Crown Boiler Company

Similar documents
INSTALLER'S GUIDE MASONRY CHIMNEY VENT KIT WARNING: BAYVENT800B 18- CH23D2-05

BC Series II OIL-FIRED CAST IRON BOILER INSTALLATION, OPERATION & MAINTENANCE MANUAL FOR US AND CANADIAN SALES

Installation Instructions

ELECTRONIC FIREPLACE DAMPER

ASX7-4-IOM-6 J

ELECTRONIC FIREPLACE DAMPER

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS CL SERIES CAST IRON OIL-FIRED BOILER

INSTALLATION AND SERVICE MANUAL

INSTALLATION AND SERVICE MANUAL

ASX7-5-IOM-3 J

STARFIRE IV SERIES 4 WATER OIL FIRED CAST IRON BOILER

FWZ Series Oil-Fired Hot Water Boilers INSTALLATION INSTRUCTIONS

VENTING CLEARANCES. BBT NORTH AMERICA Bosch Group. Bosch Water Heating 340 Mad River Park, Waitsfield, VT TWH-V-26 page 1 of 6 rev 01/06

STARFIRE IV SERIES 4 WATER OIL FIRED CAST IRON BOILER

Mighty Venter Power Vent System

Do not use this vent pipe or fittings for venting incinerators of any kind.

WATER HEATERS / BOILERS GSB8-E. Gas-Fired Steam Boiler PRODUCT SPECIFICATIONS. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB E

CHAPTER 8 CHIMNEYS AND VENTS

CHIMNEYS AND VENTS CHAPTER 8

INSTALLATION INSTRUCTIONS

CHAPTER 8 CHIMNEYS AND VENTS

Gas-Fired Natural Draft Hot Water Boilers INSTALLATION INSTRUCTIONS These instructions must be affixed on or adjacent to the boiler

GSB8. CONSERVATOR Gas-Fired Steam Boiler. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB S MODEL NUMBER IDENTIFICATION FEATURES

Instructions for High Altitude Installations Above 4500 FT.

SLANT/FIN AUTOMATIC VENT DAMPER For Galaxy, Sentinel and Sentry Series Boilers INSTALLATION INSTRUCTION MANUAL AND TROUBLESHOOTING GUIDE

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS RRO SERIES CAST IRON OIL-FIRED BOILER

SIZING HANDBOOK & APPLICATION GUIDE

WATER HEATERS / BOILERS GWB8-E. Gas-Fired Hot Water Boiler PRODUCT SPECIFICATIONS. AFUE up to 83.9% Heating Input 50,000 to 299,000 Btuh

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Suggested Specifications Prestige Excellence 110

SIZING HANDBOOK & APPLICATION GUIDE

Odyssey Model Numbers: CT Version Date:

GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM. ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont.

Vent Supplement Ultra-80, -105, -155, -230 & -310

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

4.3 Installing Appliances and Interior Vapor Distribution Systems Performance-Based Skills Assessment 2016

Oil-Fired Steam Boilers INSTALLATION INSTRUCTIONS These instructions must be affixed on or adjacent to the boiler WARNING

OWNERS MANUAL MODEL DO110 & DO180 IS CERTIFIED TO: Unit Serial # Purchased From Company Address

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

Models TRB4075 TRB4095 TRB4110 TRB5100 TRB5115 TRB5135 TRB6130 TRB6145 TRB6165 TRB7165 TRB7180 TRB7190

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

Installation, Operation and Service Manual

Oil-Fired Hot Water Boilers Installation Instructions These instructions must be affixed on or adjacent to the boiler

INSTALLATION AND SERVICE MANUAL

AFUE up to 83.9% Heating Input 50,000 to 299,000 Btuh

CONVERSION TO PROPANE MANUAL M-Series Condensing Boiler. Wall-Mounted, Gas-Fired Boiler

Introduction Engineering and Design Manual

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS EVO SERIES BOILER

RS chimney fan for gas and oil applications

DOMESTIC WATER HEATER OIL FIRED

RS Chimney Fan for Solid Fuel Applications

LGB Gas fired boiler

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents

SVB SERIES II. Gas-Fired Hot Water Induced Draft Boilers. Models SVB-2 SVB-3 SVB-4 SVB-5 SVB-6 SVB-7 INSTALLATION, OPERATION & MAINTENANCE MANUAL

INSTALLATION AND SERVICE MANUAL. Hot Water Heating Boilers Domestic Hot Water Supply Boilers 399, ,000 Btu/hr Models

RS Chimney Fan for Solid Fuel Applications

VENTING GAS APPLIANCES NFPA 54 CODE

LGB. Control Supplement. Gas fired boiler. Universal Control System. Series 2 Propane gas. Contents

CMO32 CMO50 DOMESTIC WATER HEATER OIL-FIRED. Models: CMO32 CMO50

2012 INTERNATIONAL FUEL GAS CODE VENTS

Weil-McLain part numbers are found in Weil-McLain Boilers and Controls Repair Parts Lists.

TRIAD Boiler Systems, Inc Atlantic Drive, Unit 2 West Chicago, IL

STONE RIVER. The White Mountain Log Collection: LSU24SF-2 Shown

Bosch 80% AFUE Gas Furnace BGS80 Model

Installation and Operating Service Manual

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

Installation & Operation Manual Models:

High Efficiency 3-Pass Oil Fired Hot Water Boiler

Installation Operation Service Manual

AFUE 95% Heating Input 50,000 to 200,000 Btuh

KAPPA R BOILER INSTALLATION, OPERATION INSTRUCTIONS. Gas-Fired Natural Draft Hot Water Boilers

Leisure Line Power Vent Operations & Maintenance Manual And Safety Instructions

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS EVCA SERIES CONDENSING BOILER

TWZ/CT/ODV Series. Oil-Fired Hot Water Boilers (Less Tankless Heater) These instructions must be affixed on or adjacent to the boiler

RSHT Volko Supply USA CAN READ AND SAVE THESE INSTRUCTIONS! Installation and operation manual

WARNING FIRE OR EXPLOSION HAZARD.

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

RS Chimney Fan for Gas & Oil Applications

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS EVA SERIES BOILER

Single stage operation oil burner

ESC IV STEAM SERIES 4 OIL-FIRED CAST IRON BOILER

Installation and Venting Instructions

RS Chimney Fan For Gas & Oil Applications. Installation & Operating Manual USA CAN

INSTALLATION INSTRUCTIONS

P-K MACH GAS-FIRED BOILER C1500H C2000H OUTDOOR BOILER KIT GUIDE

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS

The White Mountain Log Collection: ROCK CREEK

Installation Instructions

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

INSTALLATION INSTRUCTIONS

Description Model Weil-McLain part number. Vent Termination Kit for 3" Stainless Steel All

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

WPSB SERIES II. Models WPSB-3D WPSB-3DP WPSB-4D WPSB-4DP WPSB-5D WPSB-5DP WPSB-6D WPSB-6DP WPSB-7D WPSB-7DP WPSB-8D WPSB-8DP WPSB-9D WPSB-9DP

Leisure Line Power Vent Operations & Maintenance Manual And Safety Instructions

CSD-1 COMMERCIAL BOILER CONTROLS

SUPER HIGH EFFICIENCY WATER HEATERS SUPPLEMENT TO INSTRUCTION MANUAL P/N (Replaces pg. 2 in instruction manual.) CONGRATULATIONS!

VENTING VENTING OF INDIRECT GAS FIRED AND OIL FIRED HEATING APPLIANCES INDOOR GRAVITY VENTED UNIT HEATERS AND PACKAGED SYSTEMS

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS CAST IRON OIL-FIRED BOILER

SERVICE FACTS WARNING M801-SF-1C. Gas Furnaces Upflow & Downflow Induced Draft 1 Stage Heat Models: DISCONNECT POWER BEFORE SERVICING M801P040AU24AA

Transcription:

Crown Boiler Company Oil Vent Damper Supplemental Installation Instructions Converts Select TWZ Series Boilers to High Efficiency TWD Series Boilers These supplemental installation instructions are to be used in conjunction with the TWZ Installation Instructions Manual shipped with the boiler, as well as Field Control s Oil Vent Damper System manual. Follow these supplemental installation instructions and details outlined below unless directed otherwise. Where the TWZ installation instructions manual is missing or unavailable, please record the boiler model and serial number and contact Crown Boiler Company Customer Service at 215-535-8900 for replacement instructions. Prior to attempting any service on this boiler, read, understand and follow all instructions as outlined in this supplement and also the Installation, Operating, and Service Instructions which were provided with the boiler. Failure to follow all instructions in the proper order can cause personal injury or death. Vent this boiler according to these supplemental instructions. Failure to do so may cause products of combustion to enter the home resulting in severe property damage, personal injury or death. Insufficient Combustion Air Supply may result in the production and release of deadly carbon monoxide (CO) into the home which can cause severe personal injury or death. Improper venting may result in property damage and the release of flue gases which contain deadly carbon monoxide (CO) into the home, which can cause severe personal injury, death, or substantial property damage. Inspect existing chimney and vent connector for obstructions and deterioration before installing boiler. Failure to clean or replace perforated pipe or chimney liner will cause severe injury or death. Unlisted Vent Dampers and obstructions in the vent pipe are prohibited. The Vent Damper supplied with this kit shall not be used to block the vent of any other appliance. Installation is not complete unless the Blocked Vent Switch is installed and operating correctly. Failure to install the Blocked Vent Switch may result in dangerous levels of carbon monoxide (CO) during a blocked vent condition, which can cause severe personal injury or death. NOTICE The first closing cycle of the Oil Vent Damper may take up to 12 minutes. The capacitors on the Oil Vent Damper control board need to be fully charged before normal closure times of 3 minutes will occur. A. General. These instructions contain information for ENERGY STAR Program version 3.0 compliant boilers listed in Table 1 when equipped with the specified Field Controls Oil Vent Damper system (OVD) and at the specified firing rate. B. Crown High Efficiency Kit Contents 1. Field Controls Oil Vent Damper System (OVD) For TWD065 use Crown kit P/N 270601 which includes the OVD-6 For TWD075 use Crown kit P/N 270602 which includes the OVD-6 For TWD090 use Crown kit P/N 270603 which includes the OVD-7 For TWD125 use Crown kit P/N 270604 which includes the OVD-7 For TWD120 use Crown kit P/N 270605 which includes the OVD-8 2. Supplemental Installation Instructions 3. Orange wire nut 4. Conversion Label 5. ENERGY STAR Label 6. AHRI Certificate of Product Ratings

C. ENERGY STAR 3.0 Product Ratings TABLE 1: RATINGS Converted Burner Capacity DOE Heating Net AHRI Water Original Boiler AFUE Boiler Capacity (3) Ratings Model No. (4) % Model No. (1) GPH MBH (2) (MBH) (MBH) TWZ065 TWD065 0.65 91 80 70 88.1 TWZ075 TWD075 0.75 105 91 79 87.8 TWZ090 TWD090 0.90 126 111 97 88.2 TWZ125 TWD125 1.25 175 152 132 87.1 TWZ120 TWD120 1.20 168 147 128 87.5 (1) Boiler model with D designates Oil Vent Damper. (2) MBH refers to thousands of BTU per hour. (3) Based on standard test procedure prescribed by the United States Department of Energy at combustion conditions of 12.5% CO 2. (4) Net AHRI ratings are based on a piping and pickup allowance of 1.15. D. Installation of OVD 1. Turn off the electrical power at the service switch, circuit breaker, or fuse. 2. Install OVD and Field Controls WMO-1 Blocked Vent Safety Shut-Off Switch (included) in accordance with Field Controls Oil Vent Damp System manual and Figures 1 and 2. 3. Venting Requirements Vent installation shall be in accordance with the American National Standard ANSI/NFPA 31, Installation of Oil Burning Equipment, or the Canadian Standards Association CSA B139, Installation Code for Oil Burning Equipment, or applicable provisions of the local building codes. The use of a vent damper will reduce the offcycle losses which will result in lower flue gas temperatures and may cause condensation in the chimney. If condensation occurs, the chimney will need to be relined with a listed corrosion - resistant metal liner and a Type L or other corrosion - resistant metal chimney connector must be used. a. Install any of the following for this oil-fired boiler: i. Masonry or metal chimney. Build and install in accordance with local buildings codes; or local authority having jurisdiction; or Standards for Chimney, Fireplace, Vents, and Solid Fuel Burning Appliances, ANSI/ NFPA 211 and/or National Building Code of Canada. Masonry chimney must be lined with listed chimney system. Listed clay flue lined masonry chimneys meet venting requirements. External chimneys are more susceptible to flue gas condensation due to colder outside air temperatures. To prevent corrosion due to flue gas condensation, use a listed corrosion-resistant metal liner in chimney. Oversized chimneys are more susceptible to flue gas condensation. To reduce the likelihood of flue gas condensation and ensure proper draft, use a properly sized listed metal liner in oversized chimney. ii. Type L vent or a factory built chimney that complies with the Type HT requirements of ANSI/UL 103. Install in accordance with listing and manufacturer s instructions. b. Vent Connector shall be of any of the following and of the same size as the outlet for this oil-fired boiler. i. Type L or a factory built chimney material that complies with the Type HT requirements of ANSI/UL 103. Install in accordance with listing and manufacturer s instructions. 2

ii. Steel pipe having resistance to corrosion and heat with a minimum wall thickness of 24 Gauge (0.024 ). Failure to properly wire electrical connections to the boiler may result in serious physical harm. Never jump out or make inoperative any safety or operating controls. 4. Wiring Wire installation shall be in accordance with the National Fire Protection Association NFPA 70, National Electrical Code, or the Canadian Standards Association CSA C22.1, Canadian Electrical Code Part 1, or applicable provisions of the local building codes. a. Install the OVD wiring in accordance with Figure 2 and Field Control s Oil Vent Damper System manual. i. Terminate the Black wire from the OVD to the L1 terminal on the Boiler Control. ii. Terminate the White wire from the OVD to the L2 terminal on the Boiler Control. iii. Remove the Black wire connected to the B1 tab terminal of the Boiler Control. Cut the female quick disconnect connector off and remove the wire insulation. Wire nut the Black wire to the Yellow/Black wire from the OVD with the orange wire nut provided. iv. Connect the quick disconnect on the Orange wire from the OVD to the B1 tab terminal of the Boiler Control. v. Terminate the Green Ground wire from the OVD to the Boiler Control s ground screw. b. Refer to the boiler s installation instructions for additional boiler wiring instructions. Figure 1: Installation of OVD 3

(105 C) (105 C) Figure 2: Wiring Diagram 4

E. Burner Setup 1. Refer to TWZ Installation Instructions for Burner setup and Draft Requirements. F. Conversion Label Placement 1. Adhere the Conversion Label on the boiler jacket adjacent to the existing Rating Label on the boiler. 2. Adhere the ENERGY STAR Label adjacent to the Conversion Rating Label. G. Refer to boilers installation instructions for additional installation requirements. Manufacturer of Hydronic Heating Products P.O. Box 14818 3633 I. Street Philadelphia, PA 19134 www.crownboiler.com PN 980275 Rev A 5