Guidance on Preparation of Construction and Maintenance Costs

Similar documents
Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

Case Study Bioretention Installation and Maintenance

Analyzing the Bioretention Construction Sequence

WQ-07 INFILTRATION TRENCH

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Use of Best Management Practices

Structural Stormwater Best Management Practices

Inspection and Maintenance of Stormwater Best Management Practices

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Kearney Post-Construction Stormwater Program

Lesson 2: Stormwater Best Management Practices (BMPs)

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Please make the following changes in your copy of the bid proposal for the captioned project:

4. CONCEPT PLAN DEVELOPMENT

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

BIORETENTION FACILITY

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Templates for Maintenance Documents

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

2.1.4 Roof Downspout Rain Gardens

Operations and Maintenance Plan

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

The following general requirements will be met for all planter box installations:

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

4.6. Low Impact and Retentive Grading

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

2008 SWMM, 2010 Revision City of Tacoma

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

WATER QUALITY GUIDANCE MANUAL. Planning and Implementing Stormwater Quality Practices June 2018

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Bioretention and Permeable Pavement Maintenance

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Pavement Removal Fact Sheet

Development of LID Design Guide in Edmonton

Appendix D - Technical Design Criteria for BMPs

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Tree Pits Construction Guide

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

SMALL PROJECTS SIMPLIFIED APPROACH

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

Site Evaluation and Considerations for Design and Review of Bioretention. Jay Dorsey & John Mathews ODNR-DSWR June 18, 2014

SOIL EROSION AND SEDIMENT CONTROL

Rain Gardens Water Quality the Way Mother Nature Intended

Chapter 2 Roof Downspout Controls

Conservation Landscaping Spot Check Inspection Checklist


Low Impact Development in Northern Nevada: Bioretention

Stormwater Technical Guide

Green City, Clean Waters

Bioretention cell schematic key

Appendix F Construction phase management

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Manual of Stormwater Best Management Practices DRAFT

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

SUSTAINABLE DRAINAGE AND LANDSCAPE MANAGEMENT PLAN FOR ROBINSWOOD PRIMARY SCHOOL

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Low Impact Development Practices

A Visual Guide to Assessing, Inspection and Maintaining LID Practices

Tips for Maintaining and Enhancing Stormwater Management Areas

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

SECTION AMENDED TOPSOIL

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

Post Construction BMPs

Appendix G. Detailed Design

Homeowners Guide to Stormwater BMP Maintenance

PREPARED UNDER. The 319 Nonpoint Source Pollution Grant Program FUNDED BY. MA Department of Environmental Protection Boston, MA PREPARED BY

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Rainwater and Land Development Manual Bioretention Design Specification Updates. Jay Dorsey & John Mathews ODNR-DSWR June 18, 2014

C-12. Dry Pond. Design Objective

Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information

BEST LOCAL LAND USE PRACTICES

Stormwater Drainage Assessment For Single Family Residence

Storm Water Technology Fact Sheet Vegetated Swales

The Engineer/Developer s Perspective on Storm Water Management

Eric Konzelmann, CPESC, CPSWQ Assistant District Manager. Montgomery County Conservation District

CITY OF LACEY 2016 STORMWATER DESIGN MANUAL. Table of Contents. Chapter 1 Introduction Chapter 1 References and Information Sources...

Maintaining Your Neighborhood Stormwater Facilities

12/19/2007. Bill Hunt, PE, Ph.D. NC Cooperative Extension NC State University

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Structural Storm Water Best Management Practices (BMPs)

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician

Severn River Sub-Watershed: BMP 09-Retrofit

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

Inventory and Assessment of Stormwater Infrastructure

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE.

Appendix A.2 Simplified Approach to Stormwater Management for Small Projects - Handbook

Transcription:

INVER GROVE HEIGHTS Northwest Area Appendix F Guidance on Preparation of Construction and Maintenance Costs

Northwest Area (NWA) Inver Grove Heights Stormwater Manual Guidance on Preparation of Construction and Maintenance Costs Appendix F Key Topics: cost estimates for select BMPs Contents I. Bioretention Cost Estimate... II. Infiltration Basin Cost Estimate... III. Stormwater Pond Cost Estimate... IV. Stormwater Wetland Cost Estimate... V. Surface Sand Filter Cost Estimate... 3 4 5 6 7 2 NWA STORMWATER MANUAL

BIORETENTION DEVICE 2005 s Topsoil - salvage square yard $4.50 $0.00 Excavation - 4' average depth square yard $10.00 $0.00 Hauling off-site square yard $6.50 $0.00 Underdrain - with pea gravel and geotextile lineal foot $30.00 $0.00 Inlet structure each $1,500.00 $0.00 Outlet structure each $2,500.00 $0.00 Filter strip square yard $0.00 Soil preparation square yard $30.00 $0.00 Seeding - above outlet elevation square yard $0.50 $0.00 Planting - below outlet elevation square yard $30.00 $0.00 Mulch square yard $5.00 $0.00 Debris removal per visit $50.00 $0.00 Weed control per visit $50.00 $0.00 Sediment removal per year $500.00 $0.00 Replace planting media square yard $12.00 $0.00 Replace plants per plant $5.00 $0.00 Mow filter strips per visit $50.00 $0.00 Erosion repair square yard $75.00 $0.00 Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Bioretention BMPs. To be used for preliminary cost estimation. STORMWATER MANUAL NWA 3

INFILTRATION BASIN 2005 s Infiltration area protection - silt fence lineal foot $2.00 $0.00 Excavation - 6' depth square yard $8.00 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.00 Inlet structure each $1,500.00 $0.00 Multi-stage outlet structure each $2,500.00 $0.00 Sod filter strip lineal foot $1.50 $0.00 Soil preparation square yard $5.00 $0.00 Seeding square yard $0.50 $0.00 Planting - below outlet elevation square yard $30.00 $0.00 Mulch square yard $2.00 $0.00 Replace planting media square yard $12.00 $0.00 Debris removal per visit $50.00 $0.00 Mow filter strips per visit $50.00 $0.00 Sediment removal per year $500.00 $0.00 Replace plants per plant $5.00 $0.00 Erosion repair square yard $75.00 $0.00 Gate / valve operation per visit $125.00 $0.00 Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Infiltration Basin BMPs. To be used for preliminary cost estimation. 4 NWA STORMWATER MANUAL

STORMWATER POND 2005 s Excavation - 8' depth square yard $10.00 $0.00 Hauling off-site - 8' depth square yard $10.00 $0.00 Inlet structure each $2,000.00 $0.00 Overflow structure each $3,500.00 $0.00 Sod - above vegetative bench square yard $4.50 $0.00 Soil preparation square yard $5.00 $0.00 Seeding - vegetative bench square yard $0.50 $0.00 Mulch square yard $1.00 $0.00 Debris removal per visit $100.00 $0.00 Remove invasive plants per visit $500.00 $0.00 Replant wetland vegetation per plant $10.00 $0.00 Repair erosion square yard $75.00 $0.00 Sediment removal and disposal cubic yard $10.00 $0.00 Mow per visit $150.00 $0.00 Gate / valve operation per visit $125.00 $0.00 Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Stormwater Ponds BMPs. To be used for preliminary cost estimation. STORMWATER MANUAL NWA 5

STORMWATER WETLAND 2005 s Excavation - deepwater zone - 4' average depth square yard $5.00 $0.00 Excavation - marsh zone - 1' average depth square yard $1.00 $0.00 Hauling off-site - 5' depth square yard $5.00 $0.00 Inlet structure each $2,000.00 $0.00 Outlet structure each $3,500.00 $0.00 Sod - above vegetative bench square yard $4.50 $0.00 Soil preparation square yard $25.00 $0.00 Seeding - vegetative bench square yard $0.50 $0.00 Planting square yard $30.00 $0.00 Debris removal per visit $100.00 $0.00 Remove invasive plants per visit $500.00 $0.00 Replant wetland vegetation per plant $10.00 $0.00 Repair erosion square yard $75.00 $0.00 Sediment removal and disposal cubic yard $10.00 $0.00 Mow per visit $150.00 $0.00 Gate / valve operation per visit $125.00 $0.00 Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation. 6 NWA STORMWATER MANUAL

SURFACE SAND FILTER 2005 s Excavation - 6' depth square yard $8.00 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.00 Underdrain - with pea gravel and geotextile square yard $400.00 $0.00 Inlet structure each $1,500.00 $0.00 Sand filter media - 18" depth square yard $15.00 $0.00 Outlet structure each $3,000.00 $0.00 Sod filter strip lineal foot $1.50 $0.00 Soil preparation square yard $5.00 $0.00 Seeding square yard $0.50 $0.00 Debris removal per visit $50.00 $0.00 Mowing per visit $150.00 $0.00 Sediment removal per year $500.00 $0.00 Gate / valve operation per visiit $125.00 $0.00 Erosion repair square yard $75.00 $0.00 Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Media Filtration BMPs. To be used for preliminary cost estimation. STORMWATER MANUAL NWA 7