Forest Way School Coalville, Leicestershire

Similar documents
Melton, School SuDS scheme, Mowbray

Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory.

Victoria Park Health Centre, Leicester

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Renfrew Close, London

Wessex Water Operations Centre, Claverton Down

Blythe Valley Park, Solihull, West Midlands

St Andrews Park, Uxbridge

Hopwood Motorway Service Area, Worcestershire

paving case study GREAT WESTERN PARK DIDCOT OXFORDSHIRE

Green Streets and Water

DEALING WITH STORM WATER MANAGEMENT

Stebonheath Primary School, Llanelli

Alma Road Rain Gardens, London

Greening streets, retrofit rain gardens, Nottingham

Taking control of SuDS - with permeable paving

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

Lead Local Flood Authority SuDS Policy Statement

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

Design Assessment Checklists for Ponds/ Wetlands

Sustainable Urban Drainage Systems (SuDs)

SUDS: Innovation or a Tried and Tested Practice?

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

Delivering SuDS in Leicestershire Early Experiences. Wednesday 23 rd July Introduction

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

4.6. Low Impact and Retentive Grading

Uniclass L534:L217. December permeable. paving CASE STUDY ADOPTION IN OXFORDSHIRE.

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Manor Ponds, Sheffield

Post Construction BMPs

An Introduction to Sustainable Drainage

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Hollickwood Primary School, London

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Sewer Flooding Alleviation in the Counters Creek Catchment

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Leduc Industrial Outline Plan SE W4

Sustainable Stormwater Retrofit Best Practices

Cambrian North Basin, Llanelli

Uniclass L534:L217. November paving. permeable. for amenity CASE STUDY ROBERT BRAY ASSOCIATES SUDS PROJECTS.

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Green Roofs and Stormwater Management Virginia Stovin

Table 4.7.1: Swales Potential Application and Storm Water Regulation

6.1 Bioretention Areas

Northumbrian Water is required to provide investment to reduce spills at Whitburn and St Peter s, Sunderland in

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

SuDS The business case. Steve Wilson

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

SECONDARY BENEFITS OF STORMWATER BMPS. Growing Sustainable Communities, October 2017

Pollutant Removal Benefits

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Sewer Flooding Alleviation in the Counters Creek Catchment

Queen Caroline Estate, London

Appendix D - Technical Design Criteria for BMPs

Promoting SuDS & Green Infrastructure

USF System Campus Master Plan Updates Goals, Objectives and Policies

Selecting Appropriate Stormwater Control Measures for Your Development Project

4. CONCEPT PLAN DEVELOPMENT

Howard Street, Salford, Manchester

Grey to Green Phase 1, Sheffield

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

C-12. Dry Pond. Design Objective

Promoting Sustainable Drainage Systems

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

2

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Welcome to our public consultation

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

How You Can Help With Flood Management

Youth Justice Redevelopment Project

Welcome to our exhibition

RAIN GARDENS. Task: PART 1 (60 minutes) Student Directions: Steps you will be following: Directions for beginning: Source Information:

7. SITE DESIGN, RETAINING

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Opportunistic approaches to incorporating multi-functioning SuDS into housing redevelopments

Construction of BIOECODS for a Government Complex: A Case Study

Green Infrastructure Overview

Green Infrastructure & Low Impact Development

The checklist can be used for a single filter strip or groups of filter strips with the same characteristics.

rainwise Working with communities to manage rainwater

Berm and Swale Complex

Wetland Design Manual. A1: Vision, core outcomes and aspirational outcomes

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

Heron Court Rain Garden, London

The New Role for Councils: Driving an integrated green-blue approach. Celeste Morgan E2Designlab

Ecosystems and Biodiversity Ecosystem Services in the City. City of Burnaby Environmental Sustainability Strategy

Structural Stormwater Best Management Practices

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Learning journey of integrated sustainable landscape starts here!!

Sustainable Drainage Applied Research Group, Coventry University Priory Street, Coventry, CV1 5FB, United Kingdom 3

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

Rainwise. Sustainable Drainage Solutions. Working with communities to manage rainwater. Wuppertal Court, Jarrow

Transcription:

Forest Way School Coalville, Leicestershire SuDS used Rainwater harvesting Swales Detention basin Kerb drains Filter drains Benefits Control of runoff to greenfield runoff rate. Wetland features manage runoff to ensure clean water enters the natural drainage system. Savings in cost of installation over a conventional piped or underground drainage. Massive biodiversity increase on a site that had no water or wetland before. Engagement with school staff and students. 1. Location Forest Way School, Warren Hills Rd, Coalville, Leicestershire, LE67 4UU. 2. Description Forest Way is a new Special Educational Needs School, opened in January 2009. The site has one main building with new hard and soft surfaced play areas, multi-use games area and car parking. It is set on a campus of four schools on the edge of Coalville on the site of a demolished high school. It lies at roughly 200mAOD on the edge of the elevated ground of Charnwood Forest. The site falls steeply from north to south. Following construction of the school, various improvements to the grounds were made, including new horticultural teaching areas, paths and surfacing. 1

The overall development site is approximately 2 hectares including the school buildings, hard surfaced play areas, surrounding earthworks and soft play areas. The surface water for the development connects into private drainage on the school site which then conveys the water into an existing ditch. Figure 1 SuDS basin under construction 3. Main SuDS components used From the very early stages of the project, the brief demanded an imaginative approach to using surface water creatively, to encourage maximum biodiversity and for teaching. A ground investigation undertaken early in the design process showed that the underlying clayey ground was not sufficiently permeable for infiltration drainage (e.g. soakaways) to be used. However, the layout of the development site provided the opportunity to utilise open areas to the east and south of the school building for above ground drainage systems. The concept of a SuDS treatment train or SuDS management train to deal with stormwater was developed between DSA, Arup and the main contractor, Willmott Dixon. 2

Figure 2 Schematic of water sensitive urban design for Forest Way School Very little underground drainage is used. Due to the sloping ground level and the lack of free space close the buildings, rainwater from impervious surfaces are generally collected using either proprietary kerb drains or filter drains which discharge into a swale. Runoff from roofs is connected into a separate piped system that feeds a rainwater harvesting tank, as non-potable water supply for the building. A long swale conveys water from the northern car park to a detention basin in the southeast, which serves as the main site-scale attenuation feature. An orifice plate provides flow control before the system discharges into an existing drain. Flow is limited to existing runoff rates. Drainage to the west of the school (roughly 10%) is taken conventionally via pipes to the drainage connection. 3

Figure 3 Plan of outdoor learning areas (January 2010) 4. How it works Most runoff is taken from the building roof and paved areas above ground into either a swale or pipes and gullies, and is then conveyed around the east of the development to a large detention basin. The basin and swales contain an extensive area for natural play, within which are a series of designated play spaces for children of different ages. The basin is specifically designed to include permanent pools for curriculum use and has a ramp to allow disabled wheelchair access. The total catchment area is approximately 2 hectares. The swale is very shallow and was carefully designed and constructed to fit into the new landscape. Longitudinal sections were adjusted in fine detail on site to promote formation of micro-pools and allow intermediate development of taller marginal species. Swales contain baffle to keep velocities to a minimum. Rocks, excavated from the site, were re-used to improve the natural appeal of the system. Swales are approximately 159m in total with connecting linear drainage keeping surface water just below the surface level. 4

Figure 4 The plans 5. Specific project details Forest Way was formerly a high school. Surveys revealed that its overall biodiversity was low, relative to other sites in the area and no wetland was present. Soils on site were heavily re-worked to create a level platform for the school building and play areas. The maximum depths of cut and fill were in the order of 4m. Ground conditions are generally cohesive. The scheme was designed to safely manage a 1in 100 year plus 20% for climate change return period storm. The discharge rate from the basin into the existing drain is approximately 25 litres per second. The basin can store a volume of around 500m³ at a maximum depth of 1m for extreme storms. Headwalls to drains have been constructed using rock filled gabion baskets to improve aesthetic appearance. Planting is allowed to grow around these. 5

Figure 5 A bird hide has been constructed to allow views across the basin (March 2012) Figure 6 General basin view (March 2012) 6

The design includes 600 mm freeboard and an emergency overflow in case of blockage or exceedance. If the basin water depth exceeds the maximum design level, excess water will flow into an adjacent ditch to ensure water is conveyed away from buildings and adjacent buildings. The drainage system discharges into a 225 mm diameter private drain. Planting was modified to cope with actual conditions on the ground. It was observed that ponding occurred, due to considerable variations in soil structure, in places along the system that could not be anticipated at design stage. Figure 7 Completed basin (July 2010) A Landscape Management Plan that guides decisions on annual maintenance and allows costing, covers the site as a condition of planning. Forest Way continue to work closely with the landscape architects to maximise opportunities for teaching and learning and to increase the contact pupils have with the natural world. A novel feature of the scheme has been the engagement of the local community in the project. The opportunity was presented to show children at two of the local schools what was happening and to 7

work with them in the design of some of the art features, signage and play areas. This enabled the idea of SuDS as a learning and teaching resource to be explained. 6. Benefits Control of runoff to greenfield runoff rate; Wetland features manage runoff to ensure clean water enters the natural drainage system; Rainwater runoff from the main car park is treated biologically through the SuD system. One small oil separator was required for the mini-bus drop off area due to the site levels; Savings in cost of installation over a conventional piped or underground drainage; Massive biodiversity increase on a site that had no water or wetland before; Powerful and exciting visual features making sustainable design obvious; Engagement with school staff and students; Extended teaching and learning; Ongoing work potential data on performance; Monitoring of performance through LMP; Anticipated continued involvement of staff and students; Formed case study allowing further development of ideas in other schools (See also MV16 Melton Mowbray case study). Figure 8 The completed SuDS scheme brings learning benefits 8

7. Challenges & lessons learnt for the School children (Summer 2013) Figure 9 Species and habitat diversity Restricted site and levels determined a sub-optimal solution with a proportion of the drainage treated conventionally; Safety and maintenance concerns overcome; Reassurance provided by carrying out visits to previously installed SuDS schemes including Castle Rock and Bushloe and seeing these work well. 8. Interaction with local authority and Environmental Agency Support from Leicestershire County Planning Support from Environment Agency Officer contact: Planning Case Officer - Chris Noakes 9. Project details Status: Constructed 2009 10. Project team Client: Leicestershire County Council Property Services. John Humphries, Nigel Dutton Main Contractor: Willmott Dixon Construction, Nottingham. Les Henson, Steve Waldron 9

Landscape Architect: DSA Environment + Design, Nottingham. David Singleton Engineer: Arup Nottingham, Mike Wood Architect: Hunters, London. Andy Radcliffe 10