MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

Similar documents
Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. NFPA 270 First Draft Technical Committee FINAL Ballot Results (F2017)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

12/21/2015 National Fire Protection Association Report

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

SUBJECT: NFPA 302 Second Draft TC Final Ballot Results (A2014)

M E M O R A N D U M. NFPA Technical Committee on Telecommunications. Elena Carroll, Administrator, Technical Projects. Date: July 8, 2014

M E M O R A N D U M. Technical Committee on Flash Fire Protective Garments

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

MEMORANDUM. Technical Committee on Alternative Approaches to Life Safety. NFPA 101A First Draft Technical Committee FINAL Ballot Results (A2018)

Technical Committee on Record Protection (REA-AAA)

MEMORANDUM. NFPA Technical Committee on Hazard and Risk of Contents and Furnishings. NFPA 556 First Draft TC FINAL Ballot Results (A2015)

M E M O R A N D U M. NFPA 1 First Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. NFPA 99 Second Draft Correlating Committee FINAL Ballot Results (A2017)

Second Revision No. 1 NFPA [ Chapter 2 ]

M E M O R A N D U M. NFPA Technical Committee on Fire Department Apparatus. Yvonne Smith, Project Administrator. Date: June 4, 2014

M E M O R A N D U M. NFPA 1911 Second Draft Technical Committee FINAL Ballot Results (F2016 Cycle)

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

M E M O R A N D U M. NFPA 76 Second Draft TC FINAL Ballot Results (F2015 Cycle)

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

M E M O R A N D U M. SUBJECT: NFPA 855 First Draft Technical Committee FINAL Ballot Results (C2020)

M E M O R A N D U M. Technical Committee on Special Operations Protective Clothing and Equipment

MEMORANDUM. Technical Committee on Fundamentals of Fire Alarm and Signaling Systems

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

M E M O R A N D U M. NFPA Technical Committee on Fire Safety and Emergency Symbols. NFPA 170 Second Draft TC FINAL Ballot Results (F2014)

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation

First Revision No. 1-NFPA [ Chapter 2 ]

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

TECHNICAL COMMITTEE ON FIRE CODE

National Fire Protection Association

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

MEMORANDUM. NFPA Technical Committee on Handling and Conveying of Dusts, Vapors, and Gases. NFPA 654 Second Draft TC FINAL Ballot Results (A2016)

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12.

M E M O R A N D U M. Technical Committee on Aircraft Rescue and Fire Fighting. NFPA 403 First Draft Technical Committee FINAL Ballot Results (A2017)

Correlating Committee on Automatic Sprinkler Systems

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

MEMORANDUM. Technical Committee on Fundamentals of Combustible Dusts. NFPA 652 First Draft Technical Committee FINAL Ballot Results (A2018)

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation

Report of the Committee on Jeffrey L. Steplowski, Emergency Power Supplies Herbert V. Whittall, Douglas S. Erickson,

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

MEMORANDUM. Technical Committee on Protected Premises Fire Alarm and Signaling Systems

U.S. Codes & Standards for Energy Storage Systems. Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

M E M O R A N D U M. NFPA Technical Committee on Fixed Guideway Transit and Passenger Rail Systems

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

MEMORANDUM. NFPA Technical Committee on Liquefied Natural Gas. NFPA 59A Second Draft TC FINAL Ballot Results (F2015)

MEMORANDUM. 22 Members Eligible to Vote 7 Not Returned (Bowdoin Jr., Cirone, Convery, Donsbach, Jr., Kovach, Levengood, Naper)

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. Technical Committee on Fire Fighter Professional Qualifications

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Committee Input No. 1-NFPA [ Chapter 2 ]

David Stymiest, PE, CHFM, CHSP, FASHE cell Copyright 2014, Smith Seckman Reid, Inc.; All rights reserved

NFPA Technical Committee on Fire Tests

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

INTERNATIONAL STANDARD

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing

Standards Council Meeting AGENDA. Hotel Mazarin 730 Bienville Street New Orleans, LA (504) April 10-11, 2018

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.


1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:


National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

2016 Annual Revision Cycle Consent Document NFPA 75

2015 Fall Revision Cycle Notice of a Consent Standard NFPA 102

26 of 128 9/23/2014 9:25 AM

First Draft Meeting (F2017) Agenda Friday, March 11 th, :30 AM 4:00 PM ET

First Revision No. 6-NFPA [ Section No. 2.2 ]

CHAPTER 6 [CE] REFERENCED STANDARDS

CHAPTER 6 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

Committee on NFPA 51A

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Committee Comment No. 212-NFPA [ Section No [Excluding

Transcription:

National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Emergency Power Supplies Kelly Carey, Project Administrator DATE: November 4, 2016 SUBJECT: NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 30 Members Eligible to Vote 9 Members Not Returned (D Antona, DeMoss, Everard, Lau, Loomis, Nash, Jr., Olson, Patterson, Scroggins) 21 Members Voted Affirmative on All Revisions 0 Members Voted Affirmative with Comment on one or more Revisions 0 Members Voted Negative on one or more Revisions 0 Members Abstained on one or more Revisions The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each revision. To pass ballot, each revision requires: (1) a simple majority of those eligible to vote and (2) an affirmative vote of 2 /3 of ballots returned. See Sections 3.3.4.3.(c) and 4.3.10.1 of the Regulations Governing the Development of NFPA Standards.

First Revision No. 1-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1* This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less than 500 VA or less than 24 V or systems less than Class 0.033 in accordance with Section 4.3 (4) Unit equipment (5) Nuclear sources, solar systems, and wind stored-energy systems (6) Uninterruptible power systems (UPS) supplied by an emergency power supply system (EPSS) or a UPS supplied by a SEPSS (7) Optional standby systems Submitter Information Verification Submitter Full Name: Chris Coache Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed Sep 07 18:44:12 EDT 2016 Committee Statement Committee Statement: Item (3) references Section 4.3 as the source of the term Class 0.033. Response Message: Public Input No. 4-NFPA 111-2016 [Section No. 1.1.4.1] Ballot Results This item has passed ballot 30 Eligible Voters 9 Not Returned 21 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned D'Antona, Jason DeMoss, Dennis Everard, William H. Lau, Larry Loomis, Chad E. Nash, Jr., Hugh O. Olson, Gary L. Patterson, Ralph E. Scroggins, Rich Page 1

Affirmative All Allen, Ernest E. Battalora, Raymond J. Chisholm, Sr., Dan Cotton, Kenneth A. Dagenais, David A. Day, Richard L. Feller, Louis J. Gregory, James R. (Skip) Hardy, Ross M. Hartsell, Jonathan Hunt, James Lang, Michael J. Manche, Alan Mills, George Sappington, Steve R. Schroeder, Ronald A. Schubert, Randy H. Smidt, Ronald M. Stanko, Raymond J. Stymiest, David Windey, Timothy P. Page 2

First Revision No. 5-NFPA 111-2016 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1, Fire Code, 2015 2018 edition. NFPA 70, National Electrical Code, 2014 2017 edition. NFPA 72, National Fire Alarm and Signaling Code, 2016 edition. Submitter Information Verification Submitter Full Name: Christopher Coache Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Mon Oct 17 10:43:35 EDT 2016 Committee Statement Committee Statement: Standards updated to current edition. Response Message: Ballot Results This item has passed ballot 30 Eligible Voters 9 Not Returned 21 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned D'Antona, Jason DeMoss, Dennis Everard, William H. Lau, Larry Loomis, Chad E. Nash, Jr., Hugh O. Olson, Gary L. Patterson, Ralph E. Scroggins, Rich Affirmative All Allen, Ernest E. Battalora, Raymond J. Chisholm, Sr., Dan Cotton, Kenneth A. Dagenais, David A. Day, Richard L. Page 3

Feller, Louis J. Gregory, James R. (Skip) Hardy, Ross M. Hartsell, Jonathan Hunt, James Lang, Michael J. Manche, Alan Mills, George Sappington, Steve R. Schroeder, Ronald A. Schubert, Randy H. Smidt, Ronald M. Stanko, Raymond J. Stymiest, David Windey, Timothy P. Page 4

First Revision No. 6-NFPA 111-2016 [ Section No. 2.4 ] 2.4 References for Extracts in Mandatory Sections. NFPA 1, Fire Code, 2015 2018 edition. NFPA 110, Standard for Emergency and Standby Power Systems, 2016 edition. Submitter Information Verification Submitter Full Name: Christopher Coache Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Mon Oct 17 11:48:33 EDT 2016 Committee Statement Committee Statement: Standard updated to current edition. Response Message: Ballot Results This item has passed ballot 30 Eligible Voters 9 Not Returned 21 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned D'Antona, Jason DeMoss, Dennis Everard, William H. Lau, Larry Loomis, Chad E. Nash, Jr., Hugh O. Olson, Gary L. Patterson, Ralph E. Scroggins, Rich Affirmative All Allen, Ernest E. Battalora, Raymond J. Chisholm, Sr., Dan Cotton, Kenneth A. Dagenais, David A. Day, Richard L. Feller, Louis J. Gregory, James R. (Skip) Page 5

Hardy, Ross M. Hartsell, Jonathan Hunt, James Lang, Michael J. Manche, Alan Mills, George Sappington, Steve R. Schroeder, Ronald A. Schubert, Randy H. Smidt, Ronald M. Stanko, Raymond J. Stymiest, David Windey, Timothy P. Page 6

First Revision No. 2-NFPA 111-2016 [ Section No. 4.2.2 ] 4.2.2* The interruption times of the SEPSS types covered by this standard shall be as provided in Table 4.2.2. Table 4.2.2 Types of SEPSS Type Type O Type U Type A Type B Type 10 Type M Interruption Time No interruptions Type VFI, UPS carrying load, 0.0 sec Type VFD or Type VI, UPS system with utility as preferred source 0.25 cycle: 0.0042 sec 1.0 cycle: 0.0167 sec 10 sec Manual stationary or nonautomatic no time limit Submitter Information Verification Submitter Full Name: Chris Coache Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed Sep 07 18:47:00 EDT 2016 Committee Statement Committee Statement: This revision incorporates TIA 1175. Response Message: Public Input No. 2-NFPA 111-2016 [Section No. 4.2.2] Ballot Results This item has passed ballot 30 Eligible Voters 9 Not Returned 21 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned D'Antona, Jason DeMoss, Dennis Everard, William H. Lau, Larry Loomis, Chad E. Nash, Jr., Hugh O. Olson, Gary L. Patterson, Ralph E. Scroggins, Rich Affirmative All Page 7

Allen, Ernest E. Battalora, Raymond J. Chisholm, Sr., Dan Cotton, Kenneth A. Dagenais, David A. Day, Richard L. Feller, Louis J. Gregory, James R. (Skip) Hardy, Ross M. Hartsell, Jonathan Hunt, James Lang, Michael J. Manche, Alan Mills, George Sappington, Steve R. Schroeder, Ronald A. Schubert, Randy H. Smidt, Ronald M. Stanko, Raymond J. Stymiest, David Windey, Timothy P. Page 8

First Revision No. 4-NFPA 111-2016 [ Section No. B.1 ] Page 9

0 B.1 Use of Stored-Energy System. Page 10

1 Figure B.1(a)through Figure B.1(d)show an uninterruptable power supply (UPS) being used in different functions. Figure B.1(a)distinguishes the use of a stored-energy system as an SEPSS from a stored-energy system being supplied from an EPSS. Figure B.1(a) Stored-Energy System Serving as SEPSS (Shown on Left) and as Equipment Supplied Through an EPSS (Shown on Right). Figure B.1(b) shows a UPS being used as a stored-energy emergency power supply system (SEPSS), which is fully within the scope of this standard. Figure B.1(b) Simplified Diagram Showing a Stored-Energy Emergency Power Supply System (SEPSS). Figure B.1(c) shows a UPS being used as a bridge (also known as an auxiliary power unit) in combination with a generator emergency power supply (EPS), which is within the scope of NFPA 110. A bridge UPS is optional within NFPA 111, unless it is required for an emergency power supply that takes longer than ten seconds to start. A bridge's stored energy (e.g., battery) does not have the same reserve time as the EPS that it supports. However, because it is a component in an emergency power supply system, it is inspected and tested as part of the EPSS. Figure B.1(c) Simplified Diagram Showing a UPS Used as a Bridge (a.k.a. an Auxiliary Power Unit) within an Emergency Power Supply System (EPSS). Figure B.1(d) shows a UPS being used as an optional standby power system where life safety does not depend on the performance Page 11

2 of the system. As such, it is outside the scope of this standard. Figure B.1(d) Simplified Diagram for an Emergency Power Supply System (EPSS) and a Standby UPS. Submitter Information Verification Submitter Full Name: Christopher Coache Organization: National Fire Protection Assoc Street Address: City: State: Zip: Submittal Date: Mon Oct 17 10:39:24 EDT 2016 Committee Statement Committee Statement: Title of section added to follow style manual. Response Message: Ballot Results This item has passed ballot 30 Eligible Voters 9 Not Returned 21 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned D'Antona, Jason DeMoss, Dennis Everard, William H. Lau, Larry Loomis, Chad E. Nash, Jr., Hugh O. Olson, Gary L. Patterson, Ralph E. Scroggins, Rich Affirmative All Allen, Ernest E. Battalora, Raymond J. Chisholm, Sr., Dan Page 12

3 Cotton, Kenneth A. Dagenais, David A. Day, Richard L. Feller, Louis J. Gregory, James R. (Skip) Hardy, Ross M. Hartsell, Jonathan Hunt, James Lang, Michael J. Manche, Alan Mills, George Sappington, Steve R. Schroeder, Ronald A. Schubert, Randy H. Smidt, Ronald M. Stanko, Raymond J. Stymiest, David Windey, Timothy P. Page 13

4 First Revision No. 3-NFPA 111-2016 [ Chapter C ] Annex C Informational References C.1 Referenced Publications. The documents or portions thereof listed in this annex are referenced within the informational sections of this standard and are not part of the requirements of this document unless also listed in Chapter 2 for other reasons. C.1.1 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 70, National Electrical Code, 2014 2017 edition. NFPA 99, Health Care Facilities Code, 2015 2018 edition. NFPA 101, Life Safety Code, 2015 2018 edition. NFPA 110, Standard for Emergency and Standby Power Systems, 2016 2019 edition. C.1.2 Other Publications. C.1.2.1 ANSI Publications. American National Standards Institute, Inc., 25 West 43rd Street, 4th floor, New York, NY 10036. ANSI C84.1, American National Standard for Electric Power Systems and Equipment Voltage Ratings (60 Hertz), 2011. C.1.2.1 IEC Publications. International Electrotechnical Commission, 3, rue de Varembé, P.O. Box 131, CH-1211 Geneva 20, Switzerland. IEC 62040-3, Uninterruptible Power Systems (UPS)-Part 3: Method of Specifying the Performance and Test Requirements, 2011. C.1.2.2 IEEE Publications. IEEE, Three Park Avenue, 17th Floor, New York, NY 10016-5997. IEEE 450, Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications, 2010. IEEE 1106, Recommended Practice for Maintenance, Testing, and Replacement of Vented Nickel-Cadmium Batteries for Stationary Applications, 2005 2015. IEEE 1188, Recommended Practice for Maintenance, Testing and Replacement of Valve-Regulated Lead-Acid Batteries for Stationary Applications, 2005, Amendment 1, 2014. C.1.2.3 NEMA Publications. National Electrical Manufacturers Association, 1300 North 17th Street, Suite 900, Arlington, VA 22209. ANSI/NEMA C84.1, American National Standard for Electric Power Systems and Equipment Voltage Ratings (60 Hertz), 2011. C.1.2.4 UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL 60062-2096. ANSI/UL 1008, Standard for Safety Transfer Switch Equipment, 2012 2014. C.2 Informational References. The following documents or portions thereof are listed here as informational resources only. They are not a part of the requirements of this document. C.2.1 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance, 2013 edition. C.2.2 IEEE Publications. IEEE, Three Park Avenue, 17th Floor, New York, NY 10016-5997. ANSI/ IEEE 446, Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial Applications, 2002 1995, reaffirmed 2000. ANSI/ IEEE 484, Recommended Practice for Installation Design and Installation of Vented Lead-Acid Batteries for Stationary Applications, 2002, reaffirmed 2008. IEEE 485, Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications, 2010. ANSI/ IEEE 944, Recommended Practice for the Application and Testing of Uninterruptible Power Supplies for Power Generating Systems, 1996. (Only available in electronic format.) C.3 References for Extracts in Informational Sections. NFPA 1, Fire Code, 2015 edition. Page 14

5 Submitter Information Verification Submitter Full Name: Chris Coache Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed Sep 07 18:49:24 EDT 2016 Committee Statement Committee Statement: The references were updated to current editions. Response Message: Public Input No. 5-NFPA 111-2016 [Section No. C.1.2.4] Public Input No. 1-NFPA 111-2015 [Chapter C] Ballot Results This item has passed ballot 30 Eligible Voters 9 Not Returned 21 Affirmative All 0 Affirmative with Comments 0 Negative with Comments 0 Abstention Not Returned D'Antona, Jason DeMoss, Dennis Everard, William H. Lau, Larry Loomis, Chad E. Nash, Jr., Hugh O. Olson, Gary L. Patterson, Ralph E. Scroggins, Rich Affirmative All Allen, Ernest E. Battalora, Raymond J. Chisholm, Sr., Dan Cotton, Kenneth A. Dagenais, David A. Day, Richard L. Feller, Louis J. Gregory, James R. (Skip) Hardy, Ross M. Hartsell, Jonathan Hunt, James Lang, Michael J. Manche, Alan Mills, George Page 15

6 Sappington, Steve R. Schroeder, Ronald A. Schubert, Randy H. Smidt, Ronald M. Stanko, Raymond J. Stymiest, David Windey, Timothy P. Page 16