ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

Similar documents
4. CONCEPT PLAN DEVELOPMENT

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Appendix D - Technical Design Criteria for BMPs

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Structural Stormwater Best Management Practices

Structural Storm Water Best Management Practices (BMPs)

Homeowners Guide to Stormwater BMP Maintenance

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Action Plan for Retrofitting Structural BMPs

Kearney Post-Construction Stormwater Program

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Inspection and Maintenance of Stormwater Best Management Practices

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Stormwater Low Impact Development - A Natural Solution

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Green Infrastructure Overview

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

J. Paul Guyer, P.E., R.A.

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Green Infrastructure & Low Impact Development

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

Inventory and Assessment of Stormwater Infrastructure

Title 11 Streets and Sidewalks

Inventory and Assessment of Stormwater Infrastructure

West Virginia Stormwater Management Manual: Methods.

Green Street BMP Matrix

APPENDIX G: TOWN ORDINANCE REVIEW

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Guidance on Preparation of Construction and Maintenance Costs

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

Urban Stormwater Retrofit Program Highlights

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Stormwater Prevention and Control

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

What Are We Inspecting? Stormwater Treatment Measure Type and Design

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Urban Watershed Mentors

Post - Construction Hydromodification Development Requirements

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Appendix G. Detailed Design

Selecting Appropriate Stormwater Control Measures for Your Development Project

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

BMP Suitability Matrix

Low Impact Development Ideas and Effects in the Built Environment

Stormwater and Ecological Management Opportunities May 2008

Green Infrastructure and Low-Impact Development Technologies

Post Construction BMPs

Spokane River Forum: City of Spokane Permeable Pavements

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Coffee Creek Park Development Low Impact Development (LID)

Designing for Sustainability: A Consultant s Perspective

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

Kittson Parkway / Watershed Park Parking Lot

Table of Contents. Preface... xv

Reducing New York City s CSOs Using Green Infrastructure

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Cost Effective Low Impact Development

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Low-Impact Development Code Update. Thurston County Community Stakeholder Group June 25, 2015

West Norriton Township

3. Are there any projects exempt from the definition of Regulated Projects?

Importance of Master Planning Marcy Colclough

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Article 20 Stormwater Management

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

Low Impact Development for your homes, businesses & streets

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Table 4.7.1: Swales Potential Application and Storm Water Regulation

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

2014 Southeast NY Stormwater Conference October 15, John Dunkle, PE, CPESC, CMS4S

Funding Assistance to Stormwater Utility Fee Payers for Stormwater Solutions and Incentives. Danny Bowden City of Raleigh Stormwater Utility

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Small Town Sustainable Stormwater Solutions

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

FACT SHEET: Pervious Pavement with Infiltration

DEALING WITH STORM WATER MANAGEMENT

How to Update a Storm Water Management Program (SWMP) to Incorporate Total Maximum Daily Load (TMDL) BMPs

Transcription:

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS FEBRUARY 16, 2017 For the City and County of Honolulu MS4 NPDES Permit No. HI S000002

STORMWATER RETROFIT BMP OPPORTUNITIES

Permit Requirements Status in Action Plan Action Plan Section Continue with implementation activities for Wailupe Stream, Kuli ou ou Stream and Niu Stream and provide status updates for USACE projects and City s role. Continue implementing recommendations for 2008 report, Stormwater BMPs for four major outlets at Ka elepulu Pond. Evaluate and consider recommendations for 2010 report for Wailupe watershed. Provide DOH with updated Action Plan for retrofitting structural BMPs. An inventory of potential retrofit locations emphasizing LID controls for impaired waterbodies. Wailupe Stream: USACE is currently coordinating with City and State sponsors for a scaled down project, similar to Kuli ou ou. Kuli ou ou Stream: USACE feasibility study to be completed by August 2017. Niu Stream: No ongoing activity. Phase II catch basin improvements completed. Phase II Hele Channel streambank and inlet screen retrofit to be completed in 2018. Ka elepulu Pond monitoring to extend through December 2017. 2.1.1. 2.1.2. 2.1.3. 2.2. No outstanding recommendations at this time. 2.3. Submitted February 16, 2017, to DOH. Included in Action Plan. 3, Appendix C A list of practicable retrofit projects. Included in Action Plan. 3, Appendix C A schedule for implementation of retrofit projects, subject to available funding. Included in Action Plan. 5

WATERSHED REGIONS

COMPLETED OR ONGOING PROJECTS Action Plan Section 2. Total Cost: $101M, See Table 2-1 Figures 2-2 to 2-11

MAP OF ONGOING/COMPLETED BMP RETROFIT PROJECTS EXAMPLE

TRASH REDUCTION PLAN Action Plan Section 2.4. Baseline plan recently completed Nānākuli and Nu uanu pilot projects started Ka elepulu Pond project: catch basin baskets and screens, Hele Channel Improvements

EROSION CONTROL BMPS PROGRAM PLAN Action Plan Section 2.5. Completed projects: Appendix B, Table B-1 Ongoing projects: Table 2-4 and Appendix B, Table B-2 Ongoing BMP Types: geoweb, amended soil and grass, concrete channel, drain inlet filters, dual infiltration chambers, sediment barriers, geotextiles and mats, grouted rubble paving, low flow showerhead, preservation of existing vegetation, rain gardens (bioretention areas), streambank stabilization, trench drain and other Ongoing BMPs Total Cost/Budget: $5.1M

INDUSTRIAL AND SMALL MS4 FACILITY PLANS HONOLULU POLICE DEPARTMENT Action Plan Section 2.6.1. HPD Wahiawā Station in Progress, See Table 2-5 Grass swales Total Cost: $1.6M

KALIHI POLICE STATION Concrete Pad with Grooves at Fueling Area Bioswale

KAPOLEI POLICE STATION Vegetative Swale/Bioretention Area, Curb Cut

WAI ANAE POLICE STATION Curb Cut, Gravel Trench

INDUSTRIAL AND SMALL MS4 FACILITY PLANS HONOLULU FIRE DEPARTMENT Action Plan Section 2.6.2. Ongoing projects at Central Fire Station, Kahalu u Fire Station, and Waipahu Vehicle Maintenance Facility See Table 2-6 Grass swales, infiltration trenches, and seepage wells Total Cost/Budget: $2.6M

INDUSTRIAL AND SMALL MS4 FACILITY PLANS DEPARTMENT OF PARKS AND RECREATION Action Plan Section 2.6.3. Ongoing projects at Ala Wai Neighborhood and Community Parks See Table 2-7 Bioretention areas and amended soil and grass Total Budget: $0.45M

KAPI OLANI REGIONAL PARK Infiltration Area Permeable Pavement Vegetative Swale

MĀ ILI BEACH PARK Gravel Trench System

INDUSTRIAL AND SMALL MS4 FACILITY PLANS DEPARTMENT OF ENTERPRISE SERVICES Action Plan Section 2.6.4. Ongoing project at Ala Wai Golf Course See Table 2-8 Bioretention area and permanent vegetation Total Budget: $3.3M Projects in design at Ted Makalena Golf Course and West Loch Course See Table 2-9 Permanent vegetation and downspout filters Total Budget: $2.5M

ALA WAI DRIVING RANGE

INDUSTRIAL AND SMALL MS4 FACILITY PLANS OTHER Action Plan Section 2.6.5. Plan under development No recommendations at this time

HONOLULU AUTHORITY FOR RAPID TRANSIT Action Plan Section 2.7. See Table 2-10 and Appendix B, Table B-3 Infiltration basin, landscaping, vegetated swales, wet swales

ADDITIONAL CITY PROJECTS Action Plan Section 2.8. See Table 2-11 Seepage wells, retention basins Total Cost/Budget: $15.8M to $26.4M

NON-CITY BMP RETROFIT PROJECTS Action Plan Section 2.9. See Table 2-12, 2-13, and Appendix B, Table B-5 Over 140 non-city projects Biofiltration, detention basins, detention vaults, drywells, grassed yards, infiltration pipe, infiltration sumps, pervious pavement, ponding basins, rain garden, retention basin, underground detention, grassed swales, vegetated strips, landscaping, cistern/rain barrel

POTENTIAL STRUCTURAL BMP RETROFIT PROJECTS Action Plan Section 3. Figures 3-1 to 3-10

MAP OF POTENTIAL BMP RETROFIT PROJECTS EXAMPLE

EROSION CONTROL BMPS PROGRAM PLAN Action Plan Section 3.7. See Table 3-1 and Appendix C, Table C-1 Check dams, geotextiles and mats, geoweb, hydromulch, seeding, planting, sodding, streambank stabilization, vegetative cover. Total erosional area: 44,800 SY

INDUSTRIAL AND SMALL MS4 FACILITY PLANS HONOLULU POLICE DEPARTMENT Action Plan Section 3.8.1. Kāne ohe Station, Kahuku Station HPD Training Facility, Pearl City Station See Table 3-2 and Appendix C, Table C-2 Soil amendment, subsurface infiltration, vegetated buffer Total Cost: $0.66M

INDUSTRIAL AND SMALL MS4 FACILITY PLANS HONOLULU FIRE DEPARTMENT Action Plan Section 3.8.2. See Table 3-3 and Appendix C, Table C-3 Disconnect downspouts, grass swales, infiltration basins and trenches, replant vegetation, seepage wells, subsurface infiltration systems Total Cost: $6.6M

INDUSTRIAL AND SMALL MS4 FACILITY PLANS DEPARTMENT OF PARKS AND RECREATION Action Plan Section 3.8.3. See Table 3-4 and Appendix C, Table C-4 Bioretention areas, disconnect downspouts, grass swales, redirect runoff to ponds and infiltration areas, retention basins, seepage pit systems, topsoil and grass, vegetated buffer Total Budget: $4.6M

INDUSTRIAL AND SMALL MS4 FACILITY PLANS DEPARTMENT OF ENTERPRISE SERVICES Action Plan Section 3.8.4. See Table 3-5 and Appendix C, Table C-5 Bioretention areas, bioswales, concrete pavers, drywell, groundcover, grass pavers, gravel areas, gravel pavers, porous pavement, regrassing, stormwater storage, wood mulch Total Cost: $10M

PRIORITIZATION AND TRACKING Positive points assigned for: Number of retrofit objectives accomplished High density or high visibility watershed regions Addressing water quality standards Lower construction costs Drainage area as a percentage of watershed area Quantity of BMPs installed Shorter duration to implementation

PRIORITIZATION AND TRACKING Negative points assigned for: Lack of maintenance accessibility Permits Potential adverse environmental impacts, such as safety hazards or vectors Greater long-term maintenance costs. A tracking system to measure program trends would be implemented to validate the anticipated benefits. See Appendix D, Tables D-1 to D-4

IMPLEMENTATION SCHEDULE Permit Part D.1.f(1)(vi) See Table 5-1. 2017 to 2020 Hydrodynamic separator, inlet screens, bioretention swales, inlet filters, pervious pavers, vegetated buffer strips, seepage wells, trench drain with filters, slope embankment stabilization, nutrient separating baffle boxes, detention basin, debris basin and channel embankment stabilization, hardline embankment area along drainage channel, roadway shoulder and embankment improvements, grassing, turf reinforcement mat

NEXT STEPS The next steps consist of identifying additional potential BMP retrofit locations within priority watersheds. The first phase will utilize a desktop analysis of GIS watershed maps to identify potential retrofit site areas. A field reconnaissance survey will confirm feasibility and effectiveness of the potential sites identified in the preceding desktop screening analysis.