b. The additional lot coverage, grading, or stripping shall not: i. Decrease the stability of the slope;

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

City of Shady Cove Riparian Ordinance Ordinance XXX

ORDINANCE NO WHEREAS, the City of Kalama has many areas of timberland and open areas inside its City limits adjacent to residential areas;

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

Zoning Ordinance Article 3

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION II OF TITLE 20--COASTAL ZONING CODE

Procedures IV. V. Rural Road Design Option

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004]

Chesapeake Bay Critical Area Conservation Plan

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Exhibit A. 8:9 Scuffletown Rural Conservation District

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Public Information Meeting

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

When planning stormwater management facilities, the following principles shall be applied where possible.

WASHINGTON COUNTY OREGON

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

Nick Sigmund, Sr. Zoning Officer

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Josephine County, Oregon Board of Commissioners: Jim Riddle, Dwight F. Ellis, & Jim Raffenburg

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Rule D Wetland and Creek Buffers

Skamania County Community Development Department

ARTICLE VI: SITE PLAN REVIEW

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016

CHAPTER SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS

SECTION UNIFIED DEVELOPMENT ORDINANCE SECTION Part 1 Ordinance. ARTICLE 1 Zoning Districts

Lake O the Pines Master Plan Revision Public Information Meeting April 25 & 27, 2017

STREAM BUFFERS

SENSITIVE LANDS OVERLAY

Agricultural Buffering in Non-Urban Reserve Areas

SOIL EROSION AND SEDIMENT CONTROL

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

THE PEOPLE OF THE CITY OF LOS ANGELES DO HEREBY ORDAIN AS FOLLOWS:

Example Codes. City of Brentwood, Tennessee Brentwood Hillside Protection Overlay District Summary

CITY OF SCANDIA ORDINANCE NO. 174

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

I602. Birdwood Precinct

Deb Grube, Sr. Zoning Officer

Zoning Ordinance Chapter 10

CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

IV. Development in the Rural Overlay District

6Natural. Environment Development Permit Guidelines

Chapter 131 GENERAL REFERENCES

CHAPTER Committee Substitute for Senate Bill No. 1472

Shoreland Zoning. Kay Lutze Shoreland Zoning Policy Coordinator

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

ARTICLE IX SPECIAL PERMIT USES

Part 5. Environmental Protection Overlay District Regulations

Clackamas County Comprehensive Plan. Chapter 4: LAND USE

Shoreline Master Program Town of La Conner, Washington

Fact Sheet Regulating Oceanfront Accessory Structures Updated June 10, 2013

River Corridor Overlay Zone (RCOZ) Article 5

Chapter 3 Site Planning and Low Impact Development

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Sec Intent and purpose.

SALT LAKE COUNTY ORDINANCES CHAPTER FOOTHILLS AND CANYONS OVERLAY ZONE

CHAPTER 22 Rural Open Space Community Developments

CHAPTER 13 DESIGN GUIDELINES

ORDINANCE AN ORDINANCE OF THE TOWN COUNCIL OF THE TOWN OF LONG BEACH, LAPORTE COUNTY, INDIANA ESTABLISHING REGULATION GOVERNING:

Highway Oriented Commercial Development Criteria

707 HISTORIC LANDMARK (HL), HISTORIC DISTRICT (HD), AND HISTORIC CORRIDOR (HC)

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

ORDINANCE NO WHEREAS, a primary opportunity identified in the Plan is to Re-Connect the Uncompahgre River:

ARTICLE 17 SITE PLAN REVIEW

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017

Note: Staff reports can be accessed at Zone: I-3. Tier:

APPENDIX C Township 9 Consistency with Applicable Plans

STREAM BUFFER PROTECTION AND MANAGEMENT

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

EXHIBIT A. Chapter 2.7 SPECIAL PLANNED DISTRICTS. Article XVIII 15th Street School Master Planned Development

Riparian Buffer on the Bushkill Creek. Policies

Palmdale Municipal Code (Excerpts) Title 14: ENVIRONMENTAL MANAGEMENT Chapter 14.04: JOSHUA TREE AND NATIVE DESERT VEGETATION PRESERVATION

Article 6 Tree Protection

RIPARIAN CORRIDOR SITE PLAN REVIEW APPLICATION PRE-APPLICATION FEE: $375 TECHNICAL PLAN REVIEW: $650 PROPERTY & APPLICATION INFORMATION

ARTICLE RRCO RED ROCK CORRIDOR OVERLAY DISTRICT

Natural Heritage areas are characterized by one or more of the following values:

Joe Pool Lake Master Plan Revision Public Information Meeting May 23, 2017

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

Planned Development Review Revisions (Project No. PLNPCM )

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program:

ARTICLE XIX SCREENING, LANDSCAPING AND TREES

City of Waco Stormwater Management Regulations

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

17.18 SENSITIVE AREAS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

Chapter BOISE RIVER SYSTEM ORDINANCE

Title 11 Streets and Sidewalks

Transcription:

704 RIVER AND STREAM CONSERVATION AREA (RSCA) 704.01 PURPOSE Section 704 is adopted to: A. Maintain the integrity of the rivers and streams in the County by minimizing erosion, promoting bank stability, maintaining and enhancing water quality and fish and wildlife habitat, and preserving scenic quality and recreational potential; B. Maintain rivers in their natural state to the maximum extent practicable, thereby recognizing their natural, scenic, historic, economic, cultural, and recreational qualities; and C. Implement the River Design Plans set forth in Chapter 3 of the Comprehensive Plan. 704.02 DEFINITIONS Unless specifically defined in Subsection 704.02, words or phrases used in Section 704 shall be interpreted to give them the same meaning as they have in common usage and to give Section 704 its most reasonable application. A. Composite Bank Stabilization: A combination of structural and nonstructural bank stabilization methods that includes a revetment of rock with a natural vegetation cover or overlay. B. Development: Any manmade change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, or any other activity which results in the removal of substantial amounts of vegetation or in the alteration of natural site characteristics. C. Mean High Water Line: The bank of any river or stream established by the annual fluctuations of water generally indicated by physical characteristics such as a line on the bank, changes in soil conditions, or vegetation line. D. Nonstructural Bank Stabilization: The placement of natural vegetation to include a filter fabric if desired along a shoreline for the primary purpose of bank stabilization. E. Structural Bank Stabilization: The placement of a manmade, concrete wall or revetment of rock along a shoreline for the primary purpose of bank stabilization. 704-1

704.03 AREA OF APPLICATION A. Section 704 applies to land that is generally within a quarter mile of the mean high water line of the Clackamas, Sandy/Salmon, Molalla/Pudding, Roaring, Tualatin, and Zig Zag Rivers. These lands are classified as Principal River Conservation Areas and are identified on Comprehensive Plan Maps III-1a, Principal River Conservation Area Clackamas River Design Plan, III-1b, Principal River Conservation Area Sandy-Salmon River Design Plan, III-1c, Principal River Conservation Area Molalla River Design Plan, III-1d, Principal River Conservation Area Tualatin River Design Plan, and III-2, Scenic & Distinctive Resource Areas. The location of these rivers may vary from these maps, if more specific information is provided. B. Section 704 also applies to land that is located within 100 feet of the mean high water line of large Type F streams, except principal rivers identified in Subsection 704.03(A), identified on Water Protection Rule Classification (WPRC) Maps compiled pursuant to OAR 629-635-000 and adopted as part of the Comprehensive Plan. The location of these streams may vary from these maps if more specific information is provided. Classified as Stream Conservation Areas (SCAs), these large streams are designated in the Comprehensive Plan as those that generally have annual average flows of 10 cubic feet per second or greater. C. Section 704 also applies to land that is located within 70 feet of the mean high water line of medium Type F streams, identified on the WPRC Maps. The location of these streams may vary from these maps if more specific information is provided. Classified as SCAs, these medium streams are designated in the Comprehensive Plan as those that generally have annual average flows of greater than two cubic feet per second and less than 10 cubic feet per second. D. Section 704 also applies to land that is located within 50 feet of the mean high water line of small Type F streams, identified on the WPRC Maps. The location of these streams may vary from these maps if more specific information is provided. Classified as SCAs, these small streams are designated in the Comprehensive Plan as those that generally have annual average flows of less than two cubic feet per second. E. The provisions of Section 704 are in addition to those requirements of the State Scenic Waterways Act, Omnibus Oregon Wild and Scenic Rivers Act of 1988, and the Federal Wild and Scenic Rivers Act of 1968. In those areas so designated, the requirements of the County shall be administered subject to the application requirements of Subsection 704.08 and prevail when they are more restrictive than state and federal standards. F. Notwithstanding Subsections 704.03(A) through (E), Section 704 does not apply to land that is inside the Metropolitan Service District Boundary or the Portland Metropolitan Urban Growth Boundary, nor does it apply to Oregon Department of Fish and Wildlife, or other state or federally approved, fish enhancement projects. 704-2

704.04 RIVER AND STREAM SETBACKS The following minimum setbacks shall apply to structures exceeding 120 square feet or 10 feet in height: A. Structures shall be located a minimum of 100 feet from the mean high water line of a principal river. This minimum setback may be increased up to 150 feet from the mean high water line to lessen the impact of development. In determining the minimum setback, the following shall be considered: 1. The size and design of any proposed structures; 2. The width of the river; 3. The topography of the land between the site and the river; 4. The type and stability of the soils; 5. The type and density of existing vegetation between the site and the river; 6. Established recreation areas or areas of public access; and 7. Visual impact of any structures. B. Structures shall be located a minimum of 100 feet from the mean high water line of a large stream. C. Structures shall be located a minimum of 70 feet from the mean high water line of a medium stream. D. Structures shall be located a minimum of 50 feet from the mean high water line of a small stream. 704.05 SETBACK EXCEPTIONS A. The following uses are exempt from the minimum setback standards of Subsection 704.04: 1. Residential lots of record where lot depth precludes compliance with the setback standards of Subsection 704.04, provided that: a. Structures shall be sited the maximum distance from the mean high water line which meets the setback and other standards of the underlying zoning district; and b. The footprint of structures shall not exceed 25 percent of the lot area; 2. Repairs, additions, alterations to, or replacement of structures, roadways, driveways, or other development, which is located closer to a river or stream than permitted by the setback requirements of Subsection 704.04, provided that such development does not encroach into the setback any more than the existing structures, roadways, driveways, or other development; 3. Water dependent uses such as private boat docks, marinas, or boat ramps, provided that structures shall be muted earth tones and any structure shall be the minimum size necessary to accommodate the use; 4. Uses such as roads, bridges, culverts, pipes, and power lines that are necessary 704-3

for crossing streams, provided they do not create barriers to fish movement and that adverse impacts are mitigated; 5. Water impoundments, diversions, detention and retention facilities, and hydroelectric facilities; and 6. Structural, nonstructural, and composite bank stabilization, provided that structural bank stabilization shall only be approved if: a. Structural bank stabilization is required to protect existing structures; b. Nonstructural bank stabilization will be insufficient to adequately protect existing structures; and c. The structural bank stabilization will utilize composite bank stabilization. B. In addition to the exemptions listed in Subsection 704.05(A), the minimum setback standards of Section 704 may be modified for purposes consistent with the adopted Economic, Social, Environmental, and Energy analyses for the applicable watershed. 704.06 DEVELOPMENT STANDARDS A. The maximum height of a dwelling or a structure accessory to a dwelling shall be 35 feet, if the dwelling or accessory structure can be seen from a principal river. B. Commercial or industrial facilities, such as structures, parking areas, and storage areas shall comply with Subsection 704.04, and signs shall be screened from view of the Principal River or Stream Conservation Area by an opaque vegetation buffer. These facilities shall be subject to design review, pursuant to Section 1102. C. Subdivisions and partitions shall be designed, where possible, to allow compliance with Section 704. 704.07 VEGETATION PRESERVATION REQUIREMENTS A. A minimum of 75 percent of the setback area (distance) shall be preserved with native vegetation. B. Tree cutting and grading shall be prohibited within the buffer or filter strip, with the following exceptions: 1. Trees that endanger life or structures may be removed. 2. Tree cutting and grading may be permitted in conjunction with those uses listed in Subsections 704.05 and 704.06, to the extent necessary to accommodate those uses. Disturbed areas that are outside the footprint of structures and other improvements shall be restored with native vegetation. 3. Vegetation removal may occur when approved by the Oregon Department of Fish and Wildlife, upon written notification that such removal is required as part of a river or stream enhancement project. C. Commercial forest activities and harvesting practices outside an urban growth boundary shall be subject to the Oregon Forest Practices Act. Commercial forest 704-4

harvesting activities inside an urban growth boundary shall be reviewed pursuant to the Forest Policies of the Comprehensive Plan. 704.08 SUBMITTAL REQUIREMENTS In addition to the submittal requirements identified in Subsection 1307.07(C), an application filed pursuant to Subsection 704.09 shall include: A. A site plan showing existing vegetation and development, and locations of proposed development or tree-cutting activity; B. Elevations of any proposed structures; C. Exterior materials list for any proposed structures, including type and colors of siding and roofing; D. Cross-section of any area within the vegetative buffer or filter strip where grading, filling, or excavating will occur; and E. A stream buffer restoration plan showing the location, number, and species of native trees and vegetation to be planted. 704.09 ADMINISTRATION OF SECTION 704 A. Development and tree-cutting activities controlled by Section 704 in a Principal River Conservation Area (PRCA) shall be reviewed to ensure consistency with Section 704. Proposed developments on lands within 150 feet of the mean high water line shall be reviewed through a Type II application pursuant to Section 1307. For lands beyond 150 feet of the mean high water line, notice shall be sent to the U.S. Forest Service and Bureau of Land Management. B. Development and grading permits in a Stream Conservation Area (SCA) shall be reviewed through a Type II application pursuant to Section 1307. C. Approval of a PRCA or SCA permit is valid for four years from the date of the final written decision. If the County s final written decision is appealed, the approval period shall commence on the date of the final appellate decision. During this four-year period, the approval shall be implemented, or the approval will become void. 1. Implemented means all major development permits shall be obtained and maintained, or if no major development permits are required to complete the development contemplated by the approved PRCA or SCA permit, implemented means all other necessary County development permits (e.g. grading permit, building permit for an accessory structure) shall be obtained and maintained. a. A major development permit is: i. A building or manufactured dwelling placement permit for a new primary structure that was part of the PRCA or SCA permit approval; or ii. A permit issued by the County Engineering Division for parking lot or 704-5

road improvements that were part of the PRCA or SCA permit approval. D. If the approval of a PRCA permit is not implemented within the initial approval period established by Subsection 704.09(C), a two-year time extension may be approved pursuant to Section 1310. [Amended by Ord. ZDO-230, 9/26/11; Amended by Ord. ZDO-248, 10/13/14] 704-6