Expectations (continued)

Similar documents
FMO Fire and Building

CODE COMPLIANCE MANUAL

New Construction Fire Inspection Process

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors)

Western Michigan University Facilities Management Engineering Division

Fire Sprinkler Submittal Requirements and Acceptance Testing

Environmental Health & Safety

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

2. Welding Materials and Procedures shall conform to the ASME Code.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

PLAN REVIEW FEES. Sprinkler Systems. NUMBER OF Without With SPRINKLERS Inspections Inspections

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

Port of St Helens SIA Aircraft Hanger Scappoose, OR

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS

Construction and Development Guide

DIVISION 21 - FIRE SUPPRESSION

To expedite the plan review and inspection processes, please refer to the information below.

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

Orange Township Fire Department Fire Prevention Bureau

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

Design & Construction Standards, Revised January

WEST VIRGINIA UNIVERSITY

DIVISION 21 - FIRE SUPPRESSION

DIVISION 21 FIRE SUPPRESSION

City of Vista Fire Department

SECTION WET-PIPE SPRINKLER SYSTEMS

PART II: New Construction Inspections and Acceptance Testing Procedures

Fire Sprinkler Plan Submittal Form

Fire Protection Systems Plan Review

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

NASSAU COUNTY FIRE PROTECTION PERMIT APPLICATION

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

FIRE INSPECTION CHECKLIST

FIRE SUPPRESSION SPRINKLER SYSTEM

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION FIRE PROTECTION

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

SECTION Fire Pumps

September 30, Dear Fire Suppression System Contractor/Designer:

Global Property. QUARTERLY FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

A. This section includes design and performance information for fire protection and suppression systems.

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Model F1 LO K 8.0 (115 metric) Standard Response Sprinklers

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

FIRE & LIFE SAFTEY STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS

Winnipeg Fire Department Fire Prevention Branch

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

FIRE SPRINKLER SYSTEMS POLICY

CONSTRUCTION REQUIREMENTS

PLAN REVIEW SUBMITTAL GUIDE

SECTION INSPECTION AND TESTING OF WORK

VIOLET TOWNSHIP ZONING & BUILDING DEPARTMENT Rustic Drive Pickerington, Ohio (614) Fax (614)

FIRE SPRINKLER SYSTEMS POLICY

Global Property. SEMIANNUAL FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

Model MBEC-14. Extended Coverage Ordinary & Extra Hazard Horizontal Sidewall Sprinklers for Metal Building Applications. Model MBEC-14 (SIN R6932)

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

NORTHWEST FIRE DISTRICT

FIVE YEAR AUTOMATIC FIRE EXTINGUISHING SYSTEMS CERTIFICATION REPORT

B. Section Identification for Fire Suppression Piping and Equipment.

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

A. All Fire Suppression System design and installation shall comply with the most current and adopted version of NFPA 13.

NFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,

APPLICATION FOR INSTALLATION OF SPRINKLER SYSTEM.,. :" ROCHESTER, NH FIRE DEPARTMENT FIRE PREVENTION DIVISION

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

*** Inspection *** Please identify yourself as a Cintas representative when arriving onsite.

Contren Learning Series Apprenticeship Training Program for Fire Sprinkler Fitters

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

SUMMARY. Building receiving sprinkler credit: SPRINKLERED. Grade: 68. Percent of Building Sprinklered: 100% Sprinkler Demand Met: 91%

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

OCFA Planning and Development Section Fees Effective September 28, 2015

This regulation outlines procedures to be followed for fire drills and all school event decorations.

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Specification/ Data Sheet

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

System Test Report CLEAN AGENT

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

DIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

Bold items are particular to the City of Euless

SECTION FIRE-SUPPRESSION STANDPIPES

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

Transcription:

Expectations (continued) The work is ready to be inspected. If a problem develops where the work is not ready for inspection, call the FMO and cancel the inspection as soon as you are aware there is a problem. M-F F 703-792 792-6360 Weekends- 703-792 792-6813 and ask for the Duty Fire Marshal

Inspection Categories There are seven categories of inspections: Underground Fire Main Fire Alarm Sprinkler Hood System Fire Lane Stocking Pre-occupancy

Underground Fire Main (UGM) Visual (59) Hydrostatic (60) Flush (61) Final (82) inspections available

(59) UGM visual A visual inspection of the piping, connections, thrust blocks, threaded rods, and/or mega lug connectors from the street water valve to the base of the flange for the connection to piping of the automatic sprinkler and/or standpipe system.

UGM visual Must be installed per the approved plan. PWC Design and Construction Standards require a minimum of 42 of cover over an underground fire main.

(60) UGM hydrostatic test/inspection A 200 P.S.I. or 50 pounds over static water pressure, whichever is greater, hydrostatic test for a two (2) hour period of UGM components from the street water valve to the base of the flange for the connection to where the automatic sprinkler and/or standpipe system will be connected.

UGM hydrostatic test/inspection Gauges used in performing acceptance tests on fire suppression systems witnessed by the Fire Marshal s Office must meet the following criteria:

UGM hydrostatic test/inspection The gauge shall be appropriate for the type of test; i.e., air gauge for an air pressure test, a water gauge for a hydrostatic test. Air gauges shall have increment markings of two pounds or less. Water gauges must have increment marking of ten pounds or less.

UGM hydrostatic test/inspection The gauge shall be capable of registering pressures above the minimum pressure required during the test. (0 PSI to 300 PSI) Gauges must be marked as accepted by UL and/or FM testing laboratories.

UGM hydrostatic test/inspection The test gauge must zero out at the end of the test period or the inspection will be rejected.

(61) UGM flush A flush of the UGM piping between the street water valve and the base of the automatic sprinkler and/or standpipe system flange. This test and inspection is required for all sprinkler system water supplies. (NFPA 13, 13R, and 13D) Where there is not a separate fire protection permit number the inspection request is called in on the sprinkler fire protection permit number.

(61) UGM flush Minimum 4 diameter hose used for discharge unless the piping being flushed is less than 4 in diameter. Must be done in a safe manner, I.E. the hose used for flushing must be secured in a proper manner to prevent it from moving.

UGM inspections/tests The above tests/inspections are done in accordance with NFPA 24 (1995), Private Fire Service Mains and Their Appurtenances. The tests/inspections can be done on separate days or on the same day provided that they are performed in the proper sequence that is visual, hydrostatic, and flush.

(82) UGM final A review of the UGM test and inspection records to assure that all the required system tests/inspections on the underground fire main are code compliant and have been approved.

Common Failures Inadequate depth of cover. Approved plans not on site. Not installed per approved plan. Inability to hold test pressure. Inadequate flow to flush line. Improper restraint of piping.

Fire Alarm Inspections available Fire Alarm (73) Fire Alarm Battery Test (74) Fire Alarm Final (81)

(73) Fire Alarm Test A test/inspection of all fire alarm system components, including all manual and automatic activation/initiation devices, visual, and audible warning devices. This is a 100% test of all installed devices according to the manufacturer s recommended method.

(73) Fire Alarm Test The system should be pre-tested by the installer PRIOR to calling in for the fire alarm inspection. Device addressing and failure to function should not be found during the FMO inspection.

(73) Fire Alarm Test Do not have the system in test mode without instruction to do so by the inspector. The fire alarm control panel must be clear of trouble before the test can be conducted.

(74) Fire Alarm Battery Test A test of the ability of the fire alarm system to sound all visual and audible horns for five (5) minutes after the system has been on battery power for a twenty-four (24) hour period. Normally started upon completion of the fire alarm test/inspection.