plumbing for greywater

Similar documents
INSTALLATION MANUAL. Manufactured by AQUA-AIR MANUFACTURING. (801) or (800) FAX (801)

1 Exam Prep Plumber s Handbook Tabs and Highlights

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING. Test Code: 5924 Version: 01

TOOLS & MISCELLANEOUS

MATERIALS Traps TRAPS. No. IPC IRC Description

TUBS & SURROUNDS FIBERGLASS TUB STANDARD FIBERGLASS GARDEN TUB

Test Code: 8117 / Version 1

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Fixtures Installation

Land Use and Environmental Service Agency (Code Enforcement) Plumbing 2010

Read Only Document Not For Distribution

Building Utilities 1 Plumbing and Sanitary Systems

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

Sanitary Drainage Systems

Plumbing Technology/Plumber CIP Task Grid

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

PLUMBING INSTALLATIONS

Sources of Graywater

TEACHING LEARNING MATERIALS

PARTS STOCKED REPLACEMENT FAUCET BIBB SCREWS... SCREW ASSORTMENT MISC. 3 /8" BIBB LOC SCREW 1 /2" BIBB SCREW 1 /2" BIBB LOC SCREW 3 /8" BIBB SCREW

STACKS AND STACK VENTS

Pro Vent TM. Provent Systems Inc Capital Circle Lawrenceville Georgia

$0.98 $ KITCHEN SINK STRAINER, 3-1/2" x BATH TUB DRAIN, 1-15/16" x 2-3/4" x $ $1.89

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

Acrylic Claw Foot Tub

PLUMBING REQUIREMENTS

Protected with TechCoat finish. For Ceramic Tile Showers Cast iron Threaded for test nipple Extra heavy (.050) strainer DRAIN CONNECTION

Kallista Bath Flip Drain

2015 UPC Chapter 8 Indirect Wastes RV

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:

Acrylic Claw Foot Tub

Pipe Sizing Table. Hydraulic Load Served (fixture units)

FAUCET REPAIR RV PARTS & ACCESSORIES RV PARTS & ACCESSORIES FAUCET STEMS FAUCET ESCUTCHEONS

1. You are required to use a 20 foot ladder placed up against a building that is 40 high. At what

ProVent Systems Plumbing Fundamentals. Educational Literature. Comparison of ProVent Design Rules and The International Plumbing Code

CAST IRON CLAWFOOT TUB

Retro-DWS Other Methods Internal Heating Cable System for Sewer Pipe and Waste Drain Applications

Cable Drain & Cable Drain Trim Kit

SWIVEL HEAD WASTE AND OVERFLOW INSTALL

Union County Vocational - Technical Schools Scotch Plains, New Jersey

CHAPTER 31. VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R

CAST IRON PEDESTAL TUB

PureFlow. PureFlow. Fittings system This section doesn t meet California AB1953, Vermont ACT 193 and NSF 61 Annex G Standards.

PLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

HOME INSPECTION CHECKLIST

TRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION

PLUMBING FIXTURES CHAPTER 27

Tips from the Drain Cleaning Pro s

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof.

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Minor Home Repairs. November 4, County of Henrico Department of Community Revitalization

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER ANSWER SCHEDULE

Level I Chapter 1 Worksheet

EVALUATION SUBJECT: CAST IRON SOIL PIPE AND FITTINGS EXTRA HEAVY OR SERVICE

Is Sewer Gas Giving Your Customers the Wrong Impression?

Plumbing Fundamentals. Ron Grendzinski

Owner s Manual FS-10/FreshSpa

Instructions. Certifications Chrome 2-handle Chrome 3-handle 10-B83-WCH-AD Chrome 3-handle 10-B82-WCH-AD Chrome 2-handle

SECTION PLUMBING FIXTURES

Read Only Document Not For Distribution

WATER HAMMER ARRESTORS & MISC. SPECIALTIES

Read Only Document Not For Distribution

CHAPTER VI BUILDING PLUMBING

Special Requirements For Health Care Facilities

2015 UPC CODE - CHAPTER 8 INDIRECT WASTES

Ecodrain V1000. Selection and Installation Guide for Residential Applications TM MC TM

1 Exam Prep Plumbing State Contractors Practice Exam 2

Group 35 Drainage System. This group contains information on the holding tanks. equipment applied to the coach. ...Sink and Shower Strainers

CHAPTER 10 TRAPS AND INTERCEPTORS

Plugging Home Drains to Prevent Sewage Backup

WASHER & DRYER REPAIR

Willoughby Industries - Security Products

173 Index of Materials

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

CHAPTER 10 TRAPS AND INTERCEPTORS TABLE 10-1 HORIZONTAL LENGTHS OF TRAP ARMS (EXCEPT FOR WATER CLOSETS AND SIMILAR FIXTURES) 1, 2

PLUMBING CURRICULA OUTLINE

House Drainage System. Building Utility & Services

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

2016 Plumbing Supplemental Plan Review List

Plumber Practice Interprovincial Red Seal Exam

FEATURES. Other Fed-Flush Arrangements

TABLE OF CONTENTS. CHAPTER 2 DEFINITIONS General Applicability Definition of Terms General...

Denotes a new question! Denotes a revised/revisited question. September 2009 General:

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

TABLE OF CONTENTS Limitations of Authority...6 Table Plumbing Permit Fees...7

DUKE UNIVERSITY CONSTRUCTION STANDARDS

Jones Stephens Corp. PlumBest LTConnections SECTION M: MERCHANDISING. Pegboard Merchandising Tilt Bin Merchandising...

Welcome! Today s topic: Small Home Repairs. November 14, 2015

Making Crimp Connections

Plumbing. Definitions. Background Factors. Air Chambers. Air Gap (Drainage System) Air Gap (Water Distribution System) Air Lock.

HIGH QUALITY PRICED RIGHT! Product Guide 2/19

SECTION PLUMBING

Willoughby Industries - Security Products

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER ANSWER SCHEDULE

SUPPLEMENTARY INSTRUCTIONS

Installation Instructions

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE

TABLE OF CONTENTS Limitations of Authority...6 Table Swimming Pool, Spa, and Hot Tub Permit Fees...7

Transcription:

plumbing for greywater october 2015 christina bertea ~union trained journeywoman plumber (1978) ~plumbing contractor (1996) ~greywater action singingwater@jps.net

plumbing for greywater basic parts of a drainage system identifying the correct drain pipe where to cut in the three way valve how to cut the pipe to install the three way valve how to connect the three way valve new greywater piping from the three way valve to the garden

drainage system gathers together wastewater from all fixtures in the building a fixture is a toilet, sink, tub, shower, washing machine... where freshwater enters and wastewater flows away size of drain piping is determined by volume of wastewater flowing through it 1/4 per foot slope or grade for optimal gravity flow and removal of solids a single large drain carries wastewater out of the building to join the sewer and flow by gravity to the sewage treatment plant, or to a private septic system

basic parts of a drainage system fixture trap trap arm vent drain sewer GREYWATER DRAINText BLACKWATER DRAIN

traps required at each fixture hold water creating a water seal prevent sewer gases and vermin from entering building

vent up to roof vents every trap must have a vent prevent siphoning of trap seal (sink) sanitary (toilet) extend through roof to outside air trap greywater allow air to equalize pressure in drain/sewer system black water prevent explosive build up of gases

drains: sized according to fixture/s they serve toilets: 3 or 4 drain pipe bathroom sinks: 1-1/4 or 1-1/2 trap and drain kitchen sinks/laundry sinks: by code 1-1/2 trap, 2 drain* bathtubs: 1-1/2 trap, 2 horizontal drain* showers: by code 2 trap and drain* washing machines: 2 trap and drain * older buildings may have undersized drains for these fixtures

DWV copper galvanized steel leaded cast iron drain materials: in older buildings often main/toilet drain will be cast iron, smaller drains will be copper, galvanized steel, or ABS

drain materials (leaded cast iron not shown) and method of connection 2 ABS plastic glued joints 1-1/2 copper DWV soldered joints 2 no hub cast iron joined with no hub bands 1-1/2 galvanized steel threaded joints with Durham fittings

copper pipe WATER DWV DWV ( drain waste & vent ) copper drain lines have yellow stripes copper water tubing has red, green, or blue stripes and thicker walls careful not to cut a water line!

toilet drains convey fecal matter which creates blackwater, NOT greywater always minimum of 3 ID, minimum 2 vent typical materials: cast iron or ABS (rarely copper or galvanized) vent may be of different material than drain older buildings often have 4 cast iron stack continuing up through roof, with 4 closet bend to toilet

toilet drain: 4 cast iron closet bend up to toilet 4 vent up closet bend 4 vent up up to toilet toilet drains have no visible trap because trap is inside the toilet

toilet drain: 3 ABS lo heel 90 with 2 vent 3 up to toilet 3 ABS drain pipe

trap location: sinks typically exposed above the floor tub/showers below the floor toilet trap is inside the toilet washer trap is inside the wall (toilet) sink floor tub/showertext

washing machine drain: 2 ABS trap in the wall above the floor in older homes laundry tray may have been removed and a standpipe added to the 1-1/2 trap outside the wall

locating the shower drain side view of typical shower pan shower drain: 2 ABS, (1-1/2 in older homes) trap is visible underfloor

locating the shower drain shower drains from under the floor

locating the tub drain: trap and waste and overflow are visible underfloor

locating the tub drain 1-1/2 Durham trap with galvanized steel trap arm from tub vent up vent GW drain trap arm trap from tub trap trap arm 1-1/2 ABS trap and trap arm, 2 greywater drain

locating the tub bottom of tub drain brass waste and overflow galvanized tailpiece durham p-trap visible brass waste and overflow attached to tub, galvanized tailpiece, durham p-trap, galvanized trap arm

identifying the correct drain for greywater review location of fixtures upstairs so you can estimate which plumbing belongs to which fixture underneath floor by size: smaller than 3 (3 + pipes will likely carry toilet waste) by visible trap underfloor: shower or tub by temperature: run hot water in the fixture whose drain you are trying to identify, feel whether that drain gets hot 2 toilet vent can be confused with 2 washer or sink drain

which pipe is the right pipe? not sure? run hot water at the fixture you want to trace

where to cut in the three way valve greywater line only (less than 3 ), not blackwater (3 or 4 ) to code: diverter valve must be downstream from the vent in trap arm is not to code adequate space to fit 3-way? (greywater drain may join blackwater line too quickly

tub greywater trap arm no space to cut valve into tub drain toilet drain greywater blackwater where to cut into it adequate space? or does greywater join blackwater too quickly

three way valve under sink trap arm correct location for diverter valve blackwater correctly installed in the greywater drain line downstream from the vent not in the trap arm

vent trap arm drain valve correctly installed downstream from the vent not in the trap arm

cutting into the drain sawzall ABS/PVC: tubing cutter (wheel for plastic), sawzall, handsaw grinder plastic tubing cutter galvanized: sawzall, hacksaw DWV tubing cutter copper DWV: tubing cutter (wheel for copper), sawzall, hacksaw cast iron: snap cutter, sawzall (diamond blade), grinder with very thin wheel hacksaw handsaw mini-hacksaw minisaw

connecting the three way valve ABS glue: 1-1/2 ABS pipe glues into valve hub; 2 ABS coupling glues over outside of valve hub transition couplings join dissimilar materials or sizes no-hub couplings join like materials to each other all rubber slip couplings slide up or down pipe for ease of installation--sometimes essential when old 2 cast iron is slightly different diameter than 2 valve hub make certain the three way valve has inlet set to correct side provide instructions to homeowner re direction of flow

connecting the three way valve 2 ABS coupling glues ABS valve to 2 ABS pipe nut driver torque wrench 2 no hub coupling (removable/adjustable) connects ABS to ABS 2 Fernco slip coupling (may not be approved) 2 transition coupling connects 2 ABS valve to dissimilar material/size

transition couplings transition from one pipe size or material to another by varying thickness of rubber band CP 200: 2 cast iron plastic or steel to 2 plastic or steel CP 215: 2 cast iron plastic or steel to 1-1/2 cast iron plastic or steel CK 115: 1-1/2 cast iron plastic or steel to 1-1/2 copper

options 2 rubber slip coupling fits over hub 2 ABS coupling glues onto hub (hub OD is same as 2 pipe) 1-1/2 ABS pipe glues into hub (1-1/2 pipe OD is same as hub ID )

three way valve cut into 2 cast iron shower drainpipe transition couplings connect 2 cast iron to 2 ABS valve hubs

three way valve with electronic actuator : transition couplings connect 1-1/2 DWV copper shower drain to 1-1/2 ABS pipe stubs glued into valve hubs or a 2 ABS x 1-1/2 copper transition coupling could have been used

check valve backflow prevention from shower 2 slip coupling ABS to ABS 2 no hub band ABS to ABS backflow prevention protects diverter valve from potential blackwater backup (sometimes required) a backwater valve with cleanout is the approved fitting

labeling images of the valve handle in to garden or to sewer positions can be laminated and posted near the valve as required by code

labeling new greywater piping to garden existing piping to sewer drawing indicates handle positions ~greywater piping to garden must have continuous 1/4 slope ~be able to pass over or go through perimeter foundation

piping from the three way valve to the garden ABS pipe: 1-1/2 (or 2 for shower if permit requires it) correct fittings proper support necessary slope cleanouts testing 37

correct ABS fittings : terminology OD (outside diameter) vs ID (inside diameter) male / female (anatomically correct) hub/spigot/street sweep/radius direction of flow elbows/bends tees/branched fittings

terminology: hub OD ID hub inside diameter outside diameter

terminology: hub/ spigot/ street a hub can receive: ~the end of a pipe ~the spigot end of a street fitting

terminology: sweep / radius vent sweep determines allowed direction of flow vent 90 has no sweep used for air only in any position short sweep sanitary short sweep 90 used with flow horizontal to vertical only long sweep 90 (quarter bend) used in any position long sweep

terminology: direction of flow vent fittings: no sweep=not for liquids used to convey air only sanitary ( short sweep ) fittings: used only where flow is horizontal to vertical short sweep 90 / sanitary tee

vertical flow must enter horizontal flow on a 45 degree angle (horizontal to horizontal also) wye + street 45 = combination combination long sweep 90 sanitary tee not allowed short sweep 90 not allowed

ABS tees/ branched fittings/ elbows/ bends ABS fittings SS 90 60 45 22 wye combination long sweep sanitary tee bends: named by (wye + 45) 90 (short sweep) degrees from straight or fraction of a circle-- quarter, sixth, eighth...

naming branched fittings run name run size (larger end first if a reducing fitting) then branch size then type of material and name of fitting branch example: 2 x 1-1/2 x 1-1/2 sanitary tee ( two by inch and a half by inch and a half ABS sanitary tee )

double ells for branched drain systems: 1-1/2 2 1-1/2 for permitted shower greywater the main must be 2 ABS all the way to the first double ell (2 pipe in, 1-1/2 out both sides) 1-1/2 1-1/2 1-1/2 continuing from there piping can be 1-1/2 ABS using 1-1/2 double ells ( twin ells / double 1/4 bends ) to create a cleanout to monitor flow, drill a hole in the top of the double ell ~tap (make threads) with a metal nipple ~thread in a PVC cap, or use a cork

proper support for ABS pipe support every 4 ABS perforated plumbers tape (not for hanging pipe) official ABS rigid pipe hangers several styles plastic electrical two hole straps plastic pipe must be protected with 10 mil tape if metal strapping is used

proper support rigid pipe straps hold pipe straight maintain precise grade/slope protect in earthquake from side to side movement and uplift look professional easy to set 1/4 per foot slope: 1 difference in length of rod every 4

proper hangers prevent pipe from moving up or down when hanger rod isn t long enough a 2x4 can be added

necessary slope 1/4 per foot types of levels: torpedo, 2, 4 calibrate using block of wood some have lines indicating 1/4 per foot grade

cleanouts required every 100 ft. when aggregate number of bends adds to 135 degrees must be accessible use the plug in the double ell as a cleanout use a sanitary tee and cleanout where greywater exits the building-- this opening can be used to test and flush the system

testing at minimum do a running test check for leaks under the house defects in materials can leak bands not tight, cast iron too rough to seal? wait manufacturer s recommended length of time for glue to set before testing

Alameda Creek water temple thank you for caring about our water