TREATMENT AND CONDITIONING OF DISMANTLED MATERIAL AND OPERATION WASTE IN EWN OVERVIEW. Rohde, Mathias

Similar documents
EMPTYING, DISMANTLING AND DEMOLITION OF RADIOACTIVE WASTE DISPOSAL "ALFR" ON SITE OF NPP RHEINSBERG

IAEA Workshop Decommissioning Technologies July 2009 Karlsruhe, Germany. Decommissioning of Hot Cells at the Karlsruhe Reprocessing Plant (WAK)

DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)

Heat Pumps and Public Swimming Pools, a Perfect Match

Development Centre for Evaporation and Thermal Separation Technologies

Refrigeration and Boil Off Compression Systems for NGL Export Facilities

Dehumidification: Energy Efficiency Comparisons

COST REDUCTION BY REPLACING STEAM WITH COKE OVEN GAS FOR HOT AIR DRYER UNIT IN THE ELECTROLYTE CLEANING LINE

WM 06 Conference, February 26 - March 2, 2006, Tucson, AZ. Final Treatment Center Project for Liquid and Wet Radioactive Waste in Slovakia

THREADING TURNING MILLING BROACHING RUBBING HONING SPINNING LAPPING HOBBING DRILLING

COMPRESSORS. Heat recovery. For hot air and hot water applications.

Drying of textiles. Sustainability in commercial laundering processes. Leonardo da Vinci Project. Module 2 Machine technology.

Komline-Sanderson Paddle Dryer. Drying technology for biosolids, sludges and by-products

Part number: PSB-H90 / H90-HT CleaninGrid

Heat recovery systems. For hot air and hot water applications.

Heat Recovery Systems PTG, SWT Series.

Homework Chapter2. Homework Chapter3

COMPONENT MAINTENANCE MANUAL INDEX. Aug 2013

ProMoss TM Plant-Based Water Treatment Solves Problems in Tobacco Manufacturing Plant Air Washer Systems

Air Conditioning Inspections for Buildings Efficiency of Air Conditioning Systems

Heat recovery. Heat recovery. Gas heating 280 up to 54,000 /year. Oil heating 284 up to 54,761 /year. Electrical power consumption

Tel: Fax: Website:

ENERGY MANAGEMENT IN MILK POWDER PLANTS

All rights for changes reserved that lead to technical improvement. kolb GmbH 2017

PILOT-15 CENTRIFUGAL MOLECULAR DISTILLATION SYSTEM

2 Safety valve. 3 Pressure gauge. 4 Thermometer. 8 Ball valves

Standardization Programme ( ) Building & Construction Standards Committee

Separate food waste from other plastics/metals-> new material! Best suited for recycling! Crush & separate. PET bottles Cans Vinyl sheets

Daikin Altherma Selection Report

Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014

Site Evaluation. for. Oregon School for the Deaf. 999 Locust Street Northeast Salem, OR BE15178

Transfer Station Recycling Update SWANA Technical Session-Waste Diversion 4 2/24/2017 2/28/2017

Self-priming centrifugal pumps

Practical and Effective Approaches to Residential Ventilation for Production Builders


TMCI Padovan Evaporators

WLAC Facilities Committee Meeting. September 18, 2017

INEEL (1500) [45] 5.6 C 217 mm 60. Precipitation (mm) Temperature (oc) Month

Vapour Jet Refrigerator / Heat Pump R853

SPHERO. Underwater Pelletizing System

On Balance: Heat Rejection Control a Packaged Solution

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

EL PALOMAR 19 UNITS + HOUSE

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Westinghouse Cementation Facility of Solid Waste Treatment System 13503

CHART PERUVIAN TECHNICAL STANDARDS

USED OIL RE-REFINING UNIT PRESENTATION. Manufactured by GADGIL & COMPANY PUNE

announcements 4/10/08

Jet Vacuum Systems. GEA Wiegand GmbH

SIHI LPH-X - Liquid Ring Vacuum Pump One Stage

V SERIES Hydraulic Tools

PLASMAC Ltd. Units 11&12 Aylesbury Business Centre Chamberlain Road Aylesbury Bucks. HP19 8DY. UK

Rotary Transfer Cleaning Systems RT

Chillers, air and water cooled, featuring centrifugal compressors with magnetic levitation, from 200 to kw

Energy efficient climate control in museum stores. Poul Klenz Larsen

Free cooling on RTAF Chiller. Integrated option

Fig.: macroscopic kinetic energy is an organized form of energy and is much more useful

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

The specification for the equipment supplied complies with the standards of INNOPLANA UMWELTTECHNIK AG and its sub-contractors.

ANDRITZ SEPARATION Thermal Treatment of Sludge

FUEL TYPE relating to UK deaths from unintentional carbon monoxide poisoning from to

Solar Heating Solutions

The AST Dryer

The Ed Roberts Campus Berkeley, CA

Green deeds come in empty packages

sludge2energy - Decentralised sewage sludge utilisation

Solution of I Mid Term Steam Engineering 6ME5A

Time-Based Scheduling of Residential Ventilation

SPIKA NG ICE MAKER MAINTENANCE

Thermal equalization is the obvious answer to the situation. But, how is "thermal equalization" achieved?

Top-Secure Data Destruction Systems Over 50 Years of Experience and Innovation

Make gelato and more delicious things right in front of your customers Let the show begin!

WLAC Facilities Committee Meeting. May 15, 2017

Tips & Technology For Bosch business partners

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

ROTARY DRYER CONSTRUCTION

Integrated System Selection and Design

Dorset drying system for. poultry litter

Keywords biomass boiler, biomass resource, Small scale sewage treatment plant, twin drum type dryer,

METAL CHIP AND COOLANT MANAGEMENT PLANTS

KRAL Screw Pumps. L Series.

Electronic Air Cleaner Model Number CSC1000 OWNER S MANUAL. Installation Operation Basic Service Guide Technical Repair Guide Repair Parts

HEADWORKS PERFORATED PLATE FILTER SCREEN ROTARY DRUM SCREEN IN CHANNEL PERFORATED DRUM SCREEN

PERFORM Operating Document

ZD Tunnel Inline Cleaning Systems suginocorp.com Zippel GmbH

Radioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP 10043

Mobile home became 50 Non-Work

Cleaning Yes - Washing No

SCRAP METAL PROCESSING EQUIPMENT. Stationary hydraulic shears. Mobile hydraulic shears. Baling presses

Don t Flood The Rodeo! Preparing for Fort Worth s New Arena

Sivu 2/8 Rate data Description Suomi Shut off times total 0.0 h/day Weekends with shut off times yes Daytime rate of heat pump Time for daytime rate 5

Cork County Energy Agency

LESSONS LEARNED WITH THE DISMANTLING OF THE KARLSRUHE REPROCESSING PLANT (WAK) G. Dutzi, L Finsterwalder, C. R. Jungmann, H. Wiese

Equipment ATA 12 April 2016

BUNGARTZ CENTRIFUGAL PUMPS

Innovative Technologies [and Design Concepts] in Commercial Foodservice

CRYOGENIC MEDIA-BLASTING DEBURRING

ROTAMAT THE ROTAMAT. The ideal solution for coating of mass-produced small parts WE IMPROVE SURFACES

LUNDBERG EDGE-TRIM GRANULATING SYSTEMS FOR PAPER/ADHESIVE PAPER AND PLASTIC

ACORE Filtration Co.,Ltd provides engineering,

Laboratory Evaluation of Hybrid and Advanced Water Heaters: Performance Overview in Hot Humid Climate

Transcription:

TREATMENT AND CONDITIONING OF DISMANTLED MATERIAL AND OPERATION WASTE IN EWN OVERVIEW Rohde, Mathias

Content 1. Types of radioactive residuals 2. Treatment and conditioning facilities 3. Storage of radioactive residuals Seite 2

1. Types of radioactive residuals Seite 3

low and intermediate level active resins from the controlled area resin-sludge mixtures from the controlled area liquid evaporator concentrate low active resins from the turbine hall low active sludge from the monitored area mixed solid radioactive waste waste oil from the controlled area filter material (filter pads) stainless steel Types of radioactive residuals Seite 4

carbon steel insulation material cable electrical motor non-ferrous metal Types of radioactive residuals Seite 5

2. Treatment and conditioning facilities Seite 6

Different treatment and conditioning facilities for radioactive waste and dismantled material are located in the units 1 5 Warm Workshop Interim Storage North (ISN). Treatment and conditioning facilities Seite 7

Treatment and conditioning facilities units 1-5 Seite 8

units 1-5 available installations from the operation phase new installations in the dismantling phase facility for drying of resins rotation thin film evaporator conditioning station drum drying facility low and intermediate level active resins solid evaporator concentrates solid mixed waste, filter pads drying of all types of waste drum drying facility drum drying facility drum drying facility Interim Storage North Treatment and conditioning facilities units 1-5 Seite 9

low- and intermediate active resins storage vessel for resins: 40 m³ rinsing vessel: 3.5 m³ recirculation water pump: 12 m³/h 10 bar pump sump vessel: 12 m³ Treatment and conditioning facilities units 1-5 Drum filling station - drying of resins Seite 10

low- and intermediate active resins storage vessel for resins: 40 m³ rinsing vessel: 3.5 m³ recirculation water pump: 12 m³/h 10 bar pump sump vessel: 12 m³ Treatment and conditioning facilities units 1-5 Drum filling station - drying of resins Seite 11

Treatment and conditioning facilities units 1-5 Drum filling station - drying of resins/animation graphics Seite 12

amount of conditioned resin between: 1998-2006 approx.: this corresponds to approx.: with a net weight in average of: ambient dose rate (0.1 m): 350 Mg 2.500 200-l-drums 140 kg < 5.0 msv/h Treatment and conditioning facilities units 1-5 Drum filling station - drying of resins Seite 13

throughput: evaporator concentrate - liquid part 250 450 kg/h heading condensate heading steam compressed-air evaporator concentrate - solid part 50 90 kg/h ~ storage tank ~ ~ Rotation thin film evaporator liquid evaporator concentrate clean condensate intermediate cooling circuit waste air collector ~ vapour condenser heating steam: ~ dosing pump pressure: 0,4 1 MPa ~ primary container temperature: 143 179 C driving rotor: 5.5 kw Treatment and conditioning facilities units 1-5 Rotation thin film evaporator (RDVA) Seite 14

throughput: evaporator concentrate - liquid part 250 450 kg/h evaporator concentrate - solid part 50 90 kg/h heating steam: pressure: 0,4 1 MPa temperature: 143 179 C driving rotor: 5.5 kw Treatment and conditioning facilities units 1-5 Rotation thin film evaporator (RDVA) Seite 15

throughput: evaporator concentrate - liquid part 250 450 kg/h drive rotor evaporator concentrate - solid part 50 90 kg/h heating steam wiper blade heating steam: liquid evaporator concentrate pressure: 0,4 1 MPa temperature: 143 179 C drum driving rotor: 5.5 kw Treatment and conditioning facilities units 1-5 Rotation thin film evaporator (RDVA)/animation graphics Seite 16

amount of conditioned evaporator concentrate (Greifswald) between: 1998-2009 approx.: this corresponds to approx.: with a net weight in average of: ambient dose rate (0.1 m): 435 Mg 2.320 200-l-drums 187.5 kg 1.0-5.0 msv/h Treatment and conditioning facilities units 1-5 Rotation thin film evaporator (RDVA) Seite 17

amount of conditioned evaporator concentrate (Rheinsberg) between: 1997-2000 approx.: this corresponds to approx.: with a net weight in average of: ambient dose rate (0.1 m): 48 Mg 210 200-l-drums 228.5 kg 5.0-10.0 msv/h Treatment and conditioning facilities units 1-5 Rotation thin film evaporator (RDVA) Seite 18

max. 12 drums a 500 kg max. temperature 190 C air recirculation system gas- and fire-alarm system Treatment and conditioning facilities units 1-5 Drum drying facility (Room S306 of common Special Building) Seite 19

max. 12 drums a 500 kg max. temperature 190 C air recirculation system gas- and fire-alarm system Treatment and conditioning facilities units 1-5 Drum drying facility (Room S306 of common Special Building) Seite 20

animation graphics by-pass electrical heater Ex CO condenser by-pass CO 2 200-l drum 200-l drum 200-l drum 200-l drum electric motor door drive condensate tank 100-l Treatment and conditioning facilities units 1-5 Drum drying facility (Room S306 of common Special Building) Seite 21

amount of the dried drums between: 1998-2010 approx.: this corresponds to approx.: with a net weight in average of: ambient dose rate (0.1 m): 89 Mg 892 200-l-drums 100 kg < 5.0 msv/h Treatment and conditioning facilities units 1-5 Drum drying facility (Room S306 of common Special Building) Seite 22

usable heigth 8m length 54m width 38m Treatment and conditioning facilities units 1-5 Weatherproof construction Seite 23

Task: Emptying of all rooms Cleaning after emptying Storage of the conditioned waste in the ISN Problems: Invisible inventory was partly unknown No information about - mass - volume - kind of material - dose rate - activity - humidity Impossible to remove the waste under free sky Result: - Weatherproof construction - Caisson inside Treatment and conditioning facilities units 1-5 Special Building 1 Seite 24

Treatment and conditioning facilities units 1-5 Weatherproof construction Seite 25

Treatment and conditioning facilities units 1-5 Weatherproof construction/caisson Seite 26

Treatment and conditioning facilities units 1-5 Weatherproof construction/caisson Seite 27

Treatment and conditioning facilities units 1-5 Weatherproof construction/caisson Seite 28

Treatment and conditioning facilities units 1-5 Weatherproof construction/caisson Seite 29

Treatment and conditioning facilities units 1-5 Weatherproof construction/caisson Seite 30

Treatment and conditioning facilities units 1-5 Weatherproof construction/caisson Seite 31

Treatment and conditioning facilities units 1-5 Weatherproof construction/caisson Seite 32

Treatment and conditioning facilities units 1-5 Weatherproof construction Seite 33

amount of the removed residuals: between: 2000-2003 approx.: this corresponds to approx.: with a net weight in average of: ambient dose rate (0.1 m): 150 Mg 5.200 press drums 30 kg < 1.0-2.0 msv/h After the compaction of the press drums in the high pressure compactor, we had approx. 770 200-l-drums with pellets. this means: in average we have 6.7 press drums in one 200-l-drum volume reduction of 6.7 times between 2001-2004 we dried off 770 200-l-drums Treatment and conditioning facilities units 1-5 Weatherproof construction Seite 34

Treatment and conditioning facilities Warm Workshop Seite 35

Treatment and conditioning facilities Warm Workshop Seite 36

length x width x height: 7.0 m x 4.0 m x 4.5 m compressor for high-pressure water jet up to 2000 bar air exhaust and filtration system water treatment system material transport via roof or doors 1t - bridge crane decontamination cabin with high-pressure water jet procedure turntable Treatment and conditioning facilities Warm Workshop Decontamination Seite 37

conventional working safety: overall, mask, helmet, shoes one colleague outside of cabin decontamination cabin with high-pressure water jet procedure Treatment and conditioning facilities Warm Workshop Decontamination Seite 38

cabin dimensions working area: 2 x 13 m² height: pressure of jet: 2.5 m max. 10 bar air exhaust and filtration system gravel recycling system decontamination cabin for abrasive decontamination with steel gravel Treatment and conditioning facilities Warm Workshop Decontamination Seite 39

2 decontamination bath with a volume of 4m³ chemical decontamination with phosphoric acid Treatment and conditioning facilities Warm Workshop Decontamination Seite 40

2 electrolytic bath with a volume of approx. 2 m³ 1 rectifier with a power of 2.000 A 1 rectifier with a power of 1.000 A electrolytic decontamination with oxalic acid Treatment and conditioning facilities Warm Workshop Decontamination Seite 41

Treatment and conditioning facilities Warm Workshop Seite 42

length x width x height: 7.0 m x 4.0 m x 4.5 m air exhaust and filtration system material transport via roof or doors 1t - bridge crane cutting table cutting tools - plasma cutting for stainless steel - autogenous cutting for carbon steel thermal cutting box Treatment and conditioning facilities Warm Workshop Cutting Seite 43

cutting range: up to 300 mm cutting gases: oxygen and acetylene thermal cutting box autogenous flame cutting of carbon steel Treatment and conditioning facilities Warm Workshop Cutting Seite 44

shear force (hydraulic): 183 t cutting range for carbon and stainless steel: round bar square steel bar up to 76 mm up to 70 mm hydraulic shears, type JMC 640 Treatment and conditioning facilities Warm Workshop Cutting Seite 45

cutting range: height width up to 600 mm up to 360 mm horizontal cutting band saw Behringer, type HBP 360 Treatment and conditioning facilities Warm Workshop Cutting Seite 46

cutting range: height width feed rate up to 2.450 mm up to 2.450 mm 5-200 mm/min vertical cutting band saw PEHAKA, type LBS 1200/2400 Treatment and conditioning facilities Warm Workshop Cutting Seite 47

cutting range: height width feed rate up to 2.050 mm up to 1.600 mm 5-200 mm/min vertical cutting band saw PEHAKA, type LBS 1600/2000 Treatment and conditioning facilities Warm Workshop Cutting Seite 48

cutting range: height width up to 800 mm up to 650 mm horizontal cutting band saw Behringer, type HBP 650 Treatment and conditioning facilities Warm Workshop Cutting Seite 49

Treatment and conditioning facilities Warm Workshop Seite 50

cutting speed: peeling range: 44 m/min 1.5 mm to 90 mm cable diameter cable-peeling facility, type PR II Treatment and conditioning facilities Warm Workshop Peeling of cable - removal of insulating material Seite 51

Treatment and conditioning facilities Interim Storage North Seite 52

Treatment and conditioning facilities Interim Storage North Cross section Seite 53

Interim Storage North Evaporator High pressure compactor FAKIR Drum drying facility PETRA Thermal cutting box Scrap shear MARS Band saw conditioning raw water of ISN compaction of 200-l-drums, press-drums drying/ post drying of all waste types thermal cutting of components cutting of metallic waste cutting of large components RDVA with tank container drying facility planned: In-drumdrying-facility filter pads/ insulations wool mixed waste pipes valves metallic sheets pipes steam generators emergency flooding tanks metals (sheets) vessels sectional steel storage Interim Storage North Treatment and conditioning facilities Interim Storage North Seite 54

conditioning waste water of the Interim Storage North waste water vessels: 3 x a 25 m³ distillate vessels: 3 x a 25 m³ concentrate vessels: 2 x a 10 m³ throughput (gross): 1 m³/h Treatment and conditioning facilities Interim Storage North Evaporator facility Seite 55

compaction of solid waste pressure force: 12 MN (1200 t) length of compaction chamber: diameter of compaction channel: 905 mm 540 mm packing in: - 180-l-drums - 200-l-drums Treatment and conditioning facilities Interim Storage North High pressure compactor (FAKIR) Seite 56

Treatment and conditioning facilities Interim Storage North High pressure compactor (FAKIR)/animation graphics Seite 57

2 heating chambers: pressure in the drums: 2 x 8 drums approx. 0.02 bar temperature between: 80 190 C Treatment and conditioning facilities Interim Storage North Drum drying facility (PETRA) Seite 58

Sort of waste: pellet mixed waste resin sludge exhaust ventilation system of the ISN Vacuum unit heating chamber Cooling unit connected with the cooling system of the ISN Condensate Treatment and conditioning facilities Interim Storage North Drum drying facility (PETRA)/animation graphics Seite 59

thermal cutting of components dimension of box: 10 m x 7 m x 4 m - separate ventilation system - material transport via roof or door - cutting table - cutting tools plasma cutting for stainless steel autogenous cutting for carbon steel Treatment and conditioning facilities Interim Storage North Thermal cutting box Seite 60

cutting of metallic waste cutting power: 700 kn (70 t) shear blade opening: 650 mm cuts per minute: 4-7 dimension of the filling box: length width height 6.000 mm 2.000 mm 1.500 mm cutting examples: square ends metal sheets shafts up to 120 mm up to 80 mm up to 130 mm Treatment and conditioning facilities Interim Storage North Scrap shear (MARS) Seite 61

cutting of large components speed: max. feed rate: width of cut: height of cut: depth of cut: cutting force: 15 80 m/min 0.3 m/min max. 4.000 mm max. 4.500 mm max. 800 mm 300 to 1500 N cut direction: horizontal and vertical Treatment and conditioning facilities Interim Storage North Band saw Seite 62

Treatment and conditioning facilities Interim Storage North Band saw/animation graphics Seite 63

Throughput of the treatment and conditioning facilities in the ISN between autumn 1998 till February 2009 high pressure compactor (FAKIR): drum drying facility (PETRA): scrap shear (MARS): band saw: 1.507 Mg 691 Mg 1.235 Mg 1.155 Mg Treatment and conditioning facilities Interim Storage North Seite 64

3. Storage of radioactive residuals Seite 65

storage of spent fuel interim and decay storage of radioactive Material storage area: 20.000 m² dimension: L. 240 m x W. 140 m x H. 18 m halls 1-7: radioactive material 20 -containers concrete containers steel containers casks (cast iron) large components hall 8: spent fuel in CASTOR casks Storage of radioactive residuals Cross section Seite 66

Storage of radioactive residuals Interim Storage North hall 1 and 2 Seite 67

Storage of radioactive residuals Interim Storage North hall 7 Seite 68

Feb 09 Mar 09 Apr 09 May 09 Jun 09 Jul 09 Aug 09 Sep 09 Oct 09 Nov 09 Dec 09 Jan 09 Feb 09 Occupied volume [m³] Capacity utilization rate [%] 100.000 60,00 50,00 80.000 40,00 60.000 30,00 40.000 20,00 20.000 10,00 0 0,00 Storage of radioactive residuals Capacity utilization rate of storage halls 1-7 in the ISN (status: 02.2010) Seite 69