Farmers Investment Co. (FICO) Continental Farms

Similar documents
Farmers Investment Co. (FICO) Sahuarita Farms Specific Plan & Minor General Plan Amendment Community Meeting July 1, 2014

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Town of Sahuarita Open Space Plan Element. University of Arizona Planning Program Projects Team

ROSEMONT 138kV TRANSMISSION LINE PROJECT. Public Open House Meeting #2 August 27, 2009

National Association of Conservation Districts. Kris Hoellen Vice President, Sustainable Programs The Conservation Fund September 19, 2013

SECTION 5: REACH RECOMMENDATIONS/MAPS

Riparian Buffer on the Bushkill Creek. Policies

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

When planning stormwater management facilities, the following principles shall be applied where possible.

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

Chapter 5: Natural Resources and Environment

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

Balancing Conservation and Development on the Jordan River

Existing Conditions and Environmental Consequences Floodplains

City of Missoula and Missoula County Open Space Planning Open House

Level 1 Downstream Analysis

Parks, Trails, and Open space Element

The Trinity River Corridor Project Update

Parks, Trails, and Open Space Element

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

Chapter 3 Site Planning and Low Impact Development

Whitemarsh Township Greenway Plan

Greenways as an alternative to traditional infrastructure. Green Infrastructure

980± acre former ranch Located on east and west sides of Veterans Parkway Connects South Meadows and Donner Springs/Hidden Valley.

Northampton County, Pennsylvania

APPENDIX K WINDSOR OFFICIAL PLAN

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

ROSEMONT 138KV TRANSMISSION LINE SITING STUDY PROJECT

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

3-2 Environmental Systems

BISCUIT RUN PARK MASTER PLAN

Weston Conservation Commission

Working Group Meeting

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A

Understanding Drainage Options What s Feasible and Legal. February 2019

Parks, Recreation, and Open Space Land Use Goals

To: Planning Commission D.. June 3, 2009

Wallkill River. Floodplain Bench Project Phase 1. OCSWCD Kevin Sumner. October 2016 Orange County. Wendell Buckman

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Floodplain Technical Memorandum

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

Holland Country Club Golf Course to Wetlands

Appendix E Preliminary Location Hydraulic Study

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

GENERAL LAND USE PLAN ELEMENT

Enhance the High Line Canal Projects

City of Nogales General Plan

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

Kootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update

Surrey Ecosystem Management Study

CHAPTER 4 FUTURE LAND USE AND URBAN SERVICES DISTRICTS

Once Upon a Gravel Pit: Reconnecting Floodplain through Aggregate Extraction

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback

INTRODUCTION PLANNING HISTORY

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Executive Summary Purpose of the Plan Defining Open Space and Greenways

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

HAZARD MITIGATION GOALS AND OBJECTIVES

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Climate Smart Communities Green Infrastructure Case Studies

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

Caledon Villas Corp. c/o Mr. John Spina 55 Blue Willow Drive Woodbridge, ON L4L 9E8 May 14, Floodplain Characteristics, Old Church Road

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

APPENDIX C SPECIAL PLANNING AREAS

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

MAYFIELD WEST SECONDARY PLAN PHASE 2

A citizen s guide to the. Comprehensive Plan. City of Lakeville, Minnesota 1

SHEFFIELD PARK Paulding County, GA DRI #588

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

Parks, Open Space and Trails

Chapter 1: General Program Information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Project Narrative For Fruita RV Resort Conditional Use Permit

GENERAL PLAN UPDATE ISSUES MEETING. January 21, 2010 City Hall Mitchell Room 6:00 pm 9:00 pm

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

South Waterfront Greenway Design Guidelines. North Macadam Urban Renewal Advisory Committee April 10, 2008

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018

Town of Sahuarita Open Space Plan Element. Members of the Town of Sahuarita Town Council

Exhibit A. 8:9 Scuffletown Rural Conservation District

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Restoration in the Sky Islands:

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Future Land Use and Development Policies

Conservation Corridor Base and Thematic Maps

City of Lafayette Study Session Staff Report Design Review Commission

Technical Memorandum 5

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

Zoning Ordinance Article 3

Working together to leverage limited Funds

DRAFT MAP AMENDMENT FLU 04-4

Transcription:

Farmers Investment Co. (FICO) Continental Farms Planning & Zoning Commission Study Session (River Master Plan) January 25, 2012 FICO Property 7,000 acres total area 6,000 acres in Town of Sahuarita 1,000 acres in Pima County 12 miles of river through FICO property (single owner) ~9 linear miles in Sahuarita ~3 linear miles in Pima County 2 1

Urbanization Over Last 20 Years La Posada, Rancho Sahuarita, Madera Highlands, Quail Creek, Walden Grove High School, Green Valley (not shown) Roadway crossings, bridge improvements, utility corridors Madera Highlands Rancho Sahuarita Walden Grove HS La Posada 3 Sahuarita/Green Valley Urbanization Over Last 20 Years Population grew by over 300% 1990: Population 17,000 (U.S. Census) 2010: Population 47,000 (U.S. Census) Opportunity to plan now Green Valley Development Rancho Sahuarita 4 2

County Planning Process April 2011: Submitted CPA June 2011: P&Z CPA study session August 2012: P&Z modified CPA timeline: January: RMP study session February: P&Z public hearing April: BOS action Summer/Fall 2012: Specific Plan Zoning and RMP 5 Town Planning Process April 2011: Specific Plan and RMP No general plan amendment February 2012: Revisions and addendum to SP and RMP Town review: Spring-Summer 2012 County to review and comment on RMP within Town Town action: Fall 2012 6 3

7 Continental Farms: Plan Amendment Area 287 acres of cultivated farmland Outside primary river corridor Development to east, north and west Freeway interchange ¼ mile to west 8 4

Continental Farms: Proposed Land Use Map 9 Santa Cruz River Greenway The Common Thread unique and special opportunity 12 linear miles single owner Preserve over 1,200 acres of contiguous public open space Establish regional trail corridors Enhance wildlife corridors Enhance riparian habitat Wetland/recharge areas Flood control/safety 10 10 5

What is a River Master Plan? Comprehensive plan for longterm management of Santa Cruz River Regulates river improvements and long-term maintenance of the river Guides development of land within and adjacent to the river Provides framework for future regulatory review/approval 11 Components of a River Master Plan Hydrology Biology Cultural Resources Habitat Restoration Recreation Recharge/Wetlands River Improvement Concept 12 6

SCR Existing Conditions Relatively narrow main channel: 20 200+ feet wide Wide and shallow floodplain: 1.5 miles wide in some areas Ephemeral through this reach Has conveyed 40,000+ cfs during floods Sahuarita Road looking south Duval Mine Road looking south 13 13 SCR Existing Conditions Existing orchards within the floodplain Farm berms and floods have modified historic drainage pattern Many existing bridges not built for 100-year flood Tributary washes channelized, narrowed and/or sheet flow 14 7

USGS Gauge Data - SCR at Continental 15 USGS Flow Duration - SCR at Continental % Time Flow Rate Exceeded cfs 1 600 5 52 10 2.9 15 0 20 0 30 0 40 0 50 0 60 0 70 0 80 0 90 0 95 0 98 0 99 0 99.5 0 99.9 0 Data from 1941-46, 52-85, 92-96 cfs 700 600 500 400 300 200 100 0 0 20 40 60 80 100 120 % time exceeded 16 8

SCR Existing Conditions Downstream of property, river is very incised, continued degradation, compromised habitat value North of Pima Mine Road 17 SCR Existing Conditions Upstream of property, river is very flat, wide floodplain, habitat values highly variable South of Continental (Canoa Ranch) 18 9

SCR Photos North of Sahuarita Road Bridge South of Sahuarita Road Bridge 19 SCR Photos Continental Bridge looking north Tributary channel at Continental Farms 20 10

SCR Existing Conditions SCR at Congress: narrow channel design, low habitat values Congress Looking South 21 Sahuarita Farms Proposed River Plan Concept Average corridor width ~1,300 Feet 1,200+ Acres of public open space Multi-use opportunities Flood protection Recharge capability Management of drainage Wildlife corridors Habitat enhancement 22 11

Cross Section Concept, South of Sahuarita Road Bank Protection with Upper Terrace 5-7 high bank protection, approx. 500 wide primary floodway corridor 150 425 wide upper terraces, re-vegetated, habitat, trails, wetlands 800 1,400 wide total floodplain corridor 23 Cross Section Concept, North of Sahuarita Road Unprotected Bank with 500-foot Erosion Hazard Setback Unprotected low-flow banks (approx. 500 600 wide) 500 minimum erosion hazard setbacks Re-vegetation, habitat, wetlands, trails 24 12

Continental Farms Proposed River Plan Concept Maintain primary river corridor Excavate and fill west of river channel Erosion hazard setback (EHS) of 500 feet Multi-use (no structures) within EHS Drainage feature to protect Continental Road bridge 25 Benefits of River Improvements (Four R s) River Management flood control and public safety Restoration habitat enhancement Recharge groundwater management & sustainable yield Recreation active and passive connected public amenities 26 13

AIH CLS Designations Important Riparian Area: 665 ac. Biological Core Management Area: 431 ac. Multiple Use Management Area: 354 ac. Agricultural In-Holdings: 2,322 ac. Outside CLS: 3,142 ac. Bulk of CLS designation tied to lands that will be managed by RMP BCMA MUMA 27 Environmental/Biological Holistic view of river - environmental planning opportunities Preservation of cultural/agricultural landscapes Water use reduction over time Sustainable wildlife and riparian habitat enhancements Interconnected trails and recreational amenities Framework to achieve regional conservation goals 28 14

Early Development: Llano Grande Trailhead and Anza Trail: AZ Centennial 2012 Public/Private Partnership Dedication of Anza Trail Ultimate connection to Elephant Head Road 29 THANK YOU! Questions! 30 15