SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

Similar documents
SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

TESTING, ADJUSTING AND BALANCING

Union County Vocational - Technical Schools Scotch Plains, New Jersey

City of Duluth Festival Center 04/25

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING AND BALANCING

RAMAPO COLLEGE OF NEW JERSEY CCA0803 PHASE II HOUSING REHABILITATION 2012

University of Houston Master Construction Specifications Insert Project Name

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

CxA to Answer this Section

SECTION AIR DUCT ACCESSORIES

Test, Adjust, and Balance Services Submittal

15900 HVAC INSTRUMENTATION AND CONTROLS

SECTION AIR COILS

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

SECTION FAN COIL UNITS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

SECTION ROTARY-SCREW WATER CHILLERS

SECTION AIR COILS

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

IAQ: Re-tuning Commercial Buildings

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

COMcheck Software Version Review Mechanical Compliance Certificate

Linear Floor Heaters

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Essex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

SECTION AIR OUTLETS AND INLETS

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

UFGS (August 2008) UFGS (January 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

D. Reference Standards (Utilize latest editions available):

Design & Construction Standards, Revised January

UNIFIED FACILITIES GUIDE SPECIFICATIONS

1.1 This section applies to air handling units for HVAC Systems.

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

SECTION PLUMBING EQUIPMENT

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

SECTION WATER-TUBE BOILERS

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION AIR DOORS

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Chilled Water DOAS Fan Powered Terminal Units

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

SECTION AIR HANDLING UNIT

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

SECTION REFRIGERATION EQUIPMENT. A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories.

SECTION WATER-SOURCE UNITARY HEAT PUMPS

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

SECTION GAS-FIRED RADIANT HEATERS

COMcheck Software Version Mechanical Compliance Certificate

1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section.

DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

Copyright 2011 AIA MasterSpec Full Length 06/11 PRODUCT MASTERSPEC LICENSED BY ARCOM TO CALCANA USA LTD.

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

SECTION (15530) - REFRIGERANT PIPING

SECTION DOMESTIC WATER PUMPS

FIRE SUPPRESSION SPRINKLER SYSTEM

VERTICAL STACK INNKEEPER GUIDE SPECIFICATION CGC Hybrid Heat Pump System

The Current (2017) State of the Art for Air Leakage in Ductwork

M A R T I N P E V Z N E R E N G I N E E R I N G P. A. MECHANICAL SPECIFICATIONS MINNEAPOLIS PUBLIC HOUSING AUTHORITY MN 2-32 HOLLAND HIGHRISE

SECTION INSPECTION AND TESTING OF WORK

SECTION (15767) - UNIT HEATERS

Preventative Maintenance Tables

University of Delaware

UFGS (May 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Design and Construction Standards SECTION PLUMBING EQUIPMENT

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

Stanford University Facilities Design Guidelines SECTION DECENTRALIZED UNITARY HVAC EQUIPMENT

COMcheck Software Version Mechanical Compliance Certificate

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CABRILLO COLLEGE BUILDING 100 HVAC RENOVATIONS TECHNICAL SPECIFICATIONS

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

SECTION INTEGRATED AUTOMATION COMMISSIONING

SECTION HEATING BOILER FEEDWATER EQUIPMENT

DOCUMENT TABLE OF CONTENTS

EXHAUST FAN SCHEDULE

AABC National Standards for Total System Balance, 7th Edition: A Guided Tour Course Number: CXENERGY1624

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

C. Samples for Initial Selection: For units with factory-applied color finishes.

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

Transcription:

SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the Specifier in correctly specifying Mechanical System Testing Adjusting and Balancing. The Specifier needs to edit the guide specifications to fit the needs of specific projects. Contact a representative of the Testing, Adjusting, and Balancing Bureau (TABB) www.tabbcertified.org to assist in making the appropriate selections. Throughout the guide specification, there are Specifier notes to assist in the editing of the file. The term Architect is used throughout these guide specifications only as a guide and may be edited to read Design Professional, Engineer, Owner, or other appropriate designations as required for the specific project. TABB is the only certification organization recognized and endorsed by Sheet Metal and Air Conditioning Contractors National Association (SMACNA). TABB members are required to sign a code of conduct and continued certification depends upon maintaining this code of conduct. Technicians are required to sign and adhere to the code of conduct, thus eliminating the necessity for a third party to perform the testing, adjusting, and balancing work. TABB certified technicians have passed a 21-hour exam on testing, adjusting, and balancing fluid dynamics. The AABC certifies TAB contractors who do not perform installation of HVAC systems. The NEBB and TABB both certify mechanical contractors who may provide installation services, as well as independent contractors that only provide testing, adjusting, and balancing services. COORDINATION WITH DIVISION 1: Specifier should coordinate work of this section with each Division 1 General Requirement Sections that address testing. In cases where the Division 1 General Requirements are not provided by the Specifier editing this Section, ensure coordination is addressed by requesting a copy of the Division 1 documents edited for the project from the provider. Sections that may include conflicting information are: Section 01352 LEED Requirements Section 01400 Quality Requirements Section 01700 Execution Requirements Section 01750 Starting and Adjusting Section 01810 General Commissioning Requirements Section 01815 HVAC Commissioning Requirements Additionally, the Specifier needs to be aware that the above listed section numbers and titles are generic in nature, as well as in the best interest of the project to review all project-specific Procurement and Contracting Requirements and General Requirements. Specifier should consider including the following language in the Quality Requirements Specification Section of Division 1. Language may also be appropriate for inclusion in the other Division 1 Sections as Starting and Adjusting, and the HVAC Commissioning Requirements. Specialists: certain sections of the specifications require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy the qualification requirements indicated. Specialists and related requirement shall include: 1. All Certification programs must be endorsed by a nationally recognized organization.

SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 GENERAL 1.01 SECTION INCLUDES A. Testing, Adjusting, and Balancing of: 1.02 REFERENCES 1. Air conditioning equipment including air distribution devices, supply ducts, air handling units, condensing units, fans, coils, and related equipment. 2. Hydronic systems including pumps, water distribution systems, chillers, boilers, heat exchangers, coils, and related equipment. B. American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) 111 Practices for Measurement, Testing, Adjusting, and Balancing of Building Heating, Ventilation, Air-conditioning, and Refrigeration Systems. C. Sheet Metal and Air Conditioning Contractors National Association (SMACNA) TAB Procedural Guide Endorsed by Testing, Adjusting and Balancing Bureau (TABB). D. Associated Air Balance Council (AABC) National Standards for Total System Balance. E. National Environmental Balancing Bureau (NEBB) Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. 1.03 DEFINITIONS A. Adjusting: Varying of system flow by modifying settings of dampers and valves, in combination with varying fan speeds to obtain optimum operating conditions for the HVAC system. B. Balancing: Proportioning of air and hydronic flows through system mains, branches, and terminal devices using standardized procedures to obtain specified air or hydronic flow while imposing the least amount of restriction on the HVAC system. C. Testing: Use of specialized and calibrated instruments to measure temperatures, pressures, rotational speeds, electrical characteristic, air and hydronic flow in velocities or quantities used in evaluating the performance of the HVAC system. 1.04 SUBMITTALS A. Qualification Statements submit company certification documents including: 1. Contractor Certification 2. Supervisor Certification 3. Technician Certification 4. Submit name of testing agency to Owner within 30 days of Notice to Proceed. 5. Submit list of projects completed by testing agency of similar size, scope, and equipment. Include name of Contractor and Building Owner contacts. Project Name/Project Number/Date 15990-1 Testing, Adjusting, and Balancing for HVAC

B. Reports: 1. Deficiency Report: Following examination of installed system, prior to balancing, submit report indicating system deficiencies that would prevent proper testing, adjusting, and balancing of systems and equipment to meet specified performance. 2. TAB Report: Submit <XX> copies of the complete testing, adjusting and balancing report, including any drawings indicating air outlets, thermostats, and equipment identified to correspond with data sheets. a. Reports shall be on TABB/SMACNA, AABC, or NEBB forms that indicate information addressing each of the testing methods, readings, and adjustments. C. Closeout Submittals: 1. Provide complete copy of testing, adjusting, and balancing report. (Include report in Operation and Maintenance Manual.) 1.05 QUALITY ASSURANCE A. Qualifications: 1. Testing and Balancing shall be performed by a testing agency who specializes in testing, adjusting, and balancing of heating, ventilating, air-moving equipment, airconditioning systems and hydronic systems and has a minimum of one year experience. 2. Testing agency shall have successfully completed a minimum of five projects, similar in size and scope. 3. Testing agency shall be a certified member of TABB, AABC, and/or NEBB. 4. Maintain a copy of applicable standards at the project site. B. Certifications: 1. TAB Technician shall be certified by a nationally recognized certifying agency. C. Perform total system balance in accordance with: 1. TABB Quality Assurance Program. 2. AABC National Standards for Field Measurement and Instrumentation. 3. NEBB Quality Assurance Program Conformance Certification. 1.06 PROJECT CONDITIONS A. Testing, adjusting, and balancing shall commence after HVAC systems installation is complete and in working order. Associated areas of general construction shall be in place including interior and exterior doors, windows, walls, and ceilings. 1.07 SPECIAL WARRANTY A. Provide warranty for period of 90 days following submission of completed report, during which time Owner may request a recheck of up to 10% of total number of terminals, or resetting of any outlet, coil, or device listed in the test report. B. Warranty shall meet the requirements of the following program(s): Testing, Adjusting, and Balancing for HVAC 15990-2 Project Name/Project Number/Date

1. TABB Quality Assurance Program 2. AABC National Project Performance Guarantee 3. NEBB Conformance Certification PART 2 PRODUCTS Not Used PART 3 EXECUTION 3.01 EXAMINATION A. Prior to commencing the testing, adjusting, and balancing of environmental system(s), verify the following conditions: 1. Systems are started and operating in a safe and normal condition. 2. Temperature control systems are installed, complete, and operable. 3. Automatic and manual dampers are operable and fully open. 4. Thermal overload protection is in place for fans, pumps, chillers, and other equipment. 5. Start up air filters are removed. 6. Final filters are clean and properly installed. 7. Duct and fan systems are clean. 8. Fans are rotating correctly. 9. Fire and volume dampers are in place and open. 10. Air coil fins are cleaned and combed. 11. Access doors are closed and duct end caps are in place. 12. Air outlets are installed and connected. 13. Hydronic systems are pressure tested, flushed, filled, and properly vented. 14. Leak testing on duct system has been performed in accordance with SMACNA standards <or as specified >. 15. Pumps are rotating correctly. 16. Start-up/construction strainers have been removed and all permanent strainers are clean and in place. 17. Gauges and/or test ports are properly located for balancing. 18. Service and balance valves are fully open. B. If deficiencies are evident, submit Deficiency Report to Architect. Do not begin testing, adjusting, and balancing of environmental systems until deficiencies have been remedied. 3.02 SITE TOLERANCES Project Name/Project Number/Date 15990-3 Testing, Adjusting, and Balancing for HVAC

A. Air Handling Systems: Adjust to within plus 10 percent of outlet total plus allowable leakage rate. B. Air Outlets and Inlets: Adjust total to within plus or minus 10 percent of design for the space. C. Hydronic Systems: Adjust to within 10 percent of design flow. D. Hydronic terminal devices: Adjust to within plus or minus 10 percent of design flow. 3.03 AIR SYSTEMS PROCEDURE A. Adhere to the follow procedure: 1. TABB SMACNA TAB Procedural Guide, with particular focus on the following chapters: a. Preliminary TAB Procedures. b. General Air System TAB Procedures. c. TABB Procedures for Specific Air Systems. 2. AABC National Standards for Total System Balance. 3. NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. B. Minimum air procedures should include the following: 1. Test and adjust fan RPM to design requirements. 2. Test and record motor full load nameplate rating and actual ampere draw. 3. Test and record system static pressures, fan suction, and discharge. 4. Adjust all main supply and return air duct to within tolerances of proper design CFM. 5. Test and adjust each diffuser, grille, and register. Reading and tests of diffusers, grilles, and registers shall include design velocity (FPM) and adjusted velocity, design CFM, and adjusted CFM. 6. Test and record outside air, mixed air, and discharge temperatures (D.B. for heating cycle, D.B. and W.B. for cooling cycle). 7. In coordination with the ATC contractor, set adjustments of automatically operated dampers to operate as specified, indicated and/or noted. 8. Test and adjust air handling and distribution systems to provide required supply, return, outside, and exhaust air quantities within design tolerance. 9. Make air velocity measurements in ducts by Pitot tube traverse across entire crosssectional area of duct in accordance with SMACNA equal area method or Log Linear method. 10. Measure air quantities at all air inlets and outlets. 11. Use volume control devices to regulate air quantities only to the extent that adjustments do not create objectionable air motion or sound levels. Testing, Adjusting, and Balancing for HVAC 15990-4 Project Name/Project Number/Date

12. Vary total system air quantities by adjustment of fan speeds. Provide drive changes recommendations. Vary branch air quantities by damper regulation. 13. Measure static air pressure conditions on air supply units, including filter and coil pressure drops, and total pressure across the fan. Make allowances for loading of filters and coils. 14. Adjust outside air automatic dampers, outside air, return air, and exhaust dampers for design conditions within specified tolerances. 15. Where modulating dampers or economizers are provided, take measurement at full return air, minimum outside air, and 100% outside air mode of operation. 3.04 HYDRONIC SYSTEM PROCEDURE A. Adhere to the follow procedure: 1. TABB SMACNA TAB Procedural Guide, with particular focus on the following chapter: a. Hydronic System TAB Procedures. 2. AABC National Standards for Total System Balance. 3. NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. B. Hydronic balancing shall include the following minimum data: 1. Prepare itemized equipment schedules listing all heating and/or cooling elements and equipment in the systems to be balanced. List in order on equipment schedules, by pump or zone according to the design, all heating and/or cooling elements, all zone balancing valves, and circuit pumps, ending with the last items of equipment or transfer element in the respective zone or circuit. Include on schedule sheet column titles listing the location, type of element or apparatus, design conditions, and measured conditions. Prepare individual pump report sheets for each zone or circuit. 2. Adjust hydronic systems to provide plus or minus 10 percent of required design quantities. 3. Use calibrated Venturi tubes, orifices, metered fittings, pressure gages, and directreading instrumentation to determine flow rates for system balance. Where flowmetering devices are not installed, flow balance on temperature difference across various heat transfer elements in the system is acceptable. 4. Adjust systems to provide specified pressure drops and flows through heat transfer elements prior to thermal testing. Perform balancing by measurement of temperature differential in conjunction with air balancing. 5. Effect system balance with automatic control valves fully open to heat or cooling transfer elements. 6. Adjust hydronic distribution systems by means of balancing cocks, valves, and fittings. Do not use service or shut-off valves for balancing unless indexed for balance point. 7. Test pumps and adjust flow. Record the following on pump report sheets: a. Suction and discharge pressure. Project Name/Project Number/Date 15990-5 Testing, Adjusting, and Balancing for HVAC

3.05 ADJUSTING b. Running amps and brake horsepower of pump motor under full flow and no flow conditions. c. Pressure drop across pump in feet of water and total GMP pump is handling under full flow conditions. 8. Where available pump capacity is less than total flow requirements or individual system parts, proportional balancing must be performed. A. Recorded data shall represent actual measured or observed conditions. B. Permanently mark the setting of valves, dampers, and other adjustment devices allowing for settings to be restored. Set and lock memory stops. C. Final report to include identification of all key outlets, key branches, and key trunks in each air system that shows a critical path of no dampening from the fan to terminal device. D. Final report to include identification of all key terminal devices, key branches, and key trunks in each hydronic system that shows a critical path of no throttling of valves from the pump to terminal device. E. Leave systems in proper working order by: replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings. END OF SECTION Testing, Adjusting, and Balancing for HVAC 15990-6 Project Name/Project Number/Date