ErP OPERATIONS MANUAL FOR AIR HEATER PROTON ECO. PROTON ECO Three-speed AC-motor

Similar documents
ErP OPERATIONS MANUAL FOR AIR HEATER PROTON AST. PROTON AST Air Heater with the anemostat

ErP OPERATIONS MANUAL FOR AIR HEATER PROTON JET. PROTON JET Air Heater with with AirJet nozzle.

ErP OPERATIONS MANUAL FOR AIR HEATER PROTON EL. PROTON EL Electric heating.

ErP OPERATIONS MANUAL FOR СOMMERCIAL CURTAINS PROTON HEAT DOOR C2. Safety precautions Construction and dimensions Technical parameters Installation

Technical documentation

Technical documentaton DTR. Farmer

Technical documentaton DTR. Farmer

Technical documentation DTR AIR WATER HEATERS IN EPP CASING HC-3S SERIES

Technical documentation DTR. Farmer HCF in EPP casing

USER S MANUAL. Heat Recovery Ventilator. Vents Brig HRV 200 Vents Brig HRV 300

HEATING AND COOLING DEVICE AGC

USER S MANUAL. VCU/VCUN Series CENTRIFUGAL FAN IN SCROLL CASING

Technical documentation DTR

USER S MANUAL. Heat (Energy) Recovery Ventilator. Vents Frigate HRV 120 S Vents Frigate ERV 120 S

Technical documentation: S1 S2 S3 S4

Series VUT PW EC. wool internal heat and sound-insulating layer for VUT PE/PW 350, 600, 1000 units and 50 mm for VUT PE/PW 200, 3000 units.

USER S MANUAL NKP. Duct heater for supply air pre-heating with external control

CMA CONDENSING UNITS FOR OUTDOOR INSTALLATION INSTALLATION AND OPERATION MANUAL

1.1 VTS: number 1 in the world pillars of success

TECHNICAL DOCUMENTATION DTR AIR WATER HEATERS IN STEEL CASING S SERIES

Catalogue 2015 AHU N Range: VENTUS VS 10 - VS 650

TopVent Design Handbook

A tool for professionals.

Series. Suspended air supply units with the air capacity up to 4100 m 3 /h in the sound- and heat-insulated casing with the water heater

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual

Series VENTS VUT R WH ЕС

USER'S MANUAL INLINE CENTRIFUGAL FANS IN SOUND-INSULATED CASING VS, VS EC SERIES

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL

TECHNICAL DOCUMENTATION DTR AIR WATER HEATERS IN STEEL CASING S SERIES

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE ELECTRONIC CONTROL

VERSO Air Handling Units

BRT C/H Series PACKAGED AIR TO AIR UNITS COOLING / HEATING APPLICATIONS OUTDOOR INSTALLATION. Ver. 1.01

HEAT RECOVERY VENTILATOR

VERSO Air Handling Units

USER S MANUAL. VKP Series INLINE FAN

USER S MANUAL UET CONTROL UNIT FOR THE AIR HEATING UNIT WITH ELECTRIC HEATER AOE SERIES

Calm. Service Instructions

HEAT RECOVERY AIR HANDLING UNIT

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4

DAZZLE TM series Cassette Type Fan Coil Unit. FC-NHDU4 Cassette Type Fan Coil Unit 340~2380 m 3 /h

Technology for life. Unit heater LH

OK, OKA, OKAF; ELD; ELDM; ELH; OKC; SC; SCA; SCAF; OK-LN; OKA-LN; OKAF-LN.

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

SOUND-INSULATED FAN. Iso-B OPERATION MANUAL

DUCTIMAX 2-8 kw. Medium available static pressure ducted hydronic units. Duct unit DUCTIMAX

CMA TECHNICAL MANUAL CONDENSING UNITS FOR OUTDOOR INSTALLATION O L S A F RA N

AXIAL FANS USER S MANUAL

USER MANUAL. Frigate HRV 120 SR Frigate ERV 120 SR. Heat (energy) recovery ventilation unit

Air curtain.

CENTRIFUGAL FAN IN SCROLL CASING. Helix S-Vent OPERATION MANUAL

Product is subject to and complies with Regulation (UE) N.327/2011. cert. n Fan Coil Unit Cassette SkyStar Jumbo ECM. technical catalogue

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Series VENTS MPA...W. Supply units with the air capacity up to 6500 m 3 /h in the compact sound- and heat-insulated casing with water heater

HERO SERIES-DC INVERTER HEAT PUMPS

panel filters with filtering class G4. Supply filter F7 can be supplied with the few models.

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

Fan heater Panther Powerful fan heater for large premises

Güntner Info GVX. with microox technology kw. Always a step ahead: microox condenser system with maximum installation flexibility

ENERGY SAVING VENTILATION GEO VENTS GEOTHERMAL SYSTEMS

CENTRIFUGAL CEILING EXTRACT FAN

EBAC MODEL K100 DEHUMIDIFIER OWNER S MANUAL

EBAC MODEL CD30 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

CS90H INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

AIR HANDLING UNITS RIS P EKO 3.0. New range - 5 sizes, 20 models! Efficient EC. E f f i c i e n c y up to 94%! E x t r e m e l y low height! fans!

GHF CXGHF GGHF. The all-in-one solution for commercial refrigeration! Güntner Info. High efficiency wall/ceiling-mounted air cooler. 0.

AIR CURTAIN COMPACT 2 SURFACE MOUNTED RANGE

Issue5 07/13 USERS MANUAL IN-LINE MIXED FLOW

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER WITH RELAY CONTROL

SPECIFICATION GUIDE NEOSYS. Air-cooled Liquid Chiller for outdoor installation (NAC) Nominal cooling capacity: 200 to 460 kw

Air handling units KLASIK. Unique solutions available Flexible performance & economy Reliable, stable & efficient Tight casing & perfect insulation

Wind. Service instruction

AUTO COOL DRY FAN SPEED AIR SWING OFF ON TIMER TIMER OFF/ON FAN SPEED MODE TEMP AIR SWING TIMER ON SET OFF CANCEL AC RC SET CHECK CLOCK RESET

USER S MANUAL AiR duct heater with integrated temperature control UNit or A control UNit

INSTALLATION OPERATION & MAINTENANCE INSTRUCTION HEAT RECOVERY UNITS VHR MODELS

30GH Air-Cooled Liquid Chillers 30GH Nominal cooling capacity kw

INDUSTRIAL AIR CURTAIN. IndAC 2

RAH Ka AIR COOLED WATER CHILLERS WITH SCREW COMPRESSORS AND AXIAL FANS. COOLING CAPACITY FROM 387 TO 1207 kw 1 AND 2 COOLING CIRCUITS

42GWC Hydronic Cassette Fan Coil Units

Application guide FLATAIR - FLCK/FLHK. Providing indoor climate comfort

CENTRIFUGAL CEILING EXTRACT FAN

> HGA AIR - WATER HEAT PUMPS FOR OUTDOOR INSTALLATION. Available range. Unit description. Options. Accessories

CASSETTE UNIT. Comfort Circle

Residential and Light Commercial Ductless Systems Catalog

42AM. Air heaters PRODUCT SELECTION DATA

Bi2 4tubes * SLR 4T Fan coil radiator for heating and cooling at the same time. FEATURES. Cools, Dehumidifies, Heats and Filters

MANUAL Air curtain WRM06+ WRM08+ WRM10+ WRM12+

REPEATER FS5200R INSTRUCTION MANUAL

DOLPHIN RADIATOR & COOLING SYSTEMS P.O.Box: 1424,Ph#: , Fax#: ,

TECHNICAL DATA & SERVICE MANUAL

BLAST FREEZING ROOMS

Electric Space Heater

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315

HI Industrial Utility Heater HI Soleus Air International

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

CoolTeg Plus XC40. AC-TXC Direct expansion Air-conditioning unit with integrated compressor

Electric Salamander CHM-1200W CHM-2400W CHM-4350W. User s Manual

238 Series. Industrial/Commercial Electric Unit Heater. Owner s Manual

AQUASNAP JUNIOR 30RHV

ECO85 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Transcription:

05010416 OPERATIOS MAUAL FOR AIR HEATER PROTO ECO ErP 2015 PROTO ECO Three-speed Safety precautions Construction and dimensions Technical parameters Installation E RU www.protongroup.org

COTETS Operations manual for air heater PROTO ECO: 1. Introduction... 3. 2. Safety precautions... 4 3. General information... 5 4. Dimensions... 6 5. Construction... 7 6. Technical characteristics... 8 7. Mounting consoles... 10 8. Installation... 15 9. Connection of heat medium... 17 10. Control elements... 18 11. Wiring control elements... 21 12. Reference information... 30 2

1. ITRODUCTIO The company PROTO GROUP LLC thanks you for choosing air heaters PROTO. This manual is an integral part of the product and must always accompany it, and should be transferred to the user. To provide proper wiring and application of the unit, please, study this manual thoroughly before installation. We recommend keeping the manual safe in order to address it during operation. The user should strictly follow safety instructions while installing, using and servicing the unit. The access to the unit must be restricted for unauthorized and unqualified personnel. The appropriate training of the maintenance staff should be provided. The manufacturer disclaims any responsibility for damages caused by wrong installation and misuse of the unit. The manufacturer disclaims any responsibility for damages done by people who didn t study the manual. The manufacturer preserves the right to introduce any amendments to the manual without prior notification. The manufacturer preserves the right to alter the construction which doesn t impact its functioning and basic technical parameters. The air heater is intended only and exclusively to be installed and used for purposes which it has been designed. Any misuse or noncompliance with the manufacturer s instructions may lead to property damages, personnel injuries or death. The user has to take measures to eliminate possibilities of misuse of the unit. 3

2. SAFETY PRECAUTIOS Before any actions connected with the air heater, please, study this manual to provide safety. Installation and connection of the equipment to pipelines and networks must be performed by qualified personnel only, having appropriate access. During installation, start-up, repair and maintenance of the air heater follow the safety rules. Install the unit on a firm base or surface, which can stand its weight filled with water. Use screws appropriate for the material which the base is made of. Check correctness of connections of the system, accordance of the heat medium parameters to the parameters indicated on the rating plate as well as leak proof of joints before filling in the heat medium. Avoid substances and impurities in the heat medium causing copper corrosion. Check compliance of parameters of the electrical supply network to the ones indicated on the unit s rating plate before connecting to the power supply. Check grounding. Prohibit the use of the unit without grounding as it may cause property damages, personnel injuries and death. Current network which feeds the unit s motor and controls must be additionally protected by a fuse to prevent consequences of shunt fault. Thermal protection of fan s motor is built-in and works in a standalone mode. -t While the air heater is operating under low temperatures, the user must provide protection of the water heat exchanger or use heat medium with special additives preventing copper corrosion. To prevent defrosting of the air heater s heat exchanger when circulation of the heat medium is stopped during a heating period under outdoor temperatures lower than 0 C, you need to drain the heat medium from the heat exchanger and blow it off by compressed air. 4

3. GEERAL IFORMATIO ErP 2015 PROTO E 25; E 35; E 45; E 55; E 65; E 75 PROTO E15 PROTO ECO These air heaters are designed for heating buildings inside meeting present-day requirements. The series has some peculiarities, namely: multi-speed, wide model range, flexible settings of control elements, acceptable price. Large choice of control elements allows to provide various working modes of the equipment, including individual or group settings, manual or automatic control, multi-step temperature regulation or maintenance of constant temperature in the building. Model range PROTO E 15 heating power 5-20 kw PROTO E 25 heating power 15-25 kw PROTO E 35 heating power 20-35 kw PROTO E 45 heating power 25-50 kw PROTO E 55 heating power 30-60 kw PROTO E 65 heating power 35-65 kw PROTO E 75 heating power 40-75 kw Principle of operation Outlet pipe Applications Warehouses and hangars Production facilities Logistics centers Wholesale and retail premises Parking places Car service centers Sports facilities Airports Car washes Winter gardens and green houses Buildings of worship Inlet pipe The air heater PROTO is an element of a heating system. It is designed for heating air and its even distribution in buildings. Its work is based on axial fan functioning, which charges the air and pass it through a copper-aluminum heat exchanger in which the heat medium (hot water) flows at certain temperature. Heated air is supplied into a room and is directed to the working area by directing louvers. 5

4. DIMESIOS Dimensions of the air heater PROTO E 15 305 440 510 464 Dimensions of air heaters PROTO E25 / E 35 / E 45 / E 55 / E 65 / E 75 385 675 675 620 6

5. COSTRUCTIO Major components of the air heater PROTO ECO Casing The casing consists of plastic components. The use of aerodynamic fins permits to achieve minimal eddies of air flow that reduce noise and vibrations. Fan The fan is fixed in a special diffuser on the back of the unit, thanks to which air flow is evenly distributed on the heat exchanger s surface. This provides its most effective application. This solution decreases noise level created by the flowing air. The fan is equipped with a special grill which protects the heater from falling in of debris, leaves etc. as well as prevents possible personnel injures or death caused by rotating fan s blades. Rated power supply of PROTO ECO fans is 230 /50 Hz. Motor protection grade is IP54. Operating temperature is up to +55 C. Heat exchanger The heat exchanger consists of copper tubes and aluminum lamellas pressed on them. It is equipped with copper pipes with threading connection (external thread 3/4 ). The copper-aluminum heat exchanger is distinguished by high efficiency, is not exposed to corrosion if you don t use substances and impurities in the heat medium causing copper corrosion. Maximal parameters of heat medium supply are 105 C/1,6 MPa. Directing louvers They are made of aluminum and dyed by special paint, and provide minimal air resistance at the outlet from the air heater. Aesthetic look and high protection from corrosion guarantee durability and safety. 7

6. TECCAL CHARACTERISTICS General parameters E 15 E 25 E 35 E 45 E 55 E 65 E 75 umber of heat exchanger rows Airflow Heating power Air temperature increase R m³/h kw С 2 1 1 2 2 3 1600 4600 5500 4100 5000 3700 3 4500 20.0 26.5 32.6 47.5 58.1 65.1 75.9 37.1 23.8 17.6 42.8 34.5 57.6 50.0 Max. temperature of heat medium С 105 105 105 105 105 105 105 Max. working pressure MPa 1.6 1.6 1.6 1.6 1.6 1.6 1.6 Max. warm air throw m 13 25 27 24 26 23 25 olume of water in heat exchanger dm³ 1.04 1.30 1.30 2.25 2.25 3.18 3.18 Diameter of connection pipes inch 3/4 3/4 3/4 3/4 3/4 3/4 3/4 Weight without heat medium kg 10.1 17.1 17.3 19.0 19.2 20.8 21.0 Supply voltage /Hz 230/50 230/50 230/50 230/50 230/50 230/50 230/50 Motor power W 90 320 420 320 420 320 420 Rated current of motor А 0.42 1.40 2.00 1.40 2.00 1.40 2.00 oise level db 48 53 57 53 57 53 57 Motor protection rating IP 44 54 54 54 54 54 54 Parameters according to the heat medium E 15 Parameters T z / Tp ( С) Water 90/70 Water 80/60 Water 70/50 Water 60/40 Qp (m³/h) 1 600 P p1 ( С) 0 5 10 15 20 25 P g (kw) P p2 Q w p P g P p2 Q w p P g P p2 Q w p P g P p2 Q w ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) 20.0 37.1 0.9 6.3 17.1 31.6 0.8 4.8 14.1 26.0 0.6 3.5 10.9 20.3 0.5 2.3 18.7 39.6 0.8 5.6 15.7 34.1 0.7 4.1 12.7 28.5 0.5 2.9 9.6 22.7 0.4 1.8 17.4 42.0 0.8 4.9 14.4 36.5 0.6 3.5 11.3 30.9 0.5 2.4 8.2 25.1 0.4 1.4 16.0 44.5 0.7 4.2 13.0 38.9 0.6 2.9 10.0 33.3 0.4 1.9 6.7 27.4 0.3 1.0 14.7 46.9 0.7 3.6 11.7 41.3 0.5 2.4 8.6 35.7 0.4 1.4 5.2 29.6 0.2 0.6 13.3 49.3 0.6 3.0 10.3 43.7 0.5 1.9 7.2 38.0 0.3 1.0 3.4 31.1 0.1 0.3 p (kpa) Parameters according to the heat medium E 25 Parameters T z / Tp ( С) Water 90/70 Water 80/60 Water 70/50 Water 60/40 Qp (m³/h) 4 600 P p1 ( С) 0 5 10 15 20 25 P g Q w P g Q w P g Q w P g P p2 Q w P p2 p P p2 p P p2 p p (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) 26.5 23.8 1.2 6.9 22.5 20.3 0.9 5.3 18.5 16.7 0.8 3.8 14.4 13.0 0.6 2.5 24.7 27.2 1.1 6.1 20.7 23.7 0.9 4.5 16.7 20.0 0.7 3.1 12.6 16.3 0.5 1.9 23.0 30.6 1.0 5.3 19.0 27.0 0.9 4.5 14.9 23.4 0.6 2.6 10.8 19.7 0.5 1.5 21.2 34.0 0.9 4.6 17.2 30.4 0.8 3.2 13.1 26.7 0.6 2.0 8.9 22.9 0.4 1.0 19.4 37.3 0.9 3.9 15.4 33.7 0.7 2.6 11.3 30.1 0.6 1.5 6.9 26.1 0.3 0.7 17.6 40.6 0.8 3.3 13.6 37.0 0.6 2.1 9.4 33.3 0.4 1.1 4.5 29.0 0.2 0.3 Parameters according to the heat medium E 35 Parameters T z / Tp ( С) Water 90/70 Water 80/60 Water 70/50 Water 60/40 Qp (m³/h) 5500 P p1 ( С) 0 5 10 15 20 25 P g (kw) P p2 Q w p P g P p2 Q w p P g P p2 Q w p P g P p2 Q w ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) 32.6 17.6 1.4 10.1 27.8 15.0 1.2 7.7 22.8 12.3 1.0 5.5 17.8 9.6 0.8 3.6 30.5 21.4 1.3 8.9 25.6 18.8 1.1 6.6 20.6 16.1 0.9 4.6 15.5 13.4 0.7 2.8 28.3 25.2 1.3 7.8 23.4 22.6 1.0 5.6 18.4 19.9 0.8 3.7 13.3 17.1 0.6 2.1 26.1 29.0 1.2 6.7 21.2 26.3 0.9 4.7 16.2 23.7 0.7 2.9 10.9 20.9 0.5 2.1 23.9 32.8 1.0 5.7 19.0 30.1 0.8 3.8 13.9 27.4 0.6 2.2 8.6 24.6 0.4 1.0 21.7 36.5 1.0 4.8 16.7 33.9 0.7 3.0 11.6 31.2 0.5 1.6 5.9 28.2 0.3 0.5 p (kpa) 8

6. TECCAL CHARACTERISTICS Parameters according to the heat medium E 45 Parameters T z / Tp ( С) Water 90/70 Water 80/60 Water 70/50 Water 60/40 Qp (m³/h) 4100 P p1 ( С) 0 5 10 15 20 25 P g Q w P g Q w P g Q w P g P p2 Q w P p2 p P p2 p P p2 p p (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) 47.5 42.8 2.1 12.9 40.6 36.6 1.8 9.9 33.7 30.3 1.5 7.1 26.7 24.0 1.2 4.8 44.4 44.9 1.9 11.4 37.5 38.7 1.6 8.5 30.6 32.5 1.3 6.0 23.5 26.1 1.0 3.8 41.3 47.0 1.8 10.0 34.4 40.8 1.5 7.3 27.4 34.6 1.2 4.9 20.3 28.2 0.9 2.9 38.2 49.1 1.7 8.6 31.2 42.9 1.4 6.1 24.2 36.6 1.0 3.9 17.0 30.2 0.8 2.1 35.0 51.2 1.5 7.4 27.1 45.0 1.2 5.0 21.0 38.7 0.9 3.0 13.6 32.1 0.6 1.4 31.9 53.3 1.4 6.2 24.9 47.0 1.1 4.0 17.7 40.7 0.8 2.2 10.0 33.9 0.4 0.8 Parameters according to the heat medium E 55 Parameters T z / Tp ( С) Water 90/70 Water 80/60 Water 70/50 Water 60/40 Qp (m³/h) 5000 P p1 ( С) 0 5 10 15 20 25 P g (kw) 58.1 34.5 2.6 18.7 49.7 50.5 39.9 P p2 Q w p P g P p2 Q w p P g P p2 Q w p P g P p2 Q w ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) 29.5 2.2 14.3 41.2 24.5 1.8 10.3 32.5 19.3 1.4 6.9 54.3 37.2 2.4 16.5 45.8 32.2 2.0 12.3 37.3 27.1 1.6 8.6 28.6 22.0 1.3 5.4 2.2 14.4 42.0 34.8 1.4 10.5 33.4 29.8 1.5 7.0 24.7 24.6 1.1 4.2 46.6 42.5 2.1 12.5 38.1 37.5 1.6 8.8 29.5 32.4 1.3 5.6 20.7 27.2 0.9 3.0 42.8 45.1 1.9 10.6 34.2 40.1 1.5 7.2 25.6 35.0 1.1 4.3 16.6 29.8 0.7 2.0 38.9 47.8 1.7 8.9 30.3 42.7 1.3 5.8 21.6 37.6 0.9 3.2 12.4 32.2 0.5 1.2 p (kpa) Parameters according to the heat medium E 65 Parameters T z / Tp ( С) Water 90/70 Water 80/60 Water 70/50 Water 60/40 Qp (m³/h) 3700 P p1 ( С) 0 5 10 15 20 25 P g (kw) P p2 Q w p P g P p2 Q w p P g P p2 Q w p P g P p2 Q w ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) 65.1 57.6 2.9 17.8 56.1 49.6 2.4 13.7 47.0 41.6 2.1 10.1 37.7 33.3 1.7 6.9 60.1 58.9 2.7 15.8 51.9 50.9 2.3 11.9 42.8 42.8 1.9 8.5 33.4 34.5 1.4 5.5 56.6 60.1 2.5 13.9 47.8 52.1 2.1 10.2 38.6 44.0 1.7 7.0 29.1 35.7 1.3 4.3 52.7 61.3 2.3 12.1 43.6 53.3 1.9 8.6 34.3 45.2 1.5 5.7 24.7 36.7 1.1 3.2 48.6 62.5 2.2 10.4 39.4 54.5 1.7 7.1 30.0 46.3 1.3 4.4 20.1 37.6 0.9 2.2 44.4 63.7 2.2 8.8 35.1 55.7 1.5 5.8 25.6 47.4 1.1 3.3 15.3 38.4 0.7 1.3 p (kpa) Parameters according to the heat medium E 75 Parameters T z / Tp ( С) Water 90/70 Water 80/60 Water 70/50 Water 60/40 Qp (m³/h) 4500 P p1 ( С) 0 5 10 15 20 25 P g (kw) P p2 Q w p P g P p2 Q w p P g P p2 Q w p P g P p2 Q w ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) (kpa) (kw) ( С) (m³/h) 75.9 50.0 3.3 23.7 65.2 43.0 2.9 18.2 54.5 36.0 2.4 13.3 43.6 28.8 1.9 9.0 71.0 51.8 3.1 21.0 60.4 44.8 2.7 15.7 49.6 37.7 2.2 11.1 38.6 30.5 1.7 7.2 66.2 53.5 2.9 18.4 55.5 46.5 2.4 13.4 44.7 39.4 1.9 9.2 33.6 32.1 1.5 5.6 61.3 55.2 2.7 15.9 50.6 48.1 2.2 11.3 39.7 41.0 1.7 7.4 28.4 33.7 1.2 4.1 56.4 56.8 2.5 13.7 45.6 49.8 2.0 9.4 34.7 42.6 1.5 5.8 23.2 35.2 1.0 2.8 51.6 58.5 2.3 11.5 40.7 51.4 1.8 7.6 29.6 44.2 1.3 4.3 17.7 36.5 0.8 1.7 p (kpa) P z water temperature at the inlet of the unit P p water temperature at the outlet of the unit Q w water consumption P p1 air temperature at the inlet of the unit P p2 air temperature at the outlet of the unit p water pressure drop in heat exchanger P g heat power of the unit Q p air consumption Data on operating characteristics of air heater PROTO, when using heat medium with differing temperatures, is to be provided on demand. There is danger of heat exchanger defrosting (breakage) if room temperature falls lower than 0 C. As maximal pressure of the heat medium is 1,6 MPa, the water circuit system must have protection from pressure rise higher than accepted value. 9

Вентилято 7. MOUTIG COSOLES 7.1 Installation on a mounting console CM 2D Order of installation 1 3 2 3 М8 М8 2 3 2 3 М8 М8 2 Fasten the mounting console 1 on the air heater s body using fixing screws 2 and rings 3. Use fasteners designed for the material which the base is made of.. 10

7. MOUTIG COSOLES Fastening dimensions of the mounting console 9 120 510 30 620 12 45 Ways of installation with mounting consoles 30 45 On a wall vertically or horizontally, and under angle of 30 or 45. 30 45 Under a ceiling horizontally, or under angle of 30 or 45. oncompliance with the minimal distance (0,25 m) from a wall or ceiling will lead to wrong operation of the air heater which, in turn, will influence the useful life of the equipment. 11

7. MOUTIG COSOLES 7.2 Installation on a mounting console CM 3D Order of installation 6 А М8 4 3 2 4 3 М8 М8 5 1 4 3 B 4 3 М8 М8 М8 6 1. Fasten brackets 1 and 2 on the air heater s body using screws 3 and rings 4. Follow the brackets position A, B. 2. Fasten the console under necessary angle (position 5 ) using anchoring screws (are to be bought separately). 3. Install the air heater on the console in the position 1 into the hole on the console (position 4 ). Then putting together holes on the bracket 2 and upper hole on the console 5, fix everything by screws 6. 4. Mount the air heater under necessary angle and fix by screws 6. Use fasteners designed for the material which the base is made of.. 12

7. MOUTIG COSOLES Fastening dimensions of the mounting console 9 120 476 30 12 90 670 90 45 Ways of installation with mounting consoles 30 45 On a wall vertically or horizontally, and under angle of 30 or 45. On a wall with bend to the right or left under angle 0 to 90. 90 90 30 45 Under a ceiling horizontally, or under angle of 30 or 45. oncompliance with the minimal distance (0,25 m) from a wall or ceiling will lead to wrong operation of the air heater which, in turn, will influence the useful life of the equipment. 13

7. MOUTIG COSOLES 7.3 Installation on a mounting console CM 3D Mini Fastening dimensions of the mounting console 346 411 130 12 9 Ways of installation with mounting consoles 30 45 On a wall vertically or horizontally, and under angle of 30 or 45. 90 90 On a wall with bend to the right or left under angle 0 to 90. 30 45 Under a ceiling horizontally, or under angle of 30 or 45. oncompliance with the minimal distance (0,15 m) from a wall or ceiling will lead to wrong operation of the air heater which, in turn, will influence the useful life of the equipment. 14

8. ISTALLATIO Installation of air heater PROTO E 15 Wall mounting Distance from a wall, min. Mounting height Distance of air stream 0,15 m 2-5 m up to 13 m Ceiling mounting Distance from a ceiling, min. Mounting height 0,15 m 2,5-8 m 2-5 m * 2,5-8 m 13 m * 8 m * ** * directing louvers are installed under angle of 45 ** directing louvers are installed vertically *** directing louvers are installed symmetrically under angle of 45 Installation of air heaters PROTO E 25, E 35, E 45, E 55, E 65, E 75 Wall mounting Distance from a wall, min. Mounting height Distance of air stream 0,25 m 3-8 m up to 28 m Distance from a ceiling, min. Mounting height Ceiling mounting 0,25 m 4-12 m * 3-8 m 4-12 m 28 m * 15 m* ** * directing louvers are installed under angle of 45 ** directing louvers are installed vertically *** directing louvers are installed symmetrically under angle of 45 15

8. ISTALLATIO Монтаж Recommended аппарата distances PROTO from E 15 walls and ceiling Manifold of a heat exchanger min 0,15 m min 0,25 m min 0,5 m min 0,15 m min 0,25 m min 0,5 m min 0,5 m oncompliance with the minimal distance (0,25 m (0,15 m for air heaters E 15)) from a wall or ceiling will lead to wrong operation of the air heater which, in turn, will influence the useful life of the equipment. Монтаж Installation аппарата of a few PROTO units E 15 When connecting the heat medium pay your attention that manifolds of the air heater must be fixed. For this use two keys: one for fixing heat exchanger manifolds, the second for connecting it to the system. Recommendations of placing units 12-15 m 5-9 m 27-35 m When mounting a few air heaters PROTO it is recommended to stick to the following distances between units: installation in one line 5-9 m, installation opposite to each other 27-35 m, installation one by one 12-15 m. These distances are just recommendations. The installer should also take into account dimensions and shape of a building, its encumbering, and recommendations of specialists on a project. 16 Examples of placing the equipment which provide even distribution of heat in a building are presented on the illustrations.

9. COECTIO OF HEAT MEDIUM Piping unit heaters PROTO ЕСO Air outtake Ball cock PROTO ECO Two-way valve with actuator Ball cock 0,003 Outlet pipeline Inlet pipeline Drain Coarse filter Switch panel or Programmable controller Air heating units can be installed in closed heating systems with forced circulation with maximal temperature of the heat medium 105 C and maximal pressure 1,6 MPa. When connecting to the heating main pipes it is necessary to provide the following conditions: 1. Installation of the air heater should be carried out referring to the minimal distances from walls, ceiling and floor. 2. The air heater has to be completed with intercepting cocks on the inlet and outlet pipes. 3. It is recommended to install a coarse filter on the inlet pipe. 4. Provide at least one cock for heat medium drainage on the bottom point on the piping scheme of the air heater. 5. Provide at least one air outtake on the upper point on the piping scheme of the air heater. 6. The diameter of pipes should be selected in accordance with hydraulic calculations of the heat supply system. 7. Heating tubes from the heating system pipe to the air heater must be installed with the pitch of 3 to the pipes the heat supply system. 8. All cable trays for wiring a fan and two-way valve should be installed higher than pipes of the heating system. 9. Installation must be done by technician/company who has appropriate permissions for performing such a type of work. 17

10. COTROL ELEMETS ECOMATIC PRO ECOMATIC PRO is a control element with help of which advantages of heating and ventilation systems become more noticeable and perceivable as its use provide comfortable inside temperature and significant energy savings due to fast response of the system to changes of climatic conditions in a room. Using PROTO PRO you increase equipment lifetime protecting it from functioning under alarm mode. RS 330 Switch panel The switch is designed to control asynchronous three-speed motor and enables to choose speed of fan operation or to turn it off. It is equipped with light indicators. Manual setting of fan working mode ( high, ME medium, LO low, OFF turned off). Light indication of chosen rotation speed. Easy to install and simple in use. RA Thermostat The room mechanical thermostat is designed to control temperature in a room regulating the drive of a heat medium supply valve. Diverse ways to connect a control devise (an actuator or a fan s motor with help of additional relay). Simple and reliable construction. Availability. Energy savings. RT 55 Industrial thermostat Industrial mechanical thermostat is designed to control temperature and regulate heat medium supply by a valve s drive. The thermostat with IP55 can be installed in various buildings, including dusty and humid environments. Accurate measurement due to capillary mechanism. Ability to operate in low temperatures (up to 0 C). Ability to operate in humid and aggressive environments. Ability of direct commutation of electronically-dependent devices. More information about ECOMATIC PRO you can receive on demand. 18

10. COTROL ELEMETS RD Programmable thermostat Programmable chrono-thermostat with high accuracy controls set temperature in a room, enables to program operation of air heaters PROTO in the modes day-night and 7-day calendar. Programmability of working cycles of the air heating system. Available and effective solution. Convenient interface and soft light. Ability to connect external temperature sensor. RTS 10 Switch panel RST 10 is a mechanical panel to control temperature and fan s rotation speed. Fast heating of the building. Control of necessary temperature. Energy savings. Ability to regulate the motor. Easy to operate. Comfortable temperature control with accuracy of up to 1 C. Reduction of the noise level RTS 30 Programmable сontroller RTS 30 is a programmable controller of temperature and fan s rotation speed. Programmable temperature mode with accuracy of up to 0,5 C. Automatic regulation of fan s rotation speed. Remote controller RC 30 (option). Connection of temperature sensor(-s) TC 65 (option). High level of energy savings. Reduction of the noise level POWER BOX Сontrol device POWER BOX is a bloc to control fan s motor. Easy to set up and accurate regulation. Can provide control over up to 9 air heaters. High efficiency. More information about ECOMATIC PRO you can receive on demand. 19

10. COTROL ELEMETS SR Two-way valve with actuator A valve with actuator (power supply 230 ) allows to regulate heat medium supply in a standalone mode from a controller or thermostat. Precise control over heat medium flow. Energy savings. IP54 protection. Effective hydraulic regulation of the heat supply system. TC 65 External thermal sensor The sensor is designed to fix temperature in a room and transfer data to a controller. The sensors have IP65 construction, that allows to apply them in industrial buildings (dusty, moist, explosive environments). High accuracy. Ability to connect a group of large buildings. Ability to use in explosive buildings. More information about ECOMATIC PRO you can receive on demand. 20

11. WIRIG COTROL ELEMETS 11.1 Wiring of single-phase three-speed to switch panel RS 330 RS 330 ME LO OFF OFF MELO L1 230 /50 Hz B 4 L PE Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 1 х RS 330 6 х E 15 2 х E 25, E 45, E 65 1 х E 35, E 55, E 75 21

11. WIRIG COTROL ELEMETS 11.2 Wiring of single-phase three-speed to switch panel RS 330 and thermostat RA (RT 55, RD) RS 330 SR ME LO OFF OFF MELO L1 230 /50 Hz B 4 L PE RA L 3 4 1 or RT 55 L С PE 2 1 or Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). TC65 L RD 1 х RS 330 6 х E 15 2 х E 25, E 45, E 65 1 х E 35, E 55, E 75 11 10 9 8 7 6 5 22

11. WIRIG COTROL ELEMETS 11.3 Wiring of single-phase three-speed s to the switch panel RTS 10 (having reached set temperature in a room the valve SR closes) RTS 10 SR 1 2 3 4 5 HEAT GH OFF 9 8 7MED 6 COOL LOW 230 /50 Hz B 4 L PE SR Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 1 х RTS 10 6 х E 15 3 х E 25, E 45, E 65 2 х E 35, E 55, E 75 23

11. WIRIG COTROL ELEMETS 11.4 Wiring of single-phase three-speed s to the switch panel RTS 10 (having reached set temperature in a room the fan turns off) RTS 10 1 2 3 4 5 HEAT GH OFF 9 8 7MED 6 COOL LOW 230 /50 Hz B 4 L PE Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 1 х RTS 10 6 х E 15 2 х E 25, E 45, E 65 1 х E 35, E 55, E 75 24

11. WIRIG COTROL ELEMETS 11.5 Wiring of single-phase three-speed s to programmable сontroller RTS 30 TC 65 RTS 30 SR 10 11 1 2 3 4 5 6 7 8 9 230 /50 Hz B 4 L PE SR Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 1 х RTS 30 4 х E 15 1 х E 25, E 35, E 45, E 55, E 65, E 75 25

11. WIRIG COTROL ELEMETS 11.6 Wiring of single-phase three-speed s to POWER BOX with switch panel RTS 10 (connection of a few fans to one wire) SR SR SR POWER BOX RTS 10 1 2 3 4 5 6 7 LO ME 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 HEAT GH 9OFF8 7MED6 COOL LOW Up to 3 air heaters can be connected to one line. PE Up to 9 air heaters can be connected. Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 230 /50 Hz B 4 L PE 26

11. WIRIG COTROL ELEMETS 11.7 Wiring of single-phase three-speed s to POWER BOX with switch panel RTS 10 (connection fans to different wires) SR SR SR POWER BOX RTS 10 1 2 3 4 5 6 7 LO ME 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 HEAT GH 9OFF8 7MED6 COOL LOW Up to 9 air heaters can be connected. PE Up to 3 air heaters can be connected to one line. Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 230 /50 Hz 27 B 4 L PE

11. WIRIG COTROL ELEMETS 11.8 Wiring of single-phase three-speed s to POWER BOX with programmable сontroller RTS 30 (connection of a few fans to one wire) SR SR SR POWER BOX 1 2 3 4 5 6 7 LO ME 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 TC 65 RTS 30 10 11 1 2 3 4 5 6 7 8 9 PE Up to 3 air heaters can be connected to one line. 230 /50 Hz B 4 L PE Up to 9 air heaters can be connected. Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 28

11. WIRIG COTROL ELEMETS 11.9 Wiring of single-phase three-speed s to POWER BOX with programmable сontroller RTS 30 (connection of fans to different wires) SR SR SR 1 2 3 4 5 6 7 LO ME 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 POWER BOX TC 65 Up to 9 air heaters can be connected. PE RTS 30 Up to 3 air heaters can be connected to one line. 10 11 1 2 3 4 5 6 7 8 9 Provide installation of a device protecting the motor from shunt fault (B 4 on the scheme). 230 /50 Hz B 4 L PE 29

12. REFERECE IFORMATIO 12.1 Table of pressure calculation on a wire depending on its section Material of the conductor copper: Section of current conducting core, mm 1.5 2.5 4.0 6.0 10.0 16.0 25.0 35.0 50.0 70.0 95.0 120.0 2 Material of the conductor copper oltage, 220 oltage, 380 Current, A Power, kw Current, A Power, kw 19.0 4.1 16.0 10.5 27.0 5.9 25.0 16.5 38.0 8.3 30.0 19.8 46.0 10.1 40.0 26.4 70.0 15.4 50.0 33.0 85.0 18.7 75.0 49.5 115.0 25.3 90.0 59.4 135.0 29.7 115.0 75.9 175.0 38.5 145.0 95.7 215.0 47.3 180.0 118.8 260.0 57.2 220.0 145.2 300.0 66.0 260.0 171.6 Material of the conductor aluminum: Section of current conducting core, mm 2.5 4.0 6.0 10.0 16.0 25.0 35.0 50.0 70.0 95.0 120.0 2 20.0 28.0 36.0 50.0 60.0 85.0 100.0 135.0 165.0 200.0 230.0 Material of the conductor aluminum oltage, 220 4.4 6.1 7.9 11.0 13.2 18.7 22.0 29.7 36.3 44.0 50.6 19.0 23.0 30.0 39.0 55.0 70.0 85.0 110.0 140.0 170.0 200.0 oltage, 380 Current, A Power, kw Current, A Power, kw 11.6 15.1 19.8 25.7 36.3 46.2 56.1 72.6 92.4 112.2 132.0 Data is presented as a reference. For calculations for actual projects address to specialists. 30

12. REFERECE IFORMATIO 12.2 Recommended diameters of pipes depending on power of equipment s heat output kw Water consumption Inside diameter Type 15 kw 0.6 m³/h 20 mm 3/4 23 kw 1.0 m³/h 25 mm 1 39 kw 1.6 m³/h 32 mm 1 1 4 61 kw 2.5 m³/h 40 mm 11 2 96 kw 4.0 m³/h 50 mm 2 180 kw 8.0 m³/h 70 mm 1 2 2 Data is presented as a reference. For calculations for actual projects address to specialists. 31

Service department In case of any failures in operation of equipment address the authorized support centers of the Manufacturer. For information about support centers and procedure of claim submission contact Manufacturer s service department: PROTO GROUP LLC 03680, Ukraine, Kyiv, 3, esterova str. Tel.: +380 (44) 537 0930 Fax: +380 (44) 537 0903 E-mail: service@proton.kiev.ua www.protongroup.org www.protongroup.org