The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.

Similar documents
FORM ACCL-PC1 ACCL WITNESS TEST PROCEDURE AND CHECKLIST

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

PQS Independent type-testing protocol

PQS Quality Assurance protocol. TITLE: Cold Room/Freezer Room:

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Pre-Installation n Guide For Ultrafast Amplifiers

United Electric Controls One Series Safety Transmitter Safety Manual

INDOOR POOL DEHUMIDIFIERS CERTIFICATION PROGRAM

SECTION SECURITY TESTING AND COMMISSIONING

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

PQS Independent type-testing protocol

REBATE. Ductless Mini-Split Heat Pump

IQ/OQ Protocol Installation Qualification/ Operation Qualification

City of Duluth Festival Center 04/25

TEST REPORT IEC Safety of laser products - Part 1: Equipment classification and requirements

Massachusetts COOL SMART

Medical Gas and Vacuum Systems

DWYER INSTRUMENTS, INC. P.O. BOX 373 MICHIGAN CITY, INDIANA 46360, U.S.A. Series 670 Hood Monitor. Bulletin AV-670

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Prefunctional Checklist

Prefunctional Checklist

FIRE & LIFE SAFTEY STANDARD

Are You Prepared? The impending impact of Code on Servicing Security Systems

TESTING, ADJUSTING AND BALANCING

WATER-SOURCE HEAT PUMPS CERTIFICATION PROGRAM For 50 Hz Products

SBEC Residential Energy Efficiency 2019 Rebate Programs for Existing Homes

Digital EPIC 2 Safety manual

CONTENTS AUTOMATIC TRANSFER SWITCHES

Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU

REFRIGERANT PROCEDURE

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

SBEC Residential Energy Efficiency Rebate Programs for New Homes

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

OHIO UNIVERSITY RADIATION SAFETY REVIEW

SECTION AUTOMATIC TRANSFER SWITCHES

ZLINE FRY ELECTRONICS INSTALL

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

IQ/OQ Protocol Installation Qualification/ Operation Qualification SteamScrubber & FlaskScrubber Laboratory Glassware Washers

WEST VIRGINIA UNIVERSITY

User s Manual. YTA110, YTA310, YTA320, and YTA710 Temperature Transmitters. Manual Change No

IQ/OQ Protocol Installation Qualification/ Operation Qualification

Computer Room Guard Model VM Manual and Installation Instructions

Winston-Salem State University Campus Master Plan 2016 Update

QUALITY ASSURANCE/QUALITY CONTROL DOCUMENTATION SERIES OPTEC NGN-2 NEPHELOMETER AUDIT PROCEDURES (IMPROVE PROTOCOL) STANDARD OPERATING PROCEDURE

IQ/OQ Protocol Installation Qualification/ Operation Qualification zz FreeZone Stoppering Tray Dryer & Bulk Tray Dryer Freeze Dry Systems

SECTION 12 LANDSCAPE

Full Service Central Station Fire Alarm Listing Evaluation

GUARDED STATUS INFORMATION and REQUIREMENTS For OWNERS AND OPERATORS Of REFRIGERATION PLANTS

SECTION ULTRASONIC TRANSIT TIME CLAMP-ON FLOW MEASURING SYSTEM

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

SOP SF SOP for LN2 Freezers

SAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012

PRO-WATCH NOTIFIER SECONDARY FIRE INTERFACE ARCHITECT AND ENGINEERING SPECIFICATION

CxA to Answer this Section

CDC 10311W Fire Inspector I Performance Test

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

FUNCTIONAL DESIGN SPECIFICATION

Plan Submittal Checklist

Refrigerant Management Requirements Update

LOG BOOK & CERTIFICATES

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

Site Plan Review Residential Accessory Building

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

Architectural and Engineering Specification for a. Flash / Flare

SECTION ELECTRICAL SYSTEMS COMMISSIONING

SBEC Residential Energy Efficiency 2019 Rebate Programs for New Homes

C-NRPP Quality Assurance Guidance for Radon Test Devices

COMPLIANCE INSPECTION CHECKLIST. Date: 5/14/2011 Time In: 12:30PM Time Out: 1:00PM

CONTENTS. B. System Design and Performance Requirements

Architectural and Engineering Specification for a Real-Time Locating System Flare

AUSTIN FIRE DEPARTMENT SIA PROCEDURES FOR ANNUAL TESTING OF BUILDINGS WITH STAIRWELL AND VESTIBULE PRESSURIZATION SYSTEMS

FIRE ALARMS EMERGENCY LIGHTS NURSE CALL ACCESS CONTROL GK FIRE & SECURITY LTD, UNIT 1 GREBE RD, PRIORSWOOD IND EST, TAUNTON, TA2 8PZ

APPENDIX H (DESIGN SUBMISSION CRITERIA)

No previous protocol.

CONTRACT FOR USE OF FIRE PROTECTION SYSTEM

COMPLIANCE INSPECTION CHECKLIST. Date: 12/20/12 Time In: 1:00PM Time Out: 1:30PM

Standard Operating Procedure Ottawa Fire Services. Fire Safety Plan Approval - Revised

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

SECTION INDUCTIVE CONDUCTIVITY ANALYZERS

PREMIER M PLUS USER MANUAL, MAINTENANCE GUIDE & LOG BOOK 8-24 ZONE CONVENTIONAL FIRE ALARM PANEL LOG BOOK & CERTIFICATES

ARES-G2 Rheometer. Site Preparation Guide. Revision A Issued June 2016 Page 1

2018 CALL FOR ENTRIES: DESIGN AWARDS

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

BOARD OF COUNTY COMMISSIONERS

Erik Leider Project Engineer Hazardous Locations, Gas & Oil Underwriters Laboratories

Process Control PIP PCEA001 Fixed Gas Detection Guidelines

T-SERIES Air Conditioner. T20 Model INSTRUCTION MANUAL nvent Rev. C P/N

TABLE OF CONTENTS. 1.0 INTRODUCTION Scope References Test Specimen Description Summary 1

CITY OF LOS BANOS LANDSCAPE PLAN REVIEW PROCEDURE. Public Works Department 411 Madison Avenue, Los Banos, CA FOR ALL PROJECTS:

SECTION GENERATOR PARALLELING CONTROLS

WD7664 / WD7663 Maxon Burner. Ellis Whisper Dryer Installation & Start UP

for LABORATORY REFRIGERATOR MODEL TELR-145/ L/200L CAPACITY REVISION

SECTION Process and Immersion Turbidity and Total Suspended Solids Sensor

E/ECE/324/Rev.1/Add.27/Amend.5 E/ECE/TRANS/505/Rev.1/Add.27/Amend.5

DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP

Transcription:

ACCL Participant: Date of Inspection: Test Stand Inspection Report Number: Approval Results: FORM ACCL-PC4 ACCL FACILITY APPROVAL PROCEDURE AND CHECKLIST AHRI CERTIFICATION PROGRAM FOR AIR-COOLED (ACCL) WATER CHILLING PACKAGES Instructions to Representatives: The following Test Stand Approval Procedure and Checklist is to be used by the Representative Contracted by AHRI (Representative) to conduct Test Stand inspections for the Air-Cooled Water Chilling Packages Certification Program at a Participant s test facility (ACCL). This Test Stand Approval Procedure and Checklist is to be used in conjunction with the AHRI General Operations Manual (OM) for AHRI Certification Programs, the ACCL OM and the latest edition of AHRI Standard 550/590 (I-P) or AHRI Standard 551/591 (SI). Where the AHRI General OM, the ACCL OM and this Witness Test Procedure and Checklist differ, the other documents shall prevail. The completed checklist shall be maintained by AHRI upon the completion of the review. If an AHRI Certification Test will not be conducted in conjunction with the Test Stand Inspection, then Laboratory instrumentation comparisons are not required. If the Test Stand fails to comply with the conditions listed below: Notify AHRI Notify Participant o If the Test Stand fails inspection and was scheduled to be conducted in conjunction with an AHRI ACCL Certification Test, then the AHRI Certification Test shall be delayed until the Test Stand is brought into compliance. The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation. The Representative will conduct Preliminary Approval and then the Test Stand Inspection associated with the selected Approval Category. APPROVAL CATEGORIES Category Category Requirements 1 2 Form ACCL-FA1 Application Form ACCL-FA2 Personnel Experience Questionnaire Form ACCL-FA3 Test Stand and Equipment Questionnaire Form ACCL-FA4 Calibration Summary Copy of each calibration report showing last dates of calibration AHRI System Calibration Worksheet (Available on AHRI Website) Schematic drawing of the area of the test stand in which AHRI certification testing will be performed Drawings of Air Sampling Tree (see Figure E3 of AHRI Standard 550/590 (I-P) or AHRI Standard 551/591 (SI) for an example) Schematic drawing or photographs of placement of Air Sampling Trees for each condenser coil configuration to be tested, with consideration to the range of sizes to be tested Photographs of the test stand in which AHRI certification testing will take place (which shall include sufficient views to show the location and connection of each instrument as well as the location and connection of the ports to be used by the Laboratory during witness testing) Full Test Stand Inspection ( indicates the item is required for the category) Page 1 of 6

Category Descriptions: Category 1 = Test Stand Approval (to be compliant with the latest edition of AHRI Standard 550/590 (I-P) or AHRI Standard 551/591 (SI)). This includes the initial approval, approval after expiration of an approval, and approval after physical and/or operational changes are made which impact results of a previous Category 1 approval. Category 2 = Approval of revised capacity limits on the Test Stand with a current Category 1 Approval. An approval in this category does not modify the expiration date of the Category 1 approval. [1] This is a Test Stand Approval (to be compliant with the latest edition of AHRI Standard 550/590 or AHRI Standard 551/591 (SI)) ACCL-FA1 and all associated Forms and Documents specified in ACCL-FA1 must be signed and submitted A Full Test Stand Inspection will be conducted [2] Test Stand Approval to revise capacity limits on the Test Stand with a current Category 1 Approval. ACCL-FAI must be signed and submitted ACCL-FA2 is not required ACCL-FA3 must be signed and submitted ACCL-FA4 is not required Calibration Reports and the AHRI System Calibration Worksheet must be submitted Schematics and Photos of test facility are not required A Full Test Stand Inspection will be conducted Page 2 of 6

Pre-Visit/Preliminary Approval Confirm that the following Witness Testing Forms and Documents have been submitted by the Participant and conduct verification steps associated with each of the Forms and Documents in order to grant preliminary approval of the Test Stand: 1. ACCL-FA1: Application for Witness Testing b. Verify which Approval Category the Participant has selected 2. ACCL-FA2: Personnel Experience Questionnaire (When Required) 3. ACCL-FA3: Test Stand and Equipment Questionnaire b. Verify water flow capability matches minimum and maximum cooling capacity of the Test Stand c. Verify maximum airflow meets or exceeds the largest capacity chiller d. Verify Power Supply is suitable for the equipment being tested e. Familiarize yourself with the answers to all of the questions. Contact the Participant to resolve any issues f. Identify all NO answers. Contact the Participant to resolve any issues 4. ACCL-FA4: Calibration Summary (When Required) b. Verify that calibration has been properly conducted c. Verify that all Systems meet the required accuracy per Table C1 of AHRI Standard 550/590 or AHRI Standard 551/591 (SI), over the intended rangeof-use for the System 5. Calibration report(s) showing dates of last calibration of each System/Instrument a. Verify that each instrument listed in ACCL-FA4 is also listed in the Calibration report(s) b. Verify that all Systems/Instruments will have current calibrations at the time of the Witness Test 6. Schematic drawing of the area of the Test Stand in which AHRI certification testing will be conducted (When Required) a. Verify that the information is reasonable 7. Drawings of Air Sampling Tree (See Figure E3 of the Standard) (When Required) a. Verify that the Air Sampler design is reasonable 8. Schematic drawing or photographs of placement of the Air Sampling Trees for each condenser coil configuration to be tested (When Required) a. Verify that Air Sampler placement is reasonable b. Verify that all coil configurations are represented Page 3 of 6

Pre-Visit/Preliminary Approval (contin.) 9. Photographs of the Test Stand in which AHRI certification testing will be conducted, which shall include sufficient views to show the location and connection of each instrument as well as the location and connect of the ports to be used by the Laboratory during witness testing (When Required) a. Verify that photographic views show all instruments b. Verify that photographic views show locations of ports for Laboratory instrumentation c. Verify that the test elements (instruments, equipment, power wires, etc.) seem reasonable Determine whether the Test Stand should be granted preliminary approval If NO: Inform AHRI Inform the Participant of additional information and/or changes that are required. Upon receipt of additional information and/or confirmation of changes, decide whether to grant preliminary approval of the Test Stand or not If YES: Inform AHRI Make arrangements for Test stand inspection Prior to the Facility inspection, confirm the following with the Participant A chiller must be operated at 100% and 25% load points for the inspection The capacity of the chiller used for the inspection must be at least 85% of the maximum capacity of the Test Stand being inspected Page 4 of 6

Day of Inspection at Participant s Test Stand Upon arrival, request a brief meeting of the involved parties to review the following information: 1. Safety rules at the site 2. Completed forms FA1-FA4 3. Schedule of testing/inspection TEST STAND INSPECTION: VERIFICATION OF HARDWARE 1. Verify that the capacity of the chiller being used for the inspection is at least 85% of the maximum stated capacity of the Test Stand (as stated in Form ACCL-FA3). If the Test Stand Inspection is not conducted in conjunction with an AHRI Certification Test, then the chiller must be run at 100% and 25% (or lowest available capacity step) test points and data must be collected to verify test stand capabilities 2. Verify that all instruments are installed and are being applied as described in Form ACCL-FA3: Verify that all instruments are being applied and used in accordance with Standard 550/590 Verify that the descriptions in Form ACCL-FA3 match actual installations and usage Verify that calibration stickers are current and properly installed on all instruments 3. Verify proper installation of test chiller in test room Water connections and pressure taps are installed correctly Power connections are correct and voltage measuring devices are installed correctly 4. Verify proper installation and operation of Air Sampling Trees and associated Aspirating Psychrometers The Sampling Trees are installed correctly around the chiller The Sampling Trees are installed correctly to the Aspirating Psychrometers The Aspirating Psychrometers are functioning properly OPERATION OF CHILLER: TEST STAND CONTROL AND DATA ACQUISITION 1. Start chiller and achieve stable 100% load conditions Observe operation of the Test Stand and record any unusual circumstances. Note the time it takes to get from start up to stable 100% conditions Page 5 of 6

Day of Inspection at Participant s Test Stand (contin.) Have the Participant run a test (collecting all data) according to the Standard Verify Participant s data is recorded as per Sections C3.1.2, C5.1 and C5.2 of the Standard Did you observe any limitations of the Test Stand? 2. Achieve stable 25% load conditions or the minimum unloaded capacity of the chiller Observe operation of the Test Stand and record any unusual circumstances. Note the time it takes to change from 100% down to stable part-load conditions Have the Participant run a test (collecting all data) according to the Standard Verify Participant s data is recorded as per Sections C3.1.2, C5.1 and C5.2 of the Standard Did you observe any limitations of the Test Stand? Determine whether the Test Stand should be granted approval If NO: Identify specifically what additional information and/or changes are required If YES: Determine whether the additional information and/or required changes can be completed during this inspection visit or if another test stand inspection must be scheduled for a later date AHRI will issue Test Stand Approval Certificate This checklist & all supporting documents have been reviewed & approved by: PRINTED NAME OF REPRESENTATIVE SIGNATURE OF REPRESENTATIVE DATE Page 6 of 6