HOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance

Similar documents
DRYPACK. Protecting installations Energy optimisation. Operating principle. Description. Biogas dehumidification system. Improved profitability.

CLIMACIAT AIR COMPACT

AQUACIAT. Water chillers. Free cooling modules for AQUACIAT2 700V to 1100V AQUACIAT POWER 1200V to 1800V USE RANGE FREE COOLING

Split inverter air-to-water heat pump CERTIFIED BY CERTITA. option 30/35-40/45

GeoCIAT Modular. Components. Heat pump Heating only, Glycol/water mix/water. Refrigerant and hydraulic module diagram. HomeConnect control.

Centrifugal air heaters hot water or electrical supply

MAGISTER. Compact and attractive design Energy savings with EC motor and self-regulating control. Easy to install. Use. Chilled water operation

VEXTRA. acoustic comfort Saves up to. 40% floor space. Use. Range. Description. Drycoolers. Slim design and. Capacity up to kw.

FLOWAY. Floway Range. The dual-flow air handling unit with heat recovery guaranteeing an Economical and Durable solution. use.

AGEO CALEO. Water-to-water high temperature heat pumps USE RANGE DESCRIPTION. Designed to replace a conventional boiler and produce domestic hot water

OPERA MORE. Use. Range. Drycoolers Air-cooled condensers. for LESS. Capacity: up to 1100 kw. Water misting. Free cooling

CIATCOOLER LJA. Chilled water production units USE. Attractive design, Compact and quiet

EXPAIR. Use. Precision air handling cabinets. Reducted footprint Dual-wall construction

HYDROCIAT LW R407C. Water cooled chillers USE RANGE

WHE 2.24 / WHE 2.24 FF

NA B AIR COMPACT. Instruction manual

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

Aquaciat Free cooling

INSTALLATION AND MANINTENANCE INSTRUCTIONS

... LCSA - LCSBD - LCSC Gas Fired Unit Heaters ...

RIELLO 40 GS/M SERIES

V-Line. Nozzle-mix line burner

ECOCIAT. Domestic hot water heat recovery unit. Use. Range

Compact and silent Scroll compressors All-season operation

BOILING PANS GAS & ELECTRICS

GAS FR25 IR FRYERS. Grande Carte SPECIFICATIONS CONSTRUCTEUR. Part A: Technical characteristics Part B: Technical instructions for installation

Light oil - kerosene burner

Light oil burners. One stage operation

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Light oil / kerosene burner

Technical information. Remeha P200. Pressurized boiler. Heat output: kw

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

PEGASUS F2 N 2S. CAST IRON GAS BOILER for heating with electronic ignition and flame control INSTRUCTIONS FOR USE, INSTALLATION AND MAINTENANCE

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

V3000 KNX. KNX PID control system on water GENERAL DESCRIPTION

INDITHERM. Low temperature gas burners

CLIMACIAT. air HanDLIng UnIT: CLIMaCIaT. Air handling unit

All Heaters Part L2B Compliant. Technical Data External Oil and Gas Cabinet Heaters. For Models. EVD Vertical Ducted EHD Hortizontal Ducted

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

MHG201 Gas Hob Manual for Installation, Use and Maintenance

LOW NOx MODULATING GAS BURNERS

"HC" AIRFLO. In-duct firing line burner

DTG X.. N. Low temperature gas furnace. Instructions for use. English 14/11/2005

GAS FRYERS GRANDE CARTE MANUFACTURER S INSTRUCTIONS. Part A: Technical characteristics Part B: Installation instructions.

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Operating instructions

PICTOR DUAL CTN 24/RTN 24 CTFS 24/RTFS 24 CTFS 28/RTFS 28 INSTALLATION USE AND MAINTENANCE IST 04 C

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS

BENSON LINEAR RADIANT TUBE

Series LV AIRFLO. In-duct firing line burner

DTG Eco / V130

... RHeco. High Efficiency Condensing Unit Heaters... Low NO x. ErP. ErP Lot 21 Seasonal Efficiency and NOx compliant

... RHeco. High Efficiency Condensing Unit Heaters... Low NO x. ErP. ErP Lot 21 Seasonal Efficiency and NOx compliant

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

ARIES DUAL MAINTENANCE MADE IN ITALY IST 04 C

HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance

HIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

MAX O GAZ. Condensing water heater TECHNICAL MANUAL

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

PREEVA air handling unit

Euron. Compact Wall Mounted Gas Fired Condensing Boilers and Combis with Outputs 24kW - 30kW BOILERS

CI/SfB X. EnviroPak Series GAS FIRED HEATING, VENTILATION AND COOLING UNITS

RMG IT ES PT GB FR BE

R e m e h a P Technical Information. Remeha P 300. Pressurized boiler. Heat output: kw

VPC Gas Cabinet Heater Range

Contents. 1. Instructions for safe and proper use Positioning of hob Attachment to support structure Electrical connection 22

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

Alpha CombiMax 350 and 600

Aluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support

SURE HEAT MANUFACTURING

INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA

TWO STAGE HEAVY OIL BURNERS

Gas Instantaneous Water Heater

Superior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw

CLIMACIAT AIRTOP. Air handling units. Very short delivery time Double wall with 50 mm insulation. Complete range meeting all the tertiary requirements

24-28 kw Conventional Combi Gas Boiler. Lawa / LawaPlus

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

CI/SfB X. RHeco Series CONDENSING GAS FIRED UNIT HEATERS

User Manual. 600mm, 700mm & 900mm Gas Cooktops Model No. CF6GS, CF6GW, CF7GS, CF9GS

INDITHERM. Low temperature gas burners

... UDSA - UDSBD Gas fired unit heaters...

PDG PDG4.1...A PDG5.0...A INSTRUCTION MANUAL IO 00450/2 ( )

BENSON.... Variante3 Fired Unit Heaters...

GAS SERIES HOT AIR GENERATORS (FLOOR) HANDBOOK MODELS : GAS 20 GAS 25 GAS 29 GAS 40

installation & operating instructions

IST 03 C ELBA DUAL INSTALLATION, USE AND MAINTENANCE

VPC Gas Cabinet Heater Range Architects of your environment. heating ventilation air conditioning

DYNACIAT ILG. Use. Description. Heat pumps

SolarWall Fan Units. Introduction. Features. By Conserval Engineering Inc.

Wall-hung gas boilers. Instructions for use. English 31/08/05

Read installation manual prior to installation of this unit! Read user manual before putting this unit in operation!

PREEVA EC Gas Fired Heating, Ventilation & Cooling Units

CP+ Gas & Oil Cabinet Heater Range

GAS & ELECTRIC FRYERS

ELECTRIC PASTA COOKERS

USER MANUAL 9kW LILLY PELLET STOVE

TC MODULE (FFD) (with Gas Hob)

Transcription:

Installation Operation Commissioning Maintenance HOT AIR GENERATOR WITH GAS BURNER GGS NA11.45 A 06-2011

04-2011

CONTENTS 1. DESCRIPTION OF THE UNIT 2. INSTALLATION & CONNECTION 3. COMMISSIONING 4. CARE AND MAINTENANCE 5. PROBLEMS 6. CE CERTIFICATE OF CONFORMITY Note to reader: This document is provided for guidance only. Certain modifications may apply. The manufacturer shall not be held liable for potential errors or omissions in these instructions. 1

1. DESCRIPTION OF THE UNIT 3 CONFIGURATION TYPES: Int. burner (fig1.) Ext. burner (fig2.) Burner fixed outside (fig3.) Burner cover Flue (not supplied) Combustion chamber - Stainless steel chamber - Stainless steel exchanger - Stainless steel smoke box - Hot air deflector: zinc-plated sheet metal Tubular plate heat exchanger and smoke box Threaded condensate drain union Integrated bypass Three thermostat chamber outlet Use a differential pressure switch or another system to control the air flow (compulsory). This component is provided by CIAT service if the power and electrical control box is supplied. Fan always upstream of the combustion chamber Chamber cleaning access hatch Burner Main components: 1 air pressure switch 1 min. and max. gas pressure switch 1 ignition and safety valve block 1 gas filter 1 flame detection and control unit Burner power supply voltage: single-phase 240 V or three-phase 240/400 V; 50 Hz + Earth Burner access door Power and electrical control box (optional) Panel to access chamber cleaning hatch 3-thermostat access panel Flue, gas expansion valve, buffer tank and sectional valves not supplied 2

DIMENSIONS Ø D G C1 Fig.1 Fig.2 Burner casing Fig.3 3

TABLE OF DIMENSIONS CHAMBER P Max Kw AIR FLOW BURNERS 4

UNIT dpa chamber combustion circuit dpa chamber air side Chamber weight kg m 3 / m 3 Propane 59.04 x (gas flow m 3 /h) Volume of gas combustion products GN 21.05 x (gas flow m /h) If the air-handling unit is equipped with a fan with a 2-speed or variable-speed motor, the control must ensure that the reduction in the air flow automatically causes a reduction in power. PICTOGRAMS Condensate drain siphon Grounding compulsory Air flow Electric heater 2. INSTALLATION & CONNECTION GAS SUPPLY For a supply pressure greater than that recommended by the burner manufacturer, a pressure expansion valve must be installed to obtain the correct value while respecting the flow. The installation must have a gas supply cutoff valve for each burner and a manual valve located at the entrance to the premises, as per the conditions set out in article GZ 15 (fire safety regulations for establishments open to the public). 5

Schematic diagram of the gas system Unit exterior Unit interior (when applicable) Manual safety valve (not supplied by CIAT) Expansion valve (option) Gas inlet To burner 1 m maximum Buffer tank (not supplied by CIAT) Operating pressure Natural gas: LPG: MPA = 30 to 400 mbar expansion 18 mbar MPB = 0.4 to 4 bar expansion 18 mbar/300 mbar BUTANE expansion 28 mbar/118 mbar PROPANE expansion 37 mbar/148 mbar Recommendation for calculating the pipework diameter, see following sections. The pipework must always be installed with the greatest care. The local gas distribution prescriptions must be strictly followed (in FRANCE comply with DTU 61.1). Burnt gas evacuation duct The duct should preferably be made from special gas-grade aluminium sheet with a purity of at least 99.5% or from stainless steel sheet metal. the duct is neither flush-mounted nor engraved but fixed only to the masonry using clamps. Each duct inlet is labelled to indicate that it can only be used for the evacuation of gas combustion products. The roof outlet complies with the usual standards. Minimum height of 0.40m above any ridge (sloping roof). Minimum height of 1.20m above a terrace roof (15% slope). A T-joint with an inspection cover is provided at the base. Double-wall ducts are recommended to prevent the formation of condensates. The duct cross-section must not be smaller than that of the unit's connection nozzle. The ducts are positioned at least 20 cm from any flammable material. The burnt gas ducts are made in accordance with the prescriptions of the CE directives. Flame length and flue installation principle 1 m min Flue duct (not supplied by CIAT) Condensate drain Ø 3/4" int. evacuation Ø Condensate draining 6

The sum of the pressure drops (flue duct + combustion chamber) must not exceed that authorised by the burner (refer to the table in the "Dimensions" section). The combustion gas outlet must extend at least 1 metre above the top of the roof. It is also necessary to check that the combustion gas cannot be recycled in the premises (allow a sufficient distance between the flue outlet and the building air inlets). The condensate drains will be connected to the gutter via a sealed duct. POWER SUPPLY AND ELECTRICAL CONNECTION All the electrical connections and wiring are configured and installed in accordance with the codes, local regulations and wiring diagrams located inside the units. Connecting the safety unit Check that the available electrical power supply corresponds to the characteristics on the manufacturer's plate. Safety thermostat mounted at the chamber outlet 1st thermostat (automatic reset) Adjustable using the knob on the thermostat housing (range from 0 to 80 C). This stage can control the ventilation units in fresh air only operation (set to approximately 25 C). 2nd thermostat (automatic reset) Adjustable inside the unit (range from 30 to 120 C). This stage provides overheating protection for the combustion chamber (set to approximately 90 C). The stage must be incorporated into the burner's control chain. 3rd thermostat (automatic reset) Adjustable inside the unit (range from 40 to 100 C). This stage provides overheating protection for the combustion chamber (set to approximately 100 C). The stage must be incorporated into the burner's control chain. Honeywell L4064N FAN and LIMIT thermostat LIMIT-2 thermostat Type TR2 Code 541302 Automatic reset LOAD FAN Damper control FAN 25 LIMIT 100 C LOAD LIMIT Manual reset Check that the strap has been correctly cut White button LINE LINE Red push button Automatic Button raised Resetting FAN FAN LIMIT LIMIT LOAD LINE LOAD LINE To be inserted in the burner control duct Combustion chamber adjustment servomotor control (1-wire control) Temperature < 25 C: damper closed Temperature > 25 C: damper open 7

Breaking capacity for each thermostat - 15 A (2.5 A) at 250 V - 10 A (2.5 A) at 400 V Only qualified personnel may carry out work on the thermostat. When replacing an old thermostat with a new model, remember to carry out the wiring modifications and run an operating test. VENTILATION UNITS 1. Fresh air only operation If the temperature at the chamber outlet is lower than 25 C, the combustion chamber ventilation unit is 90% closed. If the temperature at the chamber outlet is greater than 25 C, the combustion chamber ventilation unit is open. The ventilation unit can be controlled by an On/Off servomotor without a zero return (zero return by phase inversion). This servomotor may be controlled by the thermostat's 1st stage (to fine-tune the air outlet temperature setting, the servomotor may be the modulating type controlled by a modulating regulator with a supply air sensor). The servomotor will have a mechanical stop to allow the opening and closing percentages to be set (travel limit). 2. Adjusting the bypass flap To obtain the ideal temperature at the combustion chamber outlet and reduce the risk of condensation, please set the combustion chamber bypass according to the exhaust temperature (min. 160 C in the worst-case scenario). Note: the settings are given for information only; they must be fine-tuned during operation at a low return temperature. A larger bypass opening improves operation. GENERATOR For safety and maintenance reasons, please observe the clearances given below. Access side La distance between the GGS generator and the wall must be at least 900 mm (the desired distance is the depth of the GGS generator). Opposite side The distance between the GGS and the wall must be determined on the basis of how the burnt gas duct is installed (see section relating to its installation). The unit must be installed in accordance with current regulations and standards in a well-ventilated area. The unit must not be installed in an area with a risk of fire (fine flammable dust) or explosion, or in an area containing aggressive products such as trichloroethylene, perchlorate, etc. The fresh air flow required to supply combustion is at least 2 m 3 /h per kw of heat flow. GAS PIPE AND ELECTRICAL ROUTING Inside the GGS generator Observe the correct clearance for the smoke box access panel. Allow room to access the minimum gas pressure switch (adjustment). SELECTING THE BUFFER CAPACITY The volume of the buffer tank + the volume of the pipework (expansion valve at the consumption point) must be based on the maximum flow of the installation, at least: BP (16 to 21 mbar) 2 litres per Nm3 MP (0.06 to 4 bar) 1 litre per Nm3 NOTE: the buffer capacity does not compensate for undersized pipework. Required buffer capacity in litres based on the max. flow in Nm 3 /h Gas flow rate Nm 3 /h 6 10 16 25 40 65 100 160 250 400 650 1000 Buffer volume LP pressure 12 20 32 50 80 130 200 320 500 800 1300 2000 Buffer volume MP pressure 6 10 16 25 40 65 100 160 250 400 650 1000 8

Capacity in litres per linear metre of pipe Bore (mm) 25 32 40 50 65 80 100 125 150 200 Steel 0.66 1.08 1.4 2.3 3.8 5.3 9 13.3 19.9 33.7 Copper 0.53 0.85-2.1 - - - - - - Polyethylene 0.53 0.83-2.07-4.2 6.3 7.8 13.4 21 NOTE: the buffer tank is required if the volume of the pipework is less than the buffer capacity calculated. GAS PIPEWORK DIAMETER SELECTION AID Correction factor depending on altitude and temperature F = Barometric pressure + gas pressure 273 X 1013 273+T of gas F normal average Natural GAS l 020 mbar F = 1 LPG 37 mbar F = 1 LPG 150 mbar F = 1.1 Natural GAS 300 mbar F = 1.25 GAS FLOW RATE CALCULATION NATURAL GAS Flow rate in Nm 3 /h = Generator power (kw) NCV x efficiency If the temperature is not 0 C, the gas flow rate read on the meter must be corrected using the F coefficient determined above. PROPANE GAS Flow rate in kg = Generator power (kw) 13 kw/h x efficiency Flow rate in Nm3/h = flow rate in kg/h x 0.5 Nm 3 /kg Reminder: 1 kg of propane = 13 kw/h or 1kg/h of propane = 13 kw K: 0.5 Nm 3 / kg = 1 1.98 kg/nm 3 (1.98 kg/nm3 = density of propane) Propane gas: to use the pipework diameter selection tables below, apply a coefficient of 1.66 to the calculated flow rate Corrected PROPANE GAS flow rate = propane flow rate x 1.66 Reminder: the pipework diameter based on the pressure drop (dp), depends on 3 criteria: Pressure downstream of the expansion valve Maximum flow rate Equivalent pipe length. 9

The tables give the theoretical internal diameters for straight pipes. Formed parts and accessories must be converted into straight lengths to check the influence on the selected diameter. 18 mbar Theoretical diameters for pressure = 18 mbar and dp = 1 mbar Pipe lengths in m Flow rate in Nm 3 /h 300 mbar Theoretical diameters for pressure = 300 mbar and dp = 5 mbar Pipe lengths in m Flow rate in Nm 3 /h 1 bar Theoretical diameters for pressure = 1 mbar and dp = 10 mbar Pipe lengths in m Example of pipework selection for natural gas Generator: 150 kw 150 Generator efficiency: 90% Flow rate = = 16.6 Nm 3 /h Metering Flow rate under: 300 mbar 10 x 0.9 PCl Natural in Nm 3 /h gas: 10 kw / h / m 3 Equivalent length: 40 m Pipework diameter: 31 mm minimum Buffer capacity = 1 litre per Nm3/h (16.6 litres) Example of pipework selection for propane gas Generator: 150 kw Generator efficiency: 90% Flow rate in Nm3/h: 12.8 x 0.5 = 6.4 Nm 3 /h Metering under: 150 mbar Corrected flow rate (see previous page): 6.4 Nm 3 /h x 1.66 = 10.62 Nm 3 /h Natural gas NCV: 13 kw / h / m 3 Pipework diameter: 31 mm minimum* Equivalent length: 40 m Buffer capacity = 7 litres 150 Flow rate = 13 x 0.9 = 12.8 kg/h 10

Dimension based on bore and material The smallest required bore is selected (see table of standard dimensions below) based on the necessary theoretical internal diameter and the type of pipe. The section capacity is calculated based on the selected bore and the section length, and compared to the required buffer capacity. If the section capacity is less than the required buffer capacity, a larger bore should be selected or a buffer capacity created. The actual bore to be used is defined based the material used and the standard bores available for this material. Dimensions based on standard bore and material Bore Steel in accordance with NF A 49.110 up to DN 20 inclusive and in accordance with NF A 49.111 from DN 25 Copper in accordance with NF E 29.591 DN mm Inch(es) external Ø mm thickness mm external Ø mm thickness mm Capacity in litres/metre of pipes depending on their type Bores mm Steel Copper 3. COMMISSIONING If you have not subscribed to CIAT commissioning: all the startup operations must be carried out by approved personnel. The combustion equipment is installed in accordance with current regulations relating to its category. Check the sealing of the gas ducts before connecting them to the equipment using a soapy solution, placing the ducts under pressure. When all the connections have been made, bleed the air from the gas supply duct. Adjust the burner pressure according to the generator pressure. Check that the flame does not touch the back of the chamber. Flame length (m) = w x 0.06 (with 15% excess air) If control is included, refer to the corresponding manual. 4. SERVICING AND MAINTENANCE If you have not taken out a CIAT Servicing and Maintenance contract, these operations must be carried out by approved personnel. Before servicing: Cut the gas supply Cut the electrical power supply Ensure that the AHU fan is stopped Do not use water to clean electrically-supplied parts No equipment may be modified or replaced without the manufacturer's authorisation 11

Components Action Frequency GGS Check the equipment's sealing Check the gas supply pipework's sealing Check that the burner, safety and regulation devices are operating correctly. 1 year Exhaust ducts and smoke box Chimney sweeping Cleaning 1 year Connections Check the tightness of all connections 6 months Electrical cable and wires Visually check the condition of the components 6 months 5. PROBLEM/CAUSE/OPERATION Refer to the burner manual 12

6. CERTIFICATION

Siège social Avenue Jean Falconnier B.P. 14 01350 Culoz - France Tel. : +33 (0)4 79 42 42 42 Fax : +33 (0)4 79 42 42 10 info@ciat.fr - www.ciat.com Compagnie Industrielle d Applications Thermiques S.A. au capital de 26 728 480 R.C.S. Bourg-en-Bresse B 545.620.114 CIAT Service Tel. : 08 11 65 98 98 - Fax : 08 26 10 13 63 (0,15 / mn) Non contractual document. With the thought of material improvement always in mind, CIAT reserves the right,without notice, to proceed with any technical modification.