tokyo Midtown development team tokyo, japan Jury statement

Similar documents
Elements at Kowloon Station

Kashiwa-no-ha Smart City A New Vision for the Cities of Tomorrow

Town Center. Block 5 Existing multifamily residential units are expected to remain.

REGIONAL ACTIVITY CENTER

Splendor Test Tour TEST TOUR SPLENDOR - 08/02/17

Commencement of the Makuhari Bay Towers Project (Tentative Name) Developing a Life Innovation Town with 10,000 Residents

Welcome to Greenwood Village Corporate Capital of Colorado

Visioning Statement and Guiding Principles

ELK GROVE GENERAL PLAN VISION

Subject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

AMITY STATION Revised Concept Plan Review West Rosemary Street Chapel Hill, NC September 27, 2016

Policies and Code Intent Sections Related to Town Center

FROM METRO STATIONS TO GREAT URBAN PLACES

arts, culture & Entertainment district

25 A&B Vreeland Road Florham Park, N.J.

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

New global projects merge work and play

2.0 THE PLATINUM TRIANGLE VISION

CHAPTER 4 COMMUNITY DEVELOPMENT AND DESIGN

Launch of RMB 4.5 Billion Integrated Riverfront Eco-Neighbourhood in Tianjin Eco-City

PRIMARILY RESIDENTIAL DEVELOPMENT PROJECT VISION TOWER 4 TOWER 2 TOWER 1 TOWER 5

Urban Form Case Studies

City Center Neighborhood Plan

Developer s Program. The Station at East 54

DALY CITY VISIONING PROCESS COMMUNITY WORKSHOP 3 MAY 8, 2008

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

Advance Engineering & Surveying PLLC

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

CITY OF RENO APRIL Progressive Urban Management Associates (P.U.M.A.) in association with. Economic and Planning Systems (EPS)

DSUF. Activities of the Digital Signage User s Forum. December 13, 2012 DSUF Secretariat

Market Demand and Land Use

A community focused on developing a strong foundation with sustainable achievements. Special Acknowledgements: S. Robert Kaufman (Capstone Mentor),

SUMMERSIDE / MT. CARMEL REINVESTMENT CORRIDOR COMMUNITY DEVELOPMENT STRATEGY

The Master Plan Framework

Walnut Creek BART Station

PALOMAR COLLEGE LEARNING RESOURCE CENTER

PROGRAMMING & PUBLIC INVOLVEMENT

OF SOUTHWEST ECODISTIRCT

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

SAN FRANCISCO. and. A Sampling of Installations in San Francisco, California

PARKWAY FOREST RE-URBANIZATION: EMERALD CITY

5.2 LAND USE AND ZONING

St. Louis Park Wooddale LRT Station Site development guidelines

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

PROJECT NARRATIVE STATEMENT OF JUSTIFICATION. Special Use Permit Modification Application

Prince George s County Economic Development Corporation David Iannucci President & CEO

Town Center (part of the Comprehensive Plan)

Downtown Development District. Creative Class Market Research

Living in Albemarle County s Urban Places

THE ASHLAND OVERVIEW. FXCollaborative SPAN Architecture WSP USA ICOR Associates Site/Civil Geotechnical Environmental Surveying/Geospatial

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Small Area Plan. South Gateway

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

Union Station Master Plan Task 3 Update

Former Keighley College Buildings, North Street

Animals Care About Great Design, Too

Alchemy Properties Kenneth Horn Talks City Hall Park s Evolution, Converting The Woolworth, And More

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Beaverton City Council: Work Session. SIDEDistrict. May 6, 2014

REPORT BACK BROADSHEET 3 May 2016

Silverdale Regional Center

3575 Ringsby Ct. taxibyzeppelin.com NOW PRE-LEASING

6 May 14, 2014 Public Hearing

The "Town Center" Model of Suburban Placemaking: Opportunities and Challenges

José Campos Manager of Planning and Design Review SPUR San José Symposium October 12, 2018

WEB TOUR FOR URBAN GREEN PARTNERS

PLANNING ADVISORY BOARD AGENDA OCTOBER

PROJECT SPOTLIGHT TOUR: LANGAN LEADER FEBRUARY 2018

A. WHAT IS A GENERAL PLAN?

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

Grand Opening of MEDIA SHIP Omotesando Hills on February 11 The Ship of Cultural Information Transmission to set sail for the future from Omotesando

Murphy Crossing Site Redevelopment Community Engagement Meeting September 19, 2016

BRYN MAWR. Tier 2 Characteristics: Location: Lancaster Avenue from Old Lancaster Road on the east to Norwood Avenue on the west

Bayshore Boulevard Home Improvement District Design Guidelines

East Central Area Plan

EXISTING COMPREHENSIVE PLAN

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Sustainably Repositioning Greyfield Sites. Greyfield Sites Anywhere

This Review Is Divided Into Two Phases:

WEST OAKLAND SPECIFIC PLAN Final Plan. 2. Vision & Goals. 2.1 Community-Based Goals and Objectives

Figure 1- Site Plan Concept

CITYWIDE PLANNING DIVISION

East Central Area Plan

greenprint midtown SUSTAINABILITY ACTION PLAN 2012

Contemporary. Nature

Existing Conditions Assessment. August 18, 2016

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

Chapter SAR, SENSITIVE AREA RESORT ZONE

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Hopkins. Development Guidelines May Overview. Sponsored by: Blake Road Corridor Collaborative City of Hopkins

Somers Point Master Plan

MALL REVITALIZATION CASE STUDIES

Cities are built for movement

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

The Introduction Process of the Program for Revitalizing Privately Owned Public Spaces Aiming at Neighborhood Vitalization

THE COUTURE AT A GLANCE $122 MILLION TOTAL PROJECT COST 44 STORIES / 700,000 SQUARE FEET PUBLIC PLAZAS, PARK & PEDESTRIAN BRIDGES 302 MARKET RATE

CITY OF UNION CITY MINUTES GENERAL PLAN ADVISORY COMMITTEE

2.18 MU Mixed Use District.

Transcription:

Awards04Mixed.indd 96 7/28/08 12:48:13 PM

mixed use winner tokyo Midtown tokyo, japan development team Owner/Developer Mitsui Fudosan Group www.mitsuifudosan.co.jp Tokyo Midtown is an urban infill project on the 6.9-hectare (17-ac) former headquarters site of the Defense Agency, a cabinet-level ministry of the Japanese government, in the Roppongi district of the capital city. The project includes a 248-meter (814-ft) skyscraper surrounded by five buildings with luxury apartments, high-end retail space, 311,176 square meters (3.35 million sf) of office space, and a world-class medical facility. The 564,000 square meters (6.07 million sf) of floor area is concentrated in one quadrant of the site, leaving over 40 percent of the project area reserved for an expansive, urban park that links to the community greenbelt. The project area has housed a variety of former uses: a Japanese army garrison, residences for the post World War II occupation forces, and most recently, the headquarters of Japan s Defense Agency. Master Architect Skidmore, Owings & Merrill, LLP New York, New York www.som.com Architect of Record Nikken Sekkei Ltd www.nikken.co.jp Landscape Architect EDAW San Francisco, California www.edaw.com Associate Architects Tadao Ando Architects & Associates Osaka, Japan Jun Aoki & Associates www.aokijun.com Communication Arts, Inc. Boulder, Colorado www.commarts-boulder.com Jury statement Tokyo Midtown represents a strategy by one developer to shift public perception of the Roppongi district from its reputation as a nighttime destination to an updated view one that makes the area as vital during the day as it is at night. The mixed-use development is integrated with, and doubles the area of, a public park to create an environmentally sensitive and commercially active attraction that serves the entire neighborhood and adds economic value to nearby properties. Kengo Kuma & Associates www.kkaa.co.jp Sakakura Associates www.sakakura.co.jp Mixed use 97 Awards04Mixed.indd 97 7/28/08 12:48:17 PM

98 Awards04Mixed.indd 98 7/28/08 12:48:23 PM

When the ministry relocated from Roppongi, it opened a continuous urban site for development in a city center where available land is scarce. The Roppongi area has long been considered a night town favored by expatriates, better known as a free-wheeling entertainment hub than as a traditional neighborhood. Recent mixed-use developments in the area have begun to change that perception, and Tokyo Midtown aspires to permanently transform the district s image into a balanced mix of businesses and homes, with an emphasis on cultural amenities. In fact, the relocation of the famed Suntory Museum of Art to the site completes the Roppongi art triangle, with the nearby Tokyo National Art Center and Roppongi Hills Mori Arts Center. In 2001, when developer Mitsui Fudosan began the project, Japan was in a recession. The development team envisioned Tokyo Midtown as an emblem of a resurgent Japanese economy and sought to collect the best characteristics of Japanese society and display them in a single mixed-use development. The national government designated the Roppongi area as a priority urban redevelopment area, which positioned the project to receive subsidies of approximately 2 billion (US$18.5 million) over four years for public improvements. The grant was applied to the construction of an underground passageway 470 meters (1,542 ft) long, which links the site to the neighborhood subway station. The master plans were created collaboratively among the developer; Skidmore, Owings & Merrill as master architect; Nikken Sekkei as the project architect; and EDAW as the master landscape architect. The design team achieved a harmonious balance between dense, vertical development and ample outdoor areas by clustering all the buildings on the southeast portion of the site. Doing so reserved four continuous hectares (9.9 ac) of green space or over 40 percent of the project area which was bolstered by the integration and refinement of an adjacent public park. The project s large community park also links to an existing greenbelt that connects the project area to abundant neighboring green space, including the grounds of a Tokyo government cemetery and a Shinto religious shrine. Rather than raze the entire site, the design team carefully removed and transplanted 140 mature cherry and camphor trees located on the original Defense Agency grounds. Mixed use 99 Awards04Mixed.indd 99 7/28/08 12:48:28 PM

Website www.tokyo-midtown.com Site Area 6.9 ha (17 ac) Facilities 311,176 m 2 (3.35 million sf) ofice 70,993 m 2 (764,162 sf) retail 517 multifamily units 248 hotel rooms 1,226 parking spaces Land Uses ofice, retail, restaurant, hotel, entertainment, museum, medical, parks/open space Start/Completion Dates February 2004 March 2007 ProJect data At a height of 248 meters (814 ft), Midtown Tower the second-tallest building in Tokyo soars from the center of the building podium. The Ritz-Carlton Tokyo occupies the top nine and bottom three floors of the skyscraper and includes 248 guest rooms. Two smaller towers for the Konami corporation and Fuji Film stand at the base of the Midtown Tower, in a formation inspired by a traditional Japanese rock garden. The Galleria, an expansive four-story shopping arcade, is the main retail center at Tokyo Midtown. The enclosed space, 150 meters (492 ft) long and 25 meters (82 ft) high, features more than 130 stores, including a 24-hour high-end grocery. More than 517 multifamily units are housed in a single tower with a landscaped roof, and the project includes a world-class medical facility for the community a product of an international partnership with Johns Hopkins Medicine International. Tokyo Midtown features a number of environmentally friendly designs: landscaped building roofs minimize stormwater runoff, photovoltaic arrays provide a renewable energy source, recycled rainwater is used for landscaping, sodium-sulfur batteries store late-night electricity to stabilize power use at peak demand, and the building façades use sunlight-triggered window blinds. The project introduces a regional heating and cooling system to the district, which includes the recovery of waste heat created during gas-fired power generation. The vast green space not only provides recreational opportunities for residents and workers, but also reduces the heat island effect associated with most concrete-laden urban developments. A postconstruction survey revealed the surface temperature is three degrees Celsius (5.4 degrees F) lower than surrounding areas during the summer. 100 Awards04Mixed.indd 100 7/28/08 12:48:31 PM

Tokyo Midtown has become a new center of activity in the Roppongi neighborhood, with 28 million people visiting in the first nine months. Retailers are expected to post 30 billion (US$278 million) in annual sales; the initial forecast was 25 billion (US$232 million). The public approval process and construction time frame took less time than anticipated, allowing the project to open a year ahead of schedule. The early opening led to additional rental revenues of approximately 30 billion (US$278 million) in the project s first year. site Plan PhotogrAPhS by EDAw/DAvID lloyd (96, 98tl, 99l); MItSUI FUDoSAn group (97, 98bl, 98r, 100, 101r); ShInkEnChIkU-ShA (99r); EDAw (101l) Mixed use 101 Awards04Mixed.indd 101 7/28/08 12:48:34 PM