Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

Similar documents
Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

MIAMI 21 PUBLIC HEARING-FIRST READING 2009

AS ADOPTED - JULY 2012

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

STORMWATER MANAGEMENT FACILITIES/STORMWATER PONDS - What Are They?

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

4.0 Concept Plan Implementation

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

Preferred Riverwalk Alternative Components August 17, 2017:

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

Rotary Park / Railroad Lake

Burrus Old Mill Park

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

CECW-AG 11 June 1998 MEMORANDUM FOR MAJOR SUBORDINATE COMMANDS AND DISTRICT COMMANDS

North Shore Trail. Council Meeting June 10, 2002

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Main Street Conversion Site

PARTF Scoring System for Grants

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

29 Bella Fontaine Park

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

DATE ISSUED: March 12, 2014 REPORT NO: 101. Old Globe Way Improvements and San Diego Zoo Employee Parking Structure

Eastcreek Farm. Planned Development Standards September, 2014

Preliminary Sketch Plan for Fort Hunter Park

MetroParks Board Meeting 2018 Capital Improvement Projects

Minto-Brown Island. November 18, City of Salem, Parks & Transportation Services

DRAFT SECTION 4(F) EVALUATION STILLWATER MUNICIPAL BARGE FACILITY

ACADEMY AREA CONCEPT PLAN

Bullhead City Rotary Park Plan Update

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

Clearwater Marina District Boardwalk Design Guidelines and Specifications

ENVIRONMENTAL / OPEN SPACE

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

VIRGINIA KEY CONSENSUS MASTER PLAN

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

ATTACHMENT A BUCKLEY COVE BOAT LAUNCH AND PARKING, PARK A. BUCKLEY COVE BOAT LAUNCH AND PARKING B. BUCKLEY COVE PARK

Emerson Park Master Plan Update. Public Meeting III August 27, 2014

russell+mills studios

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

2007 Blaine Wharf District Master Plan ii

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

County of El Dorado Standard Plans

PRELIMINARY DESIGN + DEVELOPMENT PLAN

SOUTH PARK. Construction of a Portion of South Park at Fresh Kills Park, Staten Island

Goat Island Masterplan

Ohlone College Measure G Project Scope Revisions

Recreation Facility Evaluation - Conclusions

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

South East Sports Complex Phase I

Outdoor Recreation Plan

Exhibit A: Project Scope

Chapter 4: Jordan Road Character District

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

Northern Branch Corridor SDEIS March 2017

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

VEHICULAR AND PEDESTRIAN CIRCULATION

M i s s i o n B a y W a t e r f r o n t

Long Branch-Wayne Local Park Renovation Project

Washington Plaza at the. Lake Anne Village Center

Las Colonias Park Master Plan

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

Building and Site Design Standards

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER

North Oakville East Parks Facilities Distribution Plan. November, 2009

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

Buffalo, Iowa. Facilitators: Scott Freres, The Lakota Group Daniel Grove, The Lakota Group

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

Littleton Fields Master Plan

Open Space and Recreational Facilities

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Hidden Pointe Landscape Master Plan. June, archi terra

(Exhibit A) Site Plan Adoption Detail and Support Information

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Summary Report. 15 Dec The Lynch Park Master Plan, Beverly, MA. Tappé Associates, Inc. Geller Associates, Inc.

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

Port of Camas-Washougal Waterfront Trail Master Plan

A cknovvledgements. Table of Contents. Project Introduction...1

Transcription:

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC A LIMITED LIABILITY COMPANY

Popp s Ferry Causeway Park Master Plan Prepared for: City of Biloxi Department of Parks and Recreation A. J. Holloway Mayor Connie Rockco Supervisor, District 5 Harrison County Nathan Sullivan Director of Parks & Recreation Prepared by: CASHIO COCHRAN LLC A LIMITED LIABILITY COMPANY

TABLE OF CONTENTS Introduction Existing Conditions Photographic Analysis The Planning Process Land Use Diagram Community Feedback & Program Development Master Plan Schematic Master Plan Back Bay Interpretive Center Bridge Fishing Pier Type A Fishing Pier Type B Fishing Pier Phasing & Estimated Construction Budgets

Introduction Popps s Ferry was named after John F. Popp, a New Orleans lumber magnate who purchased land on the south shore of the bay to be used as a ferry landing in 1883. Even after Mr. Popp s death in 1918 the ferry landing continued to be in use until the first bridge was built. Since the removal of the Popp s Ferry Causeway Bridge eliminated the Causeway as a major thoroughfare, locals have visited the area to fish, shrimp, launch boats, walk jog and ride bikes. This prompted the City to purchase the Popp s Ferry Causeway property in West Biloxi in 2000 to preserve the area as a public recreation facility.

Existing Conditions The 10 acre site is bounded by water on all sides, the Biloxi & Tchoutacabouffa Rivers to the north, Big Lake to the west and the Back Bay to the south and east. The entrance to the site is located at Burnt Bridge. From this point the main road through the site travels in a south easterly direction and dead ends at the foot of where the old bridge was located. The land adjacent to the road on the Biloxi River and Big Lake side slopes steeply into the water and to the bottom of the channel. The site is composed mostly of brackish water marshes with one upland area located to the south. There are only two existing structures currently on the site, a boat launch that accommodates four boats and a dilapidated pier. The only parking on the site is associated with the boat launch.

The Planning Process The team conducted a preliminary reconnaissance of the existing facility and potential land available for development. The design team reviewed with the client group s initial thoughts on the general Master Plan concept. A comprehensive inventory and assessment of existing conditions was made to analyze and evaluate problems and formulate potential improvements to the site. Factors considered included topography, vegetation, mitigation planting, existing services, circulation, potentially available acreage, parking, access, utilities, visibility, existing facilities and off-site constraints. A series of relationships between activities that would occur throughout the site were developed. A strong emphasis was placed on the educational component of the design which resulted in an Back Bay Interpretive Center on the uplands as a terminus to the park.

Several fishing and crabbing piers and overlook pavilions were linked together by a system of boardwalks that also take visitors throughout the marshes and wetlands. Additional parking areas were incorporated to accommodate the potential influx of visitors.

Community Feedback & Program Development On October 16, 2001 a workshop was held to present the Schematic Design to the community and to involve them, the users, in a dialog about their vision for the park. Over 100 Biloxi residents participated in the discussion. Several people suggested running a boardwalk along the length of the park to be used for walking and fishing. The addition of fishing and crabbing piers was well received. Many agreed that Burnt Bridge was one of the few good places left to fish without a boat. They also felt strongly about additional piers because shrimpers and net throwers were crowding the boat launches.

Master Plan Just after the curve in Old Popp s Ferry Causeway an entry sign was designed to create a portal through which to enter the site. After entering the park the visitor would cross Burnt Bridge which would be embellished with a wood guardrail to create a less industrial feel. A boardwalk system was designed to hang from the structure of the bridge to bring people to what so many described as the best fishing spot in the area. Two type A fishing piers occur along the new boardwalk system that hugs the existing road. A large covered, type B, fishing pier faces the river side of the park and the first system of marsh and wetland boardwalks branches off from this location into the Back Bay. Additional parking was added to service this cluster. The boat launch itself would remain with the incorporation of new boarding docks. The existing parking has been reconfigured to more safely separate pedestrians, boaters, and vehicles. The through traffic would skirt

around the parking area toward the Back Bay side of the park so they would not be in conflict with the visitor s backing boats into the launch area. The proposed parking spaces are 10 by 45 pull through spaces to ease in maneuvering the turn to retrieve the boats. A new covered fishing pier and parking complex will be constructed in place of the previous dilapidated pier. This will mark the entrance to the second system of marsh boardwalks. The Back Bay Interpretive Center and Gardens makes up the final component of the park. An elliptical parking configuration was designed to complement the existing shape of the road, as well as offer enough spaces to accommodate the Interpretive Center, the proposed fishing piers and boardwalks, and the light commercial structure. The Interpretive Center itself should be approximately 5,000 square feet with the first floor elevation set at 15 feet. The ground level would be an open pavilion area where outdoor exhibits could occur.

The gardens associated with the Center would contain educational exhibits focusing on marsh development and the flora and fauna native to the area. Additionally, a Back Bay playground will be located among the exhibits. Typical garden exhibits depicted on the master plan are butterfly, humming bird, dragonfly, wildflower, speckled trout, redfish and other brackish water fish. The gardens encircle a wildflower meadow which ties them all together. The roadway terminates in a cul de sac with a radius large enough to accommodate buses and returns visitors to the picnic area it borders.

Work Previously Completed Work Item Demolition Clearing Grubbing & Water Edge Treatment (River Side) Boardwalk Development Asphalt Roadway Repair & Topping Parking Roadway Lighting Boat Launch Fishing Piers Marsh Boardwalk & Shelters Signage & Gate Utilities Description of Work Removal of pilings, concrete slabs, broken asphalt, concrete steps, etc. Selected clearing trees & shrubs, removal of dead trees, trash & debris, etc. Break up large concrete & asphalt slabs, top with uniformed limestone rip-rap from bridge to end of old piling south of existing boat launch 8 concrete walk, benches, trash receptacles, lighting, etc. between bridge & boat launch Repair &top existing asphalt roadway with 2 ½ wearing coarse from bridge to boat launch Parking at fishing piers 16 light standards @ 60 o.c. form bridge to boat launch Catwalk repair, parking & lighting 1-Type A wood fishing piers (without shelters) between bridge & boat launch 6 wood boardwalk over marsh area with 1 shelters (north end) 2-Directional signs at Causeway Bridge Road Electrical and Water services from bridge to boat launch Updated March 19, 2012 Updated March 26, 2013

Preliminary Construction Budget Phase I Work Item Description of Amount Work Demolition Removal of pilings, $50,000 concrete slabs, broken asphalt, concrete steps, etc. Clearing & Selected clearing trees $50,000 Grubbing & shrubs, removal of dead trees, trash & debris, etc. Water Edge Break up large $100,000 Treatment (River Side) concrete & asphalt slabs, top with uniformed limestone rip-rap from bridge to end of old piling south of existing boat launch Asphalt Repair &top existing $60,000 Roadway Repair & Topping asphalt roadway with 2 ½ wearing coarse from boat launch to south end of existing road New Asphalt Parking area at $6,000 Paving proposed North Marsh Boardwalk Parking Parking at fishing $9,000 piers Roadway & parking $40,000 from future Interpretive Center to picnic area, east side of existing roadway (includes turnaround) Concrete 4 concrete walkways $20,000 Walkways & Curbing & curbing at new parking areas Roadway 16 light standards @ $20,000 Lighting 60 o.c. from boat launch to turnaround Fishing Piers 2-Type A wood $34,000 Updated March 19, 2012 Updated March 26, 2013

Marsh Boardwalk & Shelters Picnic Area Signage & gate Landscaping & Marsh Restoration Utilities fishing piers (without shelters) between bridge & boat launch 1-Type B fishing pier $60,000 (with shelter & restrooms) 2 shelters on 6 wood $40,000 boardwalk over marsh area (north end) Site Preparation, $40,000 shelters, walkways, picnic tables, trash receptacles, etc. 1-Park Entry sign & $6,000 gate at bridge Directional graphics $3,000 General landscaping $40,000 to include trees, shrubs, seeding and marsh restoration planting Electrical and water $40,000 services from boat launch to turnaround and force main services for entire Causeway Subtotal $618,000 15% Contingency $92,700 Testing & Permitting $4,000 Total Estimated Phase I $714,700 Construction Budget Updated March 19, 2012 Updated March 26, 2013

Phase II Work Item Water Edge Treatment Boardwalk Development Asphalt Paving Concrete Walkways & Curbing Roadway Lighting Fishing Piers Bridge Cladding Landscape & Irrigation Description of Work Rework existing rip-rap edge, add uniform limestone rip-rap from first phase treatment to Causeway Bridge 8 concrete walk, benches, trash receptacles, lighting, etc. between boat launch & Phase II Type B fishing pier Asphalt roads & parking at Interpretive Center area 4 concrete walkways & curbing at new Interpretive Center parking areas Concrete walkway to peninsula fishing piers 16 light standards at new parking areas Bridge fishing pier and boardwalk (includes lighting, benches, wood curbing railing, etc.) 2-Type A fishing piers (without shelters) one between boat launch and turn around and two along peninsula 1-Type B fishing piers (with shelter & restroom Wood cladding of existing bridge guard rails Trees, shrubs & seeding Amount $60,000 $25,000 $88,000 $16,000 $9,000 $33,000 $50,000 $16,000 $60,000 $5,000 $50,000 Updated March 19, 2012 Updated March 26, 2013

Interpretive Center Park Development Improvements include site clearing & grubbing, grading & drainage, fences & gates, walkways, trash receptacles, benches, lighting, landscaping & irrigation, play area, drinking fountains, interpretive stations & graphics, restrooms, utilities, etc. $361,000 Subtotal $773,000 15% Contingency $115,950 Testing & Permitting $4,000 Total Estimated Phase II $892,950 Construction Budget Updated March 19, 2012 Updated March 26, 2013

Phase III Work Item Interpretive Center Building Description of Work Improvements include site preparation, arrival plaza, lower deck, second story exhibit area, upper deck, handicap ramp, look out tower, elevator, interior interpretive exhibits, furniture, fixtures & equipment, & south marsh boardwalks & shelters Amount $1,773,000 Subtotal $1,773,000 15% $265,950 Contingency Testing & $20,000 permitting Total Estimated Phase III Construction Budget $2,058,950 Phase IV Work Item Concession & Bait Stand Description of Work Improvements include site preparation, building, decking, F,F&E, utilities, etc. Amount $217,000 Subtotal $217,000 15% $32,550 Contingency Testing & $5,000 permitting Total Estimated Phase IV Construction Budget $254,550

Popps Ferry Causeway Cost Estimate updated March 2013 Phase of Work Previously City Funded Previous FEMA Funding Previous Tidelands Funding Proposed BP Funding Total Improvements Engineering/Design/Permitting $220,000 $420,000 $640,000 Removal of debris, obstructions, old pilings & old bulkheads $215,000 $215,000 Construction of the existing Boardwalk on the west side of the $390,000 $390,000 Causeway Re-Construction of the existing boardwalk on the west side of the Causeway due to Hurricane $150,000 $150,000 Katrina Construction of the proposed concrete promenade, fishing piers, and roadway repairs on the east $650,000 $650,000 side of the Causeway Back Bay Environmental Educational Center Phase I* $714,700 $714,700 Back Bay Environmental Educational Center Phase II* $892,950 $892,950 Back Bay Environmental Educational Center Phase III* $2,058,950 $2,058,950 Back Bay Environmental Educational Center Phase IV* $254,550 $254,550 Total $220,000 $150,000 $1,255,000 $4,341,150 $5,966,150 *As shown in the Cashio Cochran Master Plan