Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

Similar documents
SPECIAL SPECIFICATION 2242 LATH, STUCCO AND PLASTER

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

CITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MARCH 30, 2016 AGENDA

SECTION 900 TURF ESTABLISHMENT

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

900 Roadside Improvement

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

PROPOSED DRAINAGE PATTERNS

SECTION TOPSOIL AND SEEDING

WASATCH HOLLOW PRESERVE PHASE II RIPARIAN RESTORATION JOB NO

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

SECTION LANDSCAPING

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 700 LANDSCAPING 703 CONSTRUCTION STANDARDS AND METHODS

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

Alternatives Analysis Summary Memorandum

EROSION & SEDIMENT CONTROL

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SECTION GYPSUM PLASTER

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C

SECTION SEEDING

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

ITEM 164 SEEDING AND EROSION CONTROL BLANKET


Section Specification for Geotextile Used in Permanent Erosion Control Application

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Revetting and Supporting River Banks 4.7 Bank revetment using low steel sheet piling and coir rolls

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805)

All materials in this presentation are taken from materials produced by:

cbever LY) \HILLS/ AGENDA REPORT

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

2016 Annual Inspection Report

DESIGN SCENE SUBJECT INDEX

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

DOCUMENT ADVERTISEMENT FOR BIDS

BANK UNDERDRAIN (ALTERNATE LOCATION) (PIPE SHALL BE WRAPPED WITH GEOTEXTILE) DRAINAGE LAYER GRANULAR MATERIAL CLASS II 3" NOMINAL DEPTH

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Geosynthetic Institute GSI GRI GT13(b) ISO Version

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

NOTICE TO CONTRACTORS

Volume 2, Chapter 12 - Revegetation

DESCRIPTION OF WORK. The bidder shall provide adequate proof of licensure and insurance.

a. Section includes planting soils specified by composition of the mixes.

Request for an Exception to the Napa County Road and Street Standards

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

DESIGN & CONSTRUCTION GUIDELINES

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

INVITATION TO BID. Allendale Elementary School 3670 Penniman Avenue, Oakland, CA 94619

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

SECTION SOIL PREPARATION

SECTION 6. Routine Maintenance Activity Details

SECTION 02230BP AGGREGATE BASE

Submittal S-NV-200-LF-M DIGITAL TEMPERATURE CONTROL STATION. Valve assembly is ASSE 1017 Certified. Valve assembly is cupc Certified

JOB CREATION PROJECTS

ALLEGAN COUNTY ROAD COMMISSION 108TH AVENUE RECONSTRUCTION PROJECT 5,000' EAST OF 15TH STREET TO 6,750' EAST OF 15TH STREET

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

Wisconsin Contractors Institute Continuing Education

Kickapoo Woods Restoration Plan

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved.

QUEENS LIBRARY BUILDINGS AND GROUNDS COMMITTEE THURSDAY, DECEMBER 21, 2017 M I N U T E S

Section 815. LANDSCAPING

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

Sun City Lincoln Hills ARC Application Checklist

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

CONSTRUCTION DRAWINGS MODULE 6 LINER SYSTEM MONTEREY PENINSULA LANDFILL

Attachment A Description of Project

MINUTES CITY OF NORCO STREETS, TRAILS AND UTILITIES COMMISSION MEETING CITY COUNCIL CHAMBERS 2820 CLARK AVENUE DECEMBER 5, 2011

leel NG CITY COUNCIL AGENDA REPORT Honorable Mayor and City Council Members

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

WILSON PLACE FINAL DESIGN

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Please replace and add the following pages (described below and attached) within the bid documents.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Cherokee Nation

SHEET L-5 SHEET L-4 SHEET L-7

L100 LANDSCAPE PLAN L101 SITE PHOTOMETRICS A1 BUILDING ELEVATIONS A2 BUILDING ELEVATIONS A3 BUILDING ISOMETRICS A-2 ARCHITECTURAL FLOOR PLAN

Bio-Engineering Techniques to Revegetate Streambanks

Appendix E Preliminary Design

Appendix N. Preliminary Design

Storm Water Basics for Construction Sites Presented by Representatives from the City of Grass Valley and Nevada County

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE

REPORT AND SPECIFICATION FOR RESTORATION WORKS ON NELLIES GLEN ROAD and THE 6 - FOOT TRACK NELLIES GLEN

Transcription:

Agenda Item: 9. MEMORANDUM TO: Programs, Projects, and Operations Subcommittee FROM: Eric Williams, Natural Resources Planner SUBJECT: Hell Creek Grade Control Stabilization, Change Order 1 DATE: August 5, 2016 The construction contract for Hell Creek Grade Control Stabilization near the confluence with West Papio was awarded to Valley Corporation, with notice to proceed on July 18, 2016. During preparation to order materials for construction, an adjustment to the quantity of sheetpile was identified by the contractor, and confirmed by FHU as the design engineer for the project. In addition, constructability analysis showed that depth of the sheetpile on the upstream side of the slab needs to be increased to meet the design specifications. Analysis and discussion with Valley Corp and FHU have indicated that the construction timeline for the project needs to be adjusted in order to allow the materials to be manufactured and delivered to the site. Final completion will be extended from November 18, 2016 to April 30, 2017 to allow for plantings and seeding in the spring. This change in timeline has created a potential need for additional interim erosion protection to be installed before the end of the construction season this winter. A minor modification to the type and quantity of aggregate to be used under the slab is also included, and that results in a net decrease in construction costs. The combined total of all items on Change Order #1 (attached) will exceed 110% of the original contract price and therefore requires approval by the Board of Directors. Original Contract Amount $ 754,653.37 Change Order #1 $ 129,339.86 New Contract Amount $ 883,993.23 New Contract, Compared to Original 117.1 % It is Staff recommendation that the PPO Subcommittee recommend to the Board of Directors that the General Manager by authorized to execute the proposed Change Order to the Valley Corporation construction contract for the Hell Creek Grade Control Stabilization Project in the amount of $ 129,339.86, bringing the total contract amount to $ 883,993.23, subject to changes deemed necessary by the General Manager and approval as to form by District Legal Counsel.

CHANGE DATE AUGUST 4, 2016 ORDER OWNER PAPIO-MISSOURI RIVER NRD HELL CREEK GRADE CONTROL STABILIZATION (AT CONFLUENCE WITH PROJECT WEST PAPILLION CREEK) JOB NO. 115048-01 CHANGE ORDER NO. 1 CONTRACTOR: VALLEY CORPORATION 28001 IDA CIRCLE VALLEY, NEBRASKA 68064 Under your contract with Papio-Missouri River Natural Resources District, Owner for Hell Creek Grade Control Stabilization (at Confluence with West Papillion Creek), near 110 th and Harry Andersen Ave, we are authorized by the Owner to direct you to make the following changes: REVISION TO THE CONTRACT BID ITEM ITEM NO. DESCRIPTION 3 STRIP, STOCKPILE AND RESPREAD TOPSOIL (110 CY X 2) APPROXIMATE QUANTITY UNIT PRICE AMOUNT 220 CY $23.57 $5185.40 The contract bid item units have been changed to reflect those used in the description and as indicated in the SPECIFICATIONS. The contract unit price remains the same and there are no additions to the contract amount as a result of this revision. REVISIONS TO CONTRACT APPROXIMATE QUANTITIES The following bid items are represented in the original contract. They ve been included in this change order because the revised quantities represent a substantial change to the original quantity as a whole (greater than 10 percent of the original contract amount). The original approximate contract quantities are as follows: ITEM NO. DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE AMOUNT 14 CONSTRUCT FLOWABLE FILL 100-125 PSI 500 CY $133.15 $66,575.00 16 CONSTRUCT SHEET PILE (PZ-22) 1730 SF $56.48 $97,710.40 17 CONSTRUCT SHEET PILE (PZ-35) 2740 SF $57.76 $158,262.40 25 INSTALL ROLLED EROSION CONTROL 1400 SF $0.36 $504.00 29 INSTALL STRAW WATTLES 650 LF $3.39 $2203.50 TOTAL $325,255.30

The revised approximate quantities are as follows: ITEM NO. DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE AMOUNT 14 CONSTRUCT FLOWABLE FILL 100-125 PSI 300 CY $133.15 $39,945.00 16 CONSTRUCT SHEET PILE (PZ-22) 2304 SF $56.48 $130,129.92 17 CONSTRUCT SHEET PILE (PZ-35) 4014 SF $57.76 $231,848.64 25 INSTALL ROLLED EROSION CONTROL 25,200 SF $0.36 $9072.00 29 INSTALL STRAW WATTLES 1300 LF $3.39 $4407.00 TOTAL $415,402.56 Total addition to the Contract as a result of revisions to the approximate contract quantities is NINETY THOUSAND ONE HUNDRED FORTY SEVEN AND 26/100 DOLLARS ($90,147.26). ADD TO THE CONTRACT ITEM NO. DESCRIPTION 31 BACKFILL AGGREGATE FOR CONCRETE SLAB (3 ) APPROXIMATE QUANTITY UNIT PRICE AMOUNT 475 TN $55.00 $26,125.00 32 TIE-BACK CONNECTION MODIFICATIONS 1 LS $7,642.60 $7,642.60 33 TIE BACK SYSTEM CORROSION PROTECTION 1 LS $5,425.00 $5,425.00 TOTAL ADDITIONS $39,192.60 Total addition to the Contract as a result of additions, in accordance with the Contract and Specification the sum of THIRTY-NINE THOUSAND, ONE HUNDRED NINETY-TWO AND 60/100 DOLLARS ($39,192.60) AMOUNT OF ORIGINAL CONTRACT $754,653.37 CHANGE ORDER NO. TOTAL ADDITIONS TOTAL DEDUCTIONS NET CHANGE 1 $129,339.86 $0.00 $129,339.86 CONTRACT AMOUNT TO DATE $883,993.23

Papio-Missouri River Natural Resources District Hell Creek Grade Control Stabilization (at Confluence with West Papillion Creek) Change Order No. 1 August 4, 2016 Page 2 TO THE PLANS Revise the following drawings in the plan set: General Notes and Tabulations (Sheet 2 of 14) Site Plan and Profile (Sheet 5 of 14) Bridge Structure, Other Details (Sheet 8 of 14) Add the enclosed drawings to the plan set including: Sheet Pile Tie Back and Connection Details (Sheet 1 of 1) TO THE SPECIFICATIONS Modify Section 01000 as follows: 2. CONTRACT TIME: The CONTRACTOR shall 1) Complete grading, grouted boulder structure work, bridge structure work, and bank stabilization by December 16, 2016 2) Complete all remaining work including channel seeding and matting, tree plantings, and live stakes by April 30, 2017 Add to Section 02010, the following: 15. BACKFILL AGGREGATE FOR CONCRETE SLAB: At the locations indicated on the PLANS, the CONTRACTOR shall provide and place a well-graded 3-inch minus limestone aggregate in accordance with City of Omaha Standard Specifications. Lifts should not exceed 8 inches and shall be compacted in place. Payment at the contract unit price per ton for Backfill Aggregate for Concrete Slab shall be full compensation for furnishing all labor, materials, equipment, tools and incidentals necessary to complete the work. Backfill aggregate will be paid for only by tickets presented to the ENGINEER s representative at the time of delivery of the rock. 16. TIE-BACK CONNECTION MODIFICATIONS: Payment at the contract lump sum for Tie-Back Connection Modifications shall be full compensation for furnishing all labor, materials, equipment, tools and incidentals to construct the proposed modifications to the tie-back system, including structural members, as indicated in the plans. 17. TIE-BACK SYSTEM CORROSION PROTECTION: The contractor shall apply corrosion protection to the tie back system as noted in the PLANS. Payment at the contract lump sum for Tie-Back System Corrosion Protection shall be full compensation for furnishing all labor, materials, equipment, tools and incidentals necessary to complete the work.

GENERAL NOTES FEL SB U RG H O L T & U L LE V IG 11422 Miracle Hills Dr., Suite 115 Omaha, NE 68154 tel 402.445.4405 fax 402.445.4394

C TH U ON SO LLI PI PA RE EK Legend T WES N CREEK LLIO PAPI FELSBURG H O LT & U LL E V I G 11422 Miracle Hills Dr., Suite 115 Omaha, NE 68154 tel 402.445.4405 fax 402.445.4394 HEL LC REE K

NOTES: FEL SB U RG H O L T & U L LE V IG 11422 Miracle Hills Dr., Suite 115 Omaha, NE 68154 tel 402.445.4405 fax 402.445.4394

GENERAL NOTES: 1. ALL STEEL COMPONENTS OF TIE-BACK SYSTEM SHALL BE HOT-DIP GALVANIZED TO A MINIMUM ZINC COATING THICKNESS OF 6.0 MILS. GALVANIZATION SHALL TAKE PLACE AFTER FABRICATION, AND PRIOR TO ERECTION. INSPECT GALVANIZATION AFTER ERECTION AND TOUCH UP WITH GALVANIZING SPRAY AS REQUIRED. 2. AFTER INSTALLATION, EXPOSED ANCHORAGE COMPONENTS SHALL BE COATED WITH COAL TAR EPOXY. 3. STEEL GRADES FOR COMPONENTS ON THIS SHEET SHALL BE AS FOLLOWS: ANGLES ASTM A36 STEEL CHANNELS ASTM A36 STEEL PLATES ASTM A36 STEEL NUTS ASTM A563 STEEL RODS ASTM A36 STEEL www.olssonassociates.com TEL 402.341.1116 FAX 402.341.5895 2' - 6" 6' - 0" SHEET PILES, SLABS, TIE-BACKS, AND CONNECTIONS BY OTHERS 4.96, SEE GEOTECH 1 3/4"Ø A36 ROD, THREADED BOTH ENDS AS REQUIRED 21' - 0" TOTAL SHEET PILE LENGTH 4' - 0" TO TIE-BACK CONNECTION POINT SLAB & SHEET PILE CONNECTION BY OTHERS 3 S501 08-04-2016 2111 South 67th Street, Suite 200 Omaha, NE 68106 1 TIE-BACK CONNECTION 3/8" = 1'-0" REV DATE REVISION DESCRIPTION REVISIONS F:\Projects\013-0903\_GTEC\Design Calcs\STRC Information\013-0903 Structural Drawing.rvt 8/4/2016 8:43:59 AM PL1 1/2"X6"X6" W/ (1) 1 13/16"Ø HOLE, CENTERED L8X4X1 W/ SHORT LEG CUT AS REQ'D, LENGTH OF SURFACE + 2", TYP (2) C10X15.3 CHANNELS, BACK TO BACK, CONTINUOUS CORRUGATED SHEET PILE, SEE PLANS 1 3/4"Ø A36 RODS, THREADED AS REQ'D TIE-BACK ANCHORS AT 6' - 0" OC LENGTH OF SURFACE + 2" 3 S501 2 TIE-BACK CONNECTION PLAN TIE-BACK CONNECTION DETAIL 3 1/2" = 1'-0" 1 1/2" = 1'-0" SEE SECTION 0' - 8" 0' - 1 5/8" 0' - 10" 1/4 1/4 1/4 CORRUGATED SHEET PILE, SEE PLANS W.P. (2) C10X15.3 CHANNELS, BACK TO BACK, CONTINUOUS 1/4 6 1/4 6 DOUBLE-NUT EACH END, W/ LOC-TITE ON THREADS 1 3/4"Ø A36 ROD, THREADED AS REQ'D PL1 1/2"X6"X6" W/ (1) 1 13/16"Ø HOLE, CENTERED EXPOSED ANCHORAGE COMPONENTS SHALL BE COATED WITH COAL TAR EPOXY AFTER INSTALLATION, SEE NOTES L8X4X1 W/ SHORT LEG CUT AS REQ'D, LENGTH OF SURFACE + 2" SHEET PILE TIE BACK AND CONNECTION DETAILS STRUCTURAL drawn by: checked by: approved by: QA/QC by: project no.: drawing no.: date: HELL CREEK GRADE CONTROL STABILIZATION S501 PAPILLION, NEBRASKA 2016 APH ARC ARC ARC 013-0903 08/04/2016