GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

Similar documents
L100 LANDSCAPE PLAN L101 SITE PHOTOMETRICS A1 BUILDING ELEVATIONS A2 BUILDING ELEVATIONS A3 BUILDING ISOMETRICS A-2 ARCHITECTURAL FLOOR PLAN

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

SITE PLAN REVIEW APPLICATION AND CHECKLIST

All materials in this presentation are taken from materials produced by:

Town of Essex Small Site Erosion Control Guide

Erosion Control for Home Builders in the. City of Jacksonville

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

APPLICATION FOR MINOR SITE PLAN REVIEW

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN


SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

APPLICATION FOR MINOR SITE PLAN REVIEW

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Community and Economic Development Department 100 N. Appleton St. PH: Appleton, WI FAX:

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

C-10. Disconnected Impervious Surface

Wisconsin Contractors Institute Continuing Education

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

EROSION & SEDIMENT CONTROL

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

STANDARD DETAILS QUICK REFERENCE

Huntington Stormwater Utility

Department of Planning & Development Planning Unit

SECTION 900 TURF ESTABLISHMENT

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

CRESCENT RESOURCES INC.

Department of Planning & Development Planning Unit

The Engineer/Developer s Perspective on Storm Water Management

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON

Kittson Parkway / Watershed Park Parking Lot

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Department of Planning & Community & Economic Development Planning Division

APPLICATION FOR SITE PLAN REVIEW

Table 4.7.1: Swales Potential Application and Storm Water Regulation

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

STORMWATER - GENERAL NOTES

Preventing Storm Water Pollution: What We Can Do

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

DIVISION 32 EXTERIOR IMPROVEMENTS

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Homeowners Guide to Stormwater BMP Maintenance

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Urban Planning and Land Use

EROSION PREVENTION BMP SUGGESTED USES MATRIX

FKW PROPERTIES LINDON. Site VINEYARD OREM. Vicinity Map. Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah

Application for Site Plan Review

The proper use of erosion and sediment controls will allow the following objectives to be met:

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES


Analyzing the Bioretention Construction Sequence

Section 9 Landscaping and Street Trees

2-B-18-UR. Revised: 3/27/2018

BIORETENTION FACILITY

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PLAN SUBMITTER'S CHECKLIST

Stormwater Control Plan: Small (Tier 1) Land Development Project

John F. Kennedy STEM High School Green Infrastructure Information Sheet

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

SITE PLAN REVIEW APPLICATION

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

SOIL EROSION AND SEDIMENT CONTROL

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

A/E REVIEW CHECKLIST SITE & LANDSCAPE

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5.0 Storm Water Landscape Guidance Introduction

Staff Report Bourbon County Joint Planning Office SPECIAL MEETING September 4, 2018

DIVISION 32 EXTERIOR IMPROVEMENTS

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

Structural Storm Water Best Management Practices (BMPs)

Appendix D - Technical Design Criteria for BMPs

6. CPRC Group, requests sketch plan review for 70 Pleasant Hill Road, Map R77, Lot 7

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

4. CONCEPT PLAN DEVELOPMENT

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

High School No.3. School District No. 27J L2.0. Development. Design

Transcription:

GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387 email: dans@rentfmi.com ULIAN KISSIOV 476 PRESIDENTIAL LANE MADISON, WISCONSIN 53711 PHONE: 608-320-3151 email: ukissiov@charter.net LOCATION MAP SHEET INDEX: NORTH UNIT MIX: D'ONOFRIO KOTTKE & ASSOC., INC. 7530 WESTWARD WAY MADISON, WISCONSIN 53717 CONTACT: DAN DAY PHONE: 608-833-7530 email: dday@donofrio.cc T AUGUST 04, 2014

ULIAN KISSIOV ARCHITECT 476 PRESIDENTIAL LN MADISON, WI 53711 PHONE: 608-320-3151 GRAND ARBOR RESERVE PROJECT: 10203 MINERAL POINT ROAD, MADISON, WI GRAND ARBOR RESERVE, LLC CLIENT: 6417 ODANA RD, MADISON, WI 53719 BUILDING B BUILDING A BUILDING A S/W - COLORS BUILDING B EXTERIOR FINISH MATERIALS *ROOF - ARCHITECTURAL ASPHALT SHINGLES A-0

PROPERTY LINE CONCRETE CURB & GUTTER EXISTING CONTOUR SANITARY SEWER WATER MAIN U:\User\1405124\Drawings\Base.dwg, 8/4/2014 6:25:54 PM

SIGN PROPERTY LINE 18" CONCRETE CURB & GUTTER PROPOSED BUILDING PROPOSED RETAINING WALL CURB STOP 2" STEEL POST WITH H.C. SIGN DETECTABLE WARNING FIELD DETECTABLE WARNING FIELD CURB STOP 2" STEEL POST WITH H.C. SIGN 4 STEPS 3 STEPS 5 STEPS (12) BICYCLE PARKING STALLS 5 STEPS CONSTRUCT COMMERCIAL DRIVE ENTRANCE PER CITY OF MADISON SPECIFICAITONS 5 STEPS 4 STEPS 2 STEPS 1 STEP U:\User\1405124\Drawings\Base.dwg, 8/5/2014 10:04:58 AM

PROPOSED CONTOUR EXISTING CONTOUR SPOT ELEVATION EP - EDGE OF PAVEMENT FG - FINISHED GRADE SW - SIDEWALK TW - TOP OF WALL (GROUND ELEVATION) BW - BOTTOM OF WALL (GROUND ELEVATION) RIM - INLET RIM SILT FENCE PROPOSED BUILDING PROPOSED RETAINING WALL GRADING AND EROSION CONTROL NOTES: 1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED BY THE CONTRACTOR IN ACCORDANCE WITH THE WISCONSIN DNR TECHNICAL STANDARDS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN A COPY OF THESE STANDARDS. 2. INSTALL EROSION CONTROL MEASURES PRIOR TO ANY SITE WORK, INCLUDING GRADING OR DISTURBANCE OF EXISTING SURFACE MATERIALS AS SHOWN ON PLAN. MODIFICATIONS TO SEDIMENT CONTROL DESIGN MAY BE CONDUCTED TO MEET UNFORESEEN FIELD CONDITIONS IF MODIFICATIONS CONFORM TO WDNR TECHNICAL STANDARDS. PROVIDE SILT FENCE AS SHOWN 3. EROSION CONTROL MEASURES INDICATED ON THE PLANS SHALL BE CONSIDERED MINIMUMS. IF DETERMINED NECESSARY DURING CONSTRUCTION THE COUNTY OR TOWN WILL REQUIRE ADDITIONAL MEASURES TO BE INSTALLED TO PREVENT SEDIMENT FROM LEAVING THE SITE. 4. INSPECTIONS AND MAINTENANCE OF ALL EROSION CONTROL MEASURES SHALL BE ROUTINE (ONCE PER WEEK MINIMUM) TO ENSURE PROPER FUNCTION OF EROSION CONTROLS AT ALL TIMES. EROSION CONTROL MEASURES ARE TO BE IN WORKING ORDER AT THE END OF EACH WORK DAY. 5. INSPECT EROSION CONTROL MEASURES AFTER EACH 1/2" OR GREATER RAINFALL. REPAIR ANY DAMAGE OBSERVED DURING THE INSPECTION. 6. NO SITE GRADING OUTSIDE OF THE LIMITS OF DISTURBANCE 7. EROSION CONTROL MEASURES SHALL BE REMOVED ONLY AFTER SITE CONSTRUCTION IS COMPLETE WITH ALL SOIL SURFACES HAVING AN ESTABLISHED VEGETATIVE COVER 8. INSTALL INLET PROTECTION IN ALL STORM SEWER INLETS AND CATCH BASINS THAT MAY RECEIVE RUNOFF FROM DISTURBED AREAS 9. CUT AND FILL SLOPES SHALL BE NO GREATER THAN 3:1 10.SLOPES EXCEEDING 4:1 SHALL BE STABILIZED WITH CLASS I, TYPE B EROSION MATTING AND ALL DRAINAGE SWALES SHALL BE STABILIZED WITH CLASS II, TYPE B EROSION MATTING. 11. ALL INCIDENTAL MUD TRACKING OFF-SITE ONTO ADJACENT PUBLIC THOROUGHFARES SHALL BE CLEANED UP AND REMOVED BY THE END OF EACH WORKING DAY USING PROPER DISPOSAL METHODS. 12. ANY DISTURBED AREA THAT REMAINS INACTIVE FOR GREATER THAN 7 DAYS SHALL BE STABILIZED WITH TEMPORARY STABILIZATION METHODS SUCH AS TEMPORARY SEEDING, SOIL TREATMENT, EROSION MATTING, OR MULCH 13.PREVENT EXCESSIVE DUST FROM LEAVING THE CONSTRUCTION SITE IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS. 14.INSTALL EROSION CONTROLS ON THE DOWNSTREAM SIDE OF STOCKPILES. PROVIDE STONE CONSTRUCTION ENTRANCE 15. AT A MINIMUM ALL DISTURBED AREAS SHALL RECEIVE A MINIMUM OF 4" OF TOPSOIL FERTILIZER, SEED AND MULCH. SEE MIXTURE SHALL BE WISCONSIN DOT SEED MIX #40 OR EQUIVALENT APPLIED AT A RATE OF 5 POUNDS PER 1000 SQFT ON ALL DISTURBED AREAS. ANNUAL RYEGRASS AT A RATE OF 1 1 2 POUNDS PER 1000 SQFT SHALL BE ADDED TO THE MIXTURE. FERTILIZER SHALL BE PLACED PER A SOIL TEST. SEE LANDSCAPE PLAN FOR A MORE DETAILED PLANTING PLAN AND LANDSCAPE DETAILS. 16.DEWATERING, IF APPLICABLE, SHALL BE CONDUCTED PER WDNR STORM WATER MANAGEMENT TECHNICAL STANDARD 1061. U:\User\1405124\Drawings\Base.dwg, 8/5/2014 10:06:11 AM

PROPERTY LINE 18" CONCRETE CURB & GUTTER PROPOSED BUILDING PROPOSED RETAINING WALL PROPOSED STORM SEWER PROPOSED SANITARY SEWER PROPOSED WATER MAIN/LATERAL PROPOSED HYDRANT 2X3 INLET 48" MANHOLE 2X3 INLET 2X3 INLET 2X3 INLET 48" MANHOLE PROPOSED 6" SANITARY LATERAL PROPOSED 6" WATER SERVICE ENDWALL IE = 1058.5 PROPOSED HYDRANT 48" MANHOLE 2X3 INLET PROPOSED 6" SANITARY LATERAL PROPOSED 6" WATER SERVICE U:\User\1405124\Drawings\Base.dwg, 8/5/2014 10:07:21 AM

FILL 4.5' WOOD OR STEEL POST FILTER FABRIC Signage as required Light gauge metal post 4"Ø steel post filled with concrete 3" DIA. CLEAR STONE REQ'D. Augered hole filled with concrete STONE TRACKING PAD DETAIL ORIGINAL GROUND ANCHOR FABRIC 6" DEEP 6" 3"R 2 1/2" R SILT FENCE DETAIL ACCESSIBLE PARKING SIGN DETAIL NOT TO SCALE 3/4" / FT 13" 7-3/4" 4" COMPACTED CRUSHED AGGREGATE 18" CURB & GUTTER DETAIL 5" THICK CONCRETE SIDEWALK 1" TOOLED RADIUSED EDGE BITUMINOUS PAVING SURFACE MOUNTED WITH CIRCULAR BASES MAINTAIN CURB HEAD HEIGHT 6" INVERTED "U" TYPE BICYCLE RACK 12" 13" 6" 3/4" / FT 3"R 2 1/2" R 2 - #4 CONTINUOUS REBARS 4" COMPACTED SAND OR GRAVEL BASE 1'-0" STAINLESS STEEL ANCHOR BOLTS WITH TAMPERPROOF TOPS 7" GENERAL NOTES: - PROVIDE 1/4" PER FOOT CROSS SLOPE ACROSS WALK 4" COMPACTED CRUSHED AGGREGATE 18" - PROVIDE TOOLED JOINTS @ +/- 5'-0" O.C. CURB & GUTTER DETAIL 3.5" BITUMINOUS PAVEMENT (1 3/4" SURFACE COURSE) (1 3/4" BINDER COURSE) BIKE RACK DETAIL NOT TO SCALE U:\User\1405124\Drawings\Base.dwg, 8/5/2014 10:57:48 AM

PROPERTY LINE 18" CONCRETE CURB & GUTTER PROPOSED BUILDING PROPOSED RETAINING WALL AERIAL ACCESS AERIAL ACCESS FIRE LANE FIRE LANE U:\User\1405124\Drawings\Base.dwg, 8/5/2014 10:23:11 AM

LANDSCAPE REQUIREMENTS SUMMARY M I N E R A L P O I N T R O A D LANDSCAPED BERM LAWN SEED LANDSCAPED BERM DEVELOPED AREA REQUIREMENT: 5 PTS PER 300 SQ FT OF DEVELOPED AREA DEVELOPED AREA = 31,890 SQ FT POINTS REQUIRED = 532 POINTS POINTS PROVIDED = 4,372 POINTS STREET FRONTAGE REQUIREMENT: 1 OVERSTORY TREE OR 2 EVERGREEN & 5 SHRUB PER 30 LF LOW GROWING PRAIRIE SEED MINERAL POINT ROAD FRONTAGE = 428 FT PLANTS REQUIRED = 14 OVERSTORY TREES OR 28 EVERGREEN TREES 72 SHRUBS PLANTS PROVIDED = 2 OVERSTORY TREES 25 EVERGREEN TREES 73 SHRUBS LANDSCAPED BERM SHEET L101 SHEET L102 SUGAR MAPLE LANE FRONTAGE = 58 FT PLANTS REQUIRED = 1 OVERSTORTY TREES OR 4 EVERGREEN TREES 10 SHRUBS PLANTS PROVIDED = 1 OVERSTORY TREES 4 EVERGREEN TREES 11 SHRUBS LAWN SEED OFFICE / VESTIBULE LAWN SEED BUILDING A S U G A R M A P L E L A N E RUSTLING BIRCH ROAD FRONTAGE = 135 FT PLANTS REQUIRED = 5 OVERSTORY TREES OR 10 EVERGREEN TREES 23 SHRUBS PLANTS PROVIDED = 0 OVERSTORY TREES 8 EVERGREEN TREES 24 SHRUBS PARKING LOT LANDSCAPING REQUIREMENT: REQUIRED LANDSCAPED AREA = 8% OF DEVELOPED LOT= 2,552 SQ FT AREA PROVIDED = 3,542 SQ FT PLANT REQUIREMENT = 1 OT PER 160 SQ FT OF REQ'D AREA = 16 OT PLANTS PROVIDED = 16 OT PLANTING SCHEDULE LAWN SEED LOW GROWING PRAIRIE SEED PROPOSED HYDRANT BUILDING B LAWN SEED SHEET L101 SHEET L102 R U S T L I N G B I R C H R O A D SITE LANDSCAPE PLAN - GENERAL NOTES 1. CONTACT DIGGER'S HOTLINE 3 WORKING DAYS PRIOR TO THE START OF CONSTRUCTION. 2. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL THE PRIVATE UTILITIES PRIOR TO THE START OF WORK. 3. ALL LANDSCAPE BEDS SHALL CONTAIN A 3" DEPTH OF SHREDDED HARDWOOD CONTAINED BY LANDSCAPE EDGING. 4. LANDSCAPE EDGING SHALL BE 3/16" x 4" ALUMINUM EDGING. 6. ALL TREES IN TURF AREAS SHALL HAVE A 5' DIAMETER CIRCLE OF 3" DEPTH SHREDDED HARDWOOD BARK MULCH CONTAINED BY LANDSCAPE EDGING. 7. ALL GENERAL TURF AREAS SHALL BE FINISH GRADED, AND SODDED OR SEEDED PER THE PROJECT MANUAL. 8. ALL GENERAL LANDSCAPE AREAS SHALL HAVE A MINIMUM 6" COMPACTED DEPTH OF TOPSOIL. 9. ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE CITY OF MADISON ZONING ORDINANCE.

(5) VDC (7) RT (3) PGD (2) CSI SITE LANDSCAPE PLAN - GENERAL NOTES LOW GROWING PRAIRIE SEED (7) POS (5) PS (5) COB (3) AC (1) PGD (1) CO SHEET L101 SHEET L102 1. CONTACT DIGGER'S HOTLINE 3 WORKING DAYS PRIOR TO THE START OF CONSTRUCTION. 2. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL THE PRIVATE UTILITIES PRIOR TO THE START OF WORK. 3. ALL LANDSCAPE BEDS SHALL CONTAIN A 3" DEPTH OF SHREDDED HARDWOOD CONTAINED BY LANDSCAPE EDGING. 4. LANDSCAPE EDGING SHALL BE 3/16" x 4" ALUMINUM EDGING. 6. ALL TREES IN TURF AREAS SHALL HAVE A 5' DIAMETER CIRCLE OF 3" DEPTH SHREDDED HARDWOOD BARK MULCH CONTAINED BY LANDSCAPE EDGING. 7. ALL GENERAL TURF AREAS SHALL BE FINISH GRADED, AND SODDED OR SEEDED PER THE PROJECT MANUAL. 8. ALL GENERAL LANDSCAPE AREAS SHALL HAVE A MINIMUM 6" COMPACTED DEPTH OF TOPSOIL. 9. ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE CITY OF MADISON ZONING ORDINANCE. (3) VDC (5) RT PLANTING SCHEDULE LANDSCAPE EDGING TYP BOTTOM OF BERM (3) RT (5) POS (5) COB LAWN SEED (3) HV (3) AC (1) AGA (1) TA (6) VDC MATCHLINE (2) TOS (5) RA (1) SM (6) CAK (3) RP (2) HV (1) TOS (1) HV (3) CAH (1) RT (3) DCN (5) RP (2) RT SHEET L101 SHEET L102 LOW GROWING PRAIRIE SEED (7) DL (3) DL (1) CC (2) TOS (1) TOS (3) CAH (6) CAK (1) TOS (3) TMT (3) DCN BUILDING B (1) TOS (3) CAK (3) FGM (1) JSW (6) SH (3) TOR (3) SS (2) SM (5) RA (3) AC (8) RT (6) SH (1) JSW (3) WR (3) SS (3) CPG (6) CAK (1) JSW (3) HK (3) SS (3) SS (3) CPG (6) CAK (1) JSW (3) WR (3) CPG (6) SH (1) HK (1) CC MATCHLINE R U S T L I N G B I R C H R O A D

SITE LANDSCAPE PLAN - GENERAL NOTES SHEET L101 SHEET L102 (3) RP (1) HV (4) RA (5) CSI (1) AC (1) UNH BY CITY 1. CONTACT DIGGER'S HOTLINE 3 WORKING DAYS PRIOR TO THE START OF CONSTRUCTION. 2. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL THE PRIVATE UTILITIES PRIOR TO THE START OF WORK. 3. ALL LANDSCAPE BEDS SHALL CONTAIN A 3" DEPTH OF SHREDDED HARDWOOD CONTAINED BY LANDSCAPE EDGING. 4. LANDSCAPE EDGING SHALL BE 3/16" x 4" ALUMINUM EDGING. 6. ALL TREES IN TURF AREAS SHALL HAVE A 5' DIAMETER CIRCLE OF 3" DEPTH SHREDDED HARDWOOD BARK MULCH CONTAINED BY LANDSCAPE EDGING. 7. ALL GENERAL TURF AREAS SHALL BE FINISH GRADED, AND SODDED OR SEEDED PER THE PROJECT MANUAL. 8. ALL GENERAL LANDSCAPE AREAS SHALL HAVE A MINIMUM 6" COMPACTED DEPTH OF TOPSOIL. 9. ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE CITY OF MADISON ZONING ORDINANCE. PLANTING SCHEDULE (1) SM (1) UNH BY CITY (1) TMH (1) SM (8) HS (1) TMH (3) HME LAWN SEED (5) CAK (3) DCN (1) TA (3) TOR (6) EH (3) PVS (3) TOR (1) GBP BY CITY (1) AGA (1) TMH (3) CAH (6) EH (1) TMH (3) HK MATCHLINE (2) HV (3) HV (3) CAK (3) DCN (3) TOR (6) EH (1) TMH (5) RP BUILDING A (3) PVS (3) TOR (6) EH (1) TMH (3) CAH (1) GBP BY CITY OFFICE / VESTIBULE (6) EH (5) DL (1) POS (3) FGM (1) TMH (3) DCN (3) PVS (3) TOR (1) GBP BY CITY (3) TMT (1) WR (6) HS (1) WR (2) RT (6) HS (1) TMH (3) HME (5) RA (1) AFC BY CITY MATCHLINE (1) SM (6) SH (3) PVS (3) CPG (3) WR (1) JSW (6) CAK (1) JSW (3) HK (2) SM (3) PVS (3) CPG (1) AFC BY CITY SHEET L102 (1) AGA SHEET L101 (1) AGA (5) SM (1) PCA LAWN SEED (3) SH (3) JSM (1) CC (3) HS (1) GBP BY CITY (1) GBP BY CITY

GRAND ARBOR RESERVE PROJECT: 10203 MINERAL POINT ROAD, MADISON, WI GRAND ARBOR RESERVE, LLC CLIENT: 6417 ODANA RD, MADISON, WI 53719 OVERALL NORTH FAÇADE OVERALL SOUTH FAÇADE ULIAN KISSIOV ARCHITECT 476 PRESIDENTIAL LN MADISON, WI 53711 PHONE: 608-320-3151 A-4

GRAND ARBOR RESERVE PROJECT: 10203 MINERAL POINT ROAD, MADISON, WI GRAND ARBOR RESERVE, LLC CLIENT: 6417 ODANA RD, MADISON, WI 53719 BUILDING A - NORTH FAÇADE BUILDING A - EAST FAÇADE ULIAN KISSIOV ARCHITECT 476 PRESIDENTIAL LN MADISON, WI 53711 PHONE: 608-320-3151 A-5

GRAND ARBOR RESERVE PROJECT: 10203 MINERAL POINT ROAD, MADISON, WI GRAND ARBOR RESERVE, LLC CLIENT: 6417 ODANA RD, MADISON, WI 53719 BUILDING A - SOUTH FAÇADE BUILDING A - WEST FAÇADE ULIAN KISSIOV ARCHITECT 476 PRESIDENTIAL LN MADISON, WI 53711 PHONE: 608-320-3151 A-6

GRAND ARBOR RESERVE PROJECT: 10203 MINERAL POINT ROAD, MADISON, WI GRAND ARBOR RESERVE, LLC CLIENT: 6417 ODANA RD, MADISON, WI 53719 BUILDING B - EAST FAÇADE BUILDING B - SOUTH FAÇADE ULIAN KISSIOV ARCHITECT 476 PRESIDENTIAL LN MADISON, WI 53711 PHONE: 608-320-3151 A-7

GRAND ARBOR RESERVE PROJECT: 10203 MINERAL POINT ROAD, MADISON, WI GRAND ARBOR RESERVE, LLC CLIENT: 6417 ODANA RD, MADISON, WI 53719 BUILDING B - WEST FAÇADE BUILDING B - NORTH FAÇADE ULIAN KISSIOV ARCHITECT 476 PRESIDENTIAL LN MADISON, WI 53711 PHONE: 608-320-3151 A-8