Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Similar documents
Electrical Design Guidelines Table of Contents

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

Electrical Inspection Service & Distribution

Element D Services Electrical

Introduction Consultant shall incorporate the material in the DSS into the project specifications.

Technical II Report Electrical Systems

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN

ELECTRICAL POWER SYSTEMS

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. #

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Page 1 of General

PANELBOARDS & BUILDING DISTRIBUTION

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015

Machinery Room Electrical Best Practices

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Executive Summary. CNBC Global Headquarters Christine Cajilig

Technical Report 2: Electrical Systems Criteria and Existing Conditions

SECTION : MEPS IDENTIFICATION & LABELING

SECTION AUTOMATIC TRANSFER SWITCHES

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004

A. Shop Drawing submittals shall include, but not be limited to, the following:

SECTION AUTOMATIC TRANSFER SWITCHES

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

TONY ESPOSITO LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY

National Electrical Code

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

CHAPTER 8 ELECTRICAL

PGR-8800 TECHNICAL FAQ

Distribution Control Center Operator Training

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

Existing Building Electrical Systems Description

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

Division 26 ELECTRICAL TABLE OF CONTENTS

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

Currently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

ELECTRICAL DESIGN BRIEF

Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION ENCLOSED CONTROLLERS

CHAPTER 8 ELECTRICAL

EMERGENCY POWER SYSTEMS

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

SECTION ELECTRICAL IDENTIFICATION

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

16620 EMERGENCY POWER SYSTEMS

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

SECTION (16075) - IDENTIFICATION FOR ELECTRICAL SYSTEMS

CONTENTS. B. System Design and Performance Requirements

SECTION ISOLATED POWER SYSTEMS

SECTION GENERATOR PARALLELING CONTROLS

Technical Report Two

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Property risk solutions

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Electrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments.

GARCIA GALUSKA DESOUSA Consulting Engineers

Building Electrical System Overview

ENGINE GENERATORS AND ACCESSORIES

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems

GPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators

Chapter 1 General... 5

Advantage Services Capabilities

Related Sections: TBD. Effective Date: January 1, 2016

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

13. ELECTRICAL - TECHNICAL

LIVELIFE.TRAVELWELL. DesignStandardsManual Electrical DenverInterna onalairport AirportInfrastructureManagement

CHAPTER 20 SERVICE EQUIPMENT

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

EQUIVALENT INITIAL ELECTRICAL SAFETY ASSESSMENT

Air Flow Diagram. Orange County Sanitation District SP-194 Section 05 Conceptual Design

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

SECTION EMERGENCY POWER SYSTEMS

PART 4 ELECTRICAL STANDARDS

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection

DIVISION 16 ELECTRICAL SYSTEMS

S AGE E NGINEERING A SSOCIATES, LLP

CONTENTS AUTOMATIC TRANSFER SWITCHES

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

SPECIFICATIONS FOR ELECTRICAL INSTALLATIONS

Appendix B. Facilities Assessment Report

Chang Liu Lighting + Electrical M.A.E./B.A.E. Integrated Degree. Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

SEL Arc-Flash Solutions

INITIAL ELECTRICAL ASSESSMENT REPORT (EAR)

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Transcription:

PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities on the main campus. Electricity is distributed on the campus at two operating voltages: 11.2 KV and 4.16 KV. Both distribution systems are configured as three phase, three wire, grounded wye. National Grid feeders supply the University electrical distribution system at 11.2 kilovolts (kv). Electricity is in turn distributed to facilities throughout the campus via local distribution substations and underground electrical ductbanks and circuits. Building distribution transformers in turn step the distribution voltage down to a utilization voltage of 120/208 volts, three phase 4 wire and/or 480/277 volts three phase four wire. B. Brown University facilities located in the downtown area (Jewelry District) are typically directly served by National Grid, the local utility company. Buildings in this area are typically fed from the downtown network, which is an underground network distribution system operating at 11.2 KV. Buildings are served either from outdoor padmount style transformers or indoor electrical vaults which directly feed the building secondary services at a utilization voltage of 120/208 volts, three phase 4 wire and/or 480/277 volts three phase four wire. C. Building electrical consumption and key building loads are metered by the Campus Utility Metering System, which consists of digital electric meters that are connected to supervisory servers via the campus Ethernet. Submetering of major systems is required in all new buildings, and in most renovations to existing buildings. Metering and consumption data is stored and archived in servers located in the Facilities Management Building. Reference Section 16002C Campus Central Metering System Design Criteria for details. 1.2 RELATED SECTIONS A. Section 01301- Design Guidelines for Energy and Environment B. Section 01701 - Building Systems Identification and Labeling C. Section 01771 Contract Record Documents 1.3 DESIGN CALCULATIONS: A. For all projects, the Engineer of Record shall perform the following basic electrical system design calculations and information prior to the completion of design. This information shall be submitted as a part of the overall project 26 00 10 1 of 7 Electrical Design Criteria

design documentation for review. Basic electrical system information required for the preparation of these studies shall be provided by the Brown University Project Manager as required. 1.Fault current availability (Short Circuit Analysis), to determine the worst-case fault current at each major equipment location. This study is required for proper selection and verification of powered mechanical equipment and electrical distribution equipment fault current withstand and interrupting ratings, and protective device sizing. 2.Load calculations and building power requirements for sizing of electrical distribution equipment, transformers and feeders. For modifications to existing building systems, verify existing system loads and perform analysis to evaluate impact of new loads on existing building and/or campus distribution systems. 3.Emergency and legally required standby power requirements and equipment sizing. For additional loads to be added to existing Emergency systems, coordinate with the Brown University Project Manager to determine existing system loading and spare capacity. 4.Short circuit and coordination studies for fuse sizing and selection, determination of setpoints for adjustable trip circuit breakers, relays and other circuit protective devices. 5.Voltage drop (on primary feeders and/or long low voltage runs). 1.4 Short-Circuit, Arc Flash and Overcurrent Device Coordination Studies: A. For all new construction, gut building renovations, larger and /or more specialized electrical system design projects, and when so directed by the Brown University Project Manager, perform the following electrical system design calculations. 1. Short circuit and overcurrent device coordination study: perform studies in accordance with IEEE Red Book standard 141 for all service and distribution equipment, including arc flash hazard calculations per IEEE 1584 and NFPA 70E requirements. 2. Overcurrent device coordination study to include time-current plots for phase and ground overcurrent coordination. Provide settings for all adjustable-trip electrical circuit protective devices, such as circuit breakers, relays and voltage sensors; provide settings for all automatic transfer switches, stanby power systems, variable speed drives, chillers and large powered mechanical equipment. 3. Arc-flash protection studies, provision and installation of specific equipment Arc-flash labeling for determination of the level of incident energy available and required personnel hazard protection. 4. Power system harmonic analysis study: required for all applications involving loads with high concentrations of harmonic content, such as personal computers, data processing equipment and variable speed drives for motors over 25 HP. Analysis shall include proposed 26 00 10 2 of 7 Electrical Design Criteria

mitigation measures to maintain total harmonic distortion at the building service within the requirements of IEEE 519, and the proper selection of equipment required to withstand anticipated harmonic distortion levels, ie. K-rated transformers. Harmonics analysis studies shall also be provided as required to comply with National Grid Company rebate program requirements. 5. Required studies shall include all electrical systems originating from the project primary service, through the service transformer(s) and distribution system down to the representative branch circuit level; include feeders and connections for major mechanical and other powered equipment. Where existing facilities are to be reconnected to new project distribution systems, include existing facility distribution systems in the studies. 6. Study reports to be provided in computer-generated format using SKM Power Tools or EDSA software. Study reports to be reviewed and stamped by a registered Professional Engineer. 1.5 MISCELLANEOUS REQUIREMENTS: A. Electrical equipment shall be configured and arranged to allow other Brown University Standards requirements to be met. B. O&M requirements: Operating and Maintenance procedures shall be provided in Owner-approved format compatible with the requirements in Brown Standards, Section 01771. Documentation shall include detailed System Sequences of Operation PM schedules, PM procedures, and baseline performance measurements for use in troubleshooting, re-commissioning or retro commissioning, engineering, and cost analyses. C. Buildings located in areas served by the Brown University campus distribution grid shall be powered from the grid, except as directed in writing by the Brown University Project Manager, in coordination with FM Operations and Engineering staff. D. Energy Rebate requirements shall be incorporated into all work. Application forms to be forwarded to Brown project manager. Reference Section 01351 Electric Rebate Program for additional requirements and information. E. Arc-flash labeling shall be provided for each piece of major electrical utilization equipment being installed in the project that is likely to require examination, adjustment, maintenance or service while energized, including but not limited to, high voltage equipment, transformers, switchboards, panelboards, and safety switches. Arc-flash labeling shall also be provided for all motor starters, variable speed drives, and any other three-phase electrically-powered mechanical equipment likely to require adjustment and calibration while energized, such as chillers, cooling towers, boilers and equipment control panels. 26 00 10 3 of 7 Electrical Design Criteria

F. Equipment identification, labeling and tagging: Refer to Section 01701. 1.6 GENERAL ELECTRICAL DESIGN REQUIREMENTS: A. It is Brown University s intent to coordinate and limit the loads added onto the campus distribution systems based on the size of the new loads and their location on the campus. In general, new building loads of 150 KVA and below shall be served from the 4.16 KV distribution system where it is readily available. Loads larger 150 KVA shall be served from the 11.2 KV distribution system. B. In general, building loads on the 4.16 KV distribution systems are configured as a radial primary connection; building loads on the 11.2 KV distribution system are configured as a loop-primary connection system. Actual distribution system connection locations and service voltages shall be coordinated with the Brown University Project Manager and Facilities Operations and Engineering staff. C. Buildings less than 25,000 gross sq. ft. and connected loads less than 250 kw may have a main secondary voltage of 208Y/120V. D. Buildings with areas exceeding 25,000 gross sq. ft., or connected loads exceeding 150 kw are recommended to have a main secondary voltage of 480Y/277V, and 120/208V for User and small power loads. 1.Mechanical equipment and lighting panels should be 480Y/277V. 2.Distribution step down transformers should provide 208Y/120V to panels serving convenience power and receptacle loads. 1.7 RELIABILITY AND REDUNDANCY CONSIDERATIONS FOR FACILITIES: A. For certain Critical facilities, redundancy of electrical supplies shall be provided where program needs require electrical power to be available in the event of a component failure or to allow for routine preventive maintenance procedures on the building distribution systems. Redundant supplies may be achieved by one or more of the following depending upon the type of facility. System redundancy needs shall be as directed by Brown University Project Manager in coordination with FM Operations and Engineering staff. 1. Double-ended switchgear/building service transformers, in a main-tiemain configuration, and connected to the primary distribution system in a loop-fed primary configuration. The switchgear/building service transformers shall be sized such that the overall building demand load may be carried on only one side of the switchgear. 2. Installation of permanent provisions at building exterior wall for ready connection of a roll-up generator to the building main switchboard. 26 00 10 4 of 7 Electrical Design Criteria

1.8 EMERGENCY AND STANDBY POWER CONSIDERATIONS: A. In general, many campus facilities (such as offices, small classroom, academic, and support facilities) typically only require Emergency power for Life Safety needs (egress lighting, exit signage and fire alarm systems). Other facilities, typically those containing Research and other important campus functions, or buildings having large Life Safety loads such as electric-powered fire pumps, smoke control systems, etc. will require a Standby generator, as their program or research needs require electrical power to be continuously available in the event of a utility outage or building outage. B. Connections of equipment to Emergency and/or Standby generator power shall be as directed by Brown University Project Manager in coordination with FM Operations and Engineering staff and shall be specified in design documents at all project stages. Where projects require connections to an existing generator, analysis shall be made on the existing generator system to verify adequate spare capacity is available to accommodate the added load(s). This may require load bank testing of the generator to verify full-load KW output. 1.9 ELECTRICAL SPACE PLANNING GUIDES: A. The following requirements are to be used for electrical space planning considerations at the conceptual design level. Refinements and modifications will be considered upon evaluation of the specific requirements in the building: 1. Main Service Entrance room shall provide for adequate equipment and maintenance clearance. Allow for clear access within the room(s) and to the building exterior for rigging in and replacement of major electrical equipment. 2. Medium-voltage equipment, where located in a common main electric room, shall be isolated from routinely accessed low-voltage local distribution panels by a full height chain link fence and a padlockable personnel access gate. 3. Centrally locate and stack local electrical rooms wherever possible so that feeder conduits and bus duct are run as straight and short as possible. 4. Electric room doors shall swing out as required by the National Electrical Code (NEC). 5. Electrical rooms shall not share space with storage, telecommunications, custodial supplies, major mechanical systems and piping. 6. Where possible, locate electric rooms away from outside walls, elevator shafts, stairwells, HVAC duct chases and other major utility corridors so that branch circuits can fan out in all directions. 7. Locate electrical room where it is not susceptible to flood from heavy rains, broken pipes, stopped drains, or surface drainage.. 8. Locate branch circuit distribution panels serving general building loads in dedicated closets or rooms; do not locate panels in public corridors. 26 00 10 5 of 7 Electrical Design Criteria

Distribution panels serving multiple branch circuit loads within a room, such as within research labs, may be located within the rooms. 9. Provide a separate space in the building for storage of spare lamps. 1.10 ELECTRIC ROOM DETAILED DESIGN GUIDES: A. Floor mounted electrical equipment to be installed on concrete housekeeping pads. Pads to be painted yellow. B. Electric rooms shall have proper ventilation, thermostatically controlled, to remove excess heat. C. Electric room lighting shall be fed from an emergency generator source, if available. D. Electric Rooms containing medium-voltage distribution equipment to include Safety grounding ring comprised of either a continuous ground bar or multiple interconnected ground busses, with all equipment connected to at least two ground points. Visibly bond all equipment, room door frame(s), etc. to the ground ring. E. Building main electrical rooms shall contain a ground bar for single point common bonding and connection of the building Grounding electrode system, site distribution grounding connections, building equipment grounding connections and intersystem (telephone, fire alarm, telecommunications, etc.) grounding connections. Install dedicated ground bars in each telecommunications room and electrical distribution room, which are bonded and connected back to the main electric room grounding bar. 1.11 ELECTRIC METERS A. All buildings that are connected to the campus distribution systems shall be separately metered and connected into the campus Central metering system. All academic and research buildings in the Jewelry District shall be separately metered and connected into the campus Central metering system. B. Provide additional submetering of key electrical system loads, such as lighting, HVAC or User loads, only where required by LEED or other project requirments. C. Refer to section 16002C Campus Central Metering System Design Criteria for additional details on electrical metering. 1.12 EQUIPMENT MANUFACTURERS: A. Square D and Siemens shall be standard for all distribution equipment unless a specific or additional manufacturer(s) is identified in detailed electrical Standards. 26 00 10 6 of 7 Electrical Design Criteria

B. All new installations requiring switchboards, switchgear, panelboards, disconnect switches, and other power related components shall all be from the same manufacturer. New equipment installed within existing facilities shall be of the same manufacturer as already installed within the facility. C. Older installations with obsolete manufacturers: coordinate with Brown Project Manager. 1.13 ACCEPTANCE TESTING: A. The Engineer of Record shall determine the particular field and factory acceptance testing requirements for each project in coordination with FM Operations and Engineering staff. B. As a minimum, factory acceptance tests are required for generators, transformers and low and medium voltage switchgear. C. Field acceptance testing for electrical distribution equipment and equipment feeders shall be completed in accordance with International Electrical Testing Association Inc. (NETA) Acceptance Testing Specifications. D. All adjustable-trip electrical protective devices, including relays, circuit breakers and automatic transfer switches shall be set and calibrated per coordination study recommendations. E. Perform an infrared thermographic inspection of all distribution equipment and feeder connections per NETA Standards, six months after beneficial occupancy. Submit reports identifying the inspection, summary of issues found and what corrective measures were taken. F. Metering systems and equipment shall be commissioned to verify proper setup, calibration and recording of data into the Campus Metering System. END OF SECTION 26 00 10 7 of 7 Electrical Design Criteria