation C 330 ECO - C 630 ECO 4.7.4. Connecting the on/off control This function is only available with the IniControl control panel. The boiler can be controlled with an on/off controller. Connect the controller to the ON/OFF-OT connector. (It does not matter which wire is connected to which cable clamp). Mains N L PUMP N L ON/OFF OT BL RL T00348-A 4.7.5. Connecting modulating controller This function is only available with the IniControl control panel. The boiler is fitted with a OpenTherm connection as standard. As a result, modulating OpenTherm room controllers can be connected without any further adjustments. Connect the two-wire cable to terminals ON/OFF-OT of the connector (It does not matter which wire is connected to which cable clamp). Mains N L PUMP N L ON/OFF OT BL RL T00348-A 4.7.6. Shutdown input The behaviour of the inlet can be modified using the IN.BL (Diematic isystem) or P35 (IniControl) parameter. 4.7.7. Release input The boiler has a release input (Normally open contact). If this contact is closed when there is a heat demand, the burner will go into shutdown after a waiting time. This input can be used in combination with the limit switches on flue gas dampers, hydraulic shutter valves, etc.. This input is on the RL terminals of the connector. Mains N L PUMP N L ON/OFF OT BL RL CAUTION Only suitable for potential-free contacts. T003484-B The behaviour of the inlet can be modified using the IN.BL (Diematic isystem) or P3 (IniControl) parameter. 40 31/05/01-760053-01

C 330 ECO - C 630 ECO 4. Installation 4.7.8. System pump An external central heating pump can be connected to the Pump terminals of the connector. The maximum input power is 300 VA. ¼ For more information on controlling a modulating pump See paragraph: "Connection possibilities for the PCB (SCU-S05)", page 4 Mains N L PUMP N L ON/OFF OT BL RL T003485-B 4.7.9. PC/Laptop connection A PC can be connected to the RS 3 input using an USB cable. Using the Recom PC/Laptop service software, you can enter, change and read out various boiler settings. T00349-E 4.7.10. Connection possibilities for the PCB (SCU- D4) J1 J J4 J5 J6 SCU-D4 J7 J8 0-10V + - 4 SAMB C SAMBB S AMPA 3 1 1 1 1 J9 Alim 30 V - 50 Hz N L B TS + B A N L N N L N L S SYST + TA - S ECS S EXT S DEP C S DEP B 1 1 1 1 1 1 J10 R00030-A 31/05/01-760053-01 41