Stormwater Management/Bioswale Design. A Forest Preserve District of Cook County/Illinois Tollway Cooperative Solution

Similar documents
2016 Vegetation Monitoring Report ERA Project # Prepared for: Downers Grove Park District

Figure 1. Bioswale along roadside. Photo courtesy of CalTrans. Figure 2. Diagram of typical bioswale (adapted from UDFCD 1999)

4.6. Low Impact and Retentive Grading

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Kearney Post-Construction Stormwater Program

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

WQ-07 INFILTRATION TRENCH

2001 Southeastern Pennsylvania Stormwater Management Symposium Villanova University. Jean K. Akers

The following general requirements will be met for all planter box installations:

City of Chesterfield Nuisance Ordinance. Weeds!

Section 3 Non-Structural BMPs

5.0 Storm Water Landscape Guidance Introduction

Use of Best Management Practices

DEALING WITH STORM WATER MANAGEMENT

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Town of Essex Small Site Erosion Control Guide

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Rain Gardens. A Welcome Addition to Your Landscape

Bioswales: A Guide to Low-Impact Development Design and Maintenance. Introduction and Compilation by: Leslie D. Bartsch And Jennifer S.

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Post Construction BMPs

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Draft Rhode Island Stormwater Design and Installation Standards Manual

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Detention /Urban Disturbed Wetlands 2013

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Vegetated Filter Strips and Buffers

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

Inspection and Maintenance of Stormwater Best Management Practices

Vegetated Filter Strips and Buffers

Soil Erosion and Sediment Control

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

STORMWATER MANAGEMENT CRITERIA APPENDIX D: STORMWATER MANAGEMENT POND DESIGN GUIDANCE D. i APPENDIX D 1 STORMWATER MANAGEMENT POND PLANTING GUIDELINES

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M)

Lesson 2: Stormwater Best Management Practices (BMPs)

2.1.4 Roof Downspout Rain Gardens

Leduc Industrial Outline Plan SE W4

Municipal Guide to. Storm Water Management Techniques

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

ACTIVITY: Tree Preservation & Maintenance TP 01

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

BIORETENTION FACILITY

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Biosolids Compost Informational Handout

Best Management Practice Fact Sheet 9: Bioretention. This fact sheet is one of a 15-part series on urban stormwater management practices.

Low Impact Development (LID) and Bioretention Techniques

Alternative Stormwater Management Practice RAIN GARDENS

Tips for Maintaining and Enhancing Stormwater Management Areas

Low Impact Development in Northern Nevada: Bioretention

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

2. IF CHANGES ARE TO BE MADE TO SEED MIX BASED ON SITE CONDITIONS THEN APPROVAL MUST BE PROVIDED BY CITY ENVIRONMENTAL PLANNER.

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

John B. Taft Connie Carroll-Cunningham Hannah L. Grant. INHS Technical Report 2014 (05)

ME DOT Route 3. File No.: City and State: Bar Harbor, ME

Storm Water Technology Fact Sheet Vegetated Swales

Vegetated Buffer Strip

4. Contractor (and subcontractors if applicable) certification statement(s)

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Reclamation Success Best Management Practices. Pinedale Field Office. Joseph Debebe PhD. Natural Resource Specialist PFO 04/30/2014

NEIGHBORHOOD WATER RESOURCES ENHANCEMENT GRANT OPPORTUNITIES

John F. Kennedy STEM High School Green Infrastructure Information Sheet

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

The Benefits and Challenges Associated with Green Infrastructure Practices

Chapter 4 - Preparation of Stormwater Site Plans

Severn River Sub-Watershed: BMP 09-Retrofit

FACT SHEET: Pervious Pavement with Infiltration

Kittson Parkway / Watershed Park Parking Lot

Biosolids Compost Informational Handout

The proper use of erosion and sediment controls will allow the following objectives to be met:

Low Impact Development in the Transportation Environment: Lessons Learned in North Carolina

When planning stormwater management facilities, the following principles shall be applied where possible.

Best Management Practices

Soil Health Practices in the Landscape

LANDSCAPE AND IRRIGATION REGULATIONS FOR THE CITY OF SAN MARINO

STREAM BUFFER PROTECTION AND MANAGEMENT

City of Sun Prairie Wetland Buffer Reduction Request

23.0 Green Roof STORMWATER MANAGEMENT SUITABILITY KEY CONSIDERATIONS

C-12. Dry Pond. Design Objective

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE

VA DCR STORMWATER DESIGN SPECIFICATION NO. 11 WET SWALE. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION

APPENDIX E DESIGN CRITERIA FOR POST-CONSTRUCTION WATER QUALITY BMPS

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

SECTION 6. Routine Maintenance Activity Details

Pollutant Removal Benefits

Transcription:

Stormwater Management/Bioswale Design A Forest Preserve District of Cook County/Illinois Tollway Cooperative Solution

Today s Challenge: Implement Stormwater BMPs for linear projects, i.e. roads and streets

Ownership of U.S. Highways, 2002 Organization % of Total Miles State Highway Agencies 19.5 County 44.7 Town/City 31.0 Other 1.7 Federal Agency 3.0 Total 100

BMP Examples Infiltration Trenches Infiltration Basins Bioswales Grass Filter

Infiltration Trenches

Infiltration Basin

Grass Lined Swale

What is a bioswale? How is it different from a ditch?

Ditches Collect and transport water away from site as quickly as possible.

Bioswale is different by design and function Transport water at reduced velocity Designed to reduce pollutants Infiltration Biological conversion Vegetative uptake Natural flocculation

Bioswale Benefits Improved vegetation native vs. exotic Enhanced water quality through infiltration Reduced Runoff Velocity Aesthetics

Examples of Bioswales Illinois Tollway 294 North - Proposed Prairie Parkway - Proposed Miller Brewing Milwaukee - Existing

I-294 Bioswales - Illinois Tollway Stakeholders -Illinois Tollway -Forest Preserve District of Cook County (FPDCC) -Friends of the Forest Preserve -Openlands Project -Friends of the Parks -Cook County Board -USACOE -US Fish & Wildlife Service -Illinois Department of Natural Resources -Illinois Natural History Survey

I-294 Bioswales - Illinois Tollway Stormwater runoff issues Roadway Pollutants FPDCC Concerns of Roadway Runoff -directly onto their sites. IDNR Water Quality Concerns for Streams Reduce Runoff Vegetative Diversity

I-294 Bioswales - Illinois Tollway Site Visit

I-294 Bioswales - Illinois Tollway Site Visit

Concept Length, ft A 6,100 B 3,600 C 3,950 D 4,450 E 6,600 F 1,350 G 1,400 H 3,550 Total 31,000 Bioswale Summary

Plant List Bioswales Species Salinity tolerance Siltation Tolerance Notes Agropyron elongatum High No data Alisma subcordatum Moderate High Aster lanceolatus Moderate High Bidens cernua Low to moderate Moderate to high Bidens frondosa Moderate to high High * species currently being engineered for extreme Bouteloua hirsuta* High No data salt tolerance Carex stipata Low to moderate Moderate Carex vulpinoidea Low to moderate Moderate Eleocharis obtusa Low to moderate Low Elymus canadensis Moderate No data Elytrigia smithii High No data Helianthus grosseserratus Moderate Moderate Panicum virgatum Moderate Low to moderate Schizachyrium scoparium High No data Scirpus acutus Moderate to high Low to moderate Scirpus americanus High Low to moderate Scirpus fluvatilis Low to moderate High Scirpus tabernaemontani Low to moderate Moderate Spartina pectinata Low to moderate Moderate Verbena hastata Moderate to high Moderate to high Other species of note Eleocharis erythropoda Solidago sempervirens Juncus effusus Trees and Shrubs Acer saccharinum Low Acer pseudoplatanus Low Celtis occidentalis Moderate Low to moderate Cephalanthus occidentalis Moderate to high Moderate Salix amygdaloides Moderate Low to moderate Salix discolor Moderate Low to moderate Slope vegetation/filter strip Tollway Salt Tolerant Seed Mix Alta Fescue Fults Pucinnellia Distans Scaldis Hard Fescue Dawson Red Fescue Perennial Ryegrass

Maintenance of Bioswales Tollway responsible for perpetual maintenance Monitoring data used to develop annual report IGA with Forest Preserve District of Cook County Annual review first 10 years Bi-annual review after 10 years Ensure plan is effective and compatible with adjacent natural resources Maintenance may include: burning, spraying, mowing cycles, mowing methods, seeding, clearing, species management, etc.

Bioswale Monitoring The Tollway retained Illinois State Geological Survey and the University of Illinois to monitor bioswales. The Tollway is coordinating with the FPDCC to evaluate data and modify the BMP as necessary. Baseline (2007/08) monitoring is occurring for groundwater (three monitoring wells) and surface water (two bioswale concept points).

Bioswale Performance Criteria

How to Assess Performance of Bioswale? Pollutant removal? Vegetation? Site Inspection?

Table 1 Average values for constituents of highway runoff (Barret, et al., 1994). Constituent SOLIDS Concentration (mg/l) Total 437 1147 Suspended 45 798 Volatile, suspended 4.3 79 Volatile, total 57 242 METALS Zinc 0.056 0.929 Cadmium 0.0 0.04 Nickel 0.053 Copper 0.022 7.033 Iron 2.429 10.3 Lead 0.073 1.78 Chromium 0.00 0.04 Magnesium 1.062 Mercury 3.22 NUTRIENTS Nitrate and Nitrate Nitrogen 0.15 1.636 Total Kjeldahl Nitrogen 0.335 55.0 Total Phosphorus 0.113 0.998 MISCELLANEOUS Chemical Oxygen Demand 14.7 272 Biological Oxygen Demand (5 day) 12.7 37 Oil and Grease 2.7 27

Pollutant Removal Efficiencies California Stormwater Quality Association Evaluation of 10 projects (1981-2002) Grassed channel (conventional) and wet/dry swales Effective in removing: Total suspended solids Metals Oil and grease Organics Effectiveness depends on maintenance Plant material Swale structure/integrity

TYPICAL POLLUTANT EFFICIENCIES OF BIOSWALES (200 ft in length) Parameter Per Cent Removal Total Suspended Solids 83 to 92 Turbidity 65 Lead 67 Copper 46 Total Phosphorus 29 to 80 Total Zinc 63 Oil & Grease 75 Nitrate 39 to 89 Source: State of Oregon DEQ

Alternatives to Pollutant Monitoring 1) Sediment Sampling 2) Biological Sampling 3) Visual Inspections

Vegetation Performance Standards Performance standards The following species should not be the five most dominant plant species in the overall vegetative cover: Teasel Purple loosestrife Non-native thistle Sweet clover Crown vetch Wild parsnip Garlic mustard Ragweed Kentucky bluegrass Buckthorn Sandbar willow Honeysuckle Multiflora rose Box elder Reed canary grass Common reed

Vegetation Performance Standards Acceptable species native to the region and not invasive as identified in the Native Plant Guide shall provide at least two-thirds of the coverage. The goals for permanent species planted in seed form: 25 per cent in the second growing season surviving 50 per cent in the third growing season surviving long term goal would be to sustain 50 per cent of the permanent species. The goals for species planted as plugs, root stock, and tubers will be: 50 per cent of the individuals planted surviving 50 per cent of the species planted would survive the first growing season all subsequent growing seasons, 50 per cent of the planted plugs, root stock, and tubers species will persist in the second growing season.

Vegetation Monitoring Vegetation sampling will occur at each bioswale during the prescribed monitoring period: sampling will be conducted in one-meter square quadrats focus of the vegetation component sampling will be on overall plant density achieve at least 90% or better coverage density in the quadrats During the first two years of operation, the site will be inspected monthly with the exception of winter primarily to assess the vegetative component of the bioswales. To minimize weedy growth, high mowing of the vegetation will occur. After two years it is anticipated that the desired plant community will be established.

Vegetation Maintenance Sections that do not meet the performance standards will be re-seeded. Areas that were planted with plugs or tubers will have additional plugs or tubers installed when performance standards are not met. When invasive herbaceous plants are observed in the bioswale in exceedance of the performance standards they will be herbicided. Mowing will occur only in the first two years while the desired plant community becomes established.

Vegetation Maintenance If soil ph falls below 6, lime will be spread to raise the soil ph. After the establishment of the native plant community in the bioswale, periodic burning will be conducted on a three year cycle to reduce the spread of invasive species. Burning will be limited to the native plant community. The roadway embankment, planted with Tollway salt tolerant species, will not be burned due to this community s lack of tolerance of fire. Prescribed burning will be conducted by a certified contractor under certain conditions to prevent visibility issues on the highway and to prevent spread into the forested community adjacent to the bioswale.

Visual Inspections Sediment Accumulation Debris Removal Ponding of Water in Swales Slope Stability Areas of Erosion Vegetative Density & Cover

Concerns Presentations to Vegetation Maintenance Stakeholders Controlled burns for vegetation Clean outs/sediment traps Monitoring Illinois Natural History Survey Pollutant Removal Efficiencies Tollway Commitments

Current Monitoring Efforts I-294 under construction Tollway secured Illinois State Geological Survey Four sites with preconstruction monitoring equipment ISGS downloads data every two weeks

Current Monitoring Efforts

Current Monitoring Efforts

Contract Plans and Constructability Issues Designers are currently developing contract plans for the bioswales. The Tollway continues to coordinate with the Forest Preserve staff, to review modifications from the concept plans. The bioswales are scheduled to be constructed in 2010, after mainline construction is completed. Bioswales will replace the temporary sediment/erosion control measures that the Tollway contractors have in place currently. Bioswale design is not meant to handle the sediment loads that are typical for an active construction site.

Contract Plans and Constructability Issues Due to delays in the bioswale/fpdcc agreement, the Tollway designers for the mainline proceeded with roadway contract plans that incorporated stormsewer for some bioswale sections. High embankment with steep slopes requires guardrails and stormsewers are preferred stormwater conveyance for steep sections. Bioswale contract plans will account for stormsewers. Outlets will discharge to bioswales. Scour protection at outfalls. Removal of furrow or pretreatment features on slope in stormsewer sections.

Contract Plans and Constructability Issues Drainage concerns of adjacent wetlands near Portwine Road. Plans must prevent continued draining of wetlands. Limited areas of more porous subsurface materials than anticipated more heavy clays. More areas have existing high water table. As a result, underdrains not proposed for certain sections. Bioswales will act more as raingardens in these sections. Underdrains will not work for the areas near Des Plaines River. Meeting in January with FPDCC to obtain comments on modifications.

Conclusion Bioswales Provide Benefits: - Remove pollutants in stormwater - Enhance ecology of drainage system - Enhance water infiltration jnovak@huffnhuff.com