For technical questions, contact: Grace Engineered Products Inc./ 5001 Tremont Ave, Davenport, IA /

Similar documents
INSTALLATION AND OPERATING INSTRUCTIONS R-3F2-LXX

Fire Alarm System Accessories

INSTRUCTION & SERVICE MANUAL

Fire Alarm System Accessories

Electron Microscopy Sciences

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 07/16/08 TSEWG TP-8: ELECTRICAL EQUIPMENT ENCLOSURES AND HAZARDOUS LOCATIONS

standards: standards:

NGD8800 USER S MANUAL

Introduction to Hazardous Electrical Location Classifications

Series. Access Power Controllers. Installation Guide

Product Bulletin. VeriSafe Absence of Voltage Tester. The Safe Way to Verify the Absence of Voltage.

INSTRUCTION MANUAL. D2xB1XH1 & D2xB1XH2 Xenon Beacons For use in Hazardous Locations

Combustible Gas Detection and Control System

Sioux EN-Series. All-Electric Extra Heavy Duty Industrial Steam Cleaners and Pressure Washers

Digital Gas Transmitters with Auxiliary Inputs & Control. PolyGard 2 DC6

Product Bulletin. VeriSafe Absence of Voltage Tester. The Safe Way to Verify the Absence of Voltage.

Easy to use, initiate test with the push of a button No additional tools required Provides visual alert to abnormal power conditions

Type SP87300 SAFE-T SHP9 Explosion Proof Stirring Hot Plate

INSTRUCTION MANUAL IS-mB1 Minialite Intrinsically Safe Round LED Beacon

Brasch Hazardous Location Unit Heaters

SP-1000X. Panic Device Power Controller Installation Guide. Rev

Hazardous area descriptions

SBS-H2 Hydrogen Gas Detector Kit

6-1 Installing Batteries 6-2 Automatic Circuit/Reset Feature 6-3 Feature Sensitivity Adjustment

9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.

Power Supply Display Module PSDM. Installation and Operation Manual

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

RPSMLR2 RPSMLR2BB. Panic Device Power Controller Installation Guide LISTED. Rev

The R. STAHL Technology Group Worldwide Success with Competence and Customer Support

www. ElectricalPartManuals. com GADD MKIII Ground Fault Indication System Instruction Manual Ground Fault Protection

MODELS 304GC, 304GCX, 314GC, and 314GCX

GG-LEL2 COMBUSTIBLE GAS SENSOR. Installation and Operation Manual

Pre-March 2016 Design - Click to be redirected to newer SBS-H2 design SBS-H2. Hydrogen Gas Detector Kit

Beamex Calibration White Paper. Calibration in hazardous areas

MODEL FPT-130 SINGLE POINT FREEZE PROTECTION HEAT TRACE CONTROL

S T R I T T & P R I E B E I N C.

INSTRUCTION MANUAL. E2xB05 & E2xB10 Xenon Beacons For use in Hazardous Locations

SBS-H2. Hydrogen Gas Detector Kit. For battery charging rooms and other areas where hydrogen gas may be present

Operator: Save these instructions for future use!

Designed for testing three-phase circuits up to 600V Install on line or load side of electrical disconnect Detects absence of AC and DC voltage

99 Washington Street Melrose, MA Phone Toll Free Visit us at

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual

INSTRUCTION & SERVICE MANUAL

Installation Guide for models:

III. 99 Washington Street Melrose, MA Phone Toll Free Visit us at OPERATING INSTRUCTIONS

Safe Operation Manual. Honeywell IQ Force Gas Detector

50A Integrated Furnace Control

VSD AND SS DRIVING ATEX MOTORS February 2014

Operating & Maintenance Manual. Alert-4 Ethernet LCD Master Alarm

Check It Panel. 1 Phase Simplex Demand Dose Operation, Maintenance & Installation Manual. Introduction. Safety Guidelines

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev

- 4 12VDC or 24VDC VDC or 24VDC - Eight (8) Fused Outputs - Eight (8) PTC Outputs. Installing Company: Service Rep.

INSTRUCTION & SERVICE MANUAL D1xS1 & D1xS2 ALARM HORNS For Use In Hazardous Locations - Gas

Public Safety DAS Annunciator Panel

TECHNICAL DATA. Humidity: 85% Relative Humidity (non-condensing) at 90 F (32 C) maximum.

Explosion-proof Duct Heaters

Refrigerant Leak Detector

G.O.L.D. GAS OPERATIONS LEAK DETECTION USER MANUAL

MICROpeL 75 Combustible Gas Sensor Part Number: PM

LD910. User Manual. Combustible Gas Leak Detector. Detects all Hydrocarbon and other Combustible Gases. Made in U.S.A. MSHA Approved Intrinsic Safety

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

Certificate of Compliance

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Operator: Save these instructions for future use!

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Operator: Save these instructions for future use!

Certificate of Compliance

SENSIT HXG-2. Instruction Manual For use with combustible gases Gas Leak Detector

GS100M Gas Detection Controller

CAUTION WARNING. 50T Integrated Furnace Control INSTALLATION INSTRUCTIONS DESCRIPTION PRECAUTIONS

SERIES VAC Microprocessor-Based Direct Spark Ignition Control with Inducer Blower Relay FEATURES APPLICATIONS SPECIFICATIONS DESCRIPTION

Installation Guide for models:

Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual

VeriSafe Absence of Voltage Tester The safe way to verify the absence of voltage

Beamex. Calibration White Paper. Calibration in hazardous areas

INSTRUCTION MANUAL. D1xB2XH1 Xenon Beacon For use in Hazardous Locations. 2) Rating & Marking Information

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

Operator: Save these instructions for future use!

INSTRUCTION MANUAL. D1xB2XH2 Xenon Beacon For use in Hazardous Locations. 2) Rating & Marking Information

PART 4 ELECTRICAL STANDARDS

Guide for hazardous areas

Surge Protective Devices Installation, Operation and Maintenance Manual. LowProfile Series: 080 and 120

ELECTRONIC FLAME SUPERVISION MULTI-BURNER

Multi-Output Access Control Power Supply Charger VDC or 24VDC VDC or 3 24VDC.

Relays for use in hazardous locations. Class I, Division 2 and ATEX

CNA-Series - Large Industrial Heaters Tankless Water Heating Solutions

Hydrocarbon Gas Detector

MODELS ASHP, ASHH, ASUP, and ASUH

Products Solutions Services CT287. Hazardous Area Classifications and Protection Systems

SEC Millenium Hydrocarbon Gas Detector

Certificate of Compliance

Chromalox. Installation, Operation. Screw Plug Heating Solution Control Panel Assembly for Screw Plug Heaters RENEWAL PARTS IDENTIFICATION

Installation Instructions for W2H Series Signals

BSF4-AH80. Flameproof Type Light Curtain Type 4. Globally-compliant flameproof structure. Ample protective height 1,595 mm 62.

Discontinued. SN Series - Safety Shower Heaters Tankless Water Heating Solutions. Standard Equipment. Construction. Code Compliance and Certifications

Getting Started Quick Reference Guide

GASGUARD H2S EXP. Hydrogen Sulfide Sensor OPERATING & INSTALLATION MANUAL

Keltech SNA-Series - Safety Shower Heaters Tankless Water Heating Solutions

Explosion-protected actuator Page 259 of 292

OPERATION & MAINTENANCE MANUAL

Transcription:

For technical questions, contact: Grace Engineered Products Inc./ 5001 Tremont Ave, Davenport, IA 52807 / 800.280.9517 563.386.9639 (Fax) INSTALLATION AND OPERATING INSTRUCTIONS R-3W2 UL APPROVED FOR: CLASS I, DIVISION 2 HAZ LOC CE, CAT III & IV www.pesd.com

BE SURE POWER IS SHUT OFF PRIOR TO INSTALLING THIS DEVICE! SAFESIDE VOLTAGE INDICATOR R-3W2 UL NEC CLASS I, DIVISION 2 Patented AUXILIARY DEVICE SUITABLE FOR USE IN CLASS I, DIVISION 2 (or ZONE 2), GROUPS A, B, C, D HAZARDOUS LOCATIONS, or NONHAZARDOUS LOCATIONS ONLY Class I Groups: A (acetylene), B (hydrogen), C (ethyl-ether vapors, ethylene or cyclopropane), D (gasoline, hexane, naptha, benzene, butane, propane, alcohol, acetone, benzol, lacquer solvent vapors, or natural gas) Division 2 : Ignitable concentrations of gases, vapors, or liquids are not likely present under normal operating conditions Haz Loc Normal Atmospheric Conditions: a) -25 C to +40 C ambient b) 21% Max. Oxygen concentration per volume c) barometric pressure range of 80 kpa (0.8 bar) to 110 kpa (1.1 bar) EXPLOSION HAZARD DO NOT DISCONNECT EQUIPMENT WHILE THE CIRCUIT IS LIVE OR UNLESS THE AREA IS KNOWN TO BE FREE OF IGNITABLE CONCENTRATIONS. R-3W2 Page 1 of 12

Approvals: UL LISTED file No. E334957 Per ISA 12.12.01-2007 CAT FILE No. E311256 per UL61010-1, 2 ND Edition CAN/CSA-C22.2 No. 61010-1, 2 ND Edition CAT III 1000V CAT IV 600V DC or AC-rms to Ground (Peak Impulse Transient 8000V 20 repetitions, 2 ohm source) UL TYPE 4X TYPE 12 TYPE 13 IND. CONT. EQ. HAZ. LOC. 42RV 46RD Specifications: - Double Insulation Symbol Input: AC SINGLE OR 3-PHASE: 40 to 600V, *50/*60/400 Hz *UL approval DC OR STORED ENERGY: 30 to 1000V, (Voltages Line-to-Line or Line-to-Ground) Maximum Rating: 750V or 1000V @ 1.2 Watts, Operating Ambient Air of 55 C Max. Detection Thresholds: 29V, 40V, 27V (typical cut-off) Temperatures Operate: Storage: Terminations: -20 C to +55 C, Code T5-45 C to +85 C (4) 8 ft, 18 AWG, 90 C @ 1000V, UL-1452 PVC insulation w/ nylon jacket L1- L3: Black w/ bar identification (Fig. 1) GND: Green w/ Yellow stripe Fig. 1 Housing: O-Ring Seal: Indicators: Black Noryl, totally encapsulated including LEDs for environment protection Blue VFMQ Florosilicone, UL approved material (8) Red Super Bright LED s EXPLOSION HAZARD SUBSTITUTION OF ANY COMPONENT MAY IMPAIR SUITABILITY FOR CLASS I, DIVISION 2 R-3W2 Page 2 of 12

INSTALLATION AND OPERATING INSTRUCTIONS: 1. Design, wiring, and service of equipment for Hazardous Locations should only be preformed by qualified personnel familiar with local, state, and related national codes including National Electrical Code (NEC) articles 500, 505 & 506. 2. To meet UL TYPE 12, 13, or 4X sealing requirements, mount on a flat surface of an enclosure qualifying for a respective TYPE or NEMA rating or equivalent elevated ambient rating. 3. Locate the unit in visual proximity to the control panel ON/OFF disconnect and within wiring distance to incoming Main Lines and Earth Ground. Verify there is no interference with the free operation of the ON/OFF disconnect mechanism. 4. (a) For Standard Mount, refer to knock-out pattern below and Control Drawing No. 196 for assembly. (b) For Low Profile Mount with R-3W2-KB kit, refer to knock-out pattern below and Control Drawing No. 198 for assembly. Standard Knockout Low Profile Knockout *These labels install around the R-3W2 with no affect on its UL certification. The lables are not UL approved. R-3W2 Page 3 of 12

5. For Delta configured power, connect the 1 bar, 2 bar & 3 bar black wires to L1, L2, & L3 respectively (Fig. 1) on the fused or disconnect side of the 3-Phase line voltage. The Green/Yellow stripe (Grn/Yel) wire MUST be connected to Earth Ground. (Fig. 3) 6. Wye configured power with grounded Neutral is connected the same as for Delta in step 5. The Grn/Yel wire DOES NOT connect to the neutral but to non-current carrying Earth Ground. Caution: The neutral will not be monitored for voltage by the Detector, only Phase-to-Phase and Phase-to-Ground voltage will be detected. To include neutral monitoring go to step 7. 7. Ungrounded or high resistance Wye configured power requires (2) additional units to include all possible voltages the Neutral line introduces. Wire as shown in Figure 2. 8. Verifying Proper Operation: First disconnect all equipment that may introduce a hazard and notify personnel before powering the panel! (a) TURN POWER ON. With normal voltage applied, the L1, L2, and L3 indicator pairs will flash at rates according to the applied voltage (See table below). INDICATOR FLASH RATES (L1, L2, L3, GND) 3 LINE-TO-LINE (VAC) <29 30 120 240 480 600 750 ~ FLASHES / SEC (TYPICAL) 0 1.3 4.2 5.8 7.3 8.0 8.8 OR STORED ENERGY (VDC) FLASHES/SEC (TYPICAL) <27 30 48 110 300 600 1000 0 1.6 2.5 4.5 6.9 8.8 9.1 R-3W2 Page 4 of 12

(Step 8 continued) (b) GND Indicator Pair Operation: For isolated Delta or 3-Phase WYE applications, it is normal for the GND indicator pairs not to flash unless a phase is lost producing an unbalanced condition. This peculiarity results when the Phase-to-Phase voltages are balanced resulting in no current to a Neutral connection. The R-3W2 indicators are current driven; therefore, no net current in the R-3W2 ground line (connected to Neutral) will cause the GND indicators to not flash. A leakage resistance path from any phase-to-ground from 2-7 Meg ohms producing a corresponding current from 7-67 µa in the GND wire is adequate for the GND indicators to flash. To complete proper installation, verify grounding of the GRD lead-wire. Under normal operation, the power system determines if GRD LEDs illuminates. Proceed to GRD verification steps below. 1.) Apply power to the R-XXX, if the GRD LEDs do not illuminate, proceed to step 2.) 2.) Remove power and re-establish an electrical safe work condition to allow one phase lead-wire to be disconnected from its source by either disconnecting wire or pull a fuse. 3.) Re-apply power and verify that the GRD LEDs now illuminate to insure a proper ground connection. 4.) Complete installation by removing power and reconnecting the phase lead-wire or fuse and reapply power and re-verify that L1, L2, & L3 LEDs illuminate. BEFORE OPENING A PANEL, TURN POWER OFF! (Steps 1-8 must first verify proper operation of indicators.) SAFETY PROCEDURES STILL APPLY: Before working on an electrical conductor, verify zero electrical energy with proper voltage testing instrument and the proper procedure as per NFPA 70E 120.1(5), 120.2 (F)(2)(f)(1-6), OSHA 1910.333(b)(2)(iv)(B). MAINTENANCE 1. For O-ring inspection, follow the respective Control Drawing directions pages 7 & 8. 2. For cleaning the front blue label or the information sticker, use only clean water and a soft cloth. For additional information, see SAFESIDE Technical Info: www.pesd.com R-3W2 Page 5 of 12

R-3W2 Page 6 of 12

R-3W2 Page 7 of 12

R-3W2 Page 8 of 12

Standard Mount Bezel Mount R-3W2 R-3W2-KB R-3W2 Page 9 of 12

Many other variations available upon request. Please call 1-800-280-9517 or visit www.pesd.com DANGER VOLTAGE IF ILLUMINATED. SAFETY PROCEDURES STILL APPLY. TEST BEFORE TOUCHING. DANGER VOLTAGE IF ILLUMINATED. SAFETY PROCEDURES STILL APPLY. TEST BEFORE TOUCHING. GRACE E N G I N E E R E D PRODUCTS, INC WWW.GRACEPORT.COM Part#: R-3W-L WARNING! Read instructions before installing. GRACE E N G I N E E R E D PRODUCTS, INC WWW.GRACEPORT.COM Part#: R-3W-NP-F WARNING! Read instructions before installing Part#: R-3W-L* Part#: R-3W-NP-F* *These labels install around the R-3W2 with no affect on its UL certification. The lables are not UL approved. R-3W2 Page 10 of 12

Fig. 2 R-3W2 Page 11 of 12

Fig. 3 Fig. 4 R-3W2 03/2014 Page 12 of 12