Figure 1. Park Ave. Portsmouth

Similar documents
Preliminary Sea Level Rise Case Study: Navarre Beach, FL

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Zoning and Development Considerations in the Boothbay Harbor Maritime/Water Dependent District

Preliminary Plan Framework: Vision and Goals

CITYWIDE PLANNING DIVISION

Rhode Island Shoreline Change Special Area Management Plan

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

THE WEST SIDE. 3. Provide more active and passive recreation for Portsmouth s citizens, including increased vistas and public access to the shoreline.

Planning for Historic/Cultural Resources Coastal Resiliency in Connecticut. Presented to ASFPM 41 st Annual Conference, Kansas City, MO

Olde Towne Vision Plan

Issues Requiring Future Study

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Planning for Historic/Cultural Resources Coastal Resiliency in Connecticut. Presented to CAFM s 3 rd Annual Conference

DRAFT Subject to Modifications

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016

greenprint midtown SUSTAINABILITY ACTION PLAN 2012

CHAPTER 7: Transportation, Mobility and Circulation

Implementation Guide Comprehensive Plan City of Allen

V. Vision and Guiding Principles

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Chapter 1 Vision Statement & Goals

CITY COUNCIL AGENDA REPORT

10.0 Open Space and Public Realm

RESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE

K. SMART ASSOCIATES LIMITED

edmonton.ca/ribbonofgreen #ribbonofgreen

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

C. Westerly Creek Village & The Montview Corridor

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

Chapter Master Planned Communities (MPC) District

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

CHAPTER 1 Introduction

COMMISSION ACTION FORM

D3 January 14, 2015 Public Hearing

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Envision Sustainable Infrastructure

Local Growth Planning in North Central Green Line Communities

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

REGIONAL ACTIVITY CENTER

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

Chapter 2: Vision, Goals and Strategies

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

Planning Commission Report

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

1 ESRI User Conference Eastside Greenway

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Resilient Redesign III

Virginia Beach and Sea Level Rise: Where Do We Go From Here?

STAFF REPORT. To: Planning Commission Meeting Date: April 12, City of North Las Vegas

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Visioning Statement and Guiding Principles

Request for Proposal

3. ELEMENTS OF THE METRO VISION 2035 PLAN

Making the case for Sustainable Transport Project Potential

Somers Point Master Plan

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Section 4: Goals, Objectives, and Strategies

Hobart A Strategic Framework

TRANSPORTATION AND LAND USE

Toronto Complete Streets Guidelines

CITY OF PUYALLUP. Background. Development Services

Special Joint Meeting. Emerald Isle Planning Board. Emerald Isle Board of Commissioners. January 18, 2017

Mitigation + Adaptation Strategies for Historic Structures and Sites

Townsville Coastal Hazard Adaptation Strategy pilot project adaptation decision-making in practice

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

The West Vaughan Employment Area Secondary Plan Policies

Appendix A. Planning Processes. Introduction

COMMUNITY RESILIENCE IN COASTAL NEW HAMPSHIRE

Bloor St. W. Rezoning - Preliminary Report

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Executive Summary. The goals of the Plan are to:

Financing Stormwater Management and Incentivizing Green Infrastructure

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety.

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

Public Meeting March 10 th 2011

Beachside Redevelopment Committee

WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018

ELK GROVE GENERAL PLAN VISION

IDENTIFICATION TO IMPLEMENTATION THE JOURNEY OF CITY RESILIENCE

Welcome to the Oakridge Centre Open House

AUTO CIRCULATION & PARKING

East Central Area Plan

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

COMMISSION ACTION FORM

Transcription:

Aquidneck Island Resilience Strategy Issue Paper 2 Issue: TRANSPORTATION Description of Concern: Aquidneck Island encompasses a 38 square mile area, including three municipalities, all supported by an extensive transportation infrastructure system. The road system consists of 137.3 miles of state, municipal and privately maintained thoroughfares. The three municipal governments must coordinate with the Rhode Island Department of Transportation (RIDOT), the Rhode Island Public Transit Authority (RIPTA), and the Rhode Island Bridge and Turnpike Authority (RITBA) depending on the issue. With three bridges connecting it to the mainland, all subject to closure under adverse conditions, the unique island geography presents challenges for both its population and governments. Over the years, sections of roadways across Aquidneck Island have experienced flooding during extreme moon tides and storm events. These flooding scenarios are likely to become more extreme and widespread as the rate of sea level rise and storm intensity increases. In combination with storm surge events, such as a 100-year storm scenario, sea level rise could cause coastal waters to reach even further inland, magnifying the potential damage caused by coastal inundation. Beyond Figure 1. Park Ave. Portsmouth surface flooding on roadways, increased volumes of water flowing around bridge foundations and being restricted by bridge abutments result in accelerated deterioration and damage this cannot be readily seen. When older infrastructure was built, the design standards didn t anticipate a system that would be increasingly more stressful. As a result agencies like RIDOT have a growing list of costly repair projects and must build to increasingly robust specifications. Discussions with a range of Aquidneck Island stakeholders have revealed the following issues and concerns related to the topic of transportation and circulation on Aquidneck Island: 1) There are specific locations where transportation is being impacted today by coastal threats and this is likely to increase in the near future. (Roads identified below) 2) Bridges represent a bottleneck where transportation on and off-island can be impeded, or cut off entirely. RITBA s policy is to close the Pell and Mount Hope Bridge to all traffic during sustained winds of 69 mph. This has widespread implications for everything from basic daily activities to emergency response. (Bridge vulnerability priorities are identified below) 3) Ownership of transportation infrastructure (ie. state vs. municipal vs. private roads) makes maintenance responsibility complicated, as well as confusing for the public.

4) Automobile transportation remains the primary means of conveyance, the result is a system with volume that has outgrown the Island s current capacity, and increased reliance on roads that may be vulnerable to flooding. 5) Increasing storm frequency and intensity will result in more flooding. This has already increased the strain on bridge foundations and roads. Not all of these effects are visible. 6) Flooding of roadways in economically vital areas (ie. tourism areas, commercial regions), as well as any general disruption of circulation, could hinder the island-wide economy. Background: Transportation is critical element of any community s continued existence, and Aquidneck Island is no exception. Over time issues, threats and priorities evolve and the plans in place to facilitate efficient transportation systems have evolved as well. As conditions change and the Aquidneck Island municipalities adapt coordinated planning and action will be required to take into account a changing coastal environment. Transportation 2035 The State of Rhode Island s long term transportation plan begins with the following vision statement :..Transportation connects the state with the global and regional economies, the home with the workplace, the individual with the community, and all of us with one another. It must equitably benefit all communities, and must be reconciled with quality of life issues as vital as the air we breathe, the water we drink, and the preservation of our natural and historic heritage and beauty of the natural and built environments. It cannot exist independently of these concerns. Municipal Comprehensive Plans The themes identified in Transportation 2035 are echoed in the comprehensive plans across Aquidneck Island. Newport strives to balance its iconic cultural identify and residential community quality of life with its lucrative annual tourist influx. Middletown seeks to find more efficient means to support its thriving business community, diversify modes of transportation and encourage complete streets. Portsmouth is in the process of updating their plan, and envisions a balanced approach that benefits both residents, business and the environment. Beyond the need for convenient transportation systems for commuters and visitors, municipalities are responsible for ensuring that the safety of their community is maintained. With sea level rise threatening coastal evacuation routes, the Municipal Hazard Mitigation Plan must account for the potential loss of access for responders and escape routes for residents.

Figure 2. Miles of Road Exposed on Aquidneck Island 3 of Sea Level Rise 100 year Storm + 3 of Sea Level Rise Middletown 0.60 6 Newport 2.17 33 Portsmouth 1.62 30 Island wide 4.39 68.97 Figure 3. Miles of Coastal Evacuation Route Exposed on Aquidneck Island Total 25 year Storm + 1 Sea Level Rise 100 year Storm + 3 Sea Level Rise Middletown 2.66 0.01 0.01 Newport 2.55 1.3 1.35 Portsmouth 3.75 0.96 1.17 Island wide 8.96 2.27 2.53 Aquidneck Island Transportation Study In 2011, Aquidneck Island Planning commission completed a detailed assessment of transportation island-wide. The report went into great detail in its analysis of transportation features, beyond roads and railways, to include bike paths and pedestrian thoroughfares. The report made specific recommendations for planners and policy makers, many of which were implemented. Statewide Transportation Vulnerability Study In 2016, Rhode Island Statewide Planning completed a study titled, Vulnerability of Municipal Transportation Assets to Sea Level Rise and Storm Surge. The vulnerability assessment quantified the extent to which roads and bridges throughout the state are exposed to flooding and established priority rankings for each individual structure. These rankings took into account the importance of the roadway to the community and then analyzed the extent of inundation under various sea level rise. In addition the roads and bridges were assessed under the sea level rise scenarios combined with a100 year storm surge. Figure 4. Most Vulnerable* Roads on Aquidneck Island Roads Most Vulnerable to Sea Level Rise Functional Classification Jurisdiction Vulnerability Score* Middletown PURGATORY RD Minor Arterial State and 5.79 Municipal THIRD BEACH RD Local Municipal 5.51 HANGING ROCKS RD Minor Collector Municipal 5.14 Newport MEMORIAL BLVD Major Collector State 8.35 AMERICAS CUP AVE Principal Arterial State 7.82 WEST MALBOROUGH ST Principal Arterial Municipal 6.90 Portsmouth BOYDS LN Major Collector State 4.53 NARRAGANSETT AVE Local Municipal 4.49 Roads Most Vulnerable to a 100 year Storm Surge Event Functional Classification Jurisdiction Vulnerability Score* Plus Sea Level Rise Middletown AQUIDNECK AVE Principal Arterial State 7.74

PURGATORY RD Principal Arterial State and 7.29 Municipal HANGING ROCK RD Major Collector Municipal 6.03 Newport AMERICAS CUP AVE Principal Arterial State 8.93 ON RAMP RI 138 W Freeway State 8.78 WEST MARLBOROUGH ST Principal Arterial Municipal 8.40 Portsmouth STATE HWY 24N Freeway State 8.70 MOUNT HOPE BRIDGE Principal Arterial State 7.58 STATE HWY 24 S Principal Arterial State 7.21 Figure 5. Most Vulnerable* Bridges in the Aquidneck Island Municipalities Municipality Bridges Possibly Affected by Sea Level Rise Bridges Most Vulnerable to a 100 year Storm Surge Event Plus Sea Level Rise Middletown EASTON BEACH EASTON BEACH HANGING ROCK ROAD 1 HANGING ROCK ROAD 1 HANGING ROCK ROAD 2 HANGING ROCK ROAD 2 Newport OCEAN AVENUE ANNA1 CONNELL HIGHWAY OCEAN AVENUE ANNA2 THIRD STREET GOAT ISLAND CAUSEWAY OLD COLONY Portsmouth SAKONNET RIVER SAKONNET RIVER BOYD LANE NB BOYD LANE SB *Vulnerability = likelihood and magnitude of hazard + social / transportation impact of the hazard occurring, values range from 0-10. Rhode Island Statewide Planning Program s Technical Paper 164, Vulnerability of Transportation Assets to Sea Level Rise (2015) The TIP The FFY 2017-2025 State Transportation Improvement Plan (TIP) process is the primary means by which a municipality can request funding for transportation related projects. Under a recent revision to the process, the TIP expanded from a five year plan to ten years, with an annual review of the plan giving municipalities the opportunity to request amendments. Project selection and prioritization decisions are based in part on input received by the State Planning Council from the municipalities. Based on feedback from staff at Statewide Planning, a municipality s ability to illustrate both wide spread benefit and/or increased resilience to the effects of climate change (including sea level rise), all serve to raise the level of a project s priorities. Additionally, there have not been any TIP submittals produced by multiple municipalities in coordination. This concept could potentially benefit the three Aquidneck Island communities if an appropriate project concept was available. The idea is not a new one, as stated in the Portsmouth Comprehensive plan (1992, revise 2002) As an island, the three Island communities transportation situations are linked.. They must work together to define and solve common transportation problems. Jointly submitted TIP applications would help strengthen each municipality s requests. (pg. 185) Overall, stakeholder perception of the current state of transportation infrastructure could be interpreted as pessimistic. Municipal planners receive frequent complaints of increased traffic and the

presence of potholes. In addition, there is often confusion by residents over who (state or local government) has the responsibility to maintain which roads. The deterioration of transporation infrastructure is an expensive issue nationwide, however the interconnectedness of the three Aquidneck Island municipalities, in terms of both vulnerability and shared interest could potentially work in the region s favor to help resolve this issue. In the face of future coastal flooding threats, increased communication between those capable of taking action appears to be a logical first step. Recommendations/ Potential Actions: 1) Through AIPC convene recurring meetings with municipal planners, engineers and public works representatives to discuss inter-municipal issues and opportunities. Include additional representatives from the Naval Station, RIDOT, RIPTA and RIBTA as appropriate in order to identify mutually beneficial opportunities. 2) Coordinate between the three municipalities on a programmatic basis through the Transportation Improvement Program (TIP) process, prioritizing vulnerable roadway segments and bridges for upgrades in order to increase their resilience. (RIDOT s 10 year transportation plan has been approved and is being incorporated into the TIP; the amendment and review process will be annual.) 3) Conduct an analysis of employee commuting patterns of major Island employers, including the Naval Station to better understand vulnerability/opportunities associated with transportation and economic drivers. 4) Diversify modes of transportation across the island. Most residents rely on cars as their primary mode of transportation (rather than utilizing a variety of transportation options such as public transportation, bicycling, and walking); therefore, encouraging a wider diversity of transportation options may lessen reliance on roadways at risk. 5) Consider current predictions and design life when making transportation infrastructure improvements and plans.