Request for Proposals (RFP) Consultant Services for the Muckleshoot Placemaking and Landscape Visual Design Services; Campus/Village Planning Project

Similar documents
VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

REQUEST FOR QUALIFICATIONS

Request for Proposals: Architectural/Design Guidelines

A Better City Request for Qualifications

ATTACHMENT A. Town of Lebanon Village Center Study Proposal Cover Sheet (to be included with Proposal) Contract shall not exceed $48,500.

Request for Proposal

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

REQUEST FOR QUALIFICATIONS

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Sewanee Village + Request for Builder/Developer Proposals

In March 2012, the County of Yolo was awarded a grant from the California State Department of Parks

Request for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Winston-Salem State University Campus Master Plan 2016 Update

ELK GROVE GENERAL PLAN VISION

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

North Fair Oaks Community Plan Summary and Information

RFP/RFQ. for Concept & Schematic Design Services. for Outdoor Garden Enhancements. to Cleveland Botanical Garden

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Laberge Group. Town of Coeymans. Draft Comprehensive Plan. Overview of Planning Process

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

Denton. A. Downtown Task Force

Vietnam Scaling up Urban Upgrading Project (SUUP)

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

The Five Components of the McLoughlin Area Plan

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

PART 1. Background to the Study. Avenue Study. The Danforth

master plan of highways bus rapid transit amendment

Planning and Public Consultation Process for the Preparation of a General Land Use Plan for South Port Kells TERMS OF REFERENCE

December 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Rapid Transit Implementation Working Group September 14, 2017

Glenborough at Easton Land Use Master Plan

DENVER DESIGN DISTRICT GDP

Hockessin Community Redevelopment Plan

CITY OF FARGO PARKING RAMP SITE EVALUATION

Parks Renaissance. Strategy. Director, Operations. General Committee. Presentation to. May 16, Barb Rabicki

COUNTY OF SACRAMENTO CALIFORNIA PLANNING COMMISSION REPORT

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

7Page 1 CLEMMONS COMMUNITY COMPASS 1 PLAN OVERVIEW

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

The University District envisions, in its neighborhood

Chapter 1.0 Introduction

Chapter 2: Vision, Goals and Strategies

I. INTRODUCTION SITE DESCRIPTION

CALL TO ARTISTS Expression of Interest (EOI)

PRIORITIES COMMITTEE MEETING

1 October Dear Citizens of Charlotte and Mecklenburg County,

Land Use Policy & Development Ordinance Update

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

T H A T E V E R Y O N E

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

REQUEST FOR QUALIFICATIONS THURGOOD MARSHALL COLLEGE NEIGHBORHOOD PLANNING STUDY UNIVERSITY OF CALIFORNIA, SAN DIEGO

Date 09/25/ Agenda Item No. 15. September 19, Sandra Tripp-iones. City Manager. City of Cambridge. 410 Academy Street. Cambridge, MD 21613

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

MASTER PLANNING: THE CRITICAL ROLE OF ELECTED LEADERS AND THE PLANNING COMMISSION Planning Michigan Conference

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

Planning Commission Report

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

CITY OF PUYALLUP. Background. Development Services

Purpose of the Master Plan

PLANNING ADVISORY BOARD AGENDA OCTOBER

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Carson Street Streetscape Improvements. Request for Proposals

DALY CITY VISIONING PROCESS COMMUNITY WORKSHOP 3 MAY 8, 2008

Acknowledgments. City of East Peoria. City of Washington. Aldermen. Commissioners. Staff. Staff. Planning Consultant. David Mingus, Mayor

Request for Qualifications For Administration of the 2016 Summer Sprout Program

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Request for Expressions of Interest & Call for Qualifications Maplewood Townhomes 433 Seymour River Place

Public Art Guidelines And Public Art Donation Program

HERITAGE ACTION PLAN. Towards a renewed Heritage Conservation Program. What is the Heritage Action Plan? Key areas of work. A Collaborative Approach

CITY OF SOCORRO, TEXAS REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL LANDSCAPE DESIGN SERVICES FOR PROPOSED MAURO ROSAS PARK

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

c. DTAH Toronto Complete Streets Guidelines

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

OVERVIEW OF PLANS FOR THE JEFFERSON COUNTY COUNTRYSIDE FARM In the Context of Quality Place Characteristics

Texas AgriLife Extension Service

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

CHAPTER 12 IMPLEMENTATION

NORTHERN LANDS NORTHERN LEADERSHIP

V. Vision and Guiding Principles

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Town Center (part of the Comprehensive Plan)

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Transcription:

Request for Proposals (RFP) Consultant Services for the Muckleshoot Placemaking and Landscape Visual Design Services; Campus/Village Planning Project To assist the Muckleshoot Indian Tribe by: 1) Providing Campus/Village Placemaking and Landscape Visual Graphic Design & Rendering Services; 2) Developing a Campus/Village Master Plan; 3) Preparing a Community Involvement Strategy (CIS); 4) Conducting a Market Assessment; 5) Providing Recommendations/Guidance of Development Code for the Project area. I. Purposes The Muckleshoot Indian Tribe Planning Department extends an invitation to select professional planning consultants/firms to submit Proposals to: 1. Develop and lead a planning effort using smart growth principles to balance critical ecosystem processes with anticipated future development; 2. Create a vibrant community gathering place with a mix of compatible land uses, that adds to the campus business vitality, and promotes pedestrian connectivity and accessibility; 3. Create well-defined and interconnected neighborhood, public facilities, recreational centers, and open spaces; 4. Facilitate community participation in developing a campus master plan for the project area with neighborhood open space, streetscape and architectural design detail to illustrate development approach and character across the district; and 5. Provide recommendations in developing regulatory tools to implement smart growth approach. II. About the Muckleshoot Indian Tribe The Muckleshoot Indian tribe is a blend of several Coastal Salish tribes that have inhabited the region surrounding the White and Green rivers of present-day Washington State for millennia. Their original language was Wuhlshootseed. The Muckleshoots' ancestral homeland is an expansive region extending along southern and eastern Puget Sound, and the western slopes of the Cascade Range. 1

The Muckleshoot Indian Reservation was established between the Green and White rivers, uphill from where the rivers met, to provide a permanent homeland for the Muckleshoot people by Executive Orders in 1856 under the authority of the Treaties of Medicine Creek and Point Elliot. The river tribes settled on the former military parcel. In 1874, an executive order defined the boundaries of the weirdly-shaped, 3,533-acre area. Later on, 39 members were allotted 3,192 acres of reservation land. As a federally recognized Indian tribe, the Muckleshoot Tribe has exercised its sovereign governmental powers over its people and lands and continues to exercise its inherent right to protect the health, safety and welfare of its citizens and resources within the Reservation. The Muckleshoot Indian Tribe is a federally recognized Indian tribe whose membership is composed of descendants of the Duwamish and Upper Puyallup people who inhabited Central Puget Sound for thousands of years before non-indian settlement. The Tribe s name is derived from the native name for the prairie on which the Muckleshoot Reservation was established. Following the Reservation s establishment in 1857, the Tribe and its members came to be known as Muckleshoot, rather than by the historic tribal names of their Duwamish and Upper Puyallup ancestors. Today, the United States recognizes the Muckleshoot Tribe as a tribal successor to the Duwamish and Upper Puyallup bands from which the Tribe s membership descends. The tribal population is currently 2,848. The 3,910 acre Muckleshoot Reservation is located in the area of Auburn, Washington, about 15 miles northeast of Tacoma and 35 miles southeast of Seattle. The Reservation is located between the White and Green Rivers and parallel to the White River. State Route (SR) 164 runs through the center of the Reservation with a right of way granted at the turn of the century. Total population of both Tribal members and Non-tribal members on the Muckleshoot Indian Reservation is currently approx. 4,317 (Source: 2011-2015 American Community Survey 5-Year Estimates, U.S. Census Bureau). III. Background and Project Description To meet the demand for housing and jobs, the Muckleshoot Indian Tribe will employ smart growth strategies to encourage higher densities in suitable areas while protecting natural environmental resources found in the this area. The Tribe aspires to address future growth and land use on the Reservation. This project builds on these efforts and focuses on a subarea that includes future campus or village developments in the coming years due to its location between City of Auburn and City of Enumclaw and its proximity to Tribal community facilities and infrastructure. The overall project area for the new Campus Center is within the eastern portion of the Reservation, approximately 7 miles southeast of the existing commercial area including the Muckleshoot Casino, Smoke Shop, and gas station (Sections 1 & 12; T-20 R-5 W.M). Site considerations include close proximity to existing housing/subdivision areas and Tribal Administration & facility buildings, and the White River Amphitheatre. The map of the project area and vicinity is attached. Existing Conditions The Muckleshoot Campus Planning Project area is diversely developed with various Tribal buildings including Tribal Administration buildings, the Tribal School campus, a Wellness Center, Elder facility buildings, the White River Amphitheatre, single-family home subdivisions, and public works infrastructure, maintenance facilities, and transfer station. 2

IV. Project Goal and Objectives Goals: The Tribe s goal for this project is to develop a plan to meet future housing needs, promote business opportunities & economic vitality, and to provide a sense of place and cultural identity. Objectives: The Muckleshoot Indian Tribe will contract with a consulting firm to provide lead consultant services to achieve the following project objectives: develop public outreach program; facilitate stakeholder and community participation; involve the community in planning a campus that promotes pedestrian walkways & biking lanes; increase economic opportunities and provide access to businesses and amenities; protect valuable environmental resources; promote effective pollution controls; and provide recommendations/guidance of standards to achieve the objectives above. To achieve these goals, the Tribe envisions a process spearheaded by a multidiscipline team of qualified, experienced professionals. The selected team will utilize a variety of community engagement tools stakeholder meetings, community workshops, surveys, and any possible media to engage the public in building a vision that will serve as the foundation for the design of a vital, safe, and unique campus area. Based on the concept plan that emerges, the team will develop design plans for future construction. V. Key Deliverables All key deliverables must be understandable to Tribal community, general public, compelling and administrable by Tribal Planning Department. Five key deliverables are listed below: 1) Project Administration Monthly Progress Reports, Meeting Summaries and Billings 2) Community Involvement Strategy 3) Market Assessment Report 4) Campus/Village Master Plan with Placemaking and Graphic Design & Rendering 5) A report of Recommendation/Guidance of Form-based Code/Smart Development Code VI. Project Guidance The consultant will receive direction from the following: 1) Project Manager: primary point of contact and project administrator as defined in the contract; 2) Core Staff: three staff from Planning Department; 3) Technical Advisory Group: Commissions, Committees, and staff from Tribal departments including but not limited to those involved in planning, housing, construction, public works, economic development, natural resources, cultural resources, spiritual, elders, educations, social services. 4) Stakeholders: Participants in the charrette meetings to be identified as part of Task 2. 3

VII. Scope of Services The work elements necessary to complete the project are presented below as a list of tasks to be performed under contract to the Muckleshoot Indian Tribe. Task 1. Project Administration Purpose: To ensure open communication and scope of work & tasks, to document progress, and to clearly define meeting expectations. Deliverables: Monthly Progress Reports and Billings Meeting Summaries Task 2 Community Involvement Strategy Purpose: To prepare and undertake an innovative and robust community involvement strategy intended to gain input from tribal and non-tribal interests and to promote the project. The consultant should describe in detail the process they will utilize to solicit public input, feedback, and comments on campus visioning, design effort, and recommendation/guidance of development of smart code/form-based-code. Preliminary steps may include a review of all relevant background information and visits to the site and surrounding campus. The followings are interest of the Tribe: Interviews with key stakeholders, community workshops designed to obtain broad community input and other methods for engaging the community in building a vision. Deliverables: Final community involvement strategy (format: powerpoint, memorandum, and report) Task 3. Market Assessment Purpose: To provide input to the Campus Plan by identifying shared market assessment goals to: Provide a market-based reality check or different approaches Understand gaps in retail, residential, office markets, and any businesses locally Strengthen and diversify the local and Tribal business base Create a strategy to pursue marketing opportunities to further Tribal objectives Deliverables: Final market assessment and economic development recommendations report. Task 4. Campus/Village Placemaking & Visual Design and Master Plan Purpose: To incorporate the recommendations and community values gained through the public process with smart growth principles and technical information, into a Campus/Village Placemaking & Visual Design and Master Plan. The Master Plan will address ways in which varied uses and activities can be accommodated on the site throughout the seasons. The plan should include ways to improve sidewalks and pedestrian routes as well as recommendations for other amenities such as seating, lighting, bicycle infrastructure, landscaping, public art, and special needs infrastructure. Deliverables: Final Campus/Village Master Plan with Placemaking and Graphic Design & Rendering 4

Task 5. Recommendation/Guidance of Development Code Purpose: To provide recommendation/guidance of a land development code that would be implemented in accordance with the Master Plan and Visual Design Plan. The recommendation and/or guidance of the land development should include elements of form-based code / smart code and other innovative approaches which is appropriate to the community context and political environment. Deliverables: A report of Recommendation/Guidance of Form-based Code/Smart Development Code VIII. Budget and Schedule The available budget will not exceed $150,000 for this contract. The timeframe for this project is January, 2018 to June, 2019. Project Tasks 2018 2019 Q1 Q2 Q3 Q4 Q1 Q2 1. Project Administration 2. Community Involvement Strategy 3. Market Assessment and economic development recommendations 4. Campus Master &Visual Design Plan 5. Recommendation/Guidance of Development Code IX. Submittal Requirements Consultants interested in performing the work outlined in this request for proposal should submit the following information to the Muckleshoot Indian Tribe Planning Department. A. PLAN OF SERVICES 1) Cover Letter: A letter signed by an officer of the firm and addressed to the Muckleshoot Indian Tribe Planning Department, binding the firm to all comments made in the proposal is required. Include a primary contact person for the proposal. 2) Qualifications and Experience: Name(s), address(es), phone number(s), contact person(s) of all firms involved on the project. History, size and structure of firm(s). 5

Name(s) of principals of firm(s). Identification of Principal in Charge and Project Manager. Experience with similar projects, including campus visual design Resumes of all personnel assigned to the project. Any applicable insurance, permits, and licensing/authorization of proposal documents. At least three (3) references from past similar projects with contact information. 3) Understanding of Scope of Services: The proposal must describe the consultant s understanding of the scope of work and the key issues associated with performing the required consulting services, and identify unusual conditions or problems that may be encountered. Please provide a detailed description of your approach to the scope of work, Gantt chart or similar format of project schedule, and cost estimate for each task described in Section VII (Scope of Services) of this request for proposal. Include a cost breakdown of hourly rates and the number of hours assigned for each task for all personnel. The Tribe is seeking a creative, proven approach to carrying out a community-led, placebased planning process that draws out new ideas and achieves general consensus. It also seeks a consultant with the ability to provide a site design that: 1) encourages a variety of activities and uses throughout the year; 2) integrates with nearby business activity; 3) provides striking amenities to attract all age groups and; 4) improves pedestrian routes and connections to adjacent areas. Other key issues to address include innovative ideas for maximizing the value and amount of work that be accomplished within the budget and the team s availability and ability to meet the desired timeline. 4) Timeline: The timeline must include the proposed schedule, identification of milestones, and the number of man-hours required for each task. It must also include any additional information to demonstrate the consultant s ability to complete the project on time. 5) Subcontracting: If subcontracting is planned, submit the firm(s) name(s), location(s), contact person(s), phone number(s), names of responsible operating officers, and evidence of any required insurance, permits and licensing/authorization of proposal documents. B. PROPOSAL DELIVERY 1) Submit a total of three (3) hard copies and (1) electronic version of your proposal to: Krongthip Sangkapreecha, Planning Director Muckleshoot Indian Tribe Planning Department 39015 172 nd Ave. S.E., Auburn, WA 98092 2) Due Date and Time: Proposals must be received by 4:00 pm on November 20, 2017. Proposals submitted after this date and time will not be accepted. 6

C. RFP QUESTIONS For questions concerning this RFP, contact Krongthip Sangkapreecha, Planning Director, Ph.D. ktsang@muckleshoot.nsn.us Phone: (253) 876-3329 X. Remarks Information provided in the RFP will, to the extent allowed by law, be held in confidence and will not be revealed or discussed with competitors. Inclusion and explanation of applicable graphics from past projects is strongly encouraged. XI. Selection Criteria The Tribe will use the following criteria to evaluate submittals: 1) Scope of Work & Approach (25 points possible) Clearly defined methodology in scope of work; demonstrates use of innovative practices; aligns with project goal, objectives and deliverables. 2) Presentation (20 points possible) Creativity, Clarity, style and organization; engaging and compelling; and quality, applicability and communicative value of graphics; follow RFP directions. 3) Community Involvement Strategy (20 points possible) How to engage diverse groups in a participatory planning process and include those who may not want to speak publicly or otherwise be involved in a planning process; how to effectively involve seniors and youth in participatory planning process in ways they may be comfortable with; how to include perspectives of tribal and non-tribal members in a meaningful way. 4) Experience with Complex Projects (15 points possible) Experience working closely with diverse communities, tribal governments and/or on Indian reservations, with similar projects and in similar settings; explicitly identify challenges or unforeseen circumstances and how these were addressed. 5) Costs (10 points possible) Clear presentation of cost breakdown by task, project staff hourly rates, billable hours, and other expenses such as travel, production costs, etc. 6) Business Ownership & Tribal Involvement (10 points possible) Participation of Indian-owned firms; participation of disadvantaged minority- and women-owned firms; extent of involvement of member of Federally recognized Indian tribe on project team and/or detailed approach to include Muckleshoot Indian Tribe member(s) or Tribal member-owned business(es). Project managers or identified contact persons will be notified after the selection committee has reviewed and evaluated each RFP. The highest-scoring RFPs will be selected for interviews. 7