GEM TRAP FITTING & MAINTENANCE INSTRUCTIONS

Similar documents
Ball Float Steam Trap with Integral Spiratec Sensor and Flanged Connections

S and SF Inverted Bucket Steam Traps Installation and Maintenance Instructions

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Installation and Maintenance Manual Forbes Marshall Bucket Trap FMBT50

GESTRA Steam Systems DK 45. English. Installation Instructions Steam Trap DK 45

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

Inverted Bucket Steam Traps

SMK 22 SMK SMK SMK 22-82

Powerflow Unvented water heater

Model: 1200 Model: 1200-G Model: 1200-N Float-Controlled Condensate Trap, PN 40

THERMODYNAMIC STEAM TRAP

TITAN FLOW CONTROL, INC.

Operating Manual. Model: Float-Controlled Condensate Trap, PN Safety instructions. 2 General description and usage

Installation and Maintenance Manual

PT15 MATERIAL : DIMENSIONS - Nominal in inches. AVAILABLE SPARES: Disc (Packet of 5) ORDERING INFORMATION: Refer to "HOW TO ORDER" page.

Installation and Maintenance Manual Forbes Marshall Tracer Line Trap FMMST63

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

MK 45-1 MK 45-2 MK 45 A-1 MK 45 A-2

LP30 High Integrity Low Level Alarm Probe Installation and Maintenance Instructions

Operation, Maintenance and Installation Manual

INSTALLATION, OPERATION

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

Duct heaters for ATEX/IECEx hazardous areas or in non-atex version

GESTRA Steam Systems BK 37 BK 28 BK 29. Installation Instructions Steam Trap BK 37, BK 28, BK 29 BK 37 ASME, BK 28 ASME, BK 29 ASME

Rycroft Storage & Non-Storage Calorifiers. Installation, Operation & Maintenance Manual

MODELS N150/300/675/900/1500/2500/2600 INSTALLATION, SERVICING AND MAINTENANCE INSTRUCTIONS

FT14 Ball Float Steam Trap (Screwed)

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

CD-33/CD-33S Controlled Disc Steam Traps

GESTRA Steam Systems BK 15. Installation Instructions Steam Trap BK 15, DN 40-50

Platen Heater Pad Replacement

GESTRA Steam Systems ER 50-1, ER Installation Instructions Level electrode

INSTRUCTION & MAINTENANCE MANUAL

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

Armstrong J Series Float, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual

Installation, Operation and Maintenance Instructions Electric Flow Heater OM009

ZIP Varipoint III. Installation, Maintenance and User Instructions. Models VP303, VP503 VP803, VP953 direct unvented water heaters. Issued August 2008

Model: 1413 Model: 1418 Float-Controlled Condensate Trap, PN 100

215 Gallon Waste Oil Tank With Bypass Regulator Installation Instructions

STAINLESS STEEL TRAP VALVE STATION

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Level Electrode NRG NRG Original Installation Instructions English

Model: 1100 Float-Controlled Condensate Trap, PN 25

A AD Oil burners fuel unit. deltapumps.com. DE A-AD_en_0709.pdf Page 1/1

Installation instructions. Pump Group. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)

13-1. Temperature Regulator

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

TECHNICAL DATA. Wet 26a. February 22, 2009

Circulation heaters for ATEX/IECEx hazardous areas or in non-atex version

INSTALLATION INSTRUCTIONS

AIC Series Float & Thermostatic Steam Trap Installation and Maintenance Instructions

I-VICFLEX.AB4. Victaulic VicFlex Style AB4 Sprinkler Fitting for Hat Furring Channel Ceiling Systems WARNING INSTALLATION INSTRUCTIONS

Float & Thermostatic Steam Traps for efficient condensate drainage of industrial process and HVAC equipment

Flow switch. Operating Manual. English manual page Page 1 of 15 Fax:

ICS Float and Thermostatic Steam Trap Installation and Operation Manual

Yarway Narvik Steam Desuperheater Series 4300 TempLow

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

INSTALLATION, OPERATION

Immersion heaters for ATEX/IECEx hazardous areas or in non-atex version

UNIVERSAL STYLE STEAM TRAPS WU450 Series

Issue 4 Oct Panamatic Top loading Maxi & Optima 3 Installation

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Operating and installation instructions

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

Wallace & Tiernan Gas Feed Systems V2000 Chlorinator

Oil burners fuel unit with solenoid valve

Kinetic. Logic. Astin. THERMOSTATIC INLINE CONTROL SHOWER VALVES Installation & aftercare instructions. Please retain for future reference

INSTALLATION MANUAL. Domestic hot water tank with option kit for air to water heat pump system EKHWSU150B3V3 EKHWSU200B3V3 EKHWSU300B3V3 EKUHWB

FLOAT AND THERMOSTATIC STEAM TRAPS FLT17 (DN 1/2 to 1 ; DN15 to DN25)

METIS. Installation instructions. Riser rail kit INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER.

CalMag Filter Installation Instructions

INSTALLATION & OPERATING INSTRUCTIONS

INSTALLATION OF VENTING SYSTEM COMPONENTS WARNING

VERSAFLOW VORTEX Supplementary instructions

Installation, Operation and Maintenance Manual for Model 8331 Condensate Accumulator

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

NICHOLSON STEAM TRAP THERMODYNAMIC STEAM TRAPS

FT14 and FT14HC. SG Iron Ball Float Steam Traps (1" HC, 1¼", 1½" and 2")

Condair Esco. Steam humidification system INSTALLATION INSTRUCTIONS EN 1310

Electrical cable Water supply tube Fittings for tube Coupler Teflon tape. Hole saw min. 2½" bit

PERFORMANCE SHOWER PRODUCTS

BK 45 BK 45-U BK 45-LT BK 46

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-d.

LIQUIDATOR UMT-TD Series Thermodynamic

Installation and Operating Instructions. Budget priced instant boiling water heater for beverages.

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

T-SERIES. Window & Roof Models. Installation, Set-up and Operating Instructions. 230V/1/50Hz

opening trap 30 mm Space required for Space required for opening trap 30 mm MK 45-1 with flanged ends (to DIN)

Installation Manual PS-225 & PS-275

ACT Cartridge Dust Collector

PIP PNE00004 Steam Trap Guidelines

SECTION AIR COILS

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-nA.

Lo-Carbon T-series Window & Roof Models

MW & EW 10 & 15 Litre Unvented Water Heaters HANDBOOK. IMPORTANT: This booklet should be given to the customer after installation and demonstration.

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

INSTRUCTION MANUAL. Keep this manual in a safe place for future reference TEMPERATURE CONTROL STEAM TRAP LEX3N-TZ LEX3N-TZ.

WARNING. Flexible Hose AH2 With AB6 With AB6. AH2-CC With AB6 With AB6

Transcription:

GEM TRAP FITTING & MAINTENANCE INSTRUCTIONS IMPORTANT Please read these instructions before fitting any traps. The following pages describe how each type of GEM Trap should be installed. If you are unsure or have any questions please contact you local representative Details on www.gemtrap.com 2 INFORMATION APPLYING TO ALL GEM TRAPS: All traps have individual serial numbers or batch numbers All traps are "tailor-made", with the exception of the Quartz trap All traps must be fitted in the correct allocated positions see enclosed Delivery Trap Schedule (If you are unsure of each trap s location, please contact GEM Ltd or your local representative.) INSTALLATION OF ALL GEM TRAPS Preferably, all traps should be fitted vertically, discharging downwards; however, GEM Traps may be installed in any orientation except discharging vertically upwards. All traps must be installed in accordance with HSE regulations and codes of practice for pressurised systems. If you are in any doubt, please call GEM Ltd. The pressure and temperature rating of the GEM Trap must exceed that of the application. Trap bodies or pipeline connectors must be assembled with the flow arrow in direction of flow (steam to condensate). Lock off two isolating valves upstream of the trap before commencing installation Isolating valves should be fitted on inlet and outlet pipework adjacent to GEM Traps. Non-return valves should be fitted downstream of traps to prevent condensate back flow to equipment which is not constantly in use. If condensate discharges to drain, non-return valves are not required. The use of jointing compounds on union seats is NOT recommended. If required to help the seal of unions, a thin film of copper grease or graphite anti-seize paste can be applied. Diffusers are not required and should not be fitted when GEM Traps are discharging to atmosphere. INSULATION AND IDENTIFICATION To reduce sensible heat loss from the trap bodies and increase safety, GEM recommends the use of insulation bags. Tailor made insulation bags for 15mm, 20mm and 25mm Sapphire GEM Traps supplied as standard. All bags have identification labels and are: ATEX certified for use in explosive environments. Suitable for use in the food industry. Please ensure GEM Trap body markings are clearly visible. If GEM insulation bags are not used, we recommend the use of separate labels or tags. MAINTENANCE OF ALL GEM TRAPS GEM Traps have no moving parts to wear out or fail, therefore require minimal maintenance, but it is advisable to: Perform temperature checks across traps after installation. Your area engineer can assist you with this. See table on overleaf for expected temperatures. Carry out an annual inspection with periodic cleaning of strainers and trap bodies as required. Use new gaskets every time the seal is broken. It is imperative that the correct GEM gaskets are used contact GEM for spare parts.

3 TRAP SIZING AND COMMISSIONING All steam traps, regardless of make, type or size require accurate sizing. As part of the GEM Trap s product support and 10 year performance guarantee, GEM will provide sizing services for all traps. Where possible, GEM s Area Engineers will conduct performance checks and provide free replacement traps/trap bodies in the unlikely event of sizing problems, whatever the cause. TEMPERATURE TESTING Table showing typical temperatures found during temperature testing of correctly operating steam traps with an infra red thermometer. (For guidance only ensure measurements are taken on black/dark surface) Steam/Condensate Pressure Bar (g) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PSI (g) 0 15 30 43 60 72 87 100 116 130 145 160 174 188 203 217 230 Saturated Steam Temperature ºC 10 120 134 144 152 159 165 171 175 180 184 188 192 195 198 201 204 Typical temperature range for surface measurement ºC 90 to 105 110 to 125 123 to 139 134 to 149 142 to 157 149 to 164 155 to 169 160 to 175 165 to 180 170 to 185 174 to 189 178 to 193 182 to 197 185 to 200 188 to 203 191 to 206 196 to 209 10 YEAR PERFORMANCE GUARANTEE All GEM Steam Traps are guaranteed against wear or loss of performance for a period of 10 years from date of purchase. Conditions: 1. All GEM Steam Traps, must be fitted in their correct positions as indicated on delivery schedule. 2. GEM Traps must be fitted in accordance with our installation instructions by a competent person and according to standard practice. 3. The steam system water should be suitably treated to avoid corrosion and system clogging. 4. This guarantee refers to the trapping performance of all GEM Traps and does not relate to standard components such as strainers, mesh baskets, unions or gaskets.

SAPPHIRE GEM TRAPS WITH SCREWED STRAINER & UNIONS 4 Pressure Rating: 15mm 17.2 bar (250 psi) 400 C 20mm 17.2 bar (250 psi) 400 C 25mm 17.2 bar (250 psi) 400 C 40mm 10.3 bar (150 psi) 185 C 50mm 10.3 bar (150 psi) 185 C Please note that 40mm and 50mm Sapphire Traps are not supplied with a strainer and are available with either a female of male union upstream of the trap. Ensure strainer, unions and trap body are assembled as shown. When assembling the male union on to strainer outlet a suitable threading compound or tape should be used. NOTE: Excess compound may block the GEM Trap, ensure flow is not obstructed. Body threads are factory sprayed with PTFE to prevent the possibility of binding. Repeated disassembly will remove the PTFE coating. In such instances use PTFE spray (available from GEM Ltd) to recoat trap body threads. GEM does not recommend the use of PTFE tape on the union collar threads or trap body threads. Ensure all unions are fully tightened before opening isolating valves trap sets are only assembled by hand before delivery. GEM strainers are supplied fitted with Graphite coated stainless steel gaskets on the basket caps and are factory assembled hand tight plus an additional half turn. In the unlikely event of leakage from strainer cap or unions carefully tighten cap or collars.

5 RUBY GEM TRAPS FOR FLANGED PIPE WORK RUBY TRAP ASSEMBLY WITH SEPARATE STRAINER RUBY FILTER TRAP ASSEMBLY WITH INTEGRAL STRAINER Rating: 100 bar (1450 psi) 500 C Flange and bolt specifications must be adequate for the pressure of the steam system; the fitter is responsible for checking they are correctly rated for the working pressures. ASSEMBLY The head of the Ruby is sandwiched between inlet and outlet flanges and so is suitable for all common flange specifications including PN and ANSI flanges. Flow Head length Good practice recommends that a strainer is fitted upstream of all traps. On low capacity applications (such as drip legs, trace heating and process loads less than 100kg/h) a 40 mesh strainer must be fitted immediately upstream of Ruby Traps without integral filters. Ensure either the inlet or outlet pipework can be removed to allow sufficient space for trap removal. On high capacity applications allow for a straight section of pipe before elbows or bends on trap discharge to prevent possible erosion. See table below for guidance Strainer provides withdrawal space Trap set face to face dimensions Head length Spool piece Flow Trap set face to face dimensions Face to face dimension head length + gasket thickness RECOMMENDED STRAIGHT LENGTH AFTER TRAP Flow rate Length (m) up to 1,000 Kg/hr 0.5 up to 2,000 Kg/hr 1.0 up to 3,000 Kg/hr 1.5 > 3,000 Kg/hr 2.0

EMERALD TRAPS FOR BOLT ON QUICK FIT PIPELINE CONNECTORS 6 Rating: 100 bar (1450 psi) 500 C Existing Connector: If a universal pipeline connector is already fitted, installation simply requires the GEM Trap connector to be bolted to the connector (see opposite). Ensure that the existing connector is installed in an acceptable orientation (see below). A new GEM gasket should always be fitted between the connector and GEM Trap (see below). New Connector: Pipeline connectors should be installed with the grooved mating surface facing upwards. It is also acceptable to install the connector with the mating face on the side of the pipework in the vertical plane, but not underneath the pipework. Cap: The Emerald Trap Cap is pre-assembled fully tightened. If leakage occurs when the steam is tuned on, immediately tighten the cap or screws as required until leakage stops. Replacement GEM graphite coated stainless steel cap gaskets should be assembled hand tight plus an additional half turn, or until a seal is formed. To avoid cap binding to body Graphite Anti Seize paste is factory applied to Cap threads. If the Cap is repeatedly removed and refitted small amounts of paste should be reapplied. Anti-Seize paste is available from GEM. Trap Fitting: The trap body should be bolted onto the mating face of the connector with the external graphite plate gasket sandwiched in between. The bolts should be hand tight plus an additional half turn, or until a seal is formed. EMERALD ASSEMBLY Cap Internal gasket Strainer basket Emerald Trap Suitablle for universal pipeline connectors External gasket GEM Pipeline Connector for screwed or welded connection (If required) M10 Socket head cap screws

7 QUARTZ GEM TRAPS FOR REPETITIVE MINIMAL LOAD APPLICATIONS Rating: 100 bar (1450psi) 500 C TOPAZ GEM TRAPS FOR CLEAN STEAM SYSTEMS Rating: 10 bar (145 psi) 200 C NOTE. This trap is an off the shelf trap designed for minimal loads, e.g. drip legs and trace heating lines. It is not tailor made by GEM Ltd for each application so performance temperature checking should be performed after installation. See table on page 3. Condensate duties should be determined by performing bucket tests with GEM engineers for generic sizing purposes. Ensure flange patterns are identical and assemble using Triclover or Dockweiler clamps. Ensure trap is installed with its flow arrow in the direction of flow. Strainers are not required for traps installed in a clean steam system. Quartz traps are supplied pre-assembled. Before fitting to inlet pipe, ensure the mesh filter is fitted and the inlet is fully tightened on to main body of the trap. Graphite faced METACAM 316 Stainless Core gaskets are factory fitted. After a maintenance inspection/cleaning ensure new gaskets are correctly fitted and tightened to torque of 50 N/m before re-assembly (contact GEM for spares). After screwing feed pipe into the trap inlet, ensure the trap body and inlet are tightened to give a metal to metal seal. To avoid binding of the thread, PTFE spray is factory applied to the external thread of the trap body. Repeated inspection may wear off the PTFE coating, which should be reapplied with PTFE spray (available from GEM Ltd). Where the trap outlet is piped into a condensate return, a union should be installed to facilitate future removal and inspection.

Gardner Energy Management 1 John Street Bristol BS1 2HS United Kingdom Telephone +44 (0)117 917 7010 Facsimile +44 (0)117 917 7011 Email enq@gemtrap.co.uk Website www.gemtrap.com Issue reference number v2.1.11.05 Revision date: January 2006 GEM Ltd. reserve the right to change the GEM Trap design and product range. All patents, design rights and copyrights will be strictly enforced