Installation instructions

Similar documents
Installation and maintenance instructions

Installation and maintenance instructions

Operating instructions

CondenseSure Siphon INSTALLATION INSTRUCTIONS UK/IE GREENSTAR EXTERNAL 500ML SIPHON

Users manual. Buderus /29/43/60 and Buderus T25/29T25 H/V. Wall-mounted condensing gas boiler. For the user

INSTALLATION INSTRUCTIONS FOR FLUE KIT

Installation instructions. Pump Group. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)

Users Manual. Gas wall hung Boiler condensing Buderus /S. Please read thoroughly before operating the unit

GB162 Concentric Horizontal Vent Kit

Operating Instructions

Gas 220 Ace Cascade Assembly Manual

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l

GB125 Concentric Vent

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

Vote for your Installer of the year at. 9/14, 14/19 & 19/24CBi. Worcester supports the Benchmark code of practice

Installation and maintenance instructions

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE

DIGISTAT PROGRAMMABLE 24 HOUR ROOM THERMOSTAT SYSTEM. Radio frequency controlled programmable room thermostat.

Installation, operating and servicing instructions

CPM, CPMSP Cascade header kits Installation, Commissioning and Maintenance Instructions

RT 10 RT 10 INSTALLATION, USER INSTRUCTIONS & CUSTOMER CARE GUIDE. Order no

Greenstar Xtra. Installation instructions. Passive flue gas heat recovery device. For use with Greenstar CDi Compact, Si Compact and i combi boilers

Service instructions. FM443 solar module. Function module. For contractors. Read carefully prior to commissioning or service

Installation, Operation and Maintenance Instructions Electric Flow Heater OM009

Operating instructions

Installation and maintenance instructions

Installation and Servicing Instructions

DIGISTAT OPTIMISER PROGRAMMABLE 7 DAY ROOM THERMOSTAT SYSTEM. Radio frequency controlled programmable room thermostat

Installation and maintenance instructions

Installation and Service Instructions

Installation and maintenance instructions

Greenstar 12i system / 24i system

Thermoplastic K-LINK hoses and accessories for refrigeration and air conditioning system

Logano G615. This manual is available in the English and French language. Please keep this manual for future reference.

Greenstar 12i/24i System

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

STREBEL S-CB + Cascade Kits

Greenstar 25Si/30Si USER INSTRUCTIONS & CUSTOMER CARE GUIDE

Operating instructions

INTRODUCTION STORAGE PRIOR TO INSTALLATION. Expansion Vessel Hose. Part No High Flow Rate Inlet Control Set. Part No.

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

ferroli Boiler Replacement Maxima 35C- Modena HE

Wall-hung boilers. Spare parts catalogue. ecotec plus

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

GREENSTAR CAMRAY UTILITY & UTILITY SYSTEM

Installation and maintenance instructions

The Buderus 500 Range O M. Technical Product Guide 24 & 28kW Combi and 24kW System High Efficiency Gas Condensing Boilers

1592P01. for liquids in piping DN max. DC 48 V, 1 A, 20 W

Operating instructions

Installation and service instructions for contractors Logano plus SB625. Burner shroud not available in UK and Ireland

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

HeatMaster. Assembling and installation instructions. 201 Booster. HeatMaster. HeatMaster. 200N (Gas) Booster ENGLISH FRANCAIS NEDERLANDS ESPAÑOL

G515/7 Cast Iron Boiler

Installation and maintenance instructions

Installation and maintenance instructions for contractors

1592P01. for liquids in piping DN

GREENSTAR Ri USER INSTRUCTIONS UK/IE WALL HUNG RSF GAS FIRED CONDENSING REGULAR BOILER FOR CENTRAL HEATING SYSTEMS a (2010/10)

Installation Instructions

24CDi, 28CDi & 35CDi II COMBI

Grohtherm Wireless! Installation Instructions Pumped High Pressure

G615/11 Cast Iron Boiler

Greenstar oil-fired. heating and hot water solutions. Product Guide 2018

Operating instructions

GB Condensing Gas Boiler

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

TIDALWAVE I/G POOL PUMP INSTRUCTION MANUAL

Uni 3000 F Output range 420 to 1850 kw. Oil/gas boiler. Installation and maintenance instructions for the contractor (2014/10) UK

Tender Breeching - Supply and Installation for Sydney Academy High School

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

NEW. Innovative heating controls. Commercial boiler control systems. Control 8000 & MX25

Greenstar 24i junior / 28i junior

GREENSTAR i JUNIOR USER INSTRUCTIONS UK/IE WALL HUNG RSF GAS FIRED CONDENSING COMBINATION BOILER

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

62" LED SPYRA. Product images may vary slightly from actual product. INSTRUCTION MANUAL

54" Skye. Instruction Manual Customer Service :30 AM to 5:00 PM EST, Monday - Friday A Kichler Decor ceiling fan

Cm Pelet-set - touch TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT

The NEW Greenstar i. intuitive. innovative. improved performance. installation ease

VAILLANT SPARE PART CATALOGUE

Greenstar System Filter

Floor Standing Bath Shower Mixer. Fitting instructions. Please keep these instructions for future reference and request of replacement parts.

IPVB EC inline power venter

Vote for your Installer of the year at HEATSLAVE

GREENSTAR HIGHFLOW 440/550CDi


Model: AC-108. Instruction Manual

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

GREENSTAR CDi WALL HUNG RSF GAS-FIRED CONDENSING COMBINATION BOILER

Moisture inside the drum is due to final testing.

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Installation and Service Instructions Logano G234X

Installation & Servicing Instructions

42 Kevlar. Instruction Manual. Kichler Lighting 7711 East Pleasant Valley Road P.O. Box Cleveland, Ohio

Flow switch. Operating Manual. English manual page Page 1 of 15 Fax:

Rif Cod i220-0

60" Tulle PatioTM. Instruction Manual. A Kichler Select ceiling fan

60" Lyndon Patio. Instruction Manual Customer Service :30 AM to 5:00 PM EST, Monday - Friday A Kichler Decor ceiling fan

Installation and maintenance instructions

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Room-temperature (economy/night) unit TR 212 E

Transcription:

7 747 006 526 08/2006 GB For heating engineers Installation instructions Cascade pipework Logano plus GB32 (Dual boiler) Please read carefully prior to installation.

Contents Positioning................................................. 3 2 Scope of supply............................................. 5 3 Installing the pipework........................................ 6 3. Installing the pipe connections................................... 6 3.2 Fitting part of the flow connection to the first boiler..................... 7 3.3 Fitting part 2 of the flow connection to the second boiler................... 7 3.4 Connecting the shut-off valves................................... 8 3.5 Installation of the return connector................................. 9 3.5. Fitting short return piece to the first boiler............................. 9 3.5.2 Fitting part of the long return piece to the second boiler..................... 9 3.5.3 Connecting the pumps...................................... 0 4 Making electrical connection to system and filling................. 4. Electrical connection of the system............................... 4.2 Filling the system.......................................... About this manual This installation manual contains important information for the safe and appropriate installation of the cascade pipework. These installation instructions are designed for heating contractors who, through their training and experience, are accustomed to working with heating systems. Only use original Buderus spare parts. Buderus cannot accept liability for any losses resulting from the use of parts not supplied by Buderus. Correct use The heating water cascade pipework is for connecting the water systems of two Logano plus GB32 boilers. Observe all standards and guidelines applicable to the installation and operation of this heating system in your country. 2 Installation instructions Logano plus GB32 cascade pipework Issue 08/2006

Positioning Positioning through frost. Install the boiler in a room where it is safe from the risk of freezing. The pipework for the two boiler blocks should be installed before fitting the flue pipe. The cascade pipework can be installed in the opposite direction. Please observe the minimum clearances. Reducing the minimum clearances makes the boiler more difficult to access. The base or foundation on which the boiler is to stand must be perfectly flat, level and strong enough to support the weight. Level the boilers horizontally and vertically. Boiler rating kw: 80* 240* 320* 400* 480* 560* A (mm) recommended 700 minimum 500 B (mm) recommended 700 minimum 500 C (mm) recommended 500 minimum 00 D (mm) recommended 700 900 minimum 550 550 500 700 650 600 E (mm) see Fig. 2 and Table 2 Tab. Dimensions in mm * Values of both dual boilers added together Fig. Item : Positioning Example of pipework direction ( ) The information in brackets applies when the pipework is installed in the opposite direction. * See Fig. 2 and Table 2. Where appropriate, allow extra wall clearances for additional components. Observe the boiler installation and maintenance instructions. Installation instructions Logano plus GB32 cascade pipework Issue 08/2006 3

Positioning 2 Fig. 2 Cascade pipework GB32 dimensions * When installing shut-off valves (available as option), E is 08 mm longer for 90 to 20 kw boilers, and 38 mm longer for 60 to 280 kw boilers. Measurement A = 560 when installing pump Please note that when installing additional shut-off valves in the flow VK and return RK, the installation dimension E increases (see dimension E* in Fig. 2). Boiler rating 2 x 90 kw (2 x 4 sect.) 2 x 20 kw (2 x 4 sect.) 2 x 60 kw (2 x 5 sect.) 2 x 200 kw (2 x 6 sect.) 2 x 240 kw (2 x 7 sect.) 2 x 280 kw (2 x 8 sect.) E 642 (750)* 642 (750)* 795 (933)* 935 (073)* 935 (073)* 935 (073)* L 842 842 995 235 235 235 B K 994 202 40 H A 339 330 330 Flange VK/RK (Fig. 2, item ) DN65 (circular hole Ø 30) DN80 (circular hole Ø 50) DN00 (circular hole Ø 70) Flange pump (Fig. 2, item 2) DN50 (circular hole Ø 0) DN50 (circular hole Ø 0) DN65 (circular hole Ø 30) Tab. 2 GB32 cascade pipework dimensions (in mm) * Observe the dimension in brackets when installing the optional shut-off valves (see also Fig. 2). 4 Installation instructions Logano plus GB32 cascade pipework Issue 08/2006

Scope of supply 2 2 Scope of supply The boiler and control device are installed as described in the installation instructions supplied with the individual products. Order pumps separately..2 Material Quantity Fig. 3 Pos. Installation instructions Flow piece (in two parts)..2. VK VK2 Long return piece (in two parts) 2. 2.2 Short return piece 3 RK Return connection piece 4 Brace 5 Tab. 3 Pipework scope of supply 2.2 * 2. RK2 3 4 * 5 Fig. 3 Pipework scope of supply * The pipe section shown here is not part of the scope of supply. It is shown in place of the pump. Installation instructions Logano plus GB32 cascade pipework Issue 08/2006 5

3 Installing the pipework 3 Installing the pipework Because welding work is required, it is advisable to fit the heating water cascade pipework before fitting the flue gas header. through incorrect installation or operation. Please observe the boiler installation, maintenance and operating instructions. 3. Installing the pipe connections The connections must only be connected to the positions shown in Fig. 4. Before installing the pipe connections, check connections on the boiler for possible damage. If one of the flanged connectors becomes loose after installation/commissioning, a new gasket should be inserted before tightening again. Fig. 4 AA VK AKO RK EKO Logano GB32 boiler connections Legend for Fig. 4 = Flue outlet = Boiler flow = Condensate outlet = Boiler return = Condensate inlet through leaking connections. Tighten screws and nuts on flanged connectors diagonally. 6 Installation instructions Logano plus GB32 cascade pipework Issue 08/2006

Installing the pipework 3 3.2 Fitting part of the flow connection to the first boiler Remove the factory-fitted welded flange from the flow. 2 3 Hold the check valve firmly when removing the welded flange. The check valve (Fig. 5, Item 5) remains fitted to the flow according to the flow direction. 4 5 6 through incorrect installation. Note the flow direction of the check valve carefully. The valve must open in the direction of flow. Place gasket (Fig. 5, Item 2) on the check valve. Screw flow piece flange (Fig. 5, Item 6) onto the flow flange (Fig. 5, Item 4) on the boiler, using four bolts (Fig. 5, Item 3) and nuts (Fig. 5, Item ). Fig. 5 Fitting the flow connection to the first boiler Item : Nut (boiler scope of supply) Item 2: Gasket (boiler scope of supply) Item 3: Bolt (boiler scope of supply) Item 4: Flange on boiler flow Item 5: Check valve (boiler scope of supply) Item 6: Flow piece (part ) 3.3 Fitting part 2 of the flow connection to the second boiler Remove the factory-fitted welded flange from the flow. 2 3 The check valve (Fig. 6, Item 5) remains fitted to the flow according to the flow direction. Hold the check valve firmly when removing the welded flange. through incorrect installation. Note the flow direction of the check valve carefully. The valve must open in the direction of flow. Place gasket (Fig. 6, Item 2) on the check valve. Screw flow piece flange (Fig. 6, Item 6) onto the flow flange (Fig. 6, Item 4) on the second boiler, using four bolts (Fig. 6, Item 3) and nuts (Fig. 6, Item ). 4 5 6 Fig. 6 Fitting flow piece onto the second boiler Item : Nut (boiler scope of supply) Item 2: Gasket (boiler scope of supply) Item 3: Bolt (boiler scope of supply) Item 4: Flange on boiler flow Item 5: Check valve (boiler scope of supply) Item 6: Flow piece (part 2) Installation instructions Logano plus GB32 cascade pipework Issue 08/2006 7

3 Installing the pipework Weld the two flow pieces together without applying any stress. Because of tolerances, the pipe sections may have to be adjusted. Shorten the pipe sections if required or bend at the elbow by warming. Installation weld seam Couplings on the flow connection (Fig. 7, Item ) are provided for ventilation. Fig. 7 Welding flow connection 3.4 Connecting the shut-off valves The shut-off valves (Fig. 8, Item ) are not part of the scope of supply and must be ordered separately. A shutoff valve can be connected to every flow and return. 5 2 3 3 4 Hold the check valve firmly when removing the shut-off valve. through incorrect installation. The check valve (Fig. 8, Item 2) remains fitted to the flow according to the flow direction. Note also the flow direction of the shut-off valve carefully. When installing the shut-off valve, the additional gasket and longer screws must be used. Place gasket (Fig. 8, Item 3) and shut-off valve (Fig. 8, Item ) on the check valve. Screw flow piece flange (Fig. 8, Item 4) onto the flow flange on the boiler, using four bolts and nuts (Fig. 4, Item 5). The flue pipe section coming from the flue gas connection on the boiler must be extended using the enclosed pipe section when installing the shut-off valve. Shorten pipe section to 08 mm for 90 to 20 kw boilers or to 38 mm for 60 to 280 kw boilers. Push in the pipe section on the boiler flue gas connection (see "Flue gas header installation instructions"). Fig. 8 Item : Item 2: Item 3: Item 4: Item 5: Fitting the shut-off valves Shut-off valve Check valve Gasket Flow piece Nut 8 Installation instructions Logano plus GB32 cascade pipework Issue 08/2006

Installing the pipework 3 3.5 Installation of the return connector 3.5. Fitting short return piece to the first boiler Remove the factory-fitted welded flange from the return. Place gasket (Fig. 9, Item 2) on the boiler return. Screw return piece flange by hand (Fig. 9, Item 5) onto the return flange (Fig. 9, Item 4) on the boiler, using four bolts (Fig. 9, Item 3) and nuts (Fig. 9, Item ). 2 3 4 5 3.5.2 Fitting part of the long return piece to the second boiler Fig. 9 Item : Item 2: Item 3: Item 4: Item 5: Fitting the return connection to the first boiler Nut (boiler scope of supply) Gasket (boiler scope of supply) Bolt (boiler scope of supply) Flange on boiler return Return piece Remove the factory-fitted welded flange from the return. Place gasket (Fig. 0, Item 2) on the return of the second boiler. Screw return piece flange (Fig. 0, Item 5) onto the return flange (Fig. 0, Item 4) on the second boiler, using four bolts (Fig. 0, Item 3) and nuts (Fig. 0, Item ). 2 3 4 5 Fig. 0 Item : Item 2: Item 3: Item 4: Item 5: Fitting return piece onto the second boiler Nut (boiler scope of supply) Gasket (boiler scope of supply) Bolt (boiler scope of supply) Flange on boiler return Return piece Installation instructions Logano plus GB32 cascade pipework Issue 08/2006 9

3 Installing the pipework 3.5.3 Connecting the pumps The pumps (heating circuit pumps) (Fig., Item ) are not part of the scope of supply and must be ordered separately. Depending on the system layout, two pumps must be used. Please note the system recommendations in the Technical Guide (e.g. using a pump (heating circuit pump) when using a "low loss header"). through fitting pump incorrectly. Always fit the pump and motor horizontally between the flange. Gasket and bolts do not form part of the scope of supply of the pipework (available as option). Place pump and gasket on the flange of the return piece in the direction of flow, and screw in place with 4 bolts and nuts. Fig. Item : Connecting the pump Pump (available as option) Fasten return connecting piece (Fig. 2, Item 2) and gasket to pump (Fig. 2, Item ) using 4 bolts and nuts as shown in Fig. 2. Position brace (Fig. 2, Item 3) under the return connecting piece and adjust its height until the return pipework is stress-free. Place the second pump (according to the flow direction) with gasket on the flange of the return connecting piece and fasten using 4 bolts and nuts. Place the flange of part 2 of the long return piece (Fig. 3, Item 2) and gasket on the second pump and fasten using 4 bolts and nuts. Tighten screws on the flanged connectors. Fig. 2 Item : 2 3 Fitting return connecting piece Pump Item 2: Return connecting piece Item 3: Brace 3.5.4 Welding part 2 of the long return piece Weld both parts of the long return piece together without applying any stress. Check all connections and weld seams for leaks. Installation weld seam Because of tolerances, the pipe sections may have to be adjusted. Shorten the pipe sections if required or bend at the elbow by warming. 2 3 The coupling on the return connection (Fig. 3, Item 3) is provided for draining. Fig. 3 Item : Welding the long return piece Part of the long return piece Item 2: Part 2 of the long return piece Item 3: Coupling on the return 0 Installation instructions Logano plus GB32 cascade pipework Issue 08/2006

Making electrical connection to system and filling 4 4 Making electrical connection to system and filling 4. Electrical connection of the system RISK TO LIFE WARNING! from electric shock. Ensure that the electrical cables are not touching any hot parts. The electrical connections must be carried out as per the wiring diagram according to the technical documentation for the controller. Fig. 4 Item : Electrical connection Electric cables from pumps 4.2 Filling the system Observe the installation and maintenance instructions of the boiler. Installation instructions Logano plus GB32 cascade pipework Issue 08/2006

Your installer: Buderus Cotswold Way, Warndon, Worcester WR4 9SW Tel.: 0905 752936, Fax: 0905 75330 www.buderus-commercial.co.uk BBT Thermotechnik GmbH D-35573 Wetzlar www.heiztechnik.buderus.de info@heiztechnik.buderus.de In the UK, Buderus is a trading name of BBT Thermotechnology Ltd.