Riyadh Metro Project. Tunnel Boring Machine (TBM)

Similar documents
Makkah-Salahuddin Tunnel Project Update p. 4

NARDEEN COMPANY PROFILE KIT PROPOSAL

Zuhair Fayez Partnership

Conference on: Technology & Sustainability in the Built Environment

Metro Station in Riyadh

Samnan Company seeks diligently to achieve satisfaction and fulfill needs of its clients by providing highest levels of services

SSRG International Journal of Civil Engineering ( SSRG IJCE ) Volume 4 Issue 10 October 2017

PROJECT SPOTLIGHT TOUR: LANGAN LEADER FEBRUARY 2018

YOUR SINGLE-SOURCE FOR PROFESSIONAL ENGINEERING SOLUTIONS

List of useful contacts

Division of Structural Design Geotechnical Branch

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

ALAA SALMAN ALGARGOOSH

CURRICULUM VITAE. Abdullah Ibn Hussein Alkadi Vice President for Studies, Development and Community Service University of Dammam

The University of Iowa Department of Civil & Environmental Engineering SOIL MECHANICS 53:030 Final Examination 2 Hours, 200 points

Abdullah Ibn Hussein Alkadi Vice President for Studies, Development and Community Service

Table of Contents. About Us. Clients. Philosophy. Services. Property inspection. Solution Unit. Benefits. JOOD in Action

COMPANY PROFILE. Introduction to the GLC Group

ISO/TC 211 Geographic information/geomatics

TUNNEL CONSTRUCTION GUIDELINES 04 - GUIDANCE NOTE ON GROUND FREEZING CONSTRUCTION

Trading & Development Partnership Thakasussi Street, P.O. Box : 1327, Riyadh Tel. : Fax :

YOUR SINGLE-SOURCE FOR PROFESSIONAL ENGINEERING SOLUTIONS CORPORATE PROFILE

Projects Completed By MAIC Contracting Establishment

PUTTART VERTICAL DRYER-GRANULATOR SLUDGE DRYING AND GRANULATING IN ONE

VAUGHAN METROPOLITAN CENTRE STATION

Dallas CBD Second Light Rail Alignment (D2)

Dallas CBD Second Light Rail Alignment (D2)

Engineering Consultants. Content. Section 1. FIRM OVERVIEW 2. SERVICES 3. REPRESENTATIVE PROJECTS

GINPROSA INGENIERÍA Company Presentation

Providing Highly Specialized Solutions

WRC Company Profile. Quality Is Everything.

Historic and classic colours. An exclusive collection

Curriculum Vitae. Mansour Nasser Jadid

CLARIFICATIONS DOCUMENT

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

The tunnelling industry in Holland

Ground Freezing Bilfinger Spezialtiefbau GmbH

Ministry of Petroleum Building, Riyadh. Commercial:

New Cities Foundation and King Abdullah Economic City release groundbreaking new report on global greenfield city projects

TRANSPORTATION. Down to Earth. Up to the Challenge. Engineering, Geoscience and Environmental Services ALEX FRASER BRIDGE, BC, CANADA

5.4.6 Cumulative Operational Impacts

Sydney Road Reclaimed Water Main, Plant City, Florida. Prepared for: Jones Edmunds & Associates, Inc.

Urban Development and Upgrading of Unplanned Districts of Jeddah, Saudi Arabia. Bani-Malek East Al-Boughdadiyah. 10th October 2012


1 Introduction. 2 General Pile Analysis Features. 2.1 Pile Internal Forces and Displacements

INDEX. Index. Company Profile Skills Technology Products References. 2

10.17 Scope of Accreditation

monitoring air flow gas detection temperature sensors CASE STUDY GAS DETECTION SYSTEM AT LOWER LEA VALLEY CABLE TUNNELS For Murphy Group/National Grid

Atiah Hanash Alzahrani Est. COMPANY PROFILE

We are the leading fit-out company in Qatar, offering a wide range of carpentary, metal work, and GRC services for large scale projects.

South Fraser Perimeter Road (SFPR)

ABDAR AL-RIYADH FOR TRADING. KW Hydraulic Tools. Adnan F. H. Sabbubeh

PROFILE. since YEARS DESIGN CONSULTING MANUFACTURING SUPPLY INSTALLATION TESTING COMMISSIONING MAINTENANCE REFURBISHMENT

Land clearance for developmental projects Many Ghaf trees among others are ruthlessly chopped down to make way for modern projects in the desert.

Test Pit Observation Report. Albertville Business Park 67th Street to 70th Street NE Albertville, Minnesota. Prepared for.

(Refer Slide Time: 03:23)

University of Delaware

Solutions that simplifies your life

Advanced Foundation Engineering. Soil Exploration

DALIA HUSSEIN MOHAMED ELDARDIRY ASSOCIATE PROFESSOR

The City of Winnipeg Bid Opportunity No GEOTECHNICAL REPORT - TEST HOLE LOGS

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

of Urban and Regional Planning

Corporate Presentation. 14 June 2009

Menara TM (Telekom Malaysia Headquarters Building) Kuala Lumpur, Malaysia

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

ASDAF Shopping Mall, Khamis Mushait. Retail & Showrooms:

BRIDGE MONITORING. Picture 1: Benjamin Sheares Bridge

Gulf Industrial Systems Co. Fire, Safety & Security Systems

East Riding of Yorkshire Council Achieving High Recycling Results

1st ISA Analysis Division Saudi Arabia Symposium Delegates Information Pack

UNIFIED FACILITIES GUIDE SPECIFICATIONS

THE CONTEMPORARY ARCHITECTURE DESING FOR THE HOUSING GREEN BUILDINGS AND IT'S ROLE IN SAVING ENERGY IN THE ARAB CITY

APPENDIX E: UC Berkeley Laboratory Testing and ILIT In-Situ Field Vane Shear Testing

Gary Person, Foundation Engineer Geotechnical Engineering Section

CITIES WITH ROOM FOR WATER AND WELL-BEING. 50 references from Roskilde to Riyadh

Gulf Power International

Soil-Structure Interaction of a Piled Raft Foundation in Clay a 3D Numerical Study

HPDM Volute Casing Pumps Axially Split

Connecting. Transport strategies that really work are not about roads, cars, bikes and buses; they re about people.

Report Date: June 25, 2013 Contact: Nick Kassam Contact No.: RTS No.: VanRIMS No.: Meeting Date: July 10, 2013

F I R E A L A R M R E C O G N I T I O N A N D E X I T C H O I C E I N U N D E R G R O U N D S TAT I O N S

Crossrail Fire Safety Designs

38-SDMS-01 SPECIFICATIONS FOR FAULT INDICATORS FOR UNDERGROUND DISTRIBUTION NETWORKS

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

Elevators & Escalators

Fire Protection and Safety in Tunnels Conference Opening Remarks. Dr Fathi Tarada Secretary, PIARC Tunnel Operations Committee

Underground Service Alert (USA) Program Regulatory Compliance Program Page 2

It is recommended that the Commission receive this report on subway garbage disposal and recycling and note the following:

Post Box 15146, DAMMAM 31444, Kingdom of Saudi Arabia. Tel: Fax: Web site:

VISION MISSION. To be internationaly renowned customer focused company offering comprehensive solutions and quality products

07/03/2016 START-UP OF THE CONSTRUCTION PROJECT ARCHITECTURAL COMPETITION István Vidovszky PhD. table of contents

Technical Advisory in Rainwater Management

BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES

Company History. Excep/onal service. Superior value. Common sense Passion Dedica/on

CONSULTANT VACANCY ANNOUNCEMENT

Equity and Environmental Justice B. MINORITY, ELDERLY, AND LOW INCOME POPULATIONS IN THE STUDY AREA

Compaction. Compaction purposes and processes. Compaction as a construction process

2

PRE- QUALIFICATION. Planting Technology Est. For Landscaping & Irrigation

Transcription:

Riyadh Metro Project Tunnel Boring Machine (TBM)

Under the supervision of: Prof. Ibrahim Alhammad Prepared by: Abdullah Khaled Al omar 430102501 Saleh Abdulaziz Alothman 430103321 Saud Abdulaziz Alothman 430102739 Ibrahim Othman Al Rasheed 429102041 Abdullah Motlaq Alotaibi 430104051 Abdullah Mansour Almazyad 430103024 Abdulaziz Saleh Bin Khenayn 429401577

Introduction Riyadh Metro Project is the present and future work experience as a new megaproject in Saudi Arabia. It consists of 6 lines integrated to each other by 4 Main Stations. A total length of 176 km linked with 85 stations

Metro Lines Line 1: Olaya Street 38 km Line 2: King Abdullah Road 25.3 km Line 3: Almadinah Road 40.7 km Line 4: King Khalid Airport 29.6 km Line 5: King Abdulaziz Road 12.9 km Line 6: Abdulrahman bin Awf 30 km

Underground Trains Length (km) Total Length Tunnel At Grade Elevated Line 1 38 17.3 4.8 15.9 Line 2 25.3 3.3 16.6 5.4 Line 3 40.7 9.4 5.2 26.1 Line 4 29.6 5.9 6.9 16.7 Line 5 12.9 12.9 0 0 Line 6 30 8 2 19.7 Line 1 has the tallest tunneling path

- At Grade - Elevated - Underground Line 1

Line 1 Contractors BACS CONSORTIUM - Bechtel - Almabani - CCC - Siemens The contract is Design and Build contract

Project Time Schedule SCHEDULE OVERALL SCHEDULE Contract Award Start Construction Design & Long-lead Procurment 48 Months Core Construction Test & Commission 8-month LD Holiday 60 Months Overall Program 60

Time Chainage Diagram

Stations Line 1 is connecting 3 Main stations and has 22 Pick-Up stations. The main stations are: 1- King Abdullah Financial District Station 2- Olaya Station 3- Qaser Al Hokm Station One Example of the Pick-Up stations is 1A2 shown in figure

Olaya Station o Location: South of King Abdullah road at the intersection of Line 1 Olaya-Batha with Line 2 king Abdullah road. oarea: 11,000 m2. odesigner: Gerber Architekten (Germany).

PRINCE TURKI IBN ABDULAZIZ ATH THANI 1A2 TEXT

1A2 EXISTING CONDITIONS 1A2 TEXT

1A2 EXISTING CONDITIONS 1A2 TEXT

1A2 EXISTING CONDITIONS 1A2 TEXT

1A2 EXISTING CONDITIONS 1A2 TEXT

PRINCE TURKI IBN ABDULAZIZ ATH THANI

PRINCE TURKI IBN ABDULAZIZ ATH THANI

Shopping Street

Shopping Street

Shopping Street

Shopping Street

Shopping Street

Shopping Street

TBM Launching Shafts TOTAL DIST. 3947m 4155m 5125m 3250m BLUE TBM ORANGE TBM BROWN TBM PURPLE TBM 1A2 1B4 1C4 1F2 1F4 1F8 1B3 DRIVE NORTH FROM LAUNCH SHAFT SOUTH OF 1B3 INTO RECEPTION SHAFT SOUTH OF 1A2 DRIVE SOUTH FROM LAUNCH SHAFT SOUTH OF 1B3 INTO RECEPTION SHAFT NORTH OF 1C4 DRIVE NORTH FROM LAUNCH SHAFT BETWEEN 1F2 & 1F4 INTO RECEPTION SHAFT SOUTH OF 1C4 DRIVE SOUTH FROM LAUNCH SHAFT BETWEEN 1F2 & 1F4 INTO RECEPTION SHAFT NORTH OF 1F8

PRINCE SULTAN IBN SALMAN IBN ABDULAZIZ STREET

1B4 EXISTING CONDITIONS

1B4 EXISTING CONDITIONS

1B4 EXISTING CONDITIONS

1B4 EXISTING CONDITIONS

TBM General Information The excavation depth in Line 1 starts from 11 m and reaches a maximum of 36 m depth at the segment between (1B1-1B2). Design life of TBM Bored tunnel is 100 years. Design fire resistance is 3 hours.

Geotechnical Design Consideration In almost half of the route of Line 1 competent limestone with limited weathering and without groundwater table is expected. From station 1F2 to 1F4 in line 1, TBM cross a silty clayey sand layer. Typically settlements over the tunnel (0-10mm). Some areas of greater predicted settlement (10-30mm) in the southern section of the Line 1 tunnel, near Station 1F2.

Geometry of TBM The tunnel internal diameter is 9.0m This diameter is further increased by 0.2 meter to accommodate TBM construction tolerance as required. The proposed TBM final lining is precast segments of 360mm thick. Lining Thickness (mm) 360 Internal diameter (mm) 9200 External diameter (mm) 9920

E F G H J K L DOCUMENT REVIEW STATUS A REVIEWED Work may proceed REVISIONS No Date Description 00A 09/04/14 60% DEVELOPED DESIGN Drawn Checked Approved C.D.Z. W.L. G.C. PROJECT BACS CONSORTIUM

Drawn Checked Approved PROJECT BACS CONSORTIUM C.D.Z. W.L. G.C. 09 APRIL 2014 SCALE 1:50

Soil Excavation Quantity In a simple calculation, we can assume the quantity of soil to be excavated. Area of tunneling= 77.29 m 2 Tunneling Length= 17.3 km Soil Volume= 17300*77.29= 1337117 m 3