Title 11 Streets and Sidewalks

Similar documents
STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

DEPARTMENT OF PUBLIC WORKS & UTILITIES

WHATCOM COUNTY LID CODE INTEGRATION PROJECT WCC (DEFINITIONS)

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Guidelines and Princi les FINANCIAL ACTION SUMMARY

ORDINANCE NO WHEREAS, the City provided the proposed code amendments to the Washington State Department of Commerce on September 20, 2017; and

Appendix D - Technical Design Criteria for BMPs

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

APPENDIX G: TOWN ORDINANCE REVIEW

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

STANDARD DETAILS QUICK REFERENCE

NAPA COUNTY PUBLIC WORKS Standards & Specifications

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE

Appendix I. Checklists

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

WHEREAS, the 2016 King County Surface Water Design Manual represents the best available standard for the control and treatment of stormwater; and

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

Chapter 4 - Preparation of Stormwater Site Plans

COMPLETE GREEN STREET CHECKLIST

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Appendix G. Detailed Design

New Development Stormwater Guidelines

Chapter 6. Green Streets

Low Impact Development

Introduction Post Construction Stormwater Management Performance Requirements

Green Infrastructure & Low Impact Development

Low-Impact Development Code Update. Thurston County Community Stakeholder Group June 25, 2015

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

Transportation Project Guidance and Workshop

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Low Impact Development Guidance Manual

Construction and Landscaping on Public Property

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

4. Contractor (and subcontractors if applicable) certification statement(s)

Leduc Industrial Outline Plan SE W4

Article 20 Stormwater Management

Pierce County Stormwater Management and Site Development Manual

Introduction Post-Construction Stormwater Management Performance Requirements

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

A BILL FOR AN ORDINANCE TO AMEND CHAPTER 9, KAUAI COUNTY CODE 1987, RELATING TO STREET REQUIRE:MENTS FOR SUBDIVISIONS

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Coffee Creek Park Development Low Impact Development (LID)

City of Richmond. Engineering Design Specifications

understanding Green Infrastructure In Zoning

Post - Construction Hydromodification Development Requirements

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

DRIVEWAY REGULATIONS

DRIVEWAY LOCATION APPROVAL RULES AND REGULATIONS

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Chapter 3 Site Planning and Low Impact Development

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

STORMWATER - GENERAL NOTES

Green Infrastructure and Low-Impact Development Technologies

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

When planning stormwater management facilities, the following principles shall be applied where possible.

County of Fairfax, Virginia

TENTATIVE MAP CHECKLIST

Stormwater Control Plan: Small (Tier 1) Land Development Project

Low Density Projects. Design Objective

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

EXHIBIT A. Chapter 2.7 SPECIAL PLANNED DISTRICTS. Article XVIII 15th Street School Master Planned Development

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

4. CONCEPT PLAN DEVELOPMENT

6.1 Bioretention Areas

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Pennsylvania Stormwater Best Management Practices Manual

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

BMP Suitability Matrix

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Chapter Landscaping and Screening

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

Community and Economic Development Department 100 N. Appleton St. PH: Appleton, WI FAX:

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

Stormwater Prevention and Control

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Landscaping Standards

Transcription:

Chapter 11.01 - Definitions Title 11 Streets and Sidewalks Low Impact Development (LID) - A stormwater and land use management strategy that strives to mimic predisturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration by emphasizing conservation, use of on-site natural features, site planning, and distributed stormwater management practices that are integrated into a project design. Low Impact Development Best Management Practices or (LID BMPs) - Distributed stormwater management practices, integrated into a project design, that emphasize pre-disturbance hydrologic processes of infiltration, filtration, storage, evaporation and transpiration. LID BMPs include, but are not limited to, bioretention, rain gardens, permeable pavements, roof downspout controls, dispersion, soil quality and depth, minimal excavation foundations, vegetated roofs, and water re-use. Permeable pavement Pervious concrete, porous asphalt, permeable pavers or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir. Stormwater - Runoff during and following precipitation and snowmelt events, including surface runoff and drainage. that portion of precipitation that does not naturally percolate into the ground or evaporate, but flows via overland flow, interflow, pipes and other features of a stormwater drainage system into a defined surface waterbody, or a constructed infiltration facility. Stormwater facility - Facilities including, but not limited to: pipes, swales, ditches, open channels, culverts, street gutters, detention ponds, retention ponds, constructed wetlands, storage basins, infiltration devices, catch basins, manholes, dry wells, oil/water separators, biofiltration swales, sediment basins, bioretention, permeable pavements and vegetated roofs. Stormwater Manual - The Stormwater Management Manual for Western Washington, which is the 5-volume technical manual prepared by the Washington State Department of Ecology Water Quality Program, December 2014, Publication No. 14-10-055 (a revision of Publication No. 12-10-030), 5 volumes, and as hereafter amended. Stormwater Permit - The City of Vancouver s National Pollutant Discharge Elimination System (NPDES) Western Washington Phase II Municipal Stormwater Permit issued August 1, 2013, and modified January 16, 2014 by the Washington State Department of Ecology. Chapter 11.02 Purpose and Authority Section 11.02.010 Purpose. It is the purpose of this Title 11 VMC to provide for the orderly use of public rights-of-way by establishing clear guidelines, standards and timeframes for use of the public rights-of-way. (M-4026, Added, 10/15/2012, Sec 2-Effective 11/15/2012) Section 11.02.020 Authority. Title 11 VMC is intended, in conformity with Article 11, Section 11 of the Washington State Constitution and the laws of the state of Washington, to provide the city with the broadest power permitted by constitutional and statutory authority to preserve the public peace, health, safety and welfare. (M-4026, Added, 10/15/2012, Sec 2-Effective 11/15/2012) Section 11.02.030 Low Impact Development No requirement of this title shall be interpreted or applied in such a way as to impose a barrier to Low Impact Development. All requirements of this Title that have an effect on use of Low Impact Development may be met using functionally equivalent Low Impact Development practices as specified in the Stormwater Permit, the Stormwater Manual, or any Low Impact Development general specifications adopted by the City. 1

Section 11.02.0340 General duty. Nothing in this Title 11 VMC is intended to create a cause of action or claim against the City of Vancouver or its officials, employees or agents running to specific individuals. Any duty created by the ordinances codified in this chapter is a general duty running in favor of the public. (M-4026, Added, 10/15/2012, Sec 2-Effective 11/15/2012) Chapter 11.20 Newsracks Section 11.20.050 Limitations on Newsrack Placement. C. Newsracks shall not be placed, installed, or maintained: 15. Within a Low Impact Development facility Chapter 11.50 Utilities in the Right of Way Section 11.50.050 General conditions and requirements. B. Location. 4. Where existing utilities or stormwater drains facilities are in place, new utilities must conform to this chapter as nearly as practical and yet be compatible with the existing installations. Section 11.50.060 Specific requirements - Underground utilities. B. Underground Utilities Cover. 4. For streets and sidewalks constructed with permeable materials, in addition to item 11.50.060B1, utilities shall maintain a minimum one (1) foot separation from the bottom of the permeable storage section. Chapter 11.60 Street Use Permits Section 11.60.040 Right-of-way use permit required. B. Exemptions. The following activities are exempt from the requirement to obtain a permit under this chapter: 11. A homeowner may temporarily store landscaping materials for up to 72 hours without a permit in compliance with the following: a. The homeowner may only store materials on right-of-way on a non-arterial street abutting the homeowner s home provided the street and/or sidewalk is not constructed of permeable material; Section 11.60.060 Types of right-of-way use permits. 5. Type E Material Encroachment Permit. a. Type E permit uses include, but are not limited to, communications and cell towers; permanent structures including, but not limited to, any use of the right-of-way for a building foundation, private stormwater facilities or other essential appurtenant infrastructure or structure that could not practicably be altered or removed without significantly impacting the use or value of the property served; or, if removed, would cause the underlying use to violate any condition of approval of a development permit. Chapter 11.80 Street and Development Standards Section 11.80.010 Purpose. This chapter establishes minimum standards for public and private streets constructed or improved in the City of Vancouver. This chapter sets forth the minimum standards for full and half-width street improvements within the 2

Secondary In d us tri al Principal Collector Arterial Minor Principal right of way, including but not limited to street pavement, curb and gutter, sidewalk, drainage improvements stormwater facilities, lighting, landscaping, signals, signing, pavement markings, and right of way dedication for the development or improvement of properties abutting City streets. Section 11.80.030 City streets - standard specifications and reference documents. 3. Standard details, plans, and design criteria, including pavement design requirements, prepared by the City, available at www.cityofvancouver.us. Section 11.80.040 Public roadway functional classifications. 1. Design Criteria The design criteria shown in Table 11.80.040.C-1 are adopted as a portion of the City s standard plans and specifications. These criteria are intended for normal conditions. The Director may require higher standards for unusual site conditions; these may include topographic features, sight distance constraints, and adopted subarea plans. These higher standards may include, but are not limited to, additional right of way or easements to enhance safety or facilitate maintenance. Table 11.80.040.C-1 Design Table S treet Type/ S tandard Plan 6-lane w/ CTWLT* & bike Minimum ROW Width (ft) Design S peed (mph) Design Volume (ADT) Minimum Full Access Intersection S pacing (ft) Minimum Intersection Radius (ft) Applicable S tandard Plan 120 50 40,000 600 35 T10-04 6-lane w/ CTWLT 110 50 40,000 600 35 T10-05 4-lane w/ CTWLT & bike 100 50 24,000 600 35 T10-06 4-lane w/ CTWLT 90 50 24,000 600 35 T10-07 4-lane w/ CTWLT & bike 100 40 24,000 500 35 T10-08 4-lane w/ CTWLT 90 40 24,000 500 35 T10-09 4-lane w/ bike 90 40 18,000 500 35 T10-10 4-lane 80 40 18,000 500 35 T10-11 3-lane w/ bike 70 40 16,000 500 35 T10-12 2-lane 60 40 12,000 500 35 T10-13 3-lane w/ bike 70 35 16,000 275 35 T10-12 2-lane 60 35 12,000 275 35 T10-13 5-lane 80 40 3-lane 60 40 12,000-24,000 8,000-12,000 275 50 T10-20 275 50 T10-21 2-lane 60 35 8,000-10,000 275 45 T10-22 3

Cul-de- Access Local Access N hood Circ Local 2-lane 50 25 <2,000 N/A 45 T10-23 2-lane 54 25 <2,000 125 25 T10-14 2-lane 50 25 <1,000 N/A 20 T10-15A/B 2-lane 50 25 250 N/A 20 T10-16 Note 1: LID facilities may require additional right of way and/or easement dedication *ROW = right of way; CTWLT = center two-way left-turn lane Section 11.80.050 Private streets. L. Additional Private Street Requirements. 3. Stormwater management is required per VMC Chapter 14.25. Section 11.80.060 Infill Streets. F. Internal Driveways and Roadways. 1. At a minimum, infill development is subject to the internal private roadway standards listed in Table 11-80.060.F-1. Table 11-80.060.F-1 - Minimum Internal Driveway and Roadway Standards Minimum Standards Total Number of Dwelling Units Served 1-4 1-4 5-20 More than 20 Road Length (ft) 150 or fewer More than 150 More than 150 More than 150 Road Width (ft) 12 16 20 24 2. Asphalt concrete surface and rock base will vary by soil type as defined in the City s transportation standard details private street standard plan. Roadways constructed as LID facilities shall meet the requirements of VMC Chapter 14.25. 3. In addition, private access roads serving infill developments must: f. Stormwater management is required per Chapter 14.25. Section 11.80.070 Circulation/connectivity. 7. Public Streets Turnaround Requirements. d. Cul-de-sacs will be constructed according to Table 11.80.070.C-1 and Table 11.80.070.C-2. Table 11.80.070.C-1 - Local Street Cul-de-Sac Maximum Length Radius to Right of Way Radius to Face of Curb 200 feet 36 feet 30 feet 400 feet 44 feet 35 feet 4

600 feet 54 feet 45 feet Note 1: LID facilities may require an increased cul-de-sac radius and right of way/easement dedication Table 11.80.070.C-2 - Industrial Street Cul-de-Sac Maximum Length Radius to Right of Way Radius to Face of Curb 600 feet 66 feet 60 feet Note 1: LID facilities may require an increased cul-de-sac radius and right of way/easement dedication D. Pedestrian Circulation. 2. Pedestrian Accessways. b. Design. Accessways will consist of a 10-foot minimum public easement and may be entirely hardscaped. All surfaces will be designed to drain stormwater run-off to the side or sides of the accessway unless constructed as an LID facility. Accessways must comply with ADA standards. Section 11.80.080 Development requirements. I. Plan Submittal Requirements. All streets must be properly related to special traffic needs, such as industries, business districts, and the pattern of existing and/or proposed commercial, residential and multifamily land uses. 3. Improvement Plans. The improvement plan must include the street alignment at a scale of not less than 1 inch to 50 feet (preferably 1 inch to 20 feet), showing bearings on centerline, curve data on all horizontal curves, right of way lines, relevant topography, existing and proposed utility location, street names in and adjoining the development, typical street section, existing and proposed drainage,structures, water quality appurtenances stormwater facilities, and such further data as the Director may require. J. City Street Design Specifications. 4. Alternate Surface Treatment Materials. Alternate surface treatment materials may be used only with the written approval of the Director. The engineer shall supply the Director with a pavement design, specifications for materials, and application rates as part of the approval. 8. Stormwater and Drainage. Stormwater management is required per VMC Chapter 14.25. O. Acceptance by the City. Streets and drainage facilities will be accepted for provisional maintenance by the City upon receipt of a workmanship and materials bond (or other secure method) in the amount of 10% of the construction cost and or the recommendation of the Director. The developer shall repair any failure within the 1 2-year period beginning from the date of final acceptance. Section 11.80.090 Frontage improvements. G. Street Drainage. Stormwater Facilities. Abutting street drainage stormwater facilities shall be designed to meet the requirements of Chapter 14.25 and sufficient to prevent water damage or impairment from normal rain flow or surface water. Erosion control pursuant to Chapter 14.24 shall be provided during construction to maintain the streets such that mud and debris are kept to a minimum. 1. Grades and Drainage Structures Stormwater Facilities. Drainage Stormwater structures, drainage details, and street centerline profile grades must be shown on the construction plans and be approved by the Director. The engineer must follow the requirements and recommendations of Sections 14.24 and 14.25. Centerline profile street grades may not be less than 1% unless an integral curb and gutter section is used, in which case the minimum grade may not be less than 0.3%. If any grading or filling of lots or other areas outside the streets is to be done which exceeds the amounts specified in Chapter 70, Uniform Building Code, an overall grading plan must be submitted and approved by the Director as part of the plans. 5

Section 11.80.100 Street restoration standards. B. Cutting Prohibition. For 5 years after a street has been constructed, reconstructed, overlaid, or seal coated, received final acceptance for construction, reconstruction, rehabilitation or preservation treatments a street cut prohibition will be in effect. Streets constructed with permeable materials will have a street cut prohibition for the life of the street. Pavement cuts may be allowed if a more reasonable alternative for service delivery does not exist and alternative engineering and trenchless construction methods (e.g., pushing, boring or bore-pulling) have been explored. The Director may allow cutting of a street under moratorium, a street cut prohibition and may set restoration conditions based on the type and impact of the work proposed, the age and condition of the street, and traffic volumes and patterns. To request the cutting of a street under moratorium a street cut prohibition: C. Pavement Restoration Requirements. The provisions for pavement cutting are a function of the pavement type and its functional classification, orientation (transverse or longitudinal), and pavement (or resurfacing) age. 1. Pavement Type c. Permeable Pavements Regardless of functional classification, the requirements for backfill and surfacing restoration will vary depending on the original pavement design, surface material type, and size and location of the cut. For pervious concrete, unless otherwise approved by the City, full panels shall be removed and replaced. In no case will any approved cut be greater than one-half a full panel in size without full panel replacement. D. General Restoration Requirements for All Utility Cuts. The following general requirements apply to all utility cuts in paved roads and paved shoulders. Utility cuts in permeable street surfaces shall be as provided in 11.80.100 (C) (c). E. Warranty requirements 2. Right of way permit holders must warranty street cut restoration work for a period of 2 years on residential streets and 5 years on arterial, industrial and permeable streets. Chapter 11.90 Construction in Right of Way Section 11.90.060 Closeout. If required by the City, after all the work and the final inspection, the permittee must submit a reproducible set of plans in hard copy and an approved electronic format for all improvements showing all construction changes, such as location of culverts, alignment and grade changes, added and deleted items, changes to street and sidewalk pavement (type, width, and section depth), pedestrian curb ramps, medians, signing, striping, street lighting, trees and plantings, location of utilities, water valves, sewer connection, etc. The as-built plans may be required to be prepared and stamped by a licensed engineer and submitted prior to final acceptance of all improvements. Failure to file as-built plans when required is a violation of the permit. 6