1ZSE en, Rev. 4. On-load tap-changers, type UZ User s manual

Similar documents
Instruction Manual. Alarm Unit For Low Gas Level # Read manual before use! Observe all safety information! Keep manual for future use!

Installation Guide. Termix Distribution unit. 1.0 Table of Contents. 1.0 Table of Contents

CRU-S Series Stainless Steel Condensate Recovery Unit

This document is a preview generated by EVS

Instruction Book for HD Punch Machines

FOSTORIA INDUSTRIES, INC North Main Street Fostoria, OH Phone: Fax:

Electronic Service Manuals

Installation Instructions

OPERATING MANUAL ORWAK March 2005 PUBL. NO Edition 4

Edition 8, From serial no Publ. no OM 5030, Orwak 5030 OPERATING INSTRUCTIONS (IN THE ORIGINAL)

DISPOSER CONTROL CENTER

TE 2 TE 2-M TE 2-S English

Installation Instructions

Audi-Larm Audible Alarm

TEMPERATURE CONTROLLERS

Edition 6, From serial no Publ. no Orwak 5030-CE. Operating manual

USER'S INFORMATION MANUAL

This document was created with FrameMaker 4.0.4

K20 K40 ICEMAKER INSTRUCTIONS

Combination Cooling/Gas Heat Package Units

AirStar Clinical Air Compressor AS60, AS90 and AS120. Installation & Operating Instructions

Installation Instructions

Model PT-05 Model PT-06

Installation Instructions Built-In Wine Coolers, Beverage Centers

Condensate Monitor CGKW. Operator s Manual 42/23-36 EN Rev. 2

INTERNATIONAL STANDARD

CFF-500 CHILLER. Operator s & Installation Manual. Release Date: November 3, 1996 Publication Number: Revision Date: March 25, 2014 Revision: F

User Manual. Spend a little Live a lot. TABLE TOP COOLER

GAS COOKTOP INSTALLATION INSTRUCTIONS BEFORE YOU BEGIN. IMPORTANT Save these instructions for local electrical inspector s use.

INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS EXHEAT FLR TYPE FLAMEPROOF RADIATORS

Operating Instructions

Original instructions JSNY7 Magnetic switch

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

Use & Care Manual. Electric Tankless Water Heaters. With Installation Instructions for the Installer AP15447 (10/10)

INSTALLATION GUIDE Dual Fuel Ranges

Installation and Maintenance Manual for Dimako NERM Panels REV 4. NERM Reference Manual NERM Panels 1 of 7

INSTRUCTION MANUAL FOR DUTCHESS MODEL 260 BAGEL & BUN SLICER

Niles Steel Tank Hot Water Generator Installation and Operation Manual

USER'S INFORMATION MANUAL

Proline GAS HOB Model TCG40IX Instruction Book

IDNr.: KH /03. Kompernaß Handelsgesellschaft mbh Burgstraße 21 D Bochum UK

Operating Manual. Combination Table Sealing Press. Series: Classic. CiMa-Pak Corporation Montreal Toronto New York. Telephone:

WHIRLPOOL AUSTRALASIA CONSUMER SERVICES

WARNING: Warns of health hazards and identifies possible risks of injury. CAUTION: Indicates possible dangers to the machine or other objects.

USER'S INFORMATION MANUAL

Edition 8 From serial no Publ. no OM 5030NHD; Orwak 5030-NHD OPERATING INSTRUCTIONS (IN THE ORIGINAL)

INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER S USE. Condensate Return Systems General Installation, Operation, & Service Instructions !

FW821 extra large integrated larder fridge Manual for Installation, Use and Maintenance

INTERNATIONAL STANDARD

Freightliner Refrigerator Troubleshooting Guide For (TJ18F) (TJ22F) (TJ18FP3)

Nautilus 4050 Heat Press. User Manual

Water Boilers ME10EN, ME15EN. Table of Contents

CENTERLINE 2100 Motor Control Center (MCC) Doors and Units with Vertical Operating Handles

SERVICE MANUAL. Bradford White ElectriFLEX HD (Heavy Duty) Commercial Electric Water Heater CEHD SERIES Immersion Thermostat Models

2CKA001473B System Manual Busch-Infoline. Handicapped toilet signal set 1510 UC

BEFORE USING THE DISHWASHER/CONNECTIONS

TE 1000-AVR. English. Printed: Doc-Nr: PUB / / 000 / 04

Com-Pak Heater Benefits You Can Depend On Com-Pak Models Line Model w/o Model w/ Voltage Thermostat Thermostat Watts Amps (1) (2)

> ENGLISH VERSION. Instructions HERU 50 HERU / utg 2

Super Elite Watch cleaning machine

SAFEGUARDING THE ENVIRONMENT IMPORTANT NOTES BEFORE USING THE OVEN OVEN ACCESSORIES CARE AND MAINTENANCE TROUBLESHOOTING GUIDE AFTER SALES SERVICE

GAS FURNACE. User's Information Manual for the operation and maintenance of model GB1AAV or GB3AAV Gas Furnace

Installation Instructions

TE 40 TE 40-AVR English

Manual Power relay SR853

DOMINATORPLUS ELECTRIC RANGE APPLIANCES INSTALLATION and SERVICING INSTRUCTIONS

NOTE TO INSTALLER: This manual must be left with the equipment user. Model 480BAV Upflow and 481BAV Downflow/Horizontal

USER'S INFORMATION MANUAL

ST1. Mod. USE AND MAINTENANCE MANUAL

This appliance has been CE-marked on the basis of compliance with the Low Voltage and EMC Directives for the voltages stated on the data plate.

SAVE THESE INSTRUCTIONS

PORT700CF Portable Fume Collector

Network Speed Dome Installation Manual

Manual. Industrial Air Curtain Model IF. English. Version 1.1

Thermo-Sealer. Manual Heat Sealer. User Manual

AVANI Grinding Booth

Installation Instructions

Installation Instructions

TE 3-M TE 3-C. English Français Español. Printed: Doc-Nr: PUB / / 000 / 01

MODELS 373LAV, 376CAV DOWNFLOW/HORIZONTAL and 383KAV, 395CAV UPFLOW GAS FURNACE

OWNER S MANUAL LG KOMPRESSOR PLUS VACUUM CLEANER

3 In 1 AIR CONDITIONER with REMOTE CONTROL MODEL NO: CA9000 PART No: OPERATION & MAINTENANCE INSTRUCTIONS

AquaSaver DISPOSER CONTROL CENTER Installation Manual. Model AS-101K

Supply air unit VEKA Installation & Maintenance

HEDMAN DI-50. Endorser Instructions. Hedman DI-50 Operators Guide

PowerVent. Installation manual (GB) English. Store this document in a safe place UK

USER GUIDE. DRENA 2 - User Manual ELECTRICAL PANEL FOR 2 MOTORS - WASTE WATER -

QUALITY ASSURANCE/QUALITY CONTROL DOCUMENTATION SERIES OPTEC NGN-2 NEPHELOMETER AUDIT PROCEDURES (IMPROVE PROTOCOL) STANDARD OPERATING PROCEDURE

AIRGOCLEAN 10 E OPERATING MANUAL AIR CLEANER TRT-BA-AIRGOCLEAN10E-TC-001-EN

Installation & Operating Instructions. Models: York Midi & Serrano Electric Stoves

Installation Instructions

Operating Instructions

Downdraft Ventilation

HX-80NRAM. High Mount Outdoor Detector

TPI Corporation P.O. BOX 4973 JOHNSON CITY, TN

INSTALLATION INSTRUCTIONS

Operator s Manual S-333. Automated Soil Compactor. Version 3.3. Durham Geo Slope Indicator 2175 West Park Court Stone Mountain, GA USA

XC-18. NOTE: *Machine shown without Lift-Up Safety Guard. This guard is included with machine. Machine should not be operated without this guard.

Owner Instructions Original Instructions Warning! Read instructions before using the machine. LoLine NLL 332 NLL 415

MODEL HS115-3, HS115-4 & HS115-5 WIRING DIAGRAM ADDENDUM

Transcription:

1ZSE 5492-154 en, Rev. 4 On-load tap-changers, type UZ User s manual

Original instruction The information provided in this document is intended to be general and does not cover all possible applications. Any specific application not covered should be referred directly to ABB or its authorized representative. ABB makes no warranty or representation and assumes no liability for the accuracy of the information in this document or for the use of such information. All information in this document is subject to change without notice. This document must not be copied without our written permission, and the contents thereof must not be imparted to a third party nor be used for any unauthorized purpose. Contravention will be prosecuted.

The manufacturer Hereby declares that The products Manufacturer s declaration ABB AB Components SE-771 80 LUDVIKA Sweden comply with the following requirements: On-load tap-changers, types UZE and UZF with motor-drive mechanism, type BUF 3 By design, the machine, considered as a component of a mineral oil filled power transformer, complies with the requirements of Machinery Directive 89/392/EEC (amended 91/368/EEC and 93/44/EEC) and 93/68/EEC (marking) provided that the installation and the electrical connection are correctly realized by the manufacturer of the transformer (e.g. in compliance with our Installation Instructions) and EMC Directive 89/336/EEC regarding the intrinsic characteristics to emission and immunity levels and Low Voltage Directive 73/23/EEC (modified by Directive 93/68/EEC) concerning the built-in motor and apparatus in the control circuits. Certificate of Incorporation: The machines above must not be put into service until the machinery into which they have been incorporated has been declared in conformity with the Machinery Directive. Date 2013-02-15 Signed by... Hans Linder Title Manager Tap-Changers, Local Product Group Unit Components

Introduction The UZ range of on-load tap-changers manufactured by ABB has been developed over many years to provide maximum reliability. The simple and rugged design gives a service life equal to the service life of the transformer. Minimum maintenance is required for trouble-free operation. The only parts requiring maintenance are contacts, that might need replacement during the service life, the insulating oil and the motor-drive mechanism. The design allows ready access to all parts, making inspection and maintenance quick and simple. The on-load tap-changer type UZE/UZF is placed in an oilfilled tank separated from the transformer tank. The motordrive mechanism is attached to the side of the tap-changer tank. Safety warnings The following warnings and notes are used in the manual: indicates an imminently hazardous situation, which if not avoided will result in death or serious injury. This signal word is to be limited to the most extreme situations. also indicates a potentially hazardous situation, which if not avoided could result in death or serious injury. CAUTION CAUTION indicates a potentially hazardous situation, which if not avoided may result in minor or moderate injury. It may also be used to alert of unsafe practices. Safety precautions Personnel operating and inspecting the tap-changer must have good knowledge of the apparatus and must be aware of the risks pointed out in this manual. Personnel making electrical connections in the motordrive mechanism have to be certified. Small amounts of explosive gases might come out from the breathing devices (dehydrating breather or one-way breather). Make sure that no open fire, hot surfaces or sparks occur in the immediate surroundings of the breathing devices. The tap-changer tank is filled with oil. The covers may be opened only by a specialist and after the transformer is taken out of service and the tapchanger is drained. The cover for access to conductors on top of the UZF tank may be opened only after draining the transformer s main tank. CAUTION After a trip from a supervisory device, an inspection must be made by a specialist. The tap-changer must be drained, opened and carefully investigated before the transformer is reenergized. CAUTION may also indicate property-damage-only hazards. 4 User's manual UZ 1ZSE 5492-154 en, Rev. 4

Operation The handcrank must not be inserted during electrical operation. If the tap-changer is not in the exact position and the handcrank is pulled out, the motor-drive mechanism will start and go to the exact position if the power supply is on. If a failure in power supply occurs during operation, the operation will be completed when the power returns. The position indicator shows the actual tap-position. The draghands show the max. and min. tap-position between which the tap-changer has been working since last resetting. The tap-change in progress indicator shows RED during operation and WHITE when the tap-changer is in position. For resetting of the emergency stop, turn the knob clockwise. The LOCAL/REMOTE switch. In position LOCAL the tapchanger can be operated by the RAISE/LOWER switch. In position LOCAL remote operation is rendered impossible. In position REMOTE the tap-changer is operated from the control room or by a voltage regulator. Local operation is not possible in remote position. Thermostat for extra heater (option). We recommend a setting at +5 C. Hygrostat for extra heater (option). We recommend a setting at approximately 60 %. Outlet (option) with earth fault protector. Normally the tap-changer is controlled by a voltage regulator and no manual operation of the tap-changer and the motordrive mechanism is needed. Maintenance schedule CAUTION To maintain the high reliability of the tap-changer it is important that the inspections and the overhauls be carried out at the interval stated on the rating plate. Maintenance of the tap-changer consists of three major steps: Inspection to be carried out by site personal once a year (see below) Overhaul to be carried out by a specialist at intervals stated on the rating plate Contact replacement to be carried out by a specialist. The possible need for replacement is decided during overhaul. A specialist is a service engineer from ABB or an authorized person trained by ABB for maintenance work on UZ tapchangers. In case of a failure in power supply for the motor-drive mechanism, it is possible to handcrank the tap-changer. Put the handcrank on the shaft. Crank in the desired direction as per the information plate above the shaft. 20 turns for a complete operation. Continue cranking until the tap-change in progress indicator shows white. When the handcrank is inserted, all electrical operations are rendered impossible. 1ZSE 5492-154 en, Rev. 4 User's manual UZ 5

Inspection CAUTION Approval should be given by the site engineer in charge for inspection as well as for operating the tapchanger. It is recommended to inspect the tap-changer once a year. This principally concerns the motor-drive mechanism and refers to a visual inspection inside the BUF 3 cabinet to check that nothing is loose, and that the heater is functioning. In the motor-drive mechanism a counter registers every tapchange operation. During inspection the counter is read and noted. If possible, motor and counter are to be tested by operating one step and then back. If the tap-changer has its own oil conservator, the breather and the oil level indicator on the oil conservator are to be checked according to the instructions from the transformer manufacturer. The inspection is to be carried out while the transformer is in service. On the conservator the following are to be checked: Oil level Breather In the motor-drive mechanism the following items are to be checked: Motor and counter Emergency stop Heater Earth fault protector for the outlet (option) If the tap-changer is equipped with an oil filter unit, the pressure drop over the filter is to be checked. Required tools The following eq uipment is required for the inspection: Set of screwdrivers Pen and note pad Procedure Checking of the breather and the oil level must be carried out from ground level since the transformer is energized. 1. Checking of the breather The breathers and the tube from the conservator might contain explosive gases. No open fire, hot surfaces or sparks may be present when removing the breather. If the oil conservator has a dehydrating breather, and more than half of the drying agent has changed colour, it must be dried or replaced. For drying see below. The drying agent normally starts to change colour from the bottom of the breather. If it has changed colour at the top, there is a leakage in the connections to the conservator. Locate the leakage and seal it. If the breather has an oil trap, check the oil level. To replace the drying agent, proceed as follows: Dismantle the breather and empty the agent. Replace with new drying agent. Alternatively, dry the old agent by placing it on a net and putting it in an oven, temperature approximately +100 o C (+212 o F), until it changes colour again. Fill the breather with drying agent. Clean the threads and apply sealing tape. Remount the breather. 2. Checking of the oil level At +20 C (68 F), oil is filled to the level where the pointer of the oil level indicator points half-way between MIN. and MAX. For other temperatures than +20 C (68 F), proceed as follows: For every 10 C (18 F) increase in temperature, adjust the oil level upwards a tenth of the scale range of the oil level indicator. For every 10 C (18 F) decrease in temperature, adjust the oil level downwards a tenth of the scale range of the oil level indicator. 6 User's manual UZ 1ZSE 5492-154 en, Rev. 4

3. Checking of the motor and the counter Open the motor-drive cabinet door and turn the selectorswitch to the LOCAL position. Then turn the control switch to the RAISE (LOWER) position. Check that the motor works properly, the position indicator increases (decreases) one step, and the counter advances one step for each operation. Record the counter s value. The counter shows the number of operations run by the tapchanger (the overhaul schedule can be determined with the help of this information). Turn the control switch to the LOWER (RAISE) position. Check that the motor also works properly in that direction, the position indicator decreases (increases) one step and the counter advances one step more. Reset the draghands. 4. Checking of the emergency stop Give a RAISE or LOWER impulse and after about one second press the emergency stop. The operation should be interrupted. Reset the emergency stop by turning the knob clockwise and set the protective motorswitch to ON. The started operation should now be completed. Operate back to service position. 5. Checking of the earth fault protector (option) If the motor-drive mechanism is equipped with an outlet, the earth fault protector should be tested by pressing the test knob on the outlet. 6. Checking of the heater Before starting any work inside the motor-drive mechanism the auxiliary power must be switched off. N. B. The motor, contactors and heating element may be energized from separate sources. Disconnect the incoming auxiliary power. Check by feeling with a finger on the protection plate that the heater has been functioning. Reconnect the incoming auxiliary power. Complete the inspection by turning the selector-switch to the REMOTE position and closing the cabinet door. 7. Checking of the oil filter unit (option) If the tap-changer is equipped with an oil filter unit from ABB: Read the pressure gauge. Note the reading so the change from year to year can be seen. If the pressure is 2.0 bar or more, or close to 2.0 bar, the filter insert should be replaced. If moisture is suspected to have come into the tap-changer compartment, the filter insert should be replaced. If a filter insert replacement is needed, call a specialist. Also check for leakages. All leakages should be repaired! 1ZSE 5492-154 en, Rev. 4 User's manual UZ 7

8 1 2 3 9 4 10 11 12 5 6 13 14 7 Layout of on-load tap-changer, typ UZ (UZF shown). 1. Connection to oil conservator 2. Cover for access to conductors, UZF only 3. Attachment flange to transformer tank 4. Terminals for conductors 5. Pressure relay 6. Oil valve 7. On-load tap-changer tank 8. Lifting eye 9. Front cover 10. Moulding 11. Change-over selector 12. Fixed contact 13. Moving contact system 14. Transition resistor 8 User's manual UZ 1ZSE 5492-154 en, Rev. 4

1 11 2 12 3 13 4 14 5 15 6 16 7 17 18 8 19 9 20 10 21 22 Cabinet layout of motor-drive mechanism, type BUF3. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Protective motor switch Locking device prepared for padlock Air vent Draghand for min. position Position indicator Draghand for max. position Counter Lamp (25 W socket E14) Shaft for handcrank Emergency stop Tap-change in progress indicator (Red = in progress, White = in position) 12. Heater 50 W (+ Option 250 W) 13. (Option) Outlet with earth fault protector 14. (Option) Thermostat or hygrostat for extra heater 250 W 15. Terminal blocks 16. RAISE/LOWER switch 17. LOCAL/REMOTE switch (Remote position for automatic operation) 18. (Option) Switch for extra heater 19. Serial number 20. Door-operated switch for lamp 21. Handcrank 22. Descriptions and circuit diagram 1ZSE 5492-154 en, Rev. 4 User's manual UZ 9

Contact us ABB AB Components SE-771 80 Ludvika, Sweden Phone: +46 240 78 20 00 Fax: +46 240 121 57 E-Mail: sales@se.abb.com www.abb.com/electricalcomponents Copyright 2013 ABB, All rights reserved. 1ZSE 5492-154 en, Rev. 4, 2013-04-15