GINPROSA INGENIERÍA Company Presentation

Similar documents
The Spanish Protocol on collaboration in the radiological surveillance of metallic materials

SUSTAINABLE SoLUTIoNS

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Urban and Landscape Design Frameworks Highways and Network Operations Guideline

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010

IMMERSED TUNNEL An innovation to cross a water-body. Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1

«Corridor» designs in town planning : Sustainable planning for large cities in developed countries

URBAN PLANNING AND WATER CORRIDORS. A CASE STUDY OF INTEGRATION OF THE HYDROLOGICAL CHARACTERISTICS INTO THE SITE LAYOUT.

GPO is a multidisciplinary Engineering and Architecture Group with global presence and local nature

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

TRANSPORTATION. Down to Earth. Up to the Challenge. Engineering, Geoscience and Environmental Services ALEX FRASER BRIDGE, BC, CANADA

M4-M5 Link Rozelle Interchange factsheet 2017

Long span bridges in Norway, including future crossing of the Oslo Fjord

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

European Transport Megaprojects

Supporting our communities. Bridges

Dallas CBD Second Light Rail Alignment (D2)

Green Roofs and Stormwater Management Virginia Stovin

Highway Alignment and Route Location Survey

Sharing Innovation in Transport between EU and Singapore Singapore, November 2015

Capital Projects in and near Odenton Town Center

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006

ENGINEERING CONSULTANTS (PVT.) LIMITED

DESIGN OF FOOTBRIDGES

The Dresden Sustainable Urban Mobility Plan (SUMP)

The role of public transport in the Strategic Sustainable Mobility Plan of the Madrid Region, Vision 2025

The Development of the Underground Infrastructure of the System of Mobility in Torino

Simon Shaw. Executive Director. Experience Overview

TRANSPORT & INFRASTRUCTURE

Welcome to the Public Consultation Exhibition

SA N T I AG O D ES EA D O 1 AILET S U STA I N A B L E C I T Y S I M U L ATO R R A 710/21/161

Patrick Thompson. Associate Director, Bridge & Specialist Structures, WA. Experience Overview

Dallas CBD Second Light Rail Alignment (D2)

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Sustainable City of the Future LUSAIL

INTRODUCTION TO SPATIAL PLANNING IN SPAIN

CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

6 BRIDGES. 6.1 Design philosophy. Proposed bridges

North Somerset Council Local Development Framework

R:\PPMENOTES2002\PPME NOTES TOC.DOC September 6, Physical Planning and Municipal Engineering

Emergency Ventilation System Design - Preliminary Report Shishir Gupta

TRANSPORT ARCHITECTURE. JOHN McASLAN + PARTNERS

1 Spain. 1.1 Introduction

Welcome to our public exhibition

Link Union Station (Link US) Project Open House September 26, 2018

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

AMENDMENTS. Date Effective. Amendment No. Council. DCP 14 Davidson St, Greenacre Page 2

Chapter 1. Introduction

Attachment D Eastside Transit Corridor Phase 2 Technical Study Route Options Screening Analysis and Community Outreach Executive Summary April 2017

TRANSPORTATION: Roads and Highways Services

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.

14. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 20

Application Guide. Should you have any questions on the Outline Application please contact:

Sheffield Victoria Station Development Prospectus January 2014

S T V. P E R F O R M A N C E M A T T E R S. highways + bridges

TIMOTHY E. DATERS, P.E. White-Daters & Associates, Inc. 24 Rahling Circle Little Rock, AR (501)

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

TRANSPORTATION COMMITTEE

VAUGHAN METROPOLITAN CENTRE STATION

New Metro North. Luas Green Line Tie-in Study. Options Appraisal Report

Appendix E Preliminary Location Hydraulic Study

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Response by the Wiltshire Archaeological and Natural History Society

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

WELCOME TO OPEN HOUSE TWO November 28, 2018

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Environmental Statement Review for Infrastructure

Vicálvaro. Madrid Calle Pirotecnia s/n. Madrid

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

Orcasur Market. Madrid Plaza del Pueblo-Avenida de Orcasur

Northern Branch Corridor DEIS December 2011

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

HS2 Environment. Protecting the environment

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Start of works exhibition

SSRG International Journal of Civil Engineering ( SSRG IJCE ) Volume 4 Issue 10 October 2017

C ity of Grande Prairie Development Services Department

East Corridor Final Environmental Impact Statement

ArcGIS Online at Philadelphia Water Department

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Wednesbury to Brierley Hill Extension

DEVELOPMENT SERVICES

Blake C. Kronkosky, PE, Ph.D.

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

D2 Subway Project Development. Stakeholder Committee October 24, 2018

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

Public Hearing April 12, Information as of April 12, 2018

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Safety Inspections of Road Tunnels.

Energy Efficient Strategies for Urban Transportation Planning

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

Grantham Southern Quadrant Link Road Environmental Statement

5.4.6 Cumulative Operational Impacts

Shift Rapid Transit Public Participation Meeting May 3, 2017

In your area. Ravenfield to Clayton LA13. June Introduction

Flooding Hearing: Long and Short Term Strategies

Transcription:

GINPROSA INGENIERÍA Company Presentation DESIGN PROJECTS & ON-SITE TECHNICAL CONSULTANCY DURING THE BUILDING WORKSFOR CIVIL WORKS PLANNING & DESIGN DEVELOPMENT

Feasibility Studies Engineering Reports Preliminary and Detail Design Projects Quality Control On-site Consultancy & Supervision PRESENTATION Roads & Highways Structures Buildings Transport Masterplanning & Development Water Supply & Waste Water Infraestructuas

THE COMPANY Founded in 1990 Central Office in MADRID: 21.500 Sq Ft Independent Company (stockholders works in the company) Offices distributed all over Spain Multidisciplinary Team of Civil Engineering Commercial & custom-made Software

GINPROSA's staff is comprised of a young and dynamic team of over one hundred professionals THE COMPANY. STAFF

FIELDS OF ACTIVITY DESIGN PROJECTS On Site Consultancy Control Roads & Highways & Construction Supervision Railways & Subways Hydraulic Works Sewerage Systems

ORGANIZATION CHART BOARD OF DIRECTORS GENERAL MANAGEMENT SECRETARY GENERAL DELEGATIONS Administration Economic Management Legal and financial management QUALITY AND ENVIRONMETAL MANAGEMENT COMMERCIAL DEPT HUMAN RESOURCES DEPARTMENT Human Resources Management Training EDITING AND GRAPHIC DESIGN DEPARMENT R+D+i I.T DEPARTMENT PROJECT MANAGEMENT AREA PRODUCTION & ORGANIZATION AREA ON SITE TECHNICAL CONSULTANCY & SUPERVISION AREA RAILWAYS Dept ROADS AND HIGHWAYS Dept HYDRAULIC WORKS Dept CIVIL WORKS Dept GEOLOGY Dept STRUCTURES Dept HYDRAULIC Dept ENVIRONMENTAL Dept TOPOGRAPHY Dept RAILWAYS Dept ROADS AND HIGHWAYS Dept HYDRAULIC WORKS Dept

THE BUSINESS

ACTIVITIES UNE EN ISO 9001: 2000 1. ROADS: -Highways -Roads 2. RAILWAYS: - High Speed Rail. -Urban Railways - Underground (Subways) 3. HYDRAULICS WORKS: - Control of waste water discharges of waste water - Foul and storm water Sewage systems - Water supply systems UNE EN ISO 14001 Preliminary Planning Transportation feasibility studies Transport & Environmental Studies. On-site technical consultancy Supervision & Inspection for construction works Implementation

ROADS & HIGHWAYS (1 of 4) The services provided in this sector activity are: On-site technical consultancy during the Construction building works Feasibility Scheme assessments and financial studies Special conservation and maintenance studies Environmental impact studies assessments Traffic and planning studies Informative Feasibility studies Preliminary designs schemes Construction Detail design projects Analysis of concessions contracts INTERSECTION BETWEEN THE A-66 AND THE A-12 INTERSECTION IN ZAMORA

EXAMPLES OF PROJECTS CARRIED OUT ROADS & HIGHWAYS (2 of 4) C-31 INTERSECTION IN MATARÓ (ACTUAL EXISTENT) HIGHWAY WIDENING PROJECTED (ARTISTS IMPRESSION)

ROADS & HIGHWAYS (3 of 4) VIADUCT OVER THE RIVER DUERO (ZAMORA) INTERSECTION OF THE A-43 INTERSECTION IN ARGAMASILLA DE CALATRAVA (CIUDAD REAL) VIADUCT OVER THE RIVER CUERPO DE HOMBRE IN BEJAR (SALAMANCA) ARTISTS IMPRESSION OF THE SOLUTION FOR THE BURIAL OF THE M-30 MOTORWAY

ROADS & HIGHWAYS (4 of 4) BRIDGE OVER CADIZ BAY (Artists impression of the bridge currently under construction) TYPICAL CROSS SECTION OF THE DECK ELEVATION OF CENTRAL SPAN

RAILWAY (1 of 3) HSR: GINPROSA has been a selected consultant for the award of railway design contracts since the 1980s Studies and specifications: Engineering studies to establish the geometrical parameters HSR, passenger traffic & mixed traffic (passengers and freight). Engineering studies to establish the design criteria for railway structures under dynamic loading. Engineering studies for the optimisation of railway tunnel cross-sections to minimise the effects of air pressure variations on the ear induced by the crossing of high speed trains (tympanic comfort). Software s Development for calculation & management of train gearing systems as a function of the track alignment parameters. HSR contracts: Madrid-Seville (4 contracts with a total length of 200 km). Stations of Ciudad Real & Puertollano. Madrid-Barcelona (3 contracts with a total length of 50 km). Córdoba Malaga (1 Contract of 18 km). Madrid-Valencia-Alicante (4 contracts with a total length of 95 km). Madrid-Valladolid-Northern Spain (2 contracts with a total length of 22 km). Málaga-Granada (1 Contract of 7 km). Madrid-Lisbon (2 contracts with a total length of 25 km). Atlantic axis, Galicia (30 km) Station of Vigo. HSR Tunnel (over 16 miles) by TBM

RAILWAY (2 of 3) RÍO JUCAR VIADUCT IN CUENCA HSR MADRID-VALENCIA-ALICANTE LOMA DEL CARRASCAL TUNNEL (CUENCA) LAS BARRANCADAS TUNNEL (ALICANTE)

RAILWAY (3 of 3) DAS MACEIRAS TUNNEL PORTAL (VIGO) XESTEIRA TUNNEL (PONTEVEDRA) FINISHED TOP HEADING TBM AT THE DAS MACEIRAS TUNNEL PORTAL SCHEMATIC OF THE SITUATION OF THE DAS MACEIRAS TUNNEL TUBES BENEATH EXISTING BUILDINGS

URBAN RAILWAYS AND SUBWAYS (1 OF 2) Barcelona & Madrid Urban railway. Design project & implementation Metro Madrid (subway)- 4 contracts (over 20 km, 6 underground station) Barcelona subway- Consultancy services (after Carmel District tunnel collapse) Cadiz tramway Construction methods LA ELIPA STATION, LÍNE 2, MADRID METRO Earth Pressure Balance Machines Belgian Method Cut and cover Development of Supervision Protocols Supervision & Control Protocols Instrumentation & Monitoring Procedures Detail design project for light rail & tramway system

URBAN RAILWAYS AND SUBWAYS (2 OF 2) INITIAL EXCAVATION FOR THE EL BERCIAL STATIÓN METROSUR (MADRID) LINE 2 TUNNEL WARNER BROS. PARK URBAN RAILWAY STATION (MADRID) STATION CONSTRUCTION BY MANUAL METHODS TBM (METROSUR) TUNNEL CONSTRUCTION, MADRID TRADITIONAL METHOD

WATER & EVIRONMENTAL ENGINEERING (1 of 2) ENVIRONMENTAL Environmental impact assessments for infrastructure works Design of any mitigation measures Revegetation of the route Design of acoustic barriers Works for the protection of water courses or aquifers Works: Supervisors role for the environmental and ecological management plans for all of the road projects that have taken place in Andalucia Ecological species surveys Supervision of planting and revegetation activities WATER SECTOR Hydrological resource planning Waste water disposal planning Detail design, on site consultancy and construction supervision for sewage systems Detail design, on site consultancy and construction supervision for large capacity storm water tanks Fluvial hydrology studies BUTARQUE STORM-WATER TANK. (523,183 yrd 3 ) Storm Water in Madrid 22 large capacity storm water tanks. 4 large capacity holding storage tanks for waste water treatment plants. Expansion of the primary treatment works for the waste water treatment plants More than 20 km (12.4 miles) of large capacity sewers.

WATER & EVIRONMENTAL ENGINEERING (2 of 2) BUTARQUE STORE WATER TANK PUMPING STATION ENERGY DISSIPATORS IN THE ABROÑIGAL SEWER ABROÑIGAL FOULD AND STORM- WATER SEWER (22.9 Ft ø) MANUALLY EXCAVATED SEWER WITH ENERGY DISSIPATORS DOUBLING OF ABROÑIGALES SEWER